Anda di halaman 1dari 1

HQ Office

HQ Office
for 88 Builders Lane
San Francisco, CA 94110

TR & Associates ARCHITECT

Sekella + Partners
88 Builders Lane 25 E. Livingston Avenue
San Francisco, CA 94108

San Francisco, CA 94110 CIVIL CONSULTANT

THBI Inc.
290 Charmel Street
San Francisco, CA 94130

prepared by MECHANICAL, ELECTRICAL AND


PLUMBING CONSULTANT

Sekella + Partners Smith Associates


640 W. Portal Ave.
San Francisco, CA 94127
25 E. Livingston Ave.
San Francisco, CA 94108 TECHNOLOGY CONSULTANT

MA Engineering
1749 Tiger St.
San Francisco, CA 94116

Civil Consultant Mechanical, Electrical and Plumbing Consultant Technology Consultant


THBI, Inc. Smith Associates MA Engineering
290 Charmel Street 640 W. Portal Ave. 1749 Tiger St.
San Francisco, CA 94130 San Francisco, CA 94127 San Francisco, CA 94116

GENERAL NOTES: SHEET INDEX SIGNATURE


1. THIS PROJECT CONSISTS OF RENOVATION OF THE FOURTH FLOOR OF 5. EACH SHEET CONTAINED IN THIS SET OF DRAWINGS IS AN INTEGRAL 10. CONTRACTOR IS TO TAKE PRECAUTIONS TO PROTECT THE EXISTING DATE
AN EXISTING BUILDING, INCLUDING STRUCTURAL, PLUMBING, HVAC AND COMPONENT OF THE CONSTRUCTION DOCUMENTS FOR THE PROJECT. BUILDING TO REMAIN AND ALL CONTENTS . GENERAL
ELECTRICAL WORK. PORTIONS OF THE WORK DESCRIBED ON ONE SHEET MAY IMPACT, BE
A-000 COVER
IMPACTED BY, OR RELY UPON INFORMATION OR WORK SHOWN ON THE 11. DURING THE CONSTRUCTION PROCESS, CONTRACTOR IS TO INFORM REVISIONS
2. THIS PROJECT HAS BEEN DESIGNED UTILIZING THE PROVISIONS OF THE OTHER SHEETS WITHIN DRAWINGS. CONTRACTORS SHALL FAMILIARIZE THE ARCHITECT OF ANY UNSTABLE CONDITIONS PRIOR TO
FOLLOWING CODES AND REGULATIONS: THEMSELVES WITH THE SCOPE OF WORK REQUIRED FOR THE ENTIRE PROCEEDING WITH THE WORK IN PROGRESS. CIVIL NO. DESCRIPTION DATE
2016 CALIFORNIA BUILDING CODE PROJECT AND SHALL BE RESPONSIBLE FOR COORDINATION OF THEIR
2016 CALIFORNIA MECHANICAL CODE RESPECTIVE PORTIONS WITH OTHER TRADES TO ASSURE THAT THE 12. DIMENSIONS ARE NOMINAL. REPORT ANY DIMENSIONAL
C-101 SITE PLAN
2016 CALIFORNIA PLUMBING CODE WORK PROGRESSES IN AN ORDERLY AND TIMELY FASHION. INCONSISTENCIES WITH THE ARCHITECT.
2016 CALIFORNIA ELECTRICAL CODE ARCHITECTURAL
+ ALL SAN FRANCISCO AMENDMENTS 6. ALL WORK SHALL BE COMPLETE IN ACCORDANCE WITH THE 13. ALL PENETRATIONS THROUGH ANY MATERIAL SHALL BE SEALED WITH
CONSTRUCTION DOCUMENTS APPROVED BY THE AUTHORITIES HAVING AN APPROPRIATE MATERIAL. A-101 FLOOR PLAN
3. THE DRAWINGS ARE INTENDED TO GRAPHICALLY DEPICT THE GENERAL JURISDICTION OVER THE PROJECT. EACH CONTRACTOR, A-201 REFLECTED CEILING PLAN
REQUIREMENTS FOR THE SCOPE OF WORK REQUIRED TO COMPLETE SUBCONTRACTOR OR OTHER PERSON PERFORMING WORK ON THE 14. THE BUILDING WILL REMAIN OCCUPIED AND IN USE FOR THE DURATION A-401 INTERIOR ELEVATIONS
THE PROJECT. THEY DO NOT SHOW OR IDENTIFY EACH AND EVERY PROJECT SHALL REFER TO THE APPROVED DOCUMENTS FOR THE OF THE PROJECT. A-601 WALL TYPES AND DETAILS
COMPONENT, MATERIAL, ITEM OR INSTALLATION METHOD NECESSARY SCOPE OF WORK REQUIRED. USE OF BID SETS, LOOSE SHEETS OR
TO MEET MANUFACTURERS OR REGULATORY REQUIREMENTS. OTHER ITEMS/DOCUMENTS NOT PART OF THE APPROVED DOCUMENTS
SPECIFIC REGULATORY COMPLIANCE ITEMS OR PROVISIONS ARE IS DONE AT THE RESPECTIVE PARTY'S SOLE RISK. CONTRACTOR SHALL PLUMBING
IDENTIFIED AND/OR REFERRED TO BY INDICATION OF THE BE RESPONSIBLE FOR MAINTENANCE AND SAFEKEEPING OF THE P-101 PLUMBING PLAN AND STACK DIAGRAM PROJECT NUMBER 1605.003
APPROPRIATE ASSEMBLY DESIGNATION OR GENERAL TERMINOLOGY. APPROVED DOCUMENTS.
THE CONTRACTOR SHALL BE REQUIRED TO FAMILIARIZE THEMSELVES DATE OF ISSUE 11.05.16
WITH THE APPLICABLE CODE PROVISIONS, ASSEMBLY DESIGNATION OR 7. DO NOT SCALE DRAWINGS. IF ANY DISCREPANCY IS FOUND OR ANY HVAC
MATERIAL IDENTIFIED AND SHALL COMPLETE THE PROJECT IN INFORMATION OR CLARIFICATION NEEDED WHICH CANNOT BE
DRAWN BY MLF
H-101 HVAC PLAN
COMPLIANCE WITH THE APPLICABLE REQUIREMENTS. REASONABLY DETERMINED BY THE CONSTRUCTION DOCUMENTS, CHECKED BY CRS
H-102 HVAC SCHEDULE AND DETAILS
CONTACT THE ARCHITECT FOR RESOLUTION. IN CASE OF DISCREPANCY
4. THE CONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, REGARDING THE QUANTITY OR QUALITY, THE HIGHER QUALITY OR
METHODS, SEQUENCING AND SAFETY REQUIREMENTS FOR THE GREATER QUANTITY SHALL BE PROVIDED. ELECTRICAL
PROJECT. EACH CONTRACTOR, SUBCONTRACTOR, LABORER OR OTHER
PERSONS PERFORMING WORK ON THE PROJECT SITE SHALL BE E-101 LIGHTING PLAN AND SCHEDULE
8. REFER TO THE PROJECT GENERAL CONDITIONS OF THE CONTRACT FOR
RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE WORKPLACE CONSTRUCTION FOR ADDITIONAL REQUIREMENTS FOR COMPLETION E-102 POWER PLAN
AND CONSTRUCTION SAFETY REGULATIONS PROMULGATED BY AND ADMINISTRATION OF THE PROJECT. THE 'GENERAL CONDITIONS OF
FEDERAL, STATE OR LOCAL AUTHORITIES, INCLUDING BUT NOT LIMITED THE CONTRACT FOR CONSTRUCTION' (CURRENT EDITION) SHALL
TO U.S. DEPT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ACT CONSTITUTE A PART OF THE CONTRACT DOCUMENTS.
(OSHA), THE INDUSTRIAL COMMISSION OF THE STATE OF CALIFORNIA
OR OTHER INDUSTRY REQUIREMENTS APPLICABLE TO CONSTRUCTION 9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS
SITES AND SAFETY. CONTRACTORS ARE RESPONSIBLE TO MAINTAIN PRIOR TO COMMENCEMENT OF THE WORK. DISCREPANCIES BETWEEN
ALL REQUIRED RECORDS, FORMS, MANUALS, RULES OR OTHER EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS THAT CAUSE
DOCUMENTS AT THE SITE. MINOR RELOCATIONS IN THE FIELD WILL NOT BE CAUSE FOR
ADDITIONAL PAYMENT.

A-000

Anda mungkin juga menyukai