BACALAH KONTRAK DENGAN CERMAT!
KONTRAK MENYELURUH
LUMP SUM CONTRACT
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
KARAKTERISTIK PENGGUNAAN :
1. JENIS PEKERJAAN DAPAT DIDEFINISIKAN DENGAN JELAS
2. VOLUME PEKERJAAN SULIT DIIDENTIFIKASI DENGAN TEPAT
3. ADA KEMUNGKINAN TERJADINYA UNBALANCED BID
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
OBYEK75,479,751.17
PERIKATAN 2.24
II PEKERJAAN BETON BERTULANG
A PONDASI DAN SLOOF
1 Beton Pondasi Plat F1 (300 X 300) m3 42.00 1,419,078.25 59,601,286.29
2 Beton Pondasi Plat F2 (200 X 200) m3 3.36 1,299,675.99 4,366,911.31
3 Beton Pondasi Plat F3 (300 X 505) m3 4.45 1,326,826.90 5,904,379.71
4 Beton Pondasi Plat FG1 (200 X 505) m3 13.13 1,924,621.38 W
25,270,278.71 u l f r a m I. E r v I a n t o
5 Beton Pondasi Plat FG2 (250 X 480) m3 18.00 2,375,553.59 42,759,964.62
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
VOLUME
TIMBUNAN
SULIT
DIHITUNG
DENGAN
TIMBUNAN
TEPAT
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
TUJUAN :
1. MENDAPATKAN KEUNTUNGAN DARI BEBERAPA ASPEK PROYEK,
MISALNYA DENGAN MENAIKKAN HARGA SATUAN PADA PEKERJAAN
AWAL UNTUK BIAYA MOBILISASI ALAT ATAU MATERIAL YANG
DIPERLUKAN.
TOTAL
ITEM UNIT KUANTITAS HARGA SATUAN
(Rp)
(Rp)
GALIAN TANAH M3 8.000 7.500 60.000.000
GALIAN BATU M3 2.000 12.500 25.000.000
TIMBUNAN M3 4.000 5.000 20.000.000
Total 105.000.000
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
TOTAL
ITEM UNIT KUANTITAS HARGA SATUAN
(Rp)
(Rp)
GALIAN TANAH M3 8.000 8.625 69.000.000
GALIAN BATU M3 2.000 10.000 20.000.000
TIMBUNAN M3 4.000 4.000 16.000.000
Total 105.000.000
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
TOTAL
ITEM UNIT KUANTITAS HARGA SATUAN
(Rp)
(Rp)
GALIAN TANAH M3 8.000 4.375 35.000.000
GALIAN BATU M3 2.000 25.000 50.000.000
TIMBUNAN M3 4.000 5.000 20.000.000
Total 105.000.000
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
46,875,000.00
BERDASAR PENGGANTIAN BIAYA UNIT PRICE COST PLUS FEE LUMP SUM
Cost plus fixed fee, jenis kontrak ini telah dipertimbangkan pembayaran
kembali kepada kontraktor berupa biaya nyata (actual cost) yang telah
dikeluarkan oleh kontraktor ditambah biaya umum (overhead cost) dan
sejumlah keuntungan yang tetap (fixed fee).
Yang dimaksud biaya nyata adalah semua biaya upah tenaga kerja, bahan
bangunan, biaya peralatan.
kontraktor akan menerima kembali/ganti semua biaya nyata (actual cost) yang
telah dikeluarkan dan akan menerima kompensasi yang besarnya berdasarkan
prosentase dari biaya nyata (actual cost) sesuai dengan kesepakatan bersama
dengan pemilik proyek.
ILUSTRASI :
OWNER
Main contract
KONTRAKTOR
KONSULTAN
UMUM
Sub-contract
OWNER
Main contract
GENERAL
CONTRACTING
KONTRAKTOR METHODE
UMUM
Sub-contract
KONTRAKTOR UTAMA
Nilai kontrak 100,000,000.00
Jasa 10% 10,000,000.00
Biaya langsung 90,000,000.00
misalnya digunakan 3 sub-kontraktor dengan nilai kontrak dianggap merata untuk 3 sub-kontraktor
SUB-KONTRAKTOR 1 SUB-KONTRAKTOR 2 SUB-KONTRAKTOR 3
Nilai kontrak 21,000,000.00 21,000,000.00 21,000,000.00
Jasa 10% 2,100,000.00 2,100,000.00 2,100,000.00
Biaya langsung 18,900,000.00 18,900,000.00 18,900,000.00
SUB-KONTRAKTOR 1.1 SUB-KONTRAKTOR 2.1 SUB-KONTRAKTOR 3.1
Nilai kontrak 18,900,000.00 18,900,000.00 18,900,000.00
Jasa 10% 1,890,000.00 1,890,000.00 1,890,000.00
Biaya langsung 17,010,000.00 17,010,000.00 17,010,000.00
SUB-KONTRAKTOR 1.1.1 SUB-KONTRAKTOR 2.1.1 SUB-KONTRAKTOR 3.1.1
Nilai kontrak 17,010,000.00 17,010,000.00 17,010,000.00
Jasa 10% 1,701,000.00 1,701,000.00 1,701,000.00
Biaya langsung 15,309,000.00 15,309,000.00 15,309,000.00
BERDASAR PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
OWNER
KONSULTAN
OWNER
KONSULTAN KONTRAKTOR
BERDASAR PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
KOMPARASI WAKTU
METODA KONVENSIONAL DENGAN RANCANG BANGUN
SELISIH WAKTU
BERDASAR PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
METODA SWAKELOLA
FORCE ACCOUNT METHODE
Metoda kontrak ini pemilik proyek tidak melakukan kontrak bagi proyek
yang akan dilaksanakan, karena pemilik mendanai sendiri proyeknya,
merancang sendiri proyeknya, melaksanakan sendiri proyeknya dan
mengawasi sendiri. Jelas bahwa ketiga pihak yang terlibat dalam proyek
kontruksi berada dalam satu pihak, sehingga pemilik proyek harus
mempunyai kemampuan yang seharusnya dimiliki oleh konsultan
(perencana, pengawas) dan kontraktor.
BERDASAR PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
1. Karena tidak terjadi kontrak, maka pemilik tidak perlu menyediakan biaya
pelelangan
2. Waktu realisasi proyek dapat dipersingkat, hal ini dapat terjadi karena dapat
dihilangkannya waktu untuk lelang.
3. Dapat dilakukan penghematan dan penghapusan biaya yang seharusnya
dialokasikan untuk keuntungan dan overhead bagi kontraktor umum maupun
subkontraktor.
--BERDASAR
KONTRAK --
PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
OWNER
KONTRAKTOR
KONSULTAN
UMUM
-- KONTRAK --
Construction Management OWNER
Design - Built
KONTRAKTOR
KONSULTAN
UMUM
KONTRAKTOR
SPESIALIS
BERDASAR PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
W u l f r a m I. E r v I a n t o
--BERDASAR
KONTRAK --
PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI
Design - Built
KONTRAKTOR
KONSULTAN
UMUM
KONTRAKTOR
SPESIALIS
BERDASAR PENGORGANISASIAN UMUM TERPISAH RANCANG BANGUN SWAKELOLA MANAJEMEN KONSTRUKSI