Anda di halaman 1dari 5

Feasibility Studies Commencement Checklist

To complete this checklist, click on the tick boxes in the approved column corresponding
to the activity done. Afterwards, sign the authorisation box and email to the approving
Project Manager or similar.

Provided
Feasibility Studies Commencement Checklist

Items to be Reviewed
- Review of Master Plan Findings

- Analysis of Functional Brief

- Area Allocation Model

- Confirmation of Site Influences

- Identification of Viable Development Options

- Evaluation of Options

- Preliminary Business Case

Feasibility Study Approvals Required


- PCG Endorsement

- Departmental Approval
- Program
- CPSP/SAPSS Unit
- Region
Feasibility Study Report
To complete this checklist, click on the tick boxes in the approved column corresponding
to the activity done. Afterwards, sign the authorisation box and email to the approving
Project Manager or similar.
Required Formats

Template
Drawing
(.dwg)
Contents

Check
Excel
Volume One

- Executive Summary

- Terms of Reference
- Project Team
- Project Scope
- Methodology

- Site Review
- Existing Buildings
- Features and Contours Survey
- Town Planning
- Traffic Engineering and Car Parking
- Geotechnical Survey
- Environmental Assessment
- Hazardous Materials
- Site Services

- Service Planning
- Link to Government Policy
- Model of Care
- Demand Management
- Current Services/ Throughputs & Future Demand Indicators 9
- Impact of Not Proceeding
- Investment Objectives

- Feasibility Study
- Functional Review
- Area Allocation Model
- Mater Plan Review
- Previous Options Review

- Development Proposal
- Confirmation of Development Parameters
- Development Options
- Development Outline
- Car Parking

- Evaluation of Development Options


- Service Delivery / Model of Care
- Government Policy
- Financial
- Facility Planning
- Flexibility and Future Expansion
Required Formats

Template
Drawing
(.dwg)
Contents

Check
Excel
- Operational Efficiencies

- Recommendation

- Engineering
- Geotechnical Investigation
- Preliminary Soil Contamination Assessment
- Structural Engineering
- Civil Engineering
- Mechanical Services
- Electrical Services
- Fire Protection
- Hydraulic Services
- Lift Services
- Site Preparation and Diversion of Services

- Equipment
- Medical Equipment
- Furniture, Fittings and Equipment

- Traffic & Carparking

- Building Surveyor Report

- Landscape

- Cost Planning Summary


- (Including reconciliation of Departmental areas against Master Plan
& Benchmarks)

- Recurrent Cost Impacts


- Staffing / Operational
- Funding Requirements (eg WIES)
- Energy
- Maintenance
- Cleaning, Security etc

- Risk Management
- Risk Management Sub-group
- Risk Management Forums
- Risk Register 9
- Risk Management Action Plan

- Development Staging

- Implementation Program

- Procurement Methodology

- Summary Recommendation

Volume Two

- Features & Contour Survey 9


Required Formats

Template
Drawing
(.dwg)
Contents

Check
Excel
- Town Planning Zoning Maps & Overlays

- Site Plan (1:500) 9

- Area Allocation Model 9


(shown against Benchmarks & Master Plan areas)

- Feasibility Sketch Plans (1:100)

- Staging Plans

- Engineering Sketch Plans

- Cost Plan B 9
- Cost Plan B Summary (including reconciliation against Master Plan
9
and benchmark costs)
- Feasibility Study Cost Plan Methodology
- Drawings & Information Used
- Area Measurement
- Specific Inclusions
- Specific Exclusions
- Tendering & Market Assumptions
- Tender Price Index
- Risks

- Energy & Sustainability 9


- Energy and Environmental Objectives
- Energy and Environmental Opportunities
- Energy and Environmental Targets and Benchmarks
- Financial Assessment Criteria

- Energy & Sustainability Report 9

- Implementation Program

Certified by Endorsed by

Principal Consultant Date Consultant Project Manager Date

Checked by

CPSP Project Manager Date


Feasibility Study Report Required Contents and Format

Contents
The checklist provided in this Guideline reflects the items typically addressed in the
Feasibility Study Report for a complex project sited on a large campus. Other items may
need to be added to the Feasibility Study Report to reflect the nature of a specific
project. Other items may not be applicable to all projects. Proposed changes to the
contents of the Feasibility Study Report must be discussed and confirmed with the CMB
Project Manager with overall responsibility for the project before commencing.

Format
The complete Feasibility Study Report is to be provided in hardcopy format as well as on
CD to the CPSP Project Manager with overall responsibility for the project.
The hardcopy of the report is to be in A4 format with folded A3 drawings.
The complete report is to also be provided on CD as a single Adobe Acrobat (.pdf) file.
The CD is also to contain:
• All drawings included in the report as separate, indexed Adobe Acrobat (.pdf) files.
• Drawings included in the report and identified in the Checklist as separate, indexed
CAD compatible drawing (.dwg) files.

Templates have been developed for some sections of the Feasibility Study Report and
these must be used where available. Copies of templates can be obtained from the CMB
project manager with overall responsibility for the project.

Quality Assurance
A copy of the checklist must be included in the Feasibility Study Report.
Included sections must be checked (Y (yes) or N (no)) and the document must be certified
and signed by the Principal Consultant and endorsed and signed by the Consultant
Project Manager.

Anda mungkin juga menyukai