Soeharto, Iman. 1999. Manajemen Proyek : Dari Konseptual Sampai Operasional. Edisi
2, Cetakan 1. Jakarta : Erlangga.
Kezner, H. 1982. Project Management for Executives. Van Nostrand Reinhold Company.
Clough, Richard H. and Scars, Glenn A. 1991. Construction Project Management. Canada
:John Willey & Sons Inc.
Ervianto, Wulfram. 2004. Teori-Aplikasi Manajemen Proyek Konstruksi. Edisi 1.
Yogyakarta:Andi.
Project Management Institute. 1996. A Guide to the Project Management Body of
Knowledge (PMBOK). United States: PMI Pulications.
26
El-Sawalhi, Nabil and Adnan Enshassi. 2012. Application of Project Time Management
Tools and Techniques to the Construction Industry in the Gaza Strip. The
Australian Journal of Construction Economics and Building [Vol 5, No 1].
Shukla, Anupam., Rajesh Tripathi, G.D.Ramtekkar. 2017. A Survey on Cost and Time
management in Highway Construction Projects. International Journal of Scientific
Development and Research (IJSDR). DOI: 2455-2631.
Al-Hazim, Nabil, Zaydoun Abu Salem. 2015. Delay and cost overrun in road construction
projects in Jordan. International Journal of Engineering & Technology. DOI:
10.14419/ijet.v4i2.4409.
Soliman, Ehab. 2017. Communication Problems Causing Governmental Projects Delay –
Kuwait Case Study. International Journal of Construction Project Management.
DOI: 1944-1436.
Kage, Sunil A, et al. 2018. Time Delay and Cost Overrun in Construction Industry of India.
International Journal of Innovative Research in Science, Engineering and
Technology. DOI: 10.15680/IJIRSET.2018.0712044.
Behnam, Ali., Toby Harfield and Russell Kenley. Construction management scheduling
and control: The familiar historical overview. DOI: 10.1051/matecconf/20166
IBCC 2016 600101.
T. G. K. Vasista. 2017. Strategic Cost Management for Construction Project Success: A
Systematic Study. DOI:10.5121/civej.2017.4105
T.Subramani, M.Sekar. 2015. Preplanning And Scheduling Of Road Construction By
Using PPM. DOI: 2319 – 4847
Chen, Peng., David Partington, Jia Ning Wang. 2008. Conceptual determinants of
construction project management competence: A Chinese perspective. International
Journal of Project Management. Volume 26, Issue 6, Pages 655-66
Thangam, P. Esakki and R. Magdalene Benila. 2016. Planning, Scheduling, and Time
Management of Six Lanes Road Construction Work at V.O.C Port Trust using
Primavera P6 Software. International Journal of Science Technology &
Engineering, Volume 2, Issue 11. ISSN (online): 2349-784X
Abbasi, G. and Al-Mharmah, H. 2000. Project Management by the Public Sector in a
Developing Country. International Journal of Project Management, vol.18, no.2,
pp.105-109. DOI: 0263-7863/00/$20.00. PII: S0263-7863 (98) 00074-X
Memon, Aftab Hameed, et al. 2014. Significant Factors Causing Time Overrun in
Construction Projects of Peninsular Malaysia. Modern Applied Science; Vol. 8,
No. 4; 2014. ISSN 1913-1844 E-ISSN 1913-1852. DOI: 10.5539/mas.v8n4p16
27
Doloi, Hemanta., et al. 2011. Analysing Factors Affecting Delays in Indian Construction
Projects. International Journal of Project Management 30 (2012) 479–489.
DOI:10.1016/j.ijproman.2011.10.004
Ahsan, Kamrul and Indra Gunawan. 2009. Analysis of Cost and Schedule Performance of
International Development Projects. International Journal of Project Management
28 (2010) 68–78. DOI:10.1016/j.ijproman.2009.03.005
Osorio, P.C.Felix, et al. 2014. Critical Success Factors in Project Management: An
Exploratory Study of an Energy Company in Brazil. Global Journal of Management
and Business Research: A Administration and Management. Volume 14 Issue 10
Version 1.0 Year 2014. Online ISSN: 2249-4588 & Print ISSN: 0975-5853.
Perera, B.A.K.S., Indika Dhanasinghe, and Raufdeen Rameezdeen. 2010. Risk
Management in road construction: The Case of Sri Lanka. International Journal of
Strategic Property Management. ISSN 1648-715X print / ISSN 1648-9179 online.
DOI: 10.3846/1648-715X.2009.13.87-102
28