NOTICE OF POWER INTERRUPTION

Please be Informed that the BENGUET ELECTRIC COOPERATIVE. INC. (BENECO) Is scheduling Electric Sen/Ice IntenvpSon on the fdlkmng date/s and time:

EST.
EST. NO. OF
SUB EQUIPTREF.OF UNDELIVERE PROJECT
DATE TIME FEEDER AREAS AFFECTED PURPOSE CONS. CREW
STATION DE-ENERGIZED AREA D /UNUSED CODE
AFFECTED
ENERGY

B009749 Jollibee Session (Prime Hotel), Baguio City BENECO POWER INTERRUPTION:

2-75»CVA
- Retirement of 2-75kVA Buyback Distribution 1 320 Ammecs ELT-046-2019
Transformers
B1948&B2260
Parts of Brookside, Holyghost Extension, Baguio City BENECO POWER INTERRUPTION:
B001356
Feeder 05 - Replacement of Rotten Secondary Pole 145 232 Garnet PRO-067-2019
Monday, North Sanitary SOkVA B2094
9:00 AM to
April 01, Camp
5:00 PM Parts of Upper Brookside, Baguio City BENECO POWER INTERRUPTION: MS-074-2019
2019 Substation
BC03835 - Relocation of Primary Pole 153 280 Foxtrot OPX-531-2019
Fuse Sectlonalizer - Installation of Intermediate Pole
(cont)

B024043
Parts of Lubas Proper, Lubas, La Trinidad BENECO POWER INTERRUPTION:
Feeder 09 - Relocation of Secondary Pole 134 184 Ji PRO-085-2019
37.5kVAB1702

B000203
Parts of Upper and Middie San Carlos Heights, Baguio City BENECO POWER INTERRUPTION:
- Relocation of Secondary Pole
Irlsan 25kVA B5166
Feeder 03 114 176 J1 PRO-093-2019
Substation BC08692
75kVA B5994
Parts of Lower Sadag, Bahong, La Trinidad BENECO POWER INTERRUPTION:
B003274
- Correction of Leaning Secondary Pole & 105 96 Regular Crew OPX-584-2019
37.5KVAB4660 Rehabilitation of Secondary Line
Feeder 09
Tuesday, Parts of Ubudan, AIno, Ixi Trinidad BENECO POWER INTERRUPTION:
9:00 AM to North Sanitary LT01098
April 02, - Relocation of Secondary Pole with Eroded 39 44 Garnet OPX-107-2019
5:00 PM Camp 25kVAB6541
2019 Base
Substation
Gayasi, Buyagan Cemetery, Central Buyagan, Windy Hill - Pobiadon LT, La BENECO POWER INTERRUPTION:
LT01361
Trinidad - Relocation of Primary Pole
Feeder 10 Fuse Valley Bread 835 1,336 Blesi MS-121-2019
Buyagan
Parts of Pobiadon, Itogon (near Substation) BENECO POWER INTERRUPTION:
Dalicno B01319G PEP-041-2018
Dalicno - Extension of Primary Lines 18 40 Expendables
Substation 15kVA B9000 (cont.)

Parts of Agro, Dumpsite, Purok 15 and 17, Irisan, Baguio City BENECO POWER INTERRUPTION:
B003482
Irisan - Replacement of Rotten Primary Pole
Feeder03 Fuse Purok 15 156 248 JI OPX-587-2019
Substation
& 17, Irisan
Taloy Sur (Palina, Asinas), Tabaan Norte, Tuba BENECO POWER INTERRUPTION:
North Sanitary
B038856 - Relocation of Primary Pole PRO-096-2019
Camp Feeder 08 313 375 Garnet
Fuse Patina Taloy Sur
Substation

Parts of Uoab (Poded. Peday, Canog, Southern Baayan), itogon BENECO POWER INTERRUPTION:
Wednesday, - Installation of Block Metering
9:00 AM to Lamut IT03612
April 03, Feeder 11 22 24
5:00 PM Substation 25kVA B7291
2019
SEMO LWiM-027-2019
Parts of Kias, Virac, Itogon BENECO POWER INTERRUPTION:
Dalicno IT01276 - Installation of Block Metering
Dalicno 73 144
Substation 25kVAB0045

BENECO POWER INTERRUPTION:


Atok B010771 - Restructuring of Primary and Secondary
Circuit 01 Ambongdolan, Tubiay Structure
188 225 Foxtrot OPX-569-2019
Substation Recloser Ambongdolan

Page 1 of 2
EST.
EST. NO. OF
EQUIPT REF. OF UNDELIVERE PROJECT
SUB PURPOSE CONS. CREW
DATE TIME FEEDER AREAS AFFECTED
STATION DE-ENERGIZED AREA D /UNUSED CODE
AFFECTED
ENERGY
Parapad, North Sanitary Camp. Baguio City BENECO POWER INTERRUPTION:
B028086 - Rerouting of Secondary Lines 53 214 Crew OPX-534-2019
North Sanitary Feeder 05
25kVAB1733
Camp
Substation B029391
Parts of Buyagan. La Trinidad (near Buyagan Elementary S^ool) BENECO POWER INTERRUPTION:
- Corectlon of Leaning Secondary Pole 189 360 Crew OPX-538-2019
Feeder 10
75kVA 89504
Simsim Compound - Tiptop Ambuklao, Cario-Duclos Village, Pacdal. Baguio BENECO POWER INTERRUPTION:
Thursday, - Extension of Primary Line to Con^ ixw PEQ-007-2019
9:00 AM to B000122 City 151 586 Ammecs
April 04, Feeder 11 Voltage (cont)
5:00 PM Fuse Simsim Compound
2019

Lamut Parts of Apugan, Poliwes BENECO POWER INTERRUPTION:


B001197 121 Crew OPX-539-2019
Substation • Con'ection of Secondary Line Clearance 76
25kVA B2995
Feeder 13 LDH iviines Enterprise BENECO POWER INTERRUPTION:
TB02656 • Retirement of 3-50kVA Distribution Blesi ELT-057-2019
2 352
3-100kVA Transformers

Parts of Timoy, Puguis to Talingguroy, Wangal, La Trinidad BENECO POWER INTERRUPTION:


PEP-032-2019
Irisan LT04364 - Extension of Primary Line
Feeder 04 130 72 Expendables (cont.)
Substation 37.5kVA B0931 • Installation of 1-10kVA Buyback Distribution
PBB-061-2019
Transformer

Parts of Cabinet Hill.Marcovilie. Whole of Engineers Hill. Baguio City. BENECO POWER INTERRUPTION:
BC13249 PRO-060-2019
- Replacement of Bare Secondary Lines 580 1920 Siglat
Feeder 05 Fuse Engineer's Hill/ (conL)
Friday, April 9:00 AM to
North Sanitary Marcovilie

05, 2019 5:00 PM


Camp Whole of: Domlnican-Mirador, Lower Lourdes Subdivision. Lourdes BENECO POWER INTERRUPTION:
Substation B032550 - Extension of Primary Line
Proper. Baguio City PEP-028-2019
Feeder 07 Recloser Dominican 2.579 4,480 Ammecs
Parts of: Lourdes Subdivision Extension. Upper Rock Ouany. Middle Rock - Installation of 3-37.5kVA Buyback Distribution PBB-053-2019
Mirador Transfonmers
Quarry, San Roque Village,
Simsim Compound • Tiptop Ambuklao, Cario-Duclos Village, Pacdal. Baguio BENECO POWER INTERRUPTION:
B000122 City - Extension of Primary Line to Correct Low PEQ-007-2019
Lamut 151 586 Ammecs
Feeder 11 (cont)
Substation Fuse Simsim Compound Voltage

B000613 50kVA
Parts of Tiptop, Ambuklao Rd.. Pacdal, Baguio City BENECO POWER INTERRUPTION:
Saturday, - Extension and Conversion of Primary Lines
9:00 AM to Lamut (Communal DT) 80 192 Blesi MS-027-2019 (cont.)
April 06, Feeder 11 and Installation of Private Transformer
5:00 PM Substation BC00355
2019
lOkVA B6218

NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to Inspect and Institute necessary safety measures/actions
on their cables/lines attached on the affected BENECO poles.
2. Always consider all lines energized. Power maybe restored earlier than the scheduled time.
For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202109175921698

APPROVED FOR PUBLIC^ANNOUNCEMENT: '\ A

CARLO JOf ANDRES


OIC Manager. NetwoMt-wrvices Department

car. all local Radio &TV stations, Telephone & Cable Companies, all afTeded big loaders
nsd/cwocc/isd/nnsd/fiie/comrel/NGCP