WAKTU PELAKSANAAN (TIME SCHEDULE)

PROYEK PEMBANGUNAN ………

JUMLAH WAKTU
BOBOT
NO URAIAN PEKERJAAN HARGA Dec-18
(RP.) (%) 1 2
A PEKERJAAN PERSIAPAN 100,000,000.00

B PEKERJAAN GALIAN TANAH 25,000,000.00

C PEKERJAAN STRUKTUR BAWAH 270,000,000.00

D PEKERJAAN STRUKTUR ATAS 500,000,000.00

E PEKERJAAN FINISHING 600,000,000.00

F PEKERJAAN ME 1,200,000,000.00

JUMLAH =
RENCANA PROGRESS MINGGUAN (%) =
RENCANA PROGRESS KOMULATIF (%) =

REALISASI PROGRESS MINGGUAN (%) =


REALISASI PROGRESS KOMULATIF (%) =

SELISIH (DEVIASI) MINGGUAN (%) = 0.00


SELISIH (DEVIASI) KOMULATIF (%) = 0.00
WAKTU PELAKSANAAN PEKERJAAN = 4 BULAN
Dec-18 Jan-19 Feb-19 KET.
3 4 1 2 3 4 1 2 3 4
100

80

60

40

20