28 Jln Buroh

based on NA A1.1
Gk - dead load
Qk - imposed y0 1 storage condition because arch drwg refer as warehouse concrete cover defineas fo
Rk - roof imposed load y0 0.7 roof
Wk - Wind load y0 0.5 wind
EHL- imperfection consider as 1.35Gk+1.5Qk, that why EHF gf = 1.0

Combination 1, general formula

Comb 1 1.35Gk + 1.5Qk +1.5Rk +1.5*y0*Wk +EHF case 1 as wind load has both direction X, Y. similar apply to EHF
Str. / ultmate 1.35Gk + 1.5Qk +1.5Rk +0.75Wk +EHF

1.35Gk + 1.5*y0*Qk +1.5*y0*Rk +1.5Wk +EHF case 2


1.35Gk + 1.5Qk +1.05Rk +1.5Wk +EHF

Combination 2, geotechnical consideration for pile, footing


Comb 2 1.0Gk + 1.3Qk +1.3Rk +1.3*y0*Wk +EHF case 1 as wind load has both direction X, Y. similar apply to EHF
Geotechnical 1.0Gk + 1.3Qk +1.3Rk +0.65Wk +EHF

1.0Gk + 1.3Qk +1.3Rk +1.3*y0*Wk +EHF case 1


1.0Gk + 1.3Qk +0.91Rk +1.3Wk +EHF

comb 1 condition Structuraal design on element


Primary Load Case nos 1 2 3 3 4 5 6 7 8 9 10

Load Case Wind Wind Wind Wind


direct X direct X direct Y direct Y
Dead LoadLive Load Live Load 0 deg 0 deg 180 deg 180 deg this group of column load
ULS
WL180 WL180
Gk Qk Rk Wk0 +x1 Wk0 -x2 +Y3 -Y4 EHFx EHF-x EHFy EHF-y
Comb load case 100 1.35 1.5 1.5 0 0 0 0 0 0 0 0
Comb load case 111 1.35 1.5 1.5 0.75 1
Comb load case 112 1.35 1.5 1.5 0.75 1
Comb load case 113 1.35 1.5 1.5 0.75 1
Comb load case 114 1.35 1.5 1.5 0.75 1
Comb load case 201 1.35 1.5 1.05 1.5 1
Comb load case 202 1.35 1.5 1.05 1.5 1
Comb load case 203 1.35 1.5 1.05 1.5 1
Comb load case 204 1.35 1.5 1.05 1.5 1

comb 2 condition geotechnical


Primary Load Case nos 1 2 3 3 4 5 6 7 8 9 10

Load Case Wind Wind Wind Wind


direct X direct X direct Y direct Y
Dead LoadLive Load Live Load 0 deg 0 deg 180 deg 180 deg this group of column load
ULS
WL180 WL180
Gk Qk Rk Wk0 +x1 Wk0 -x2 +Y3 -Y4 EHFx EHF-x EHFy EHF-y
Comb load case 100 1 1.3 1.3 0 0 0 0 0 0 0 0
Comb load case 111 1 1.3 1.3 0.65 1
Comb load case 112 1 1.3 1.3 0.65 1
Comb load case 113 1 1.3 1.3 0.65 1
Comb load case 114 1 1.3 1.3 0.65 1
Comb load case 201 1 1 0.91 1.3 1
Comb load case 202 1 1 0.91 1.3 1
Comb load case 203 1 1 0.91 1.3 1
Comb load case 204 1 1 0.91 1.3 1
based on EC2 part Fire resistace
concrete cover defineas follow: column 75mm
Beam 50mm
slab 50mm

ilar apply to EHF

ilar apply to EHF

this group of column load at foundation will compare with pile capcity (comb 2)