Check list for Final Coat Painting (Internal)
guru
CIVIL CONSTRUCTION
Comments
27-final-coat-paint-int
27-final-coat-paint-int
COMPANY NAME
Project Project
Project detail/ Location
No. Name
S.
Points to be verified Yes No N/A Remarks
No.
Approval of painting
system and colour as
1
per individual room
received
Is the surface to be
2
painted dry
Sequence of painting
is correctly followed
3 as per the
manufacturer
recommendations
Electrical/ door
ironmongery/flooring
4 etc. protected from
dirtying during and
after painting
2
Sealing of wood
7 knots in door frames
is done
Rusted metal
surfaces are properly
8 treated and
approved paint
system is applied
To avoid overlapping
of paint, wall/ ceiling
9 corners are
protected with
masking tape
Co-ordination with M
& E services carried
11
out as per the check
list
Site Engineer
3
MEP Engineer
Project Engineer
Project Manager
HSEQ
QA/QC Incharge
Building:
Updated: December 24, 2016 — 9:30 pm
← Previous Post
Next Post →
Leave a Reply
Your email address will not be published. Required fields are marked *
Comment
Name *
Email *
Website
Notify me of follow-up comments by email.
Notify me of new posts by email.
The Search Box
4
Recent Posts
CONSTRUCTION MACHINERIES, EQUIPMENTS AND INSTRUMENTS / HANDLING AND
MAINTANANCE
Check list for Ready Mix Concrete (Parapet wall)
Check list for Grade Slab
Check list for Sandstone Cladding
Check list for Marble Cladding
Recent Comments
Meta
Register
Log in
Entries RSS
Comments RSS
WordPress.org