CIUJUNG PRIORITY CIVIL WORK PACKAGE 1 AND 2

SUPERVISION TEAM CS01 SERANG

C 118 Basic U/S 6.948 Elv m


D/S -1.500 Elv m
H 8.448 m
L (jarak kum) 12,000.000 m
Slope=H/L 0.0000704

Surcharge WL Kenaikan MAW di Section C 118 0.387 m


Elv MAB existing +14.500
Elv MAB surcharge +14.887
Crest dike +15.500
Freeboard 0.613 m
Minimum freeboard 0.500 m
Kesimpulan OK

A1_bawah

C 118-Existing Dimensi Sal B bawah 17.643 17.643 m


Elv Dasar -0.800

H-depth 10.896 11.696 m 15.500


-0.800 10.896
L talud 59.467 59.467 m 8.191

Slope talud m 5.084


B atas 136.577 m

A 901.879 m2
P 60.606 138.856 m 9.396
R = A/P 6.495 m

Hit Manning asumsi n 0.03


V 0.974 m/det
Froude

Kapasitas A 901.879 m2
Q=VxA 878.085 m3/det
Q target 2200.000 m3/det
-1321.9154
0.704 /10 km

HITUNG CAD CAD: Reduksi 2,0m Surcharge WL 0.387 m


A2_atas A_full +14.749

163.68

4.604 15.500 16.300 15.162 15.549


-0.800
8.191 67.658 84.400

1.779 4.151 5.428


180.062 152.959 186.443

791.2941 1693.173 1574.934 1554.875 1.27% 1586.677


182.472 69.594 156.831 185.801 181.773 85.8204 189.284
4.337 10.796 8.476 8.554 8.383

1.366 1.163 1.170 1.154


0.133 0.128 0.128 0.127

1693.173 1574.934 1554.875 1586.677


2313.201 1831.205 1818.882 0.67% 1831.205
2200.000 2200.000 2200.000 2200.000
113.201 -368.795 -381.118 -368.795
5.15% -16.76% -17.32% -16.76%
A =
2.55%

(reduksi 2,0m)

-11.743
(iterasi A)

0.000
(iterasi Q)
86.4
CIUJUNG PRIORITY CIVIL WORK PACKAGE 1 AND 2
SUPERVISION TEAM CS01 SERANG

C 117 Basic U/S 6.948 Elv m


D/S -1.500 Elv m
H 8.448 m
L (jarak kum) 12,000.000 m
Slope=H/L 0.0000704

Surcharge WL Kenaikan MAW di Section C 117 1.078 m


Elv MAB existing +14.500
Elv MAB surcharge +15.578
Crest dike +15.500
Freeboard -0.078 m
Minimum freeboard 0.500 m
Kesimpulan Modif

A1_bawah

C 117-Existing Dimensi Sal B bawah 24.553 24.553 m


Elv Dasar 0.500

H-depth 10.933 10.433 m 15.500


0.500 10.933

L talud 60.868 60.868 m 7.816

Slope talud m 5.834


B atas 146.289 m

A 891.197 m2
P 61.756 148.064 m 9.052
R = A/P 6.019 m

Hit Manning asumsi n 0.03


V 0.925 m/det
Froude

Kapasitas A 891.197 m2
Q=VxA 824.748 m3/det
Q target 2200.000 m3/det
-1375.25204329
HITUNG CAD CAD: Reduksi 2,0m Surcharge WL 1.078 m
A2_atas A_full +15.253

189.03

4.567 15.500 15.000 13.675 14.753


0.500

7.816 68.684 66.684

1.711 4.579 5.834


204.662 161.921 196.695

898.9957 1790.193 1632.024 1612.412 1.20% 1632.024


207.135 70.303 165.159 194.63 190.833 87.3262 199.205
4.340 10.839 8.385 8.449 8.193

1.370 1.154 1.160 1.137


0.133 0.127 0.127 0.127

1790.193 1632.024 1612.412 1632.024


2452.245 1883.950 1870.780 0.70% 1854.991
2200.000 2200.000 2200.000 2200.000
252.245 -316.050 -329.220 -345.009
11.47% -14.37% -14.96% -15.68%

A =
7.88%

(reduksi 2,0m)

0.000
(iterasi A)

28.959
(iterasi Q)
86.4

48.203
24.553