FLOW CHART FOR PREPARATION OF MECHANICAL STABILIZED SUB-BASE(G30)

Pass
Sub grdde will be checked for Preparation of G30 Sub-base
Compaction and Levels Layer as per Section
Preparation for Granular Base
Sub-base(G30) will be checked Pass
course Layer of Material CBR
Fail compaction,Layer thicksness
>80%
Mechanical Stabilization and Levels
involves
Layer will be re compacted to
G15materail+Crusher Waste
achieve compaction at
Material
mositures with in +/- 2% of
Fail
OMC
Necessary corrective actions
Pass
will be made.Layer will be re
compacted to achieve
Spreading of G15
Uniform Mixing of Materials compaction at mositures with
Material+Crusher Waste
to a depth of 200mm with in +/- 2% of OMC,
material
the help of Reclaimer

Corrective actions Material Wil be checked for complience with Table


will be taken 3702/5 of GS
Fail