Anda di halaman 1dari 7

OHSE Monthly Report – (TOA PROJECT)

From 29 OCTOBER – 25 NOVEMBER 2018

Archetype Group

Archetype Indonesia
12th Fl. Menara 165 Tower Office Building
TB Simatupang Street, Kav 1, Jakarta Selatan
DKI Jakarta, Indonesia

Author: Andri Setiawan


Telephone: +621289752740
E-mail: andri.setiawan@archetype-group.com

Date: December ,08 2018


Order number:-------
Document number:---------
Revision: Original

Rev. Date Description Author Checked by

01 08/12/2018 OHSE Monthly Report Andri Setawan Stephane Better

Safety work has been controlled by ARCHETYPE with all activities at site;
We manage and control to get ZERO HARM activities during the execution of the construction phase.
Shaping Tomorrow

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.
1.Highlights
1.1 Archetype Office / Staff
1.1.1 Office
Office ACT using room main office GF

1.1.2 Attendance - Work hours / Sick


Archetype staffs present on site of November is 5 persons and temporay document control 1 week/ 3
day Every person on site one day is 8 hours of work. Average manpower Archetype work on site are 5
staffs. Manhours work for on September 2018 is 8 hours.

1.1.3 OHSE Staff Training


N/A

1.1.4 Safety Performance – Audit results Once per Quarter


N/A

1.1.5 ISO & Legal Requirements


N/A

1.1.6 Remarks
. N/A
1.2 (TOA PROJECT)
Some contractors at TOA Site
MAU- Civil ( Finishing work and Punch list )
GBE- MEP ( Install cable tray, pulling cable, inatall street lamp, install pipe hydrant, sprinkler , install box
hydrant, )
MCL – Steel Structure ( Welding, bracing and painting)
Taiyo Sinar - Process ( Install machine and tank , install pipe and electrical procees)
DCR – WWTP (Finishing and punchlist WWTP)
Samudra Korindo – Cargo Lift ( Install cage, Painting and bracing)

1.2.2 Main OHSE issues


a. Name the issue
- May not work if there are other contractor jobs below.
- Protection All Equipment when working hot work
- Poorhousekeeping Area
b. Immediate Actions Taken
1. Barriccade Area , Rope all wrench when working at heights
2. Protection with fire blanket or or fire resistant material
3. Housekeeping before and after work

c. Recommendation / Suggestions
1. Information with ACT if there is working concurrent work between contractors
2. Mandatory all contractors if any working hot work.
3. Will information to All Site manager Contractors.
d. Who is responsible?
1. All contractors
2. All contractors
3. All Contractors
4. All Contractors/ACT

e. Deadline
1. 10 December 2018
2. 10 December 2018
Shaping Tomorrow

3. 10 December 2018
4. 10 December 2018

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.
1.2.3 OHSE Training conducted on site
N/A

1.2.4 Safety Performance


I. Audit results and summary
Audit result and summary this month still need improvement with HSE contractor to implement
this site.

II. Result from Joint Safety Walks and safe committee meetings
Main finding of safety patrol of November was dominated by Housekeeping, where the
contractors must be remove material that is not used at site
III. Environmental issues
Check septic tank toilet temporary and check all equipment and generator
1.2.5 Security
TOA client Already provide team Security

1.2.6 Remarks
Tim Security check all ID Card TOA and Contractors ( 10 December 2018 )

2. Requirement / Needs / Suggestions


2.1 Office
Check all document for preparation hand over document to client
2.2 Projects
Stop Work Working if not safely.

3. Next Month’s Plan


 Any Functions/trips planned

 Scheduled Trainings
Shaping Tomorrow

N/A

4. Attachments

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.
A. 1. OHSE Exposure Values 2018

Shaping Tomorrow

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.
A. 2. Intervention record

Shaping Tomorrow

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.
A. 3. Incident Archetype

A. 4. Incident Contractor

Shaping Tomorrow

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.
B. ACT Staff OHSE Training Matrix
N/A

Shaping Tomorrow

© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without
permission of the publisher.

Anda mungkin juga menyukai