tf
Design Forces
End Plate :
Width Be = 200 mm
Length Le = 750 mm
Thickness te = 25 mm
Width wh = 650 mm
Height Lh = 360 mm
Bolt Configuration :
Bolt Dia = 20 mm
Hole size = 22 mm
g= 90 mm
Column Flange :
A maximum spread of (b + bolt dia ) is used for checking the flange capacity so that a plastic hinge
can be assumed at the bolt line for the design of the end plate.
Consider flange for maximum bolt load (F1) with equal moments at bolt line and root :
M= F1 x b / 2
M= 60.66 x 1000 x 30.75 / (2 x 1000)
M= 932.67 N-m
Bolts :
Stiffeners
25.2.3
Use 2 No. 100 x 12 stiffeners
Buckling Resistance
End Plate
By inspection, design will be governed by bolt force just below the the top flange
Trail end plate : width = 200 mm
thickness = 25 mm
PROJECT :
Beam Flanges
Capacity of flange = py x A
= 275 x 170 x 12.7 / 1000
= 593.73 kN
Tension in top flange = 2 x 60.66 (Assuming the entire max bolt force taken by the flange)
= 121.32 kN < 593.73 kN….. OK
Welds
= 60.66 - 25.02
= 35.64 kN
= 60.66 - 29.99
= 30.67 kN
Weld Size : 6 mm
Weld Size : 6 mm
Summary :
Column : HE 240 A
Beam : IPE 360
3055.096 830
57.28133
57.28133
51.28405
45.28676
39.28947
33.29219
27.2949
20.39354
14.63089
8.868255
3.105614
601.454
b