Issue 04
Date 2019-01-07
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: http://www.huawei.com
Email: support@huawei.com
Contents
5 Replacing a BTS3911E.................................................................................................................. 7
6 Replacing an Optical Module................................................................................................... 11
Introduction
This document describes routine maintenance items for a BTS3911E, such as power-on and
power-off operations. It also explains how to replace components and modules.
Product Version
The following table lists the product versions related to this document.
Intended Audience
This document is intended for:
l System engineers
l Site maintenance engineers
04 (2019-01-07)
This is the third commercial release.
Compared with Issue 03 (2018-02-05), this issue does not include any new information.
Compared with Issue 03 (2018-02-05), this issue includes the following changes.
03 (2018-02-05)
This is the third commercial release.
Compared with Issue 02 (2017-06-30), this issue does not include any new information.
Compared with Issue 02 (2017-06-30), this issue includes the following changes.
Procedure
Step 1 Instruct the network operator to run the SET INDICATORSW command to turn on the
indicators.
The installation or maintenance personnel can locally observe the indicator status.
----End
Procedure
Step 1 Instruct the network operator to run the SET INDICATORSW command to turn off the
indicators.
The installation or maintenance personnel can locally observe that all the indicators are off.
----End
The indicator status of a BTS3911E must be observed following a power-on to check its
running status. Normal power-off can be used to power off a BTS3911E.
Prerequisites
l The BTS3911E and its cables have been installed.
l The input voltage and frequency of the BTS3911E range from 100 V AC to 240 V AC,
and 45 Hz to 65 Hz, respectively.
Context
After a BTS3911E is unpacked, power it on within 24 hours. If the BTS3911E is powered off
for maintenance, restore power to it within 24 hours.
Procedure
Step 1 Power on the BTS3911E.
Do not look into optical modules without eye protection after the BTS3911E is powered on.
Step 2 Wait for 3 to 5 minutes, and observe the indicator status. Then, take actions based on the
indicator status.
The RUN indicator blinks green slowly (on The BTS3911E is running properly and the
for 1s and off for 1s) and the ALM indicator power-on check is completed.
is off
Any other indicator status is observed The BTS3911E is faulty. Rectify the faults,
and go to Step 1.
NOTE
----End
Procedure
Switch off the external power supply equipment connected to the BTS3911E.
5 Replacing a BTS3911E
BTS3911Es use modular design. Faulty ones must be replaced promptly. Replacing a
BTS3911E interrupts ongoing services.
Prerequisites
l Tools and materials, such as ESD gloves, a torque wrench, and an M6/M10 inner
hexagon torque screwdriver, are ready.
l The BTS3911E to be replaced is confirmed, and a new BTS3911E is ready.
l You have obtained site visit permission.
Procedure
Step 1 Ask the network operator to perform the following operations for BTS3911E replacement:
1. Block all the cells served by the BTS3911E to be replaced.
– Run the BLK CELL command for the LTE RAT.
– Run the BLK ULOCELL command for the UMTS RAT.
2. Remove the backup SN label from the surface of the new BTS3911E and paste the label
on the SN collection template. For details, see Obtaining the SN.
3. Upload a configuration file for the new BTS3911E over FTP. For details, see Micro
BTS3900 Series Commissioning Guide.
4. Copy the configuration file and required software package to a TF card or a laptop where
the LMT has been installed.
Do not touch the BTS3911E that is just powered off until it cools down.
Step 2 Switch off the external power supply equipment connected to the BTS3911E.
Take proper ESD protection measures, for example, wear ESD gloves, to prevent electrostatic
damages to the BTS3911E or its electronic components.
Step 4 (Optional) Record the horizontal and vertical angles of the BTS3911E. Pay attention to the
direction.
Step 5 Record all cable connections.
Step 7 Use an inner hexagon torque screwdriver to remove the angle adjusting screw on the top of
the BTS3911E attachment plate. Push the BTS3911E and its attachment plate upward out of
the angle-adjustable attachment plate. See the following figure.
When demounting a BTS3911E, hold the BTS3911E tight to prevent it from falling.
Step 9 Connect all the cables on the new BTS3911E and seal the vacant ports with waterproof rubber
plugs.
Step 10 Power on the new BTS3911E by following instructions provided in 4.1 Powering On a
BTS3911E.
Step 11 Observe the indicator status to check the operating status of the new BTS3911E. For the
indicator status meanings, see section "Ports and Indicators" in BTS3911E Hardware
Description.
Step 12 Download the configuration file and software package to the new BTS3911E using either of
the following methods:
l Using the LMT
a. On the Upgrade Software tab page, select Download Configuration File and
Download Version Software to download the configuration file and software
package. Select Activate Configuration File and Activate Version Software to
activate the configuration file and software package. After the activation is
completed, the BTS3911E restarts and runs the new software version. For details,
see Micro BTS3900 Series LMT User Guide.
b. Ensure that no alarms are generated on the BTS3911E. For details, see Micro
BTS3900 Series LMT User Guide.
l Using a TF card. For details, see Micro BTS3900 Series Commissioning Guide.
----End
Follow-up Procedure
l Place the old BTS3911E into an ESD bag. Then, place the ESD bag into a foam-padded
carton or the packing box of the new BTS3911E.
l Fill in the fault form with detailed information of the old BTS3911E.
l Contact the local Huawei office to handle the faulty BTS3911E.
Prerequisites
l The type and number of optical modules to be replaced are confirmed, and new optical
modules are ready.
l Tools and materials, such as an M6 inner hexagon torque screwdriver, ESD gloves, an
ESD box, and an ESD bag, are ready.
Context
l Optical modules are inserted in FE/GE2 and FE/GE3 ports of the BTS3911E.
l Optical modules are hot-swappable.
l Optical module replacement involves disconnecting the optical cable, removing the
faulty optical module, inserting a new optical module, connecting the optical cable to the
new module, and waiting for the link on the Ethernet optical port to resume. The whole
process takes about 5 minutes.
Procedure
Step 1 Put on ESD gloves.
Take proper ESD protection measures, for example, wear ESD gloves, to prevent electrostatic
damages to the optical module or its electronic components.
Step 2 Switch off the external power supply equipment connected to the BTS3911E.
Step 3 Open the maintenance cavity cover. For the BTS3911E installed on a wall with large-angle
adjustment, if the maintenance cavity cover cannot be opened, perform the following
operations:
Step 5 Press the bulge on the optical connector and remove the connector from the faulty optical
module.
Do not look into the disconnected optical cable or optical module without eye protection.
Step 6 Lower the puller on the faulty optical module, and then pull the puller until the optical module
is removed from the BTS3911E.
Step 7 According to the label on the faulty optical module, prepare a new one of the same type.
Insert the new optical module into the optical port on the BTS3911E.
NOTE
The new optical module must match the rate at the optical port.
Step 8 Insert the optical connector into the optical module, and close the maintenance cavity cover.
Step 9 Power on the new BTS3911E by following instructions provided in 4.1 Powering On a
BTS3911E.
Step 10 Observe the indicator status to check signal transmission. For the indicator status meanings,
see section "Ports and Indicators" in BTS3911E Hardware Description.
Step 11 Take off the ESD gloves and pack up all the tools.
----End
Follow-up Procedure
l Place the old optical module into an ESD bag. Then, place the ESD bag into a foam-
padded carton or the packing box of the new optical module.
l Fill in the fault form with detailed information of the old optical module.
l Contact the local Huawei office to handle the faulty optical module.