Client: NCC Limited

Consultant : Epitome Project Management Consultancy Services,Chennai


Project : Sabarmati Terminal - Fitout Work
Item: Summary of Wall Finishes schedule for the Terminal Building A & B

Sl.No Item Description Code Unit Quantity Remarks

For the Building A & B

A Plastering Works
Plastering Works CP Sqm 131,758.33

B Cladding Works
Polished Granite Stone Dry Cladding 30mm CGD Sqm 4,701.96
Polished Granite Stone Wet Cladding 18mm CGW Sqm 6,148.70
Ceramic Tiles Cladding CCT Sqm 3,343.59
Vitrified Tiles Cladding CVT Sqm 2,761.33
Aluminium composite panels CACP Sqm 2,118.04
6mm Lacquerred saint gobain cladding CLG Sqm 598.40
Senester Stone Cladding CSS Sqm 1,742.49
Solid Acrylic Surface CAC Sqm 2,787.62

C Painting Works
Epoxy Paint with Primer IEP Sqm 3,652.56
Putty Woks PUTTY Sqm 70,045.67
Acrylic Emulsion IAP Sqm 63,836.64
POP Works POP Sqm 3,454.99
Designer Paint IDP Sqm 3,454.99
Cement Paint ICP Sqm 38,687.10

D Coping/Skirting/Counter Works
Granite Coping Works - 300mm CGC Rmt 988.00
Granite Skirting Works - 100mm CGS Rmt 1,238.80
Kota Skirting Works - 100mm KS Rmt 2,084.70
Steel Skirting Works - 200mm SS Rmt 539.78
Granite Counter Works CGP Sqm 122.68
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Summary of Floor wise Wall Finishes schedule for the Terminal Building A & B
CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Only Cement Granite Granite Aluminium 6mm Senester Acrylic Granite Granite Kota Steel Granite
Sl.No Floor Plaster Ceramic Tiles Vitrified Tiles Lacquerred Solid Acrylic Epoxy Paint Only Putty Designer
Stone Dry Stone Wet Cladding Cladding composite saint gobain Stone Surface r with Primer Woks Emulsion & Paint & POP Cement Paint Coping Skirting Skirting Skirting Counter
Cladding Cladding panels cladding Cladding Putty Works Works Works Works Works
30mm 18mm

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Rmt Sqm Sqm Sqm Sqm

1 Basement Floor 10,714.78 224.70 291.84 2,022.04 - - - - - 2,300.31 - 8,444.64 413.76 3,773.45 - 14.69 77.01 - -

2 Ground Floor 7,586.36 218.93 1,274.79 219.60 184.03 933.64 - - - 441.71 - 4,786.87 397.10 3,433.04 83.22 21.40 14.74 - 4.68

3 1st Floor 5,027.05 178.79 1,190.63 202.05 - 657.51 - - - 441.71 - 2,622.28 303.74 2,918.08 91.80 9.54 13.59 - -

4 2nd Floor 5,223.94 178.79 1,402.52 227.40 - 526.89 - - - 468.84 - 2,832.42 340.23 2,918.08 121.38 9.54 15.26 - -

5 3rd Floor 16,426.61 2,892.77 449.81 343.50 - - 598.40 1,742.49 2,787.62 - 6,209.03 4,053.89 585.00 5,578.69 - 16.78 22.89 107.96 40.24

6 4th Floor 10,174.46 179.76 296.76 - 1,288.65 - - - - - - 6,485.18 256.24 3,433.04 - 9.43 11.05 - 38.88

7 5th Floor 10,174.46 179.76 296.76 - 1,288.65 - - - - - - 6,485.18 256.24 3,433.04 - 9.43 11.05 - 38.88

8 6th Floor 11,463.11 179.76 239.16 - - - - - - - - 7,773.83 256.24 3,433.04 - 9.43 11.05 - -

9 7th Floor 11,463.11 179.76 239.16 - - - - - - - - 7,773.83 256.24 3,433.04 - 9.43 11.05 - -

10 8th Floor 10,020.55 179.76 239.16 164.50 - - - - - - - 6,878.11 256.24 2,886.20 - 9.43 11.05 - -

11 9th Floor 7,066.35 109.20 168.72 - - - - - - - - 4,280.55 133.96 2,651.84 - 4.78 9.73 - -

12 Terrace Floor 2,215.43 - 59.40 164.50 - - - - - - - 1,419.88 - 795.55 - - - - -

Total Quantity 107,556.20 4,701.96 6,148.70 3,343.59 2,761.33 2,118.04 598.40 1,742.49 2,787.62 3,652.56 6,209.03 63,836.64 3,454.99 38,687.10 296.40 123.88 208.47 107.96 122.68
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Rmt Sqm Sqm Sqm Sqm
a Parking Area
Epoxy Paint all over the basement IEP 1 1103.90 1.20 - - - - - - - - - 1,324.68 - - - - - - - - -
Deduct D2 IEP -17 2.20 1.20 - - - - - - - - - -44.88 - - - - - - - - -
Add jams for D2 IEP 17 2.40 0.10 - - - - - - - - - 4.08 - - - - - - - - -
Deduct D1b IEP -5 2.20 1.20 - - - - - - - - - -13.20 - - - - - - - - -
Add jams for D1b IEP 5 2.40 0.10 - - - - - - - - - 1.20 - - - - - - - - -
Deduct D4 IEP -2 1.00 1.20 - - - - - - - - - -2.40 - - - - - - - - -
Add jams for D4 IEP 2 2.40 0.10 - - - - - - - - - 0.48 - - - - - - - - -
Deduct D1a IEP -9 2.20 1.20 - - - - - - - - - -23.76 - - - - - - - - -
Add jams for D1a IEP 9 2.40 0.10 - - - - - - - - - 2.16 - - - - - - - - -
Deduct D3 IEP -2 1.50 1.20 - - - - - - - - - -3.60 - - - - - - - - -
Add jams for D3 IEP 2 2.40 0.10 - - - - - - - - - 0.48 - - - - - - - - -
Building-A - lobby for office, ST-01& Electri CP IAP 1 28.20 4.20 3.00 118.44 - - - - - - - - - - 84.60 - - - - - - -
Deduct D2 CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D2 CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Services CP IAP 1 24.50 4.20 3.00 102.90 - - - - - - - - - - 73.50 - - - - - - -
Deduct D2 CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D2 CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Lobby for HSR,ST-02 Security Control & Servi CP IAP 1 59.30 4.20 3.00 249.06 - - - - - - - - - - 177.90 - - - - - - -
Deduct D2 CP IAP -4 2.20 2.10 0.90 -18.48 - - - - - - - - - - -7.92 - - - - - - -
Add jams for D2 CP IAP 4 6.40 0.10 0.10 2.56 - - - - - - - - - - 2.56 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D2 CP IAP -2 2.20 2.10 0.90 -9.24 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D2 CP IAP 2 6.40 0.10 0.10 1.28 - - - - - - - - - - 1.28 - - - - - - -
Staircase - ST-18 CP IAP 1 31.20 4.20 3.00 131.04 - - - - - - - - - - 93.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Building-A - lobby for office, ST-03 & Services CP IAP 1 61.90 4.20 3.00 259.98 - - - - - - - - - - 185.70 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 0.90 -3.15 - - - - - - - - - - -1.35 - - - - - - -
Add jams for D3 CP IAP 1 1.80 0.10 0.10 0.18 - - - - - - - - - - 0.18 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 55.80 4.20 3.00 234.36 - - - - - - - - - - 167.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Services Room CP IAP 1 14.70 4.20 3.00 61.74 - - - - - - - - - - 44.10 - - - - - - -
Deduct D2 CP IAP -2 1.20 2.10 0.90 -5.04 - - - - - - - - - - -2.16 - - - - - - -
Add jams for D2 CP IAP 2 5.40 0.10 0.10 1.08 - - - - - - - - - - 1.08 - - - - - - -
Staircase -ST-17 CP IAP 1 22.10 4.20 3.00 92.82 - - - - - - - - - - 66.30 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Services Fan Room CP IAP 1 12.50 4.20 3.00 52.50 - - - - - - - - - - 37.50 - - - - - - -
Deduct D2 CP IAP -1 1.20 2.10 0.90 -2.52 - - - - - - - - - - -1.08 - - - - - - -
Add jams for D2 CP IAP 1 5.40 0.10 0.10 0.54 - - - - - - - - - - 0.54 - - - - - - -
Staircase -ST-05 & Lobby Area CP IAP 1 47.30 4.20 3.00 198.66 - - - - - - - - - - 141.90 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 0.90 -3.15 - - - - - - - - - - -1.35 - - - - - - -
Add jams for D3 CP IAP 1 1.80 0.10 0.10 0.18 - - - - - - - - - - 0.18 - - - - - - -
Staircase -ST-06 & Lobby Area CP IAP 1 79.20 4.20 3.00 332.64 - - - - - - - - - - 237.60 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D2 CP IAP -2 1.20 2.10 0.90 -5.04 - - - - - - - - - - -2.16 - - - - - - -
Add jams for D2 CP IAP 2 5.40 0.10 0.10 1.08 - - - - - - - - - - 1.08 - - - - - - -
Staircase -ST-15 CP IAP 1 27.90 4.20 3.00 117.18 - - - - - - - - - - 83.70 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Pump Room CP IAP 1 41.20 4.20 3.00 173.04 - - - - - - - - - - 123.60 - - - - - - -
Deduct D2 CP IAP -1 1.20 2.10 0.90 -2.52 - - - - - - - - - - -1.08 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D2 CP IAP 1 5.40 0.10 0.10 0.54 - - - - - - - - - - 0.54 - - - - - - -
Staircase -ST-16 CP IAP 1 16.10 4.20 3.00 67.62 - - - - - - - - - - 48.30 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Services Fan Room CP IAP 1 14.80 4.20 3.00 62.16 - - - - - - - - - - 44.40 - - - - - - -
Deduct D2 CP IAP -2 1.20 2.10 0.90 -5.04 - - - - - - - - - - -2.16 - - - - - - -
Add jams for D2 CP IAP 2 5.40 0.10 0.10 1.08 - - - - - - - - - - 1.08 - - - - - - -
Staircase -ST-12 CP IAP 1 16.40 4.20 3.00 68.88 - - - - - - - - - - 49.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Staircase -ST-13 CP IAP 1 16.30 4.20 3.00 68.46 - - - - - - - - - - 48.90 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Electrical, AC Plant room, STP & Staircase -STCP IAP 1 97.90 4.20 3.00 411.18 - - - - - - - - - - 293.70 - - - - - - -
Deduct D2 CP IAP -3 1.20 2.10 0.90 -7.56 - - - - - - - - - - -3.24 - - - - - - -
Add jams for D2 CP IAP 3 5.40 0.10 0.10 1.62 - - - - - - - - - - 1.62 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 0.90 -4.62 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Parking Area Columns Epoxy & Acrylic Paint - - - - - - - - - - - - - - - - - - -
C1 IEP 68 2.51 1.20 - - - - - - - - - 204.98 - - - - - - - - -
C1 IAP 68 2.51 3.00 - - - - - - - - - - - 512.45 - - - - - - -
C2 IEP 23 2.51 1.20 - - - - - - - - - 69.33 - - - - - - - - -
C2 IAP 23 2.51 3.00 - - - - - - - - - - - 173.33 - - - - - - -
C3 IEP 3 2.51 1.20 - - - - - - - - - 9.04 - - - - - - - - -
C3 IAP 3 2.51 3.00 - - - - - - - - - - - 22.61 - - - - - - -
C4 IEP 27 2.51 1.20 - - - - - - - - - 81.39 - - - - - - - - -
C4 IAP 27 2.51 3.00 - - - - - - - - - - - 203.47 - - - - - - -
C5 IEP 6 2.10 1.20 - - - - - - - - - 15.12 - - - - - - - - -
C5 IAP 6 2.10 3.00 - - - - - - - - - - - 37.80 - - - - - - -
C6 IEP 15 3.00 1.20 - - - - - - - - - 54.00 - - - - - - - - -
C6 IAP 15 3.00 3.00 - - - - - - - - - - - 135.00 - - - - - - -
C7 IEP 93 3.00 1.20 - - - - - - - - - 334.80 - - - - - - - - -
C7 IAP 93 3.00 3.00 - - - - - - - - - - - 837.00 - - - - - - -
C8 IEP 27 4.40 1.20 - - - - - - - - - 142.56 - - - - - - - - -
C8 IAP 27 4.40 3.00 - - - - - - - - - - - 356.40 - - - - - - -
C9 IEP 10 2.80 1.20 - - - - - - - - - 33.60 - - - - - - - - -
C9 IAP 10 2.80 3.00 - - - - - - - - - - - 84.00 - - - - - - -
C10 IEP 18 3.60 1.20 - - - - - - - - - 77.76 - - - - - - - - -
C10 IAP 18 3.60 3.00 - - - - - - - - - - - 194.40 - - - - - - -
C11 IEP 4 3.00 1.20 - - - - - - - - - 14.40 - - - - - - - - -
C11 IAP 4 3.00 3.00 - - - - - - - - - - - 36.00 - - - - - - -
RC1 IEP 6 2.51 1.20 - - - - - - - - - 18.09 - - - - - - - - -
RC1 IAP 6 2.51 3.00 - - - - - - - - - - - 45.22 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.20 - 67.20 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 26.40 1.20 - - 31.68 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.40 3.00 3.00 79.20 - - - - - - - - - - - 79.20 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 25.30 1.20 - - 30.36 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic paint above wet cladding area CP IAP 1 25.30 3.00 3.00 75.90 - - - - - - - - - - 75.90 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.20 - 65.10 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 3.00 3.00 69.90 - - - - - - - - - - - 69.90 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic paint above wet cladding area CP IAP 1 25.90 3.00 3.00 77.70 - - - - - - - - - - 77.70 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.20 - 44.10 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 3.00 3.00 67.20 - - - - - - - - - - - 67.20 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.50 1.20 - - 31.80 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic paint above wet cladding area CP IAP 1 26.50 3.00 3.00 79.50 - - - - - - - - - - 79.50 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.20 - 44.10 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.30 1.20 - - 26.76 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.30 3.00 3.00 66.90 - - - - - - - - - - - 66.90 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic paint above wet cladding area CP IAP 1 25.70 3.00 3.00 77.10 - - - - - - - - - - 77.10 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 25.90 3.00 3.00 77.70 - - - - - - - - - - - 77.70 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Building - 01 Lobby for Office & Staircase ST-06 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 9.40 4.20 - 39.48 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -3 1.20 2.40 - -8.64 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 3 6.00 0.20 - 3.60 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.70 1.20 - - 27.24 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.70 3.00 3.00 68.10 - - - - - - - - - - - 68.10 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-06 CGW 1 26.10 1.20 - - 31.32 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic paint above wet cladding area CP IAP 1 26.10 3.00 3.00 78.30 - - - - - - - - - - 78.30 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
Electrical Panel Room CCT 1 52.50 1.50 - - - 78.75 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 50.30 0.10 - - - - - - - - - - - - - - - - 5.03 - -
Acrylic paint above tile cladding area CP IAP 1 52.50 2.70 2.70 141.75 - - - - - - - - - - 141.75 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
ST-01 Services Electrical Room CCT 1 18.60 1.50 - - - 27.90 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
Acrylic paint above tile cladding area CP IAP 1 18.60 2.70 2.70 50.22 - - - - - - - - - - 50.22 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
ST-01 Services Fan Room CCT 1 13.70 1.50 - - - 20.55 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 11.50 0.10 - - - - - - - - - - - - - - - - 1.15 - -
Acrylic paint above tile cladding area CP IAP 1 13.70 2.70 2.70 36.99 - - - - - - - - - - 36.99 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Services Room between ST-01 & ST-02 CCT 1 40.90 1.50 - - - 61.35 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 38.70 0.10 - - - - - - - - - - - - - - - - 3.87 - -
Acrylic paint above tile cladding area CP IAP 1 40.90 2.70 2.70 110.43 - - - - - - - - - - 110.43 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Security control Room near ST-02 CCT 1 48.80 1.50 - - - 73.20 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 46.60 0.10 - - - - - - - - - - - - - - - - 4.66 - -
Acrylic paint above tile cladding area CP IAP 1 48.80 2.70 2.70 131.76 - - - - - - - - - - 131.76 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Services near ST-02 CCT 1 39.50 1.50 - - - 59.25 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 37.30 0.10 - - - - - - - - - - - - - - - - 3.73 - -
Acrylic paint above tile cladding area CP IAP 1 39.50 2.70 2.70 106.65 - - - - - - - - - - 106.65 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Services Fan Room near ST-02 CCT 1 49.90 1.50 - - - 74.85 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 47.70 0.10 - - - - - - - - - - - - - - - - 4.77 - -
Acrylic paint above tile cladding area CP IAP 1 27.80 2.70 2.70 75.06 - - - - - - - - - - 75.06 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
Deduct D4 CCT -2 1.00 1.50 - - - -3.00 - - - - - - - - - - - - - - -
Add jams for D4 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Acrylic paint above tile cladding area CP IAP 1 22.10 2.70 2.70 59.67 - - - - - - - - - - 59.67 - - - - - - -
Deduct D4 CP IAP -2 1.00 0.60 0.60 -1.20 - - - - - - - - - - -1.20 - - - - - - -
Add jams for D4 CP IAP 2 2.20 0.10 0.10 0.44 - - - - - - - - - - 0.44 - - - - - - -
Services Fan Room near ST-17 CCT 1 27.50 1.50 - - - 41.25 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 25.30 0.10 - - - - - - - - - - - - - - - - 2.53 - -
Acrylic paint above tile cladding area CP IAP 1 27.50 2.70 2.70 74.25 - - - - - - - - - - 74.25 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
Services Electrical Room near ST-03 CCT 1 14.40 1.50 - - - 21.60 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 12.90 0.10 - - - - - - - - - - - - - - - - 1.29 - -
Acrylic paint above tile cladding area CP IAP 1 14.40 2.70 2.70 38.88 - - - - - - - - - - 38.88 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services Fan Room near ST-04 CCT 1 18.70 1.50 - - - 28.05 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 16.50 0.10 - - - - - - - - - - - - - - - - 1.65 - -
Acrylic paint above tile cladding area CP IAP 1 18.70 2.70 2.70 50.49 - - - - - - - - - - 50.49 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Services Electrical Room near ST-05 CCT 1 18.30 1.50 - - - 27.45 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 16.80 0.10 - - - - - - - - - - - - - - - - 1.68 - -
Acrylic paint above tile cladding area CP IAP 1 18.30 2.70 2.70 49.41 - - - - - - - - - - 49.41 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services & LV Room near ST-06 CCT 1 49.50 1.50 - - - 74.25 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 47.30 0.10 - - - - - - - - - - - - - - - - 4.73 - -
Acrylic paint above tile cladding area CP IAP 1 49.50 2.70 2.70 133.65 - - - - - - - - - - 133.65 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
STP Room CCT 1 72.90 1.50 - - - 109.35 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 70.70 0.10 - - - - - - - - - - - - - - - - 7.07 - -
Acrylic paint above tile cladding area CP IAP 1 72.90 4.50 4.50 328.05 - - - - - - - - - - 328.05 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
AC Plant Room CCT 1 132.00 1.50 - - - 198.00 - - - - - - - - - - - - - - -
Deduct D2 CCT -3 2.20 1.50 - - - -9.90 - - - - - - - - - - - - - - -
Add jams for D2 CCT 3 3.00 0.10 - - - 0.90 - - - - - - - - - - - - - - -
Granite skirting KS 1 129.80 0.10 - - - - - - - - - - - - - - - - 12.98 - -
Acrylic paint above tile cladding area CP IAP 1 132.00 4.50 4.50 594.00 - - - - - - - - - - 594.00 - - - - - - -
Deduct D2 CP IAP -3 2.20 0.60 0.60 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D2 CP IAP 3 3.40 0.10 0.10 1.02 - - - - - - - - - - 1.02 - - - - - - -
Electrical Panel Room CCT 1 100.20 1.50 - - - 150.30 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 98.00 0.10 - - - - - - - - - - - - - - - - 9.80 - -
Acrylic paint above tile cladding area CP IAP 1 100.20 4.50 4.50 450.90 - - - - - - - - - - 450.90 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Services-Fan Room CCT 1 27.40 1.50 - - - 41.10 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
Acrylic paint above tile cladding area CP IAP 1 27.40 2.70 2.70 73.98 - - - - - - - - - - 73.98 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
Pump Room CCT 1 80.60 1.50 - - - 120.90 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 78.40 0.10 - - - - - - - - - - - - - - - - 7.84 - -
Acrylic paint above tile cladding area CP IAP 1 80.60 4.50 4.50 362.70 - - - - - - - - - - 362.70 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
d Other Staircases - - - - - - - - - - - - - -
ST-18,ST-17,ST-15,ST-14,ST-13,ST-12, ST-16 CP IAP 1 146.90 4.20 4.20 616.98 - - - - - - - - - - 616.98 - - - - - - -
Skirting ST-18,ST-17,ST-15,ST-14,ST-13,ST-12, SCGS 1 146.90 0.10 - - - - - - - - - - - - - - 14.69 - - -
e UG Tanks - - - - - - - - - - - - - -
UG Water Tanks - Ceramic tile full height CCT 1 159.29 3.70 - - - 589.37 - - - - - - - - - - - - - - -
Soft water & Flushing water - Ceramic tile full CCT 1 79.14 3.70 - - - 292.82 - - - - - - - - - - - - - - -
f Inside Ducts - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.35 4.35 89.18 - - - - - - - - - - - - 89.18 - - - - -
SH-02 CP ICP 1 3.60 4.35 4.35 15.66 - - - - - - - - - - - - 15.66 - - - - -
SH-03 CP ICP 1 11.60 4.35 4.35 50.46 - - - - - - - - - - - - 50.46 - - - - -
SH-04 CP ICP 4 4.60 4.35 4.35 80.04 - - - - - - - - - - - - 80.04 - - - - -
SH-05 CP ICP 1 13.40 4.35 4.35 58.29 - - - - - - - - - - - - 58.29 - - - - -
SH-06 CP ICP 1 18.70 4.35 4.35 81.35 - - - - - - - - - - - - 81.35 - - - - -
SH-07 CP ICP 1 21.00 4.35 4.35 91.35 - - - - - - - - - - - - 91.35 - - - - -
SH-08 CP ICP 1 4.60 4.35 4.35 20.01 - - - - - - - - - - - - 20.01 - - - - -
SH-09 CP ICP 1 4.60 4.35 4.35 20.01 - - - - - - - - - - - - 20.01 - - - - -
SH-10 CP ICP 1 4.60 4.35 4.35 20.01 - - - - - - - - - - - - 20.01 - - - - -
SH-11 CP ICP 1 8.00 4.35 4.35 34.80 - - - - - - - - - - - - 34.80 - - - - -
SH-12 CP ICP 1 8.10 4.35 4.35 35.24 - - - - - - - - - - - - 35.24 - - - - -
SH-13 CP ICP 1 8.14 4.35 4.35 35.41 - - - - - - - - - - - - 35.41 - - - - -
SH-14 CP ICP 1 8.40 4.35 4.35 36.54 - - - - - - - - - - - - 36.54 - - - - -
SH-15 CP ICP 1 7.80 4.35 4.35 33.93 - - - - - - - - - - - - 33.93 - - - - -
SH-16 CP ICP 1 7.40 4.35 4.35 32.19 - - - - - - - - - - - - 32.19 - - - - -
SH-17 CP ICP 1 6.60 4.35 4.35 28.71 - - - - - - - - - - - - 28.71 - - - - -
SH-18 CP ICP 1 7.70 4.35 4.35 33.50 - - - - - - - - - - - - 33.50 - - - - -
SH-19 CP ICP 1 7.40 4.35 4.35 32.19 - - - - - - - - - - - - 32.19 - - - - -
SH-20 CP ICP 1 8.40 4.35 4.35 36.54 - - - - - - - - - - - - 36.54 - - - - -
SH-21 CP ICP 10 4.60 4.35 4.35 200.10 - - - - - - - - - - - - 200.10 - - - - -
SH-22 CP ICP 2 5.00 4.35 4.35 43.50 - - - - - - - - - - - - 43.50 - - - - -
SH-23 CP ICP 1 5.20 4.35 4.35 22.62 - - - - - - - - - - - - 22.62 - - - - -
SH-24 CP ICP 1 11.20 4.35 4.35 48.72 - - - - - - - - - - - - 48.72 - - - - -
SH-25 CP ICP 1 5.00 4.35 4.35 21.75 - - - - - - - - - - - - 21.75 - - - - -
SH-26 CP ICP 1 4.60 4.35 4.35 20.01 - - - - - - - - - - - - 20.01 - - - - -
SH-27 CP ICP 3 4.60 4.35 4.35 60.03 - - - - - - - - - - - - 60.03 - - - - -
SH-28 CP ICP 2 5.00 4.35 4.35 43.50 - - - - - - - - - - - - 43.50 - - - - -
SH-29 CP ICP 1 10.80 4.35 4.35 46.98 - - - - - - - - - - - - 46.98 - - - - -
SH-30 CP ICP 1 6.20 4.35 4.35 26.97 - - - - - - - - - - - - 26.97 - - - - -
SH-31 CP ICP 1 10.50 4.35 4.35 45.68 - - - - - - - - - - - - 45.68 - - - - -
SH-32 CP ICP 1 17.60 4.35 4.35 76.56 - - - - - - - - - - - - 76.56 - - - - -
SH-33 CP ICP 1 10.84 4.35 4.35 47.15 - - - - - - - - - - - - 47.15 - - - - -
SH-34 CP ICP 2 19.72 4.35 4.35 171.56 - - - - - - - - - - - - 171.56 - - - - -
SH-35 CP ICP 2 19.72 4.35 4.35 171.56 - - - - - - - - - - - - 171.56 - - - - -
SH-36 CP ICP 1 15.36 4.35 4.35 66.82 - - - - - - - - - - - - 66.82 - - - - -
SH-37 CP ICP 1 17.90 4.35 4.35 77.87 - - - - - - - - - - - - 77.87 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Basement Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING/SKIRTING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion & Paint & Cement Remarks
Sl.No Work Description/Location dding Type Nos (m) Height Height Cladding composite
Cladding Cladding & Cladding & panels saint Stone Surface & with Primer Woks Paint Coping Skirting Skirting Skirting Counter
Type (m) 30mm & 18mm & Plaster Plaster gobain Cladding Plaster Putty POP Works Works Works Works Works
(m) cladding
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-38 CP ICP 1 3.44 4.35 4.35 14.96 - - - - - - - - - - - - 14.96 - - - - -
SH-39 CP ICP 1 3.60 4.35 4.35 15.66 - - - - - - - - - - - - 15.66 - - - - -
SH-40 CP ICP 3 4.60 4.35 4.35 60.03 - - - - - - - - - - - - 60.03 - - - - -
SH-41 CP ICP 10 8.00 4.35 4.35 348.00 - - - - - - - - - - - - 348.00 - - - - -
SH-42 CP ICP 1 6.20 4.35 4.35 26.97 - - - - - - - - - - - - 26.97 - - - - -
SH-43 CP ICP 2 4.60 4.35 4.35 40.02 - - - - - - - - - - - - 40.02 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.35 4.35 1,211.04 - - - - - - - - - - - - 1,211.04 - - - - -
Total Quantity 10,714.78 224.70 291.84 2,022.04 - - - - - 2,300.31 - 8,444.64 413.76 3,773.45 - 14.69 77.01 - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ground Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Parking Area
Building-A - lobby for office, ST-01 & Lifts oi CGW 1 21.00 1.20 - - 25.20 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 21.00 2.65 2.65 55.65 - - - - - - - - - - 55.65 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D2 CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Lobby for HSR,ST-02 Security Control & ServiCGW 1 22.80 1.20 - - 27.36 - - - - - - - - - - - - - - - -
Deduct D4 CGW -1 1.00 1.20 - - -1.20 - - - - - - - - - - - - - - - -
Add jams for D4 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 22.80 2.65 2.65 60.42 - - - - - - - - - - 60.42 - - - - - - -
Deduct D4 CP IAP -1 1.00 0.90 0.90 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D4 CP IAP 1 2.80 0.10 0.10 0.28 - - - - - - - - - - 0.28 - - - - - - -
Staircase - ST-18 CGW 1 30.60 1.20 - - 36.72 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 30.60 2.65 2.65 81.09 - - - - - - - - - - 81.09 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building-A - lobby for office, ST-03 & ServicesCGW 1 62.40 1.20 - - 74.88 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 62.40 2.65 2.65 165.36 - - - - - - - - - - 165.36 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CGW 1 62.00 1.20 - - 74.40 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 62.00 2.65 2.65 164.30 - - - - - - - - - - 164.30 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Lobby for HSR, ST-05 & Services CGW 1 96.90 1.20 - - 116.28 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D4 CGW -1 1.00 1.20 - - -1.20 - - - - - - - - - - - - - - - -
Add jams for D4 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 96.90 2.65 2.65 256.79 - - - - - - - - - - 256.79 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - -1.35 - - - - - - -
Add jams for D3 CP IAP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - 0.33 - - - - - - -
Deduct D4 CP IAP -1 1.00 0.90 0.90 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D4 CP IAP 1 2.80 0.10 0.10 0.28 - - - - - - - - - - 0.28 - - - - - - -
Staircase -ST-06 & Lobby Area CGW 1 52.20 1.20 - - 62.64 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D2 CGW -3 2.20 1.20 - - -7.92 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 3 2.40 0.10 - - 0.72 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 52.20 2.65 2.65 138.33 - - - - - - - - - - 138.33 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ground Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D2 CP IAP -3 2.20 0.90 0.90 -5.94 - - - - - - - - - - -5.94 - - - - - - -
Add jams for D2 CP IAP 3 4.00 0.10 0.10 1.20 - - - - - - - - - - 1.20 - - - - - - -
Staircase - ST-14 CGW 1 34.50 1.20 - - 41.40 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 34.50 2.65 2.65 91.43 - - - - - - - - - - 91.43 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-13 & ST-09 CGW 1 27.90 1.20 - - 33.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.90 2.65 2.65 73.94 - - - - - - - - - - 73.94 - - - - - - -
Staircase - ST-12 & Lift lobby outside CGW 1 51.30 1.20 - - 61.56 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 51.30 2.65 2.65 135.95 - - - - - - - - - - 135.95 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D2 CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Substation outside CGW 1 16.80 1.20 - - 20.16 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 16.80 2.65 2.65 44.52 - - - - - - - - - - 44.52 - - - - - - -
Brickwork area CGW 1 42.60 1.20 - - 51.12 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 42.60 2.65 2.65 112.89 - - - - - - - - - - 112.89 - - - - - - -
Louvers Area full upto 1.20m cladding CGW 1 158.10 1.20 - - 189.72 - - - - - - - - - - - - - - - -
Louvers Area full above 0.30m coping works CGC 1 158.10 0.30 - - - - - - - - - - - - - - 47.43 - - - -
Structural glazing Area full upto 0.75m claddCGW 1 112.30 0.75 - - 84.23 - - - - - - - - - - - - - - - -
Structural glazing Area above 0.30m coping wCGC 1 112.30 0.30 - - - - - - - - - - - - - - 33.69 - - - -
Parking Area Columns Epoxy & Acrylic Paint - - - - - - - - - - - - - - - - - - -
C2 - 1.2m epoxy paint IEP 24.00 2.51 1.20 - - - - - - - - - 72.35 - - - - - - - - -
C2 IAP 24.00 2.51 2.80 - - - - - - - - - - - 168.81 - - - - - - -
C5 IEP 2.00 2.10 1.20 - - - - - - - - - 5.04 - - - - - - - - -
C5 IAP 2.00 2.10 2.80 - - - - - - - - - - - 11.76 - - - - - - -
C6 IEP 7.00 3.00 1.20 - - - - - - - - - 25.20 - - - - - - - - -
C6 IAP 7.00 3.00 2.80 - - - - - - - - - - - 58.80 - - - - - - -
C7 IEP 61.00 3.00 1.20 - - - - - - - - - 219.60 - - - - - - - - -
C7 IAP 61.00 3.00 2.80 - - - - - - - - - - - 512.40 - - - - - - -
C8 IEP 15.00 4.40 1.20 - - - - - - - - - 79.20 - - - - - - - - -
C8 IAP 15.00 4.40 2.80 - - - - - - - - - - - 184.80 - - - - - - -
C9 IEP 12.00 2.80 1.20 - - - - - - - - - 40.32 - - - - - - - - -
C9 IAP 12.00 2.80 2.80 - - - - - - - - - - - 94.08 - - - - - - -
C1 - ACP Cladding full height CACP 16.00 2.51 3.85 - - - - - 154.74 - - - - - - - - - - - - -
C3 CACP 6.00 2.51 3.85 - - - - - 58.03 - - - - - - - - - - - - -
C4 CACP 29.00 2.51 3.85 - - - - - 280.46 - - - - - - - - - - - - -
C6 CACP 4.00 3.00 3.85 - - - - - 46.20 - - - - - - - - - - - - -
C7 CACP 9.00 3.00 3.85 - - - - - 103.95 - - - - - - - - - - - - -
C8 CACP 8.00 4.40 3.85 - - - - - 135.52 - - - - - - - - - - - - -
RC1 CACP 16 2.51 3.85 - - - - - 154.74 - - - - - - - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 3.85 - 61.60 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 26.40 1.20 - - 31.68 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.40 2.65 2.65 69.96 - - - - - - - - - - - 69.96 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ground Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 25.40 1.20 - - 30.48 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.40 2.65 2.65 67.31 - - - - - - - - - - 67.31 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 3.85 - 59.68 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.65 2.65 61.75 - - - - - - - - - - - 61.75 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.65 2.65 73.14 - - - - - - - - - - 73.14 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 3.85 - 40.43 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.65 2.65 59.36 - - - - - - - - - - - 59.36 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.50 1.20 - - 31.80 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.50 2.65 2.65 70.23 - - - - - - - - - - 70.23 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 3.85 - 40.43 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.30 1.20 - - 26.76 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.30 2.65 2.65 59.10 - - - - - - - - - - - 59.10 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.65 2.65 68.11 - - - - - - - - - - 68.11 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ground Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.65 2.65 68.64 - - - - - - - - - - 68.64 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Staircase - ST-18 CGW 1 22.80 1.20 - - 27.36 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.65 2.65 68.64 - - - - - - - - - - 68.64 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-06 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 9.40 3.85 - 36.19 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -3 1.20 2.40 - -8.64 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 3 6.00 0.20 - 3.60 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.70 1.20 - - 27.24 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.70 2.65 2.65 60.16 - - - - - - - - - - - 60.16 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-06 CGW 1 26.10 3.85 - - 100.49 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.10 2.65 2.65 69.17 - - - - - - - - - - 69.17 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Backside Lift Lobby Area - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 5.00 3.85 - 19.25 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -2 1.20 2.40 - -5.76 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 2 6.00 0.20 - 2.40 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 38.50 1.20 - - 46.20 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 38.50 2.65 2.65 102.03 - - - - - - - - - - - 102.03 - - - - - -
Deduct D2 CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D2 CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CCT 1 18.60 1.50 - - - 27.90 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
Acrylic paint above tile cladding area CP IAP 1 18.60 2.25 2.25 41.85 - - - - - - - - - - 41.85 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
ST-01 Services control Room CCT 1 13.70 1.50 - - - 20.55 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 11.50 0.10 - - - - - - - - - - - - - - - - 1.15 - -
Acrylic paint above tile cladding area CP IAP 1 13.70 2.25 2.25 30.83 - - - - - - - - - - 30.83 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
Services Electrical Room near ST-03 CCT 1 14.40 1.50 - - - 21.60 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 12.90 0.10 - - - - - - - - - - - - - - - - 1.29 - -
Acrylic paint above tile cladding area CP IAP 1 14.40 2.25 2.25 32.40 - - - - - - - - - - 32.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services Electrical Room near ST-05 CCT 1 18.30 1.50 - - - 27.45 - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ground Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 16.80 0.10 - - - - - - - - - - - - - - - - 1.68 - -
Acrylic paint above tile cladding area CP IAP 1 18.30 2.25 2.25 41.18 - - - - - - - - - - 41.18 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services control room, 01& 02 CCT 1 91.30 1.50 - - - 136.95 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 89.10 0.10 - - - - - - - - - - - - - - - - 8.91 - -
Acrylic paint above tile cladding area CP IAP 1 91.30 2.25 2.25 205.43 - - - - - - - - - - 205.43 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
d Other Staircases - - - - - - -
ST-07, ST-08, ST-15, ST-10, ST-17, ST-12, ST-13,CP IAP 1 214.00 3.85 3.85 823.90 - - - - - - - - - - 823.90 - - - - - - -
ST-07, ST-08, ST-15, ST-10, ST-17, ST-12, ST-13,CGS 1 214.00 0.10 - - - - - - - - - - - - - - 21.40 - - -
e Sub stations - - - - - - -
Sub stations CP IAP 1 199.40 3.85 3.85 767.69 - - - - - - - - - - 767.69 - - - - - - -
f Toilets - - - - - - -
Toilet Aea CVT 1 47.80 3.85 - - - - 184.03 - - - - - - - - - - - - - -
Granite coping above ledge wall CGC 1 7.00 0.30 - - - - - - - - - - - - - - 2.10 - - - -
Wash basin counter CGP 1 7.80 0.60 - - - - - - - - - - - - - - - - - - 4.68
g Inside Ducts - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-06 CP ICP 1 18.70 4.00 4.00 74.80 - - - - - - - - - - - - 74.80 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-08 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-14 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 10 4.60 4.00 4.00 184.00 - - - - - - - - - - - - 184.00 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-27 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-31 CP ICP 1 10.50 4.00 4.00 42.00 - - - - - - - - - - - - 42.00 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-37 CP ICP 1 17.90 4.00 4.00 71.60 - - - - - - - - - - - - 71.60 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-40 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ground Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-41 CP ICP 10 8.00 4.00 4.00 320.00 - - - - - - - - - - - - 320.00 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 7,586.36 218.93 1,274.79 219.60 184.03 933.64 - - - 441.71 - 4,786.87 397.10 3,433.04 83.22 21.40 14.74 - 4.68
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - First Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Parking Area
Building-A - lobby for office, ST-01 & Lifts oi CGW 1 23.20 1.20 - - 27.84 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 23.20 2.05 2.05 47.56 - - - - - - - - - - 47.56 - - - - - - -
Lobby for HSR,ST-02 Security Control & ServiCGW 1 26.90 1.20 - - 32.28 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.90 2.05 2.05 55.15 - - - - - - - - - - 55.15 - - - - - - -
Building-A - lobby for office, ST-03 & ServicesCGW 1 62.40 1.20 - - 74.88 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 62.40 2.05 2.05 127.92 - - - - - - - - - - 127.92 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CGW 1 62.00 1.20 - - 74.40 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 62.00 2.05 2.05 127.10 - - - - - - - - - - 127.10 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Lobby for HSR, ST-05 & Services CGW 1 98.10 1.20 - - 117.72 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 98.10 2.05 2.05 201.11 - - - - - - - - - - 201.11 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - -1.35 - - - - - - -
Add jams for D3 CP IAP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - 0.33 - - - - - - -
Staircase -ST-06 & Lobby Area CGW 1 52.20 1.20 - - 62.64 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D2 CGW -3 2.20 1.20 - - -7.92 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 3 2.40 0.10 - - 0.72 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 52.20 2.05 2.05 107.01 - - - - - - - - - - 107.01 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D2 CP IAP -3 2.20 0.90 0.90 -5.94 - - - - - - - - - - -5.94 - - - - - - -
Add jams for D2 CP IAP 3 4.00 0.10 0.10 1.20 - - - - - - - - - - 1.20 - - - - - - -
SH-40,SH-37, SH-21, SH-23 ducts outside CGW 1 43.70 1.20 - - 52.44 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 43.70 2.05 2.05 89.59 - - - - - - - - - - 89.59 - - - - - - -
ST-09 CGW 1 12.10 1.20 - - 14.52 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 12.10 2.05 2.65 24.81 - - - - - - - - - - 32.07 - - - - - - -
Staircase - ST-12 & Lift lobby outside CGW 1 45.40 1.20 - - 54.48 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 45.40 2.05 2.05 93.07 - - - - - - - - - - 93.07 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D2 CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Brickwork area CGW 1 52.25 1.20 - - 62.70 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 52.25 2.05 2.05 107.11 - - - - - - - - - - 107.11 - - - - - - -
Louvers Area full upto 1.20m cladding CGW 1 209.30 1.20 - - 251.16 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - First Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Louvers Area full above 0.30m coping works CGC 1 209.30 0.30 - - - - - - - - - - - - - - 62.79 - - - -
Structural glazing Area full upto 0.75m claddCGW 1 96.70 0.75 - - 72.53 - - - - - - - - - - - - - - - -
Structural glazing Area above 0.30m coping wCGC 1 96.70 0.30 - - - - - - - - - - - - - - 29.01 - - - -
Parking Area Columns Epoxy & Acrylic Paint - - - - - - - - - - - - - - - - - - -
C2 - 1.2m epoxy paint IEP 24.00 2.51 1.20 - - - - - - - - - 72.35 - - - - - - - - -
C2 IAP 24.00 2.51 2.20 - - - - - - - - - - - 132.63 - - - - - - -
C5 IEP 2.00 2.10 1.20 - - - - - - - - - 5.04 - - - - - - - - -
C5 IAP 2.00 2.10 2.20 - - - - - - - - - - - 9.24 - - - - - - -
C6 IEP 7.00 3.00 1.20 - - - - - - - - - 25.20 - - - - - - - - -
C6 IAP 7.00 3.00 2.20 - - - - - - - - - - - 46.20 - - - - - - -
C7 IEP 61.00 3.00 1.20 - - - - - - - - - 219.60 - - - - - - - - -
C7 IAP 61.00 3.00 2.20 - - - - - - - - - - - 402.60 - - - - - - -
C8 IEP 15.00 4.40 1.20 - - - - - - - - - 79.20 - - - - - - - - -
C8 IAP 15.00 4.40 2.20 - - - - - - - - - - - 145.20 - - - - - - -
C9 IEP 12.00 2.80 1.20 - - - - - - - - - 40.32 - - - - - - - - -
C9 IAP 12.00 2.80 2.20 - - - - - - - - - - - 73.92 - - - - - - -
C1 - ACP Cladding full height CACP 16.00 2.51 3.25 - - - - - 130.62 - - - - - - - - - - - - -
C3 CACP 6.00 2.51 3.25 - - - - - 48.98 - - - - - - - - - - - - -
C4 CACP 29.00 2.51 3.25 - - - - - 236.76 - - - - - - - - - - - - -
C6 CACP 4.00 3.00 3.25 - - - - - 39.00 - - - - - - - - - - - - -
C7 CACP 9.00 3.00 3.25 - - - - - 87.75 - - - - - - - - - - - - -
C8 CACP 8.00 4.40 3.25 - - - - - 114.40 - - - - - - - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 3.25 - 52.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 26.40 1.20 - - 31.68 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.40 2.05 2.05 54.12 - - - - - - - - - - - 54.12 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 25.40 1.20 - - 30.48 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.40 2.05 2.05 52.07 - - - - - - - - - - 52.07 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 3.25 - 50.38 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.05 2.05 47.77 - - - - - - - - - - - 47.77 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - First Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.05 2.05 56.58 - - - - - - - - - - 56.58 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 3.25 - 34.13 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.05 2.05 45.92 - - - - - - - - - - - 45.92 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.50 1.20 - - 31.80 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.50 2.05 2.05 54.33 - - - - - - - - - - 54.33 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 3.25 - 34.13 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.30 1.20 - - 26.76 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.30 2.05 2.05 45.72 - - - - - - - - - - - 45.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.05 2.05 52.69 - - - - - - - - - - 52.69 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.05 2.05 53.10 - - - - - - - - - - 53.10 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-06 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 9.40 3.25 - 30.55 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -3 1.20 2.40 - -8.64 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 3 6.00 0.20 - 3.60 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.70 1.20 - - 27.24 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.70 2.05 2.05 46.54 - - - - - - - - - - - 46.54 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-06 CGW 1 26.10 1.20 - - 31.32 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.10 2.05 2.05 53.51 - - - - - - - - - - 53.51 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Backside Lift Lobby Area - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - First Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Dry Cladding on Lift Opening Area CGD 1 5.00 3.25 - 16.25 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -2 1.20 2.40 - -5.76 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 2 6.00 0.20 - 2.40 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 38.50 1.20 - - 46.20 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 38.50 2.05 2.05 78.93 - - - - - - - - - - - 78.93 - - - - - -
Deduct D2 CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D2 CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CCT 1 18.60 1.50 - - - 27.90 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
Acrylic paint above tile cladding area CP IAP 1 18.60 1.65 1.65 30.69 - - - - - - - - - - 30.69 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services Electrical Room near ST-03 CCT 1 14.40 1.50 - - - 21.60 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 12.90 0.10 - - - - - - - - - - - - - - - - 1.29 - -
Acrylic paint above tile cladding area CP IAP 1 14.40 1.65 1.65 23.76 - - - - - - - - - - 23.76 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services Electrical Room near ST-05 CCT 1 18.30 1.50 - - - 27.45 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 16.80 0.10 - - - - - - - - - - - - - - - - 1.68 - -
Acrylic paint above tile cladding area CP IAP 1 18.30 1.65 1.65 30.20 - - - - - - - - - - 30.20 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services control room, 01& 02 CCT 1 91.30 1.50 - - - 136.95 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 89.10 0.10 - - - - - - - - - - - - - - - - 8.91 - -
Acrylic paint above tile cladding area CP IAP 1 91.30 1.65 1.65 150.65 - - - - - - - - - - 150.65 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
d Other Staircases - - - - - - -
ST-07, ST-08, ST-09, ST-10 CP IAP 1 95.40 3.25 3.25 310.05 - - - - - - - - - - 310.05 - - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-10 CGS 1 95.40 0.10 - - - - - - - - - - - - - - 9.54 - - -
e Inside Ducts - - - - - - -
SH-01 CP ICP 1 20.50 3.40 3.40 69.70 - - - - - - - - - - - - 69.70 - - - - -
SH-02 CP ICP 1 3.60 3.40 3.40 12.24 - - - - - - - - - - - - 12.24 - - - - -
SH-03 CP ICP 1 11.60 3.40 3.40 39.44 - - - - - - - - - - - - 39.44 - - - - -
SH-04 CP ICP 2 4.60 3.40 3.40 31.28 - - - - - - - - - - - - 31.28 - - - - -
SH-05 CP ICP 1 13.40 3.40 3.40 45.56 - - - - - - - - - - - - 45.56 - - - - -
SH-06 CP ICP 1 18.70 3.40 3.40 63.58 - - - - - - - - - - - - 63.58 - - - - -
SH-07 CP ICP 1 21.00 3.40 3.40 71.40 - - - - - - - - - - - - 71.40 - - - - -
SH-08 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-09 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-10 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-11 CP ICP 1 8.00 3.40 3.40 27.20 - - - - - - - - - - - - 27.20 - - - - -
SH-12 CP ICP 1 8.10 3.40 3.40 27.54 - - - - - - - - - - - - 27.54 - - - - -
SH-13 CP ICP 1 8.14 3.40 3.40 27.68 - - - - - - - - - - - - 27.68 - - - - -
SH-14 CP ICP 1 8.40 3.40 3.40 28.56 - - - - - - - - - - - - 28.56 - - - - -
SH-15 CP ICP 1 7.80 3.40 3.40 26.52 - - - - - - - - - - - - 26.52 - - - - -
SH-16 CP ICP 1 7.40 3.40 3.40 25.16 - - - - - - - - - - - - 25.16 - - - - -
SH-17 CP ICP 1 6.60 3.40 3.40 22.44 - - - - - - - - - - - - 22.44 - - - - -
SH-18 CP ICP 1 7.70 3.40 3.40 26.18 - - - - - - - - - - - - 26.18 - - - - -
SH-19 CP ICP 1 7.40 3.40 3.40 25.16 - - - - - - - - - - - - 25.16 - - - - -
SH-20 CP ICP 1 8.40 3.40 3.40 28.56 - - - - - - - - - - - - 28.56 - - - - -
SH-21 CP ICP 10 4.60 3.40 3.40 156.40 - - - - - - - - - - - - 156.40 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - First Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-22 CP ICP 2 5.00 3.40 3.40 34.00 - - - - - - - - - - - - 34.00 - - - - -
SH-23 CP ICP 1 5.20 3.40 3.40 17.68 - - - - - - - - - - - - 17.68 - - - - -
SH-24 CP ICP 1 11.20 3.40 3.40 38.08 - - - - - - - - - - - - 38.08 - - - - -
SH-25 CP ICP 1 5.00 3.40 3.40 17.00 - - - - - - - - - - - - 17.00 - - - - -
SH-26 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-27 CP ICP 3 4.60 3.40 3.40 46.92 - - - - - - - - - - - - 46.92 - - - - -
SH-28 CP ICP 2 5.00 3.40 3.40 34.00 - - - - - - - - - - - - 34.00 - - - - -
SH-29 CP ICP 1 10.80 3.40 3.40 36.72 - - - - - - - - - - - - 36.72 - - - - -
SH-30 CP ICP 1 6.20 3.40 3.40 21.08 - - - - - - - - - - - - 21.08 - - - - -
SH-31 CP ICP 1 10.50 3.40 3.40 35.70 - - - - - - - - - - - - 35.70 - - - - -
SH-32 CP ICP 1 17.60 3.40 3.40 59.84 - - - - - - - - - - - - 59.84 - - - - -
SH-33 CP ICP 1 10.84 3.40 3.40 36.86 - - - - - - - - - - - - 36.86 - - - - -
SH-34 CP ICP 2 19.72 3.40 3.40 134.10 - - - - - - - - - - - - 134.10 - - - - -
SH-35 CP ICP 2 19.72 3.40 3.40 134.10 - - - - - - - - - - - - 134.10 - - - - -
SH-36 CP ICP 1 15.36 3.40 3.40 52.22 - - - - - - - - - - - - 52.22 - - - - -
SH-37 CP ICP 1 17.90 3.40 3.40 60.86 - - - - - - - - - - - - 60.86 - - - - -
SH-38 CP ICP 1 3.44 3.40 3.40 11.70 - - - - - - - - - - - - 11.70 - - - - -
SH-39 CP ICP 1 3.60 3.40 3.40 12.24 - - - - - - - - - - - - 12.24 - - - - -
SH-40 CP ICP 3 4.60 3.40 3.40 46.92 - - - - - - - - - - - - 46.92 - - - - -
SH-41 CP ICP 10 8.00 3.40 3.40 272.00 - - - - - - - - - - - - 272.00 - - - - -
SH-42 CP ICP 1 6.20 3.40 3.40 21.08 - - - - - - - - - - - - 21.08 - - - - -
SH-43 CP ICP 2 4.60 3.40 3.40 31.28 - - - - - - - - - - - - 31.28 - - - - -
Lift Shafts inside CP ICP 1 278.40 3.40 3.40 946.56 - - - - - - - - - - - - 946.56 - - - - -
Total Quantity 5,027.05 178.79 1,190.63 202.05 - 657.51 - - - 441.71 - 2,622.28 303.74 2,918.08 91.80 9.54 13.59 - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Second Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Parking Area
Building-A - lobby for office, ST-01 & Lifts oi CGW 1 35.10 1.20 - - 42.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 35.10 2.05 2.05 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Lobby for HSR,ST-02 Security Control & ServiCGW 1 38.50 1.20 - - 46.20 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 38.50 2.05 2.05 78.93 - - - - - - - - - - 78.93 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building-A - lobby for office, ST-03 & ServicesCGW 1 54.60 1.20 - - 65.52 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 54.60 2.05 2.05 111.93 - - - - - - - - - - 111.93 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - -1.35 - - - - - - -
Add jams for D3 CP IAP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - 0.33 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CGW 1 56.50 1.20 - - 67.80 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 56.50 2.05 2.05 115.83 - - - - - - - - - - 115.83 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Lobby for HSR, ST-05 & Services CGW 1 102.50 1.20 - - 123.00 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 102.50 2.05 2.05 210.13 - - - - - - - - - - 210.13 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - -1.35 - - - - - - -
Add jams for D3 CP IAP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - 0.33 - - - - - - -
Staircase -ST-06 & Lobby Area CGW 1 84.00 1.20 - - 100.80 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D2 CGW -3 2.20 1.20 - - -7.92 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 3 2.40 0.10 - - 0.72 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 84.00 2.05 2.05 172.20 - - - - - - - - - - 172.20 - - - - - - -
Deduct D1b CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1b CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Deduct D2 CP IAP -3 2.20 0.90 0.90 -5.94 - - - - - - - - - - -5.94 - - - - - - -
Add jams for D2 CP IAP 3 4.00 0.10 0.10 1.20 - - - - - - - - - - 1.20 - - - - - - -
SH-40,SH-37, SH-21, SH-23 ducts outside CGW 1 43.70 1.20 - - 52.44 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Second Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Acrylic Paint above wet cladding area CP IAP 1 43.70 2.05 2.05 89.59 - - - - - - - - - - 89.59 - - - - - - -
ST-09 CGW 1 12.10 1.20 - - 14.52 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 12.10 2.05 2.65 24.81 - - - - - - - - - - 32.07 - - - - - - -
Staircase - ST-12 & Lift lobby outside CGW 1 61.80 1.20 - - 74.16 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 61.80 2.05 2.05 126.69 - - - - - - - - - - 126.69 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D2 CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Brickwork area CGW 1 55.00 1.20 - - 66.00 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 55.00 2.05 2.05 112.75 - - - - - - - - - - 112.75 - - - - - - -
Louvers Area full upto 1.20m cladding CGW 1 307.70 1.20 - - 369.24 - - - - - - - - - - - - - - - -
Louvers Area full above 0.30m coping works CGC 1 307.70 0.30 - - - - - - - - - - - - - - 92.31 - - - -
Structural glazing Area full upto 0.75m claddCGW 1 96.90 0.75 - - 72.68 - - - - - - - - - - - - - - - -
Structural glazing Area above 0.30m coping wCGC 1 96.90 0.30 - - - - - - - - - - - - - - 29.07 - - - -
Parking Area Columns Epoxy & Acrylic Paint - - - - - - - - - - - - - - - - - - -
C2 - 1.2m epoxy paint IEP 33.00 2.51 1.20 - - - - - - - - - 99.48 - - - - - - - - -
C2 IAP 33.00 2.51 2.20 - - - - - - - - - - - 182.37 - - - - - - -
C5 IEP 2.00 2.10 1.20 - - - - - - - - - 5.04 - - - - - - - - -
C5 IAP 2.00 2.10 2.20 - - - - - - - - - - - 9.24 - - - - - - -
C6 IEP 7.00 3.00 1.20 - - - - - - - - - 25.20 - - - - - - - - -
C6 IAP 7.00 3.00 2.20 - - - - - - - - - - - 46.20 - - - - - - -
C7 IEP 61.00 3.00 1.20 - - - - - - - - - 219.60 - - - - - - - - -
C7 IAP 61.00 3.00 2.20 - - - - - - - - - - - 402.60 - - - - - - -
C8 IEP 15.00 4.40 1.20 - - - - - - - - - 79.20 - - - - - - - - -
C8 IAP 15.00 4.40 2.20 - - - - - - - - - - - 145.20 - - - - - - -
C9 IEP 12.00 2.80 1.20 - - - - - - - - - 40.32 - - - - - - - - -
C9 IAP 12.00 2.80 2.20 - - - - - - - - - - - 73.92 - - - - - - -
C1 - ACP Cladding full height CACP 9.00 2.51 3.25 - - - - - 73.48 - - - - - - - - - - - - -
C3 CACP 6.00 2.51 3.25 - - - - - 48.98 - - - - - - - - - - - - -
C4 CACP 20.00 2.51 3.25 - - - - - 163.28 - - - - - - - - - - - - -
C6 CACP 4.00 3.00 3.25 - - - - - 39.00 - - - - - - - - - - - - -
C7 CACP 9.00 3.00 3.25 - - - - - 87.75 - - - - - - - - - - - - -
C8 CACP 8.00 4.40 3.25 - - - - - 114.40 - - - - - - - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 3.25 - 52.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 26.40 1.20 - - 31.68 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.40 2.05 2.05 54.12 - - - - - - - - - - - 54.12 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 25.40 1.20 - - 30.48 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.40 2.05 2.05 52.07 - - - - - - - - - - 52.07 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 3.25 - 50.38 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Second Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.05 2.05 47.77 - - - - - - - - - - - 47.77 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.05 2.05 56.58 - - - - - - - - - - 56.58 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 3.25 - 34.13 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.05 2.05 45.92 - - - - - - - - - - - 45.92 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.50 1.20 - - 31.80 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.50 2.05 2.05 54.33 - - - - - - - - - - 54.33 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 3.25 - 34.13 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.30 1.20 - - 26.76 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.30 2.05 2.05 45.72 - - - - - - - - - - - 45.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.05 2.05 52.69 - - - - - - - - - - 52.69 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.05 2.05 53.10 - - - - - - - - - - 53.10 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-06 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 9.40 3.25 - 30.55 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -3 1.20 2.40 - -8.64 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 3 6.00 0.20 - 3.60 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.70 1.20 - - 27.24 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Second Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Designer Paint above wet cladding area CP IDP 1 22.70 2.05 2.05 46.54 - - - - - - - - - - - 46.54 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-06 CGW 1 26.10 1.20 - - 31.32 - - - - - - - - - - - - - - - -
Deduct D1a CGW -2 2.20 1.20 - - -5.28 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 2 2.40 0.10 - - 0.48 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.10 2.05 2.05 53.51 - - - - - - - - - - 53.51 - - - - - - -
Deduct D1a CP IAP -2 2.20 0.90 0.90 -3.96 - - - - - - - - - - -3.96 - - - - - - -
Add jams for D1a CP IAP 2 4.00 0.10 0.10 0.80 - - - - - - - - - - 0.80 - - - - - - -
Backside Lift Lobby Area - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 5.00 3.25 - 16.25 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -2 1.20 2.40 - -5.76 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 2 6.00 0.20 - 2.40 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 56.30 1.20 - - 67.56 - - - - - - - - - - - - - - - -
Deduct D2 CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 56.30 2.05 2.05 115.42 - - - - - - - - - - - 115.42 - - - - - -
Deduct D2 CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D2 CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CCT 1 18.60 1.50 - - - 27.90 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
Acrylic paint above tile cladding area CP IAP 1 18.60 1.65 1.65 30.69 - - - - - - - - - - 30.69 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services Electrical Room near ST-03 CCT 1 14.40 1.50 - - - 21.60 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 12.90 0.10 - - - - - - - - - - - - - - - - 1.29 - -
Acrylic paint above tile cladding area CP IAP 1 14.40 1.65 1.65 23.76 - - - - - - - - - - 23.76 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services Electrical Room near ST-05 CCT 1 18.30 1.50 - - - 27.45 - - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 16.80 0.10 - - - - - - - - - - - - - - - - 1.68 - -
Acrylic paint above tile cladding area CP IAP 1 18.30 1.65 1.65 30.20 - - - - - - - - - - 30.20 - - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - - -
Services control room, 01& 02 CCT 1 91.30 1.50 - - - 136.95 - - - - - - - - - - - - - - -
Deduct D2 CCT -2 2.20 1.50 - - - -6.60 - - - - - - - - - - - - - - -
Add jams for D2 CCT 2 3.00 0.10 - - - 0.60 - - - - - - - - - - - - - - -
Granite skirting KS 1 89.10 0.10 - - - - - - - - - - - - - - - - 8.91 - -
Acrylic paint above tile cladding area CP IAP 1 91.30 1.65 1.65 150.65 - - - - - - - - - - 150.65 - - - - - - -
Deduct D2 CP IAP -2 2.20 0.60 0.60 -2.64 - - - - - - - - - - -2.64 - - - - - - -
Add jams for D2 CP IAP 2 3.40 0.10 0.10 0.68 - - - - - - - - - - 0.68 - - - - - - -
Services room near backside lift area CCT 1 18.90 1.50 - - - 28.35 - - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - - -
Granite skirting KS 1 16.70 0.10 - - - - - - - - - - - - - - - - 1.67 - -
Acrylic paint above tile cladding area CP IAP 1 18.90 1.65 1.65 31.19 - - - - - - - - - - 31.19 - - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - - -
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - - -
d Other Staircases - - - - - - -
ST-07, ST-08, ST-09, ST-10 CP IAP 1 95.40 3.25 3.25 310.05 - - - - - - - - - - 310.05 - - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-10 CGS 1 95.40 0.10 - - - - - - - - - - - - - - 9.54 - - -
e Inside Ducts - - - - - - -
SH-01 CP ICP 1 20.50 3.40 3.40 69.70 - - - - - - - - - - - - 69.70 - - - - -
SH-02 CP ICP 1 3.60 3.40 3.40 12.24 - - - - - - - - - - - - 12.24 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Second Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Woks Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-03 CP ICP 1 11.60 3.40 3.40 39.44 - - - - - - - - - - - - 39.44 - - - - -
SH-04 CP ICP 2 4.60 3.40 3.40 31.28 - - - - - - - - - - - - 31.28 - - - - -
SH-05 CP ICP 1 13.40 3.40 3.40 45.56 - - - - - - - - - - - - 45.56 - - - - -
SH-06 CP ICP 1 18.70 3.40 3.40 63.58 - - - - - - - - - - - - 63.58 - - - - -
SH-07 CP ICP 1 21.00 3.40 3.40 71.40 - - - - - - - - - - - - 71.40 - - - - -
SH-08 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-09 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-10 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-11 CP ICP 1 8.00 3.40 3.40 27.20 - - - - - - - - - - - - 27.20 - - - - -
SH-12 CP ICP 1 8.10 3.40 3.40 27.54 - - - - - - - - - - - - 27.54 - - - - -
SH-13 CP ICP 1 8.14 3.40 3.40 27.68 - - - - - - - - - - - - 27.68 - - - - -
SH-14 CP ICP 1 8.40 3.40 3.40 28.56 - - - - - - - - - - - - 28.56 - - - - -
SH-15 CP ICP 1 7.80 3.40 3.40 26.52 - - - - - - - - - - - - 26.52 - - - - -
SH-16 CP ICP 1 7.40 3.40 3.40 25.16 - - - - - - - - - - - - 25.16 - - - - -
SH-17 CP ICP 1 6.60 3.40 3.40 22.44 - - - - - - - - - - - - 22.44 - - - - -
SH-18 CP ICP 1 7.70 3.40 3.40 26.18 - - - - - - - - - - - - 26.18 - - - - -
SH-19 CP ICP 1 7.40 3.40 3.40 25.16 - - - - - - - - - - - - 25.16 - - - - -
SH-20 CP ICP 1 8.40 3.40 3.40 28.56 - - - - - - - - - - - - 28.56 - - - - -
SH-21 CP ICP 10 4.60 3.40 3.40 156.40 - - - - - - - - - - - - 156.40 - - - - -
SH-22 CP ICP 2 5.00 3.40 3.40 34.00 - - - - - - - - - - - - 34.00 - - - - -
SH-23 CP ICP 1 5.20 3.40 3.40 17.68 - - - - - - - - - - - - 17.68 - - - - -
SH-24 CP ICP 1 11.20 3.40 3.40 38.08 - - - - - - - - - - - - 38.08 - - - - -
SH-25 CP ICP 1 5.00 3.40 3.40 17.00 - - - - - - - - - - - - 17.00 - - - - -
SH-26 CP ICP 1 4.60 3.40 3.40 15.64 - - - - - - - - - - - - 15.64 - - - - -
SH-27 CP ICP 3 4.60 3.40 3.40 46.92 - - - - - - - - - - - - 46.92 - - - - -
SH-28 CP ICP 2 5.00 3.40 3.40 34.00 - - - - - - - - - - - - 34.00 - - - - -
SH-29 CP ICP 1 10.80 3.40 3.40 36.72 - - - - - - - - - - - - 36.72 - - - - -
SH-30 CP ICP 1 6.20 3.40 3.40 21.08 - - - - - - - - - - - - 21.08 - - - - -
SH-31 CP ICP 1 10.50 3.40 3.40 35.70 - - - - - - - - - - - - 35.70 - - - - -
SH-32 CP ICP 1 17.60 3.40 3.40 59.84 - - - - - - - - - - - - 59.84 - - - - -
SH-33 CP ICP 1 10.84 3.40 3.40 36.86 - - - - - - - - - - - - 36.86 - - - - -
SH-34 CP ICP 2 19.72 3.40 3.40 134.10 - - - - - - - - - - - - 134.10 - - - - -
SH-35 CP ICP 2 19.72 3.40 3.40 134.10 - - - - - - - - - - - - 134.10 - - - - -
SH-36 CP ICP 1 15.36 3.40 3.40 52.22 - - - - - - - - - - - - 52.22 - - - - -
SH-37 CP ICP 1 17.90 3.40 3.40 60.86 - - - - - - - - - - - - 60.86 - - - - -
SH-38 CP ICP 1 3.44 3.40 3.40 11.70 - - - - - - - - - - - - 11.70 - - - - -
SH-39 CP ICP 1 3.60 3.40 3.40 12.24 - - - - - - - - - - - - 12.24 - - - - -
SH-40 CP ICP 3 4.60 3.40 3.40 46.92 - - - - - - - - - - - - 46.92 - - - - -
SH-41 CP ICP 10 8.00 3.40 3.40 272.00 - - - - - - - - - - - - 272.00 - - - - -
SH-42 CP ICP 1 6.20 3.40 3.40 21.08 - - - - - - - - - - - - 21.08 - - - - -
SH-43 CP ICP 2 4.60 3.40 3.40 31.28 - - - - - - - - - - - - 31.28 - - - - -
Lift Shafts inside CP ICP 1 278.40 3.40 3.40 946.56 - - - - - - - - - - - - 946.56 - - - - -
Total Quantity 5,223.94 178.79 1,402.52 227.40 - 526.89 - - - 468.84 - 2,832.42 340.23 2,918.08 121.38 9.54 15.26 - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Third Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Nos Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion Cement Coping Remarks
Sl.No Work Description/Location composite saint Stone & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) (m) 30mm & 18mm & Plaster Plaster cladding Plaster Plaster
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & ServicesCGD 1 63.25 6.30 - 398.48 - - - - - - - - - - - - - - - - -
Deduct D1a CGD -1 2.20 2.10 - -4.62 - - - - - - - - - - - - - - - - -
Deduct DW1 CGD -1 2.90 2.10 - -6.09 - - - - - - - - - - - - - - - - -
Deduct D4 CGD -1 1.00 2.10 - -2.10 - - - - - - - - - - - - - - - - -
Deduct D3 CGD -1 1.50 2.10 - -3.15 - - - - - - - - - - - - - - - - -
Escalator & Staircase between ST-01 & ST-02 CGD 1 26.90 6.30 - 169.47 - - - - - - - - - - - - - - - - -
Building-A - lobby for HSR, ST-02 & Services oCGD 1 33.90 6.30 - 213.57 - - - - - - - - - - - - - - - - -
Plastering & Painting of structural glazing side CP IAP 1 15.00 6.30 6.30 94.50 - - - - - - - - - - 94.50 - - - - - - -
Lift Backside entrance walls CP IAP 1 17.00 6.30 6.30 107.10 - - - - - - - - - - 107.10 - - - - - - -
Staircase ST-07 outside CGD 1 14.40 6.30 - 90.72 - - - - - - - - - - - - - - - - -
Deduct D1a CGD -1 2.20 2.10 - -4.62 - - - - - - - - - - - - - - - - -
Staircase ST-08 outside CGD 1 19.40 6.30 - 122.22 - - - - - - - - - - - - - - - - -
Deduct D1a CGD -1 2.20 2.10 - -4.62 - - - - - - - - - - - - - - - - -
Building-A - lobby for office, ST-03 & ServicesCGD 1 41.40 6.30 - 260.82 - - - - - - - - - - - - - - - - -
Deduct D1a CGD -1 2.20 2.10 - -4.62 - - - - - - - - - - - - - - - - -
Deduct DW2 CGD -1 3.90 2.10 - -8.19 - - - - - - - - - - - - - - - - -
Building-A - lobby for HSR, ST-04 & Services oCGD 1 51.40 6.30 - 323.82 - - - - - - - - - - - - - - - - -
Deduct D1a CGD -1 2.20 2.10 - -4.62 - - - - - - - - - - - - - - - - -
Deduct DW2 CGD -1 3.90 2.10 - -8.19 - - - - - - - - - - - - - - - - -
Building-B - lobby area dry cladding works CGD 1 35.36 6.30 - 222.77 - - - - - - - - - - - - - - - - -
Deduct D2 CGD -2 2.20 2.10 - -9.24 - - - - - - - - - - - - - - - - -
ST-05, ST-10 & Lift lobbies outside CGD 1 76.10 6.30 - 479.43 - - - - - - - - - - - - - - - - -
Deduct D1a CGD -2 2.20 2.10 - -9.24 - - - - - - - - - - - - - - - - -
Deduct D3 CGD -2 1.50 2.10 - -6.30 - - - - - - - - - - - - - - - - -
Deduct D4 CGD -1 1.00 2.10 - -2.10 - - - - - - - - - - - - - - - - -
Toilets Opening CGD -2 1.00 2.40 - -4.80 - - - - - - - - - - - - - - - - -
ST-06 & Lift lobbies outside CGD 1 52.20 6.30 - 328.86 - - - - - - - - - - - - - - - - -
Deduct DW3 CGD -1 4.25 2.10 - -8.93 - - - - - - - - - - - - - - - - -
Deduct D3 CGD -1 1.50 2.10 - -3.15 - - - - - - - - - - - - - - - - -
Deduct D4 CGD -1 1.00 2.10 - -2.10 - - - - - - - - - - - - - - - - -
Toilets Opening CGD -2 1.00 2.40 - -4.80 - - - - - - - - - - - - - - - - -
Solid Acrylic Panels on Columns - - - - - - - - - - - - - - - - - - -
C2 - Column Cladding CAC CAC 52.00 3.74 6.30 - - - - - - - - 1,225.22 - - - - - - - - - -
C2 - Skirting SS SS 52.00 3.74 0.20 - - - - - - - - - - - - - - - - - 38.90 -
C5 - Column Cladding CAC CAC 20.00 5.20 6.30 - - - - - - - - 655.20 - - - - - - - - - -
C5 - Skirting SS SS 20.00 5.20 0.20 - - - - - - - - - - - - - - - - - 20.80 -
Internal columns in shop areas CAC CAC 40.00 3.60 6.30 - - - - - - - - 907.20 - - - - - - - - - -
C6 - Skirting SS SS 40.00 3.60 0.20 - - - - - - - - - - - - - - - - - 28.80 -
b Lift Lobbies - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 6.30 - 100.80 - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 26.40 1.20 - - 31.68 - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Deduct DW1 CGW -1 2.90 1.20 - - -3.48 - - - - - - - - - - - - - - -
Add jams for DW1 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.40 5.15 5.15 135.96 - - - - - - - - - - - 135.96 - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - -
Deduct DW1 CP IDP -1 2.90 0.90 0.90 -2.61 - - - - - - - - - - - -2.61 - - - - -
Add jams for DW1 CP IDP 1 4.70 0.10 0.10 0.47 - - - - - - - - - - - 0.47 - - - - -
Staircase - ST-01 CGW 1 27.30 1.20 - - 32.76 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.30 5.15 5.15 140.60 - - - - - - - - - - 140.60 - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 6.30 - 97.65 - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Third Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Nos Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion Cement Coping Remarks
Sl.No Work Description/Location composite saint Stone & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) (m) 30mm & 18mm & Plaster Plaster cladding Plaster Plaster
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Deduct DW2 CGW -1 3.90 1.20 - - -4.68 - - - - - - - - - - - - - - -
Add jams for DW2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 5.15 5.15 120.00 - - - - - - - - - - - 120.00 - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - -
Deduct DW2 CP IDP -1 3.90 0.90 0.90 -3.51 - - - - - - - - - - - -3.51 - - - - -
Add jams for DW2 CP IDP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - - 0.57 - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 5.15 5.15 133.39 - - - - - - - - - - 133.39 - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 6.30 - 66.15 - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - -
Deduct DW2 CGW -1 3.90 1.20 - - -4.68 - - - - - - - - - - - - - - -
Add jams for DW2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 5.15 5.15 115.36 - - - - - - - - - - - 115.36 - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 5.15 5.15 138.02 - - - - - - - - - - 138.02 - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 6.30 - 66.15 - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - -
Deduct DW2 CGW -1 3.90 1.20 - - -4.68 - - - - - - - - - - - - - - -
Add jams for DW2 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 5.15 5.15 115.36 - - - - - - - - - - - 115.36 - - - - -
Deduct DW2 CP IDP -1 3.90 0.90 0.90 -3.51 - - - - - - - - - - - -3.51 - - - - -
Add jams for DW2 CP IDP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - - 0.57 - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 5.15 5.15 132.36 - - - - - - - - - - 132.36 - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 5.15 5.15 133.39 - - - - - - - - - - 133.39 - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - -
Building - 02 Lobby for Office & Staircase ST-06 - - - - - -
Dry Cladding on Lift Opening Area CGD 1 9.40 6.30 - 59.22 - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -3 1.20 2.40 - -8.64 - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 3 6.00 0.20 - 3.60 - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.70 1.20 - - 27.24 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Deduct DW3 CGW -1 4.25 1.20 - - -5.10 - - - - - - - - - - - - - - -
Add jams for DW3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.70 5.15 5.15 116.91 - - - - - - - - - - - 116.91 - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - -
Deduct DW3 CP IDP -1 4.25 0.90 0.90 -3.83 - - - - - - - - - - - -3.83 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Third Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Nos Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion Cement Coping Remarks
Sl.No Work Description/Location composite saint Stone & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) (m) 30mm & 18mm & Plaster Plaster cladding Plaster Plaster
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for DW3 CP IDP 1 6.05 0.10 0.10 0.61 - - - - - - - - - - - 0.61 - - - - -
Staircase - ST-06 CGW 1 26.10 1.20 - - 31.32 - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.10 5.15 5.15 134.42 - - - - - - - - - - 134.42 - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - -
Backside Lift Lobby Area - - - - - -
Dry Cladding on Lift Opening Area CGD 1 5.20 6.30 - 32.76 - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -2 1.20 2.40 - -5.76 - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 2 6.00 0.20 - 2.40 - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 72.90 1.20 - - 87.48 - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 72.90 5.15 5.15 375.44 - - - - - - - - - - 375.44 - - - - - -
Deduct D2 CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - -
Add jams for D2 CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - -
c Services Area - - - - - -
ST-01 Services Electrical Room CCT 1 18.60 1.50 - - - 27.90 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 -
Acrylic paint above tile cladding area CP IAP 1 18.60 5.15 5.15 95.79 - - - - - - - - - - 95.79 - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
ST-01 Services- AHU CCT 1 27.80 1.50 - - - 41.70 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 26.30 0.10 - - - - - - - - - - - - - - - - 2.63 -
Acrylic paint above tile cladding area CP IAP 1 27.80 5.15 5.15 143.17 - - - - - - - - - - 143.17 - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
ST-02 Services- AHU CCT 1 46.60 1.50 - - - 69.90 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 45.10 0.10 - - - - - - - - - - - - - - - - 4.51 -
Acrylic paint above tile cladding area CP IAP 1 46.60 5.15 5.15 239.99 - - - - - - - - - - 239.99 - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
Services Electrical Room near ST-03 CCT 1 14.40 1.50 - - - 21.60 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 12.90 0.10 - - - - - - - - - - - - - - - - 1.29 -
Acrylic paint above tile cladding area CP IAP 1 14.40 5.15 5.15 74.16 - - - - - - - - - - 74.16 - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
Services Electrical Room near ST-05 CCT 1 17.90 1.50 - - - 26.85 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 16.40 0.10 - - - - - - - - - - - - - - - - 1.64 -
Acrylic paint above tile cladding area CP IAP 1 17.90 5.15 5.15 92.19 - - - - - - - - - - 92.19 - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
Services - Air Washer/AHU CCT 1 44.60 1.50 - - - 66.90 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 43.10 0.10 - - - - - - - - - - - - - - - - 4.31 -
Acrylic paint above tile cladding area CP IAP 1 44.60 5.15 5.15 229.69 - - - - - - - - - - 229.69 - - - - - -
Deduct D3 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D3 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
Services & Air Washer & AHU CCT 1 70.20 1.50 - - - 105.30 - - - - - - - - - - - - - -
Deduct D2 CCT -1 2.20 1.50 - - - -3.30 - - - - - - - - - - - - - -
Add jams for D2 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Deduct D3 CCT -1 1.50 1.50 - - - -2.25 - - - - - - - - - - - - - -
Add jams for D3 CCT 1 3.00 0.10 - - - 0.30 - - - - - - - - - - - - - -
Granite skirting KS 1 68.00 0.10 - - - - - - - - - - - - - - - - 6.80 -
Acrylic paint above tile cladding area CP IAP 1 70.20 5.15 5.15 361.53 - - - - - - - - - - 361.53 - - - - - -
Deduct D2 CP IAP -1 2.20 0.60 0.60 -1.32 - - - - - - - - - - -1.32 - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Third Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Nos Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion Cement Coping Remarks
Sl.No Work Description/Location composite saint Stone & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) (m) 30mm & 18mm & Plaster Plaster cladding Plaster Plaster
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D2 CP IAP 1 3.40 0.10 0.10 0.34 - - - - - - - - - - 0.34 - - - - - -
Deduct D2 CP IAP -1 1.50 0.60 0.60 -0.90 - - - - - - - - - - -0.90 - - - - - -
Add jams for D2 CP IAP 1 2.70 0.10 0.10 0.27 - - - - - - - - - - 0.27 - - - - - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08, ST-09, ST-10, ST-19, ST- CP IAP 1 167.80 6.35 6.35 1,065.53 - - - - - - - - - - 1,065.53 - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-10, ST-19, ST CGS 1 167.80 0.10 0.10 - - - - - - - - - - - - - - - 16.78 - -
Deduct D1a CP IAP -7 2.20 2.10 2.10 -32.34 - - - - - - - - - - -32.34 - - - - - - -
Internal staircase area outside CP IAP 1 66.00 6.35 6.35 419.10 - - - - - - - - - - 419.10 - - - - - - -
Deduct D1a CP IAP -2 2.20 2.10 2.10 -9.24 - - - - - - - - - - -9.24 - - - - - - -
e Toilet Entrance - - - - - -
ST-01, Toilet Entrance CLG 1 32.80 6.15 - - - - - - 201.72 - - - - - - - - - - - -
ST-01, Toilet Entrance SS Railing - 200mm SS 1 32.80 0.20 - - - - - - - - - - - - - - - - - 6.56 -
ST-04, Toilet Entrance CLG 1 32.60 6.15 - - - - - - 200.49 - - - - - - - - - - - -
ST-04, Toilet Entrance SS Railing - 200mm SS 1 32.60 0.20 - - - - - - - - - - - - - - - - - 6.52 -
ST-05, Toilet Entrance CLG 1 13.40 6.15 - - - - - - 82.41 - - - - - - - - - - - -
ST-05, Toilet Entrance SS Railing - 200mm SS 1 13.40 0.20 - - - - - - - - - - - - - - - - - 2.68 -
ST-06, Toilet Entrance CLG 1 18.50 6.15 - - - - - - 113.78 - - - - - - - - - - - -
ST-06, Toilet Entrance SS Railing - 200mm SS 1 18.50 0.20 - - - - - - - - - - - - - - - - - 3.70 -
f Toilets - - - - - -
ST-01 Toilet inside CSS 1 103.20 6.35 - - - - - - - 655.32 - - - - - - - - - - -
ST-01 Toilet ledge wall CGW 1 13.30 1.50 - - 19.95 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 17.50 0.80 - - - - - - - - - - - - - - - - - - 14.00
Deduct D5 CSS -0.5 1.00 2.10 - - - - - - - -1.05 - - - - - - - - - - -
Deduct D4 CSS -0.5 1.00 2.10 - - - - - - - -1.05 - - - - - - - - - - -
ST-04 Toilet inside CSS 1 86.00 6.35 - - - - - - - 546.10 - - - - - - - - - - -
ST-04 Toilet ledge wall CGW 1 11.80 1.50 - - 17.70 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 13.60 0.80 - - - - - - - - - - - - - - - - - - 10.88
Deduct D5 CSS -0.5 1.00 2.10 - - - - - - - -1.05 - - - - - - - - - - -
Deduct D4 CSS -0.5 1.00 2.10 - - - - - - - -1.05 - - - - - - - - - - -
ST-05 Toilet inside CSS 1 42.50 6.35 - - - - - - - 269.88 - - - - - - - - - - -
ST-05 Toilet ledge wall CGW 1 12.40 1.50 - - 18.60 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 9.80 0.80 - - - - - - - - - - - - - - - - - - 7.84
Deduct D4 CSS -0.5 1.00 2.10 - - - - - - - -1.05 - - - - - - - - - - -
ST-06 Toilet inside CSS 1 43.70 6.35 - - - - - - - 277.50 - - - - - - - - - - -
ST-06 Toilet ledge wall CGW 1 12.25 1.50 - - 18.38 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 9.40 0.80 - - - - - - - - - - - - - - - - - - 7.52
Deduct D4 CSS -0.5 1.00 2.10 - - - - - - - -1.05 - - - - - - - - - - -
g Shops - - - - - -
Shops around ST-01 CP Putty 1 105.60 6.35 6.35 670.56 - - - - - - - - - 670.56 - - - - - - - -
Backside Lift ST-02 CP Putty 1 17.00 6.35 6.35 107.95 - - - - - - - - - 107.95 - - - - - - - -
Shops around ST-03 CP Putty 1 275.55 6.35 6.35 1,749.74 - - - - - - - - - 1,749.74 - - - - - - - -
Shops around ST-04 CP Putty 1 250.85 6.35 6.35 1,592.90 - - - - - - - - - 1,592.90 - - - - - - - -
Shops around ST-05 CP Putty 1 149.60 6.35 6.35 949.96 - - - - - - - - - 949.96 - - - - - - - -
Shops around ST-06 CP Putty 1 110.00 6.35 6.35 698.50 - - - - - - - - - 698.50 - - - - - - - -
Food court area CP Putty 1 69.20 6.35 6.35 439.42 - - - - - - - - - 439.42 - - - - - - - -
h Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 6.50 6.50 133.25 - - - - - - - - - - - - 133.25 - - - - -
SH-02 CP ICP 1 3.60 6.50 6.50 23.40 - - - - - - - - - - - - 23.40 - - - - -
SH-03 CP ICP 1 11.60 6.50 6.50 75.40 - - - - - - - - - - - - 75.40 - - - - -
SH-04 CP ICP 2 4.60 6.50 6.50 59.80 - - - - - - - - - - - - 59.80 - - - - -
SH-05 CP ICP 1 13.40 6.50 6.50 87.10 - - - - - - - - - - - - 87.10 - - - - -
SH-06 CP ICP 1 18.70 6.50 6.50 121.55 - - - - - - - - - - - - 121.55 - - - - -
SH-07 CP ICP 1 21.00 6.50 6.50 136.50 - - - - - - - - - - - - 136.50 - - - - -
SH-08 CP ICP 1 4.60 6.50 6.50 29.90 - - - - - - - - - - - - 29.90 - - - - -
SH-09 CP ICP 1 4.60 6.50 6.50 29.90 - - - - - - - - - - - - 29.90 - - - - -
SH-10 CP ICP 1 4.60 6.50 6.50 29.90 - - - - - - - - - - - - 29.90 - - - - -
SH-11 CP ICP 1 8.00 6.50 6.50 52.00 - - - - - - - - - - - - 52.00 - - - - -
SH-12 CP ICP 1 8.10 6.50 6.50 52.65 - - - - - - - - - - - - 52.65 - - - - -
SH-13 CP ICP 1 8.14 6.50 6.50 52.91 - - - - - - - - - - - - 52.91 - - - - -
SH-14 CP ICP 1 8.40 6.50 6.50 54.60 - - - - - - - - - - - - 54.60 - - - - -
SH-15 CP ICP 1 7.80 6.50 6.50 50.70 - - - - - - - - - - - - 50.70 - - - - -
SH-16 CP ICP 1 7.40 6.50 6.50 48.10 - - - - - - - - - - - - 48.10 - - - - -
SH-17 CP ICP 1 6.60 6.50 6.50 42.90 - - - - - - - - - - - - 42.90 - - - - -
SH-18 CP ICP 1 7.70 6.50 6.50 50.05 - - - - - - - - - - - - 50.05 - - - - -
SH-19 CP ICP 1 7.40 6.50 6.50 48.10 - - - - - - - - - - - - 48.10 - - - - -
SH-20 CP ICP 1 8.40 6.50 6.50 54.60 - - - - - - - - - - - - 54.60 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Third Floor

CLADDING WORKS WALL FINISHES COUNTER/COPPING

Polished Polished
Plaster Plaster/ Putty/P
OP
Only Cement Granite Granite Ceramic 6mm
Vitrified Aluminium Lacquerred Senester Solid Acrylic Designer Granite Granite Kota Steel Granite
ing/Cla Paint Nos Length Cladding /Paint Plaster Stone Dry Stone Wet Tiles Tiles Acrylic Epoxy Paint Only Putty Emulsion Cement Coping Remarks
Sl.No Work Description/Location composite saint Stone & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) (m) 30mm & 18mm & Plaster Plaster cladding Plaster Plaster
Plaster Plaster

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-21 CP ICP 10 4.60 6.50 6.50 299.00 - - - - - - - - - - - - 299.00 - - - - -
SH-22 CP ICP 2 5.00 6.50 6.50 65.00 - - - - - - - - - - - - 65.00 - - - - -
SH-23 CP ICP 1 5.20 6.50 6.50 33.80 - - - - - - - - - - - - 33.80 - - - - -
SH-24 CP ICP 1 11.20 6.50 6.50 72.80 - - - - - - - - - - - - 72.80 - - - - -
SH-25 CP ICP 1 5.00 6.50 6.50 32.50 - - - - - - - - - - - - 32.50 - - - - -
SH-26 CP ICP 1 4.60 6.50 6.50 29.90 - - - - - - - - - - - - 29.90 - - - - -
SH-27 CP ICP 3 4.60 6.50 6.50 89.70 - - - - - - - - - - - - 89.70 - - - - -
SH-28 CP ICP 2 5.00 6.50 6.50 65.00 - - - - - - - - - - - - 65.00 - - - - -
SH-29 CP ICP 1 10.80 6.50 6.50 70.20 - - - - - - - - - - - - 70.20 - - - - -
SH-30 CP ICP 1 6.20 6.50 6.50 40.30 - - - - - - - - - - - - 40.30 - - - - -
SH-31 CP ICP 1 10.50 6.50 6.50 68.25 - - - - - - - - - - - - 68.25 - - - - -
SH-32 CP ICP 1 17.60 6.50 6.50 114.40 - - - - - - - - - - - - 114.40 - - - - -
SH-33 CP ICP 1 10.84 6.50 6.50 70.46 - - - - - - - - - - - - 70.46 - - - - -
SH-34 CP ICP 2 19.72 6.50 6.50 256.36 - - - - - - - - - - - - 256.36 - - - - -
SH-35 CP ICP 2 19.72 6.50 6.50 256.36 - - - - - - - - - - - - 256.36 - - - - -
SH-36 CP ICP 1 15.36 6.50 6.50 99.84 - - - - - - - - - - - - 99.84 - - - - -
SH-37 CP ICP 1 17.90 6.50 6.50 116.35 - - - - - - - - - - - - 116.35 - - - - -
SH-38 CP ICP 1 3.44 6.50 6.50 22.36 - - - - - - - - - - - - 22.36 - - - - -
SH-39 CP ICP 1 3.60 6.50 6.50 23.40 - - - - - - - - - - - - 23.40 - - - - -
SH-40 CP ICP 3 4.60 6.50 6.50 89.70 - - - - - - - - - - - - 89.70 - - - - -
SH-41 CP ICP 10 8.00 6.50 6.50 520.00 - - - - - - - - - - - - 520.00 - - - - -
SH-42 CP ICP 1 6.20 6.50 6.50 40.30 - - - - - - - - - - - - 40.30 - - - - -
SH-43 CP ICP 2 4.60 6.50 6.50 59.80 - - - - - - - - - - - - 59.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 6.50 6.50 1,809.60 - - - - - - - - - - - - 1,809.60 - - - - -
Total Quantity 16,426.61 2,892.77 449.81 343.50 - - 598.40 1,742.49 2,787.62 - 6,209.03 4,053.89 585.00 5,578.69 - 16.78 22.89 107.96 40.24 -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Fourth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 102.50 4.00 4.00 410.00 - - - - - - - - - - 410.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 71.70 4.00 4.00 286.80 - - - - - - - - - - 286.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1 1.00 2.10 2.10 -2.10 - - - - - - - - - - -2.10 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Staircase ST-07 outside CP IAP 1 24.70 4.00 4.00 98.80 - - - - - - - - - - 98.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Staircase ST-08 outside CP IAP 1 16.00 4.00 4.00 64.00 - - - - - - - - - - 64.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Building-A - lobby for office, ST-03 & Service CP IAP 1 70.80 4.00 4.00 283.20 - - - - - - - - - - 283.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 59.50 4.00 4.00 238.00 - - - - - - - - - - 238.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP 0.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-05 Staircase outside CP IAP 1 40.60 4.00 4.00 162.40 - - - - - - - - - - 162.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-06 Staircase outside CP IAP 1 34.40 4.00 4.00 137.60 - - - - - - - - - - 137.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-19 Staircase outside & SH-37 CP IAP 1 22.40 4.00 4.00 89.60 - - - - - - - - - - 89.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-09 Staircase outside CP IAP 1 9.40 4.00 4.00 37.60 - - - - - - - - - - 37.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-20 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-21 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
All Cutouts outside CP IAP 1 134.60 4.00 4.00 538.40 - - - - - - - - - - 538.40 - - - - - - -
Columns - - - - - - - - - - - - - - - - - - -
C2 - Column CP IAP 52.00 3.74 4.00 4.00 777.92 - - - - - - - - - - 777.92 - - - - - - -
C5 - Column CP IAP 20.00 5.20 4.00 4.00 416.00 - - - - - - - - - - 416.00 - - - - - - -
Internal columns CP IAP 40.00 3.60 4.00 4.00 576.00 - - - - - - - - - - 576.00 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.00 - 64.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Fourth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wet Cladding on Lobby area-1.20m height CGW 1 26.60 1.20 - - 31.92 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.60 2.80 2.80 74.48 - - - - - - - - - - - 74.48 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.00 - 62.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.80 2.80 65.24 - - - - - - - - - - - 65.24 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 2.80 2.80 75.04 - - - - - - - - - - 75.04 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Fourth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.80 2.80 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-06 CGW 1 27.10 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.10 2.80 2.80 75.88 - - - - - - - - - - 75.88 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-20 CGW 1 25.30 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.30 2.80 2.80 70.84 - - - - - - - - - - 70.84 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-21 CGW 1 24.40 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 24.40 2.80 2.80 68.33 - - - - - - - - - - 68.33 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CP IAP 1 18.60 4.00 4.00 74.40 - - - - - - - - - - 74.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
ST-01 Services- AHU & Services Room CP IAP 1 56.50 4.00 4.00 226.00 - - - - - - - - - - 226.00 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 55.00 0.10 - - - - - - - - - - - - - - - - 5.50 - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-01 Pantry Room CVT 1 17.60 4.00 4.00 - - - - 70.40 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-02 Services- AHU CP IAP 1 26.70 4.00 4.00 106.80 - - - - - - - - - - 106.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
ST-02 Pantry Room CVT 1 18.10 4.00 4.00 - - - - 72.40 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-03 Services- Electrical Room CP IAP 1 14.70 4.00 4.00 58.80 - - - - - - - - - - 58.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 13.20 0.10 - - - - - - - - - - - - - - - - 1.32 - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08, ST-09, ST-19 CP IAP 1 94.30 4.00 4.00 377.20 - - - - - - - - - - 377.20 - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-19 CGS 1 94.30 0.10 0.10 - - - - - - - - - - - - - - - 9.43 - -
Deduct D1a CP IAP -4 2.20 2.10 2.10 -18.48 - - - - - - - - - - -18.48 - - - - - - -
e Toilets - - - - - -
ST-01 Toilet inside CVT 1 103.20 4.00 - - - - 412.80 - - - - - - - - - - - - - -
ST-01 Toilet ledge wall CGW 1 13.30 1.50 - - 19.95 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 17.50 0.80 - - - - - - - - - - - - - - - - - - 14.00
Deduct D5 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-04 Toilet inside CVT 1 86.00 4.00 - - - - 344.00 - - - - - - - - - - - - - -
ST-04 Toilet ledge wall CGW 1 11.80 1.50 - - 17.70 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Fourth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wash Basin Counters CGP 1 13.60 0.80 - - - - - - - - - - - - - - - - - - 10.88
Deduct D5 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-02 Toilet inside CVT 1 99.10 4.00 - - - - 396.40 - - - - - - - - - - - - - -
ST-02 Toilet ledge wall CGW 1 13.30 1.50 - - 19.95 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 17.50 0.80 - - - - - - - - - - - - - - - - - - 14.00
Deduct D4 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
h Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 186.70 4.00 4.00 746.80 - - - - - - - - - - 746.80 - - - - - - -
i Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-06 CP ICP 1 18.70 4.00 4.00 74.80 - - - - - - - - - - - - 74.80 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-08 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-14 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 10 4.60 4.00 4.00 184.00 - - - - - - - - - - - - 184.00 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-27 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-31 CP ICP 1 10.50 4.00 4.00 42.00 - - - - - - - - - - - - 42.00 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-37 CP ICP 1 17.90 4.00 4.00 71.60 - - - - - - - - - - - - 71.60 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-40 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-41 CP ICP 10 8.00 4.00 4.00 320.00 - - - - - - - - - - - - 320.00 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 10,174.46 179.76 296.76 - 1,288.65 - - - - - - 6,485.18 256.24 3,433.04 - 9.43 11.05 - 38.88 -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes -Fifth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 102.50 4.00 4.00 410.00 - - - - - - - - - - 410.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 71.70 4.00 4.00 286.80 - - - - - - - - - - 286.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1 1.00 2.10 2.10 -2.10 - - - - - - - - - - -2.10 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Staircase ST-07 outside CP IAP 1 24.70 4.00 4.00 98.80 - - - - - - - - - - 98.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Staircase ST-08 outside CP IAP 1 16.00 4.00 4.00 64.00 - - - - - - - - - - 64.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Building-A - lobby for office, ST-03 & Service CP IAP 1 70.80 4.00 4.00 283.20 - - - - - - - - - - 283.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 59.50 4.00 4.00 238.00 - - - - - - - - - - 238.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP 0.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-05 Staircase outside CP IAP 1 40.60 4.00 4.00 162.40 - - - - - - - - - - 162.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-06 Staircase outside CP IAP 1 34.40 4.00 4.00 137.60 - - - - - - - - - - 137.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-19 Staircase outside & SH-37 CP IAP 1 22.40 4.00 4.00 89.60 - - - - - - - - - - 89.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-09 Staircase outside CP IAP 1 9.40 4.00 4.00 37.60 - - - - - - - - - - 37.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-20 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-21 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
All Cutouts outside CP IAP 1 134.60 4.00 4.00 538.40 - - - - - - - - - - 538.40 - - - - - - -
Columns - - - - - - - - - - - - - - - - - - -
C2 - Column CP IAP 52.00 3.74 4.00 4.00 777.92 - - - - - - - - - - 777.92 - - - - - - -
C5 - Column CP IAP 20.00 5.20 4.00 4.00 416.00 - - - - - - - - - - 416.00 - - - - - - -
Internal columns CP IAP 40.00 3.60 4.00 4.00 576.00 - - - - - - - - - - 576.00 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.00 - 64.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes -Fifth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wet Cladding on Lobby area-1.20m height CGW 1 26.60 1.20 - - 31.92 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.60 2.80 2.80 74.48 - - - - - - - - - - - 74.48 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.00 - 62.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.80 2.80 65.24 - - - - - - - - - - - 65.24 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 2.80 2.80 75.04 - - - - - - - - - - 75.04 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes -Fifth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.80 2.80 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-06 CGW 1 27.10 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.10 2.80 2.80 75.88 - - - - - - - - - - 75.88 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-20 CGW 1 25.30 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.30 2.80 2.80 70.84 - - - - - - - - - - 70.84 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-21 CGW 1 24.40 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 24.40 2.80 2.80 68.33 - - - - - - - - - - 68.33 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CP IAP 1 18.60 4.00 4.00 74.40 - - - - - - - - - - 74.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
ST-01 Services- AHU & Services Room CP IAP 1 56.50 4.00 4.00 226.00 - - - - - - - - - - 226.00 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 55.00 0.10 - - - - - - - - - - - - - - - - 5.50 - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-01 Pantry Room CVT 1 17.60 4.00 4.00 - - - - 70.40 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-02 Services- AHU CP IAP 1 26.70 4.00 4.00 106.80 - - - - - - - - - - 106.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
ST-02 Pantry Room CVT 1 18.10 4.00 4.00 - - - - 72.40 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-03 Services- Electrical Room CP IAP 1 14.70 4.00 4.00 58.80 - - - - - - - - - - 58.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 13.20 0.10 - - - - - - - - - - - - - - - - 1.32 - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08, ST-09, ST-19 CP IAP 1 94.30 4.00 4.00 377.20 - - - - - - - - - - 377.20 - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-19 CGS 1 94.30 0.10 0.10 - - - - - - - - - - - - - - - 9.43 - -
Deduct D1a CP IAP -4 2.20 2.10 2.10 -18.48 - - - - - - - - - - -18.48 - - - - - - -
e Toilets - - - - - -
ST-01 Toilet inside CVT 1 103.20 4.00 - - - - 412.80 - - - - - - - - - - - - - -
ST-01 Toilet ledge wall CGW 1 13.30 1.50 - - 19.95 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 17.50 0.80 - - - - - - - - - - - - - - - - - - 14.00
Deduct D5 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-04 Toilet inside CVT 1 86.00 4.00 - - - - 344.00 - - - - - - - - - - - - - -
ST-04 Toilet ledge wall CGW 1 11.80 1.50 - - 17.70 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes -Fifth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wash Basin Counters CGP 1 13.60 0.80 - - - - - - - - - - - - - - - - - - 10.88
Deduct D5 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
Deduct D4 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
ST-02 Toilet inside CVT 1 99.10 4.00 - - - - 396.40 - - - - - - - - - - - - - -
ST-02 Toilet ledge wall CGW 1 13.30 1.50 - - 19.95 - - - - - - - - - - - - - - - -
Wash Basin Counters CGP 1 17.50 0.80 - - - - - - - - - - - - - - - - - - 14.00
Deduct D4 CVT -0.5 1.00 2.10 - - - - -1.05 - - - - - - - - - - - - - -
h Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 186.70 4.00 4.00 746.80 - - - - - - - - - - 746.80 - - - - - - -
i Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-06 CP ICP 1 18.70 4.00 4.00 74.80 - - - - - - - - - - - - 74.80 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-08 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-14 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 10 4.60 4.00 4.00 184.00 - - - - - - - - - - - - 184.00 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-27 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-31 CP ICP 1 10.50 4.00 4.00 42.00 - - - - - - - - - - - - 42.00 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-37 CP ICP 1 17.90 4.00 4.00 71.60 - - - - - - - - - - - - 71.60 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-40 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-41 CP ICP 10 8.00 4.00 4.00 320.00 - - - - - - - - - - - - 320.00 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 10,174.46 179.76 296.76 - 1,288.65 - - - - - - 6,485.18 256.24 3,433.04 - 9.43 11.05 - 38.88 -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Sixth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 102.50 4.00 4.00 410.00 - - - - - - - - - - 410.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 71.70 4.00 4.00 286.80 - - - - - - - - - - 286.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1 1.00 2.10 2.10 -2.10 - - - - - - - - - - -2.10 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Staircase ST-07 outside CP IAP 1 24.70 4.00 4.00 98.80 - - - - - - - - - - 98.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Staircase ST-08 outside CP IAP 1 16.00 4.00 4.00 64.00 - - - - - - - - - - 64.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Building-A - lobby for office, ST-03 & Service CP IAP 1 70.80 4.00 4.00 283.20 - - - - - - - - - - 283.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 59.50 4.00 4.00 238.00 - - - - - - - - - - 238.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP 0.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-05 Staircase outside CP IAP 1 40.60 4.00 4.00 162.40 - - - - - - - - - - 162.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-06 Staircase outside CP IAP 1 34.40 4.00 4.00 137.60 - - - - - - - - - - 137.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-19 Staircase outside & SH-37 CP IAP 1 22.40 4.00 4.00 89.60 - - - - - - - - - - 89.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-09 Staircase outside CP IAP 1 9.40 4.00 4.00 37.60 - - - - - - - - - - 37.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-20 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-21 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
All Cutouts outside CP IAP 1 134.60 4.00 4.00 538.40 - - - - - - - - - - 538.40 - - - - - - -
Columns - - - - - - - - - - - - - - - - - - -
C2 - Column CP IAP 52.00 3.74 4.00 4.00 777.92 - - - - - - - - - - 777.92 - - - - - - -
C5 - Column CP IAP 20.00 5.20 4.00 4.00 416.00 - - - - - - - - - - 416.00 - - - - - - -
Internal columns CP IAP 40.00 3.60 4.00 4.00 576.00 - - - - - - - - - - 576.00 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.00 - 64.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Sixth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wet Cladding on Lobby area-1.20m height CGW 1 26.60 1.20 - - 31.92 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.60 2.80 2.80 74.48 - - - - - - - - - - - 74.48 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.00 - 62.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.80 2.80 65.24 - - - - - - - - - - - 65.24 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 2.80 2.80 75.04 - - - - - - - - - - 75.04 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Sixth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.80 2.80 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-06 CGW 1 27.10 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.10 2.80 2.80 75.88 - - - - - - - - - - 75.88 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-20 CGW 1 25.30 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.30 2.80 2.80 70.84 - - - - - - - - - - 70.84 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-21 CGW 1 24.40 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 24.40 2.80 2.80 68.33 - - - - - - - - - - 68.33 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CP IAP 1 18.60 4.00 4.00 74.40 - - - - - - - - - - 74.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
ST-01 Services- AHU & Services Room CP IAP 1 56.50 4.00 4.00 226.00 - - - - - - - - - - 226.00 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 55.00 0.10 - - - - - - - - - - - - - - - - 5.50 - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-01 Pantry Room CP IAP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - 70.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Services- AHU CP IAP 1 26.70 4.00 4.00 106.80 - - - - - - - - - - 106.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
ST-02 Pantry Room CP IAP 1 18.10 4.00 4.00 72.40 - - - - - - - - - - 72.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-03 Services- Electrical Room CP IAP 1 14.70 4.00 4.00 58.80 - - - - - - - - - - 58.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 13.20 0.10 - - - - - - - - - - - - - - - - 1.32 - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08, ST-09, ST-19 CP IAP 1 94.30 4.00 4.00 377.20 - - - - - - - - - - 377.20 - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-19 CGS 1 94.30 0.10 0.10 - - - - - - - - - - - - - - - 9.43 - -
Deduct D1a CP IAP -4 2.20 2.10 2.10 -18.48 - - - - - - - - - - -18.48 - - - - - - -
e Toilets - - - - - -
ST-01 Toilet inside CP IAP 1 103.20 4.00 4.00 412.80 - - - - - - - - - - 412.80 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-04 Toilet inside CP IAP 1 86.00 4.00 4.00 344.00 - - - - - - - - - - 344.00 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Toilet inside CP IAP 1 99.10 4.00 4.00 396.40 - - - - - - - - - - 396.40 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Sixth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
h Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 186.70 4.00 4.00 746.80 - - - - - - - - - - 746.80 - - - - - - -
i Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-06 CP ICP 1 18.70 4.00 4.00 74.80 - - - - - - - - - - - - 74.80 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-08 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-14 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 10 4.60 4.00 4.00 184.00 - - - - - - - - - - - - 184.00 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-27 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-31 CP ICP 1 10.50 4.00 4.00 42.00 - - - - - - - - - - - - 42.00 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-37 CP ICP 1 17.90 4.00 4.00 71.60 - - - - - - - - - - - - 71.60 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-40 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-41 CP ICP 10 8.00 4.00 4.00 320.00 - - - - - - - - - - - - 320.00 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 11,463.11 179.76 239.16 - - - - - - - - 7,773.83 256.24 3,433.04 - 9.43 11.05 - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Seventh Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 102.50 4.00 4.00 410.00 - - - - - - - - - - 410.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 71.70 4.00 4.00 286.80 - - - - - - - - - - 286.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1 1.00 2.10 2.10 -2.10 - - - - - - - - - - -2.10 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Staircase ST-07 outside CP IAP 1 24.70 4.00 4.00 98.80 - - - - - - - - - - 98.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Staircase ST-08 outside CP IAP 1 16.00 4.00 4.00 64.00 - - - - - - - - - - 64.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Building-A - lobby for office, ST-03 & Service CP IAP 1 70.80 4.00 4.00 283.20 - - - - - - - - - - 283.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 59.50 4.00 4.00 238.00 - - - - - - - - - - 238.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP 0.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-05 Staircase outside CP IAP 1 40.60 4.00 4.00 162.40 - - - - - - - - - - 162.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-06 Staircase outside CP IAP 1 34.40 4.00 4.00 137.60 - - - - - - - - - - 137.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-19 Staircase outside & SH-37 CP IAP 1 22.40 4.00 4.00 89.60 - - - - - - - - - - 89.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-09 Staircase outside CP IAP 1 9.40 4.00 4.00 37.60 - - - - - - - - - - 37.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-20 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-21 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
All Cutouts outside CP IAP 1 134.60 4.00 4.00 538.40 - - - - - - - - - - 538.40 - - - - - - -
Columns - - - - - - - - - - - - - - - - - - -
C2 - Column CP IAP 52.00 3.74 4.00 4.00 777.92 - - - - - - - - - - 777.92 - - - - - - -
C5 - Column CP IAP 20.00 5.20 4.00 4.00 416.00 - - - - - - - - - - 416.00 - - - - - - -
Internal columns CP IAP 40.00 3.60 4.00 4.00 576.00 - - - - - - - - - - 576.00 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.00 - 64.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Seventh Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wet Cladding on Lobby area-1.20m height CGW 1 26.60 1.20 - - 31.92 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.60 2.80 2.80 74.48 - - - - - - - - - - - 74.48 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.00 - 62.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.80 2.80 65.24 - - - - - - - - - - - 65.24 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 2.80 2.80 75.04 - - - - - - - - - - 75.04 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Seventh Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.80 2.80 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-06 CGW 1 27.10 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.10 2.80 2.80 75.88 - - - - - - - - - - 75.88 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-20 CGW 1 25.30 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.30 2.80 2.80 70.84 - - - - - - - - - - 70.84 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-21 CGW 1 24.40 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 24.40 2.80 2.80 68.33 - - - - - - - - - - 68.33 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CP IAP 1 18.60 4.00 4.00 74.40 - - - - - - - - - - 74.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
ST-01 Services- AHU & Services Room CP IAP 1 56.50 4.00 4.00 226.00 - - - - - - - - - - 226.00 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 55.00 0.10 - - - - - - - - - - - - - - - - 5.50 - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-01 Pantry Room CP IAP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - 70.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Services- AHU CP IAP 1 26.70 4.00 4.00 106.80 - - - - - - - - - - 106.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
ST-02 Pantry Room CP IAP 1 18.10 4.00 4.00 72.40 - - - - - - - - - - 72.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-03 Services- Electrical Room CP IAP 1 14.70 4.00 4.00 58.80 - - - - - - - - - - 58.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 13.20 0.10 - - - - - - - - - - - - - - - - 1.32 - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08, ST-09, ST-19 CP IAP 1 94.30 4.00 4.00 377.20 - - - - - - - - - - 377.20 - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-19 CGS 1 94.30 0.10 0.10 - - - - - - - - - - - - - - - 9.43 - -
Deduct D1a CP IAP -4 2.20 2.10 2.10 -18.48 - - - - - - - - - - -18.48 - - - - - - -
e Toilets - - - - - -
ST-01 Toilet inside CP IAP 1 103.20 4.00 4.00 412.80 - - - - - - - - - - 412.80 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-04 Toilet inside CP IAP 1 86.00 4.00 4.00 344.00 - - - - - - - - - - 344.00 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Toilet inside CP IAP 1 99.10 4.00 4.00 396.40 - - - - - - - - - - 396.40 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Seventh Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
h Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 186.70 4.00 4.00 746.80 - - - - - - - - - - 746.80 - - - - - - -
i Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-06 CP ICP 1 18.70 4.00 4.00 74.80 - - - - - - - - - - - - 74.80 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-08 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-14 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 10 4.60 4.00 4.00 184.00 - - - - - - - - - - - - 184.00 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-27 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-31 CP ICP 1 10.50 4.00 4.00 42.00 - - - - - - - - - - - - 42.00 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-37 CP ICP 1 17.90 4.00 4.00 71.60 - - - - - - - - - - - - 71.60 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-40 CP ICP 3 4.60 4.00 4.00 55.20 - - - - - - - - - - - - 55.20 - - - - -
SH-41 CP ICP 10 8.00 4.00 4.00 320.00 - - - - - - - - - - - - 320.00 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 11,463.11 179.76 239.16 - - - - - - - - 7,773.83 256.24 3,433.04 - 9.43 11.05 - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Eighth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 102.50 4.00 4.00 410.00 - - - - - - - - - - 410.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 71.70 4.00 4.00 286.80 - - - - - - - - - - 286.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1 1.00 2.10 2.10 -2.10 - - - - - - - - - - -2.10 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Staircase ST-07 outside CP IAP 1 24.70 4.00 4.00 98.80 - - - - - - - - - - 98.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Staircase ST-08 outside CP IAP 1 16.00 4.00 4.00 64.00 - - - - - - - - - - 64.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Building-A - lobby for office, ST-03 & Service CP IAP 1 70.80 4.00 4.00 283.20 - - - - - - - - - - 283.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 59.50 4.00 4.00 238.00 - - - - - - - - - - 238.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP 0.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-05 Staircase outside CP IAP 1 40.60 4.00 4.00 162.40 - - - - - - - - - - 162.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-06 Staircase outside CP IAP 1 34.40 4.00 4.00 137.60 - - - - - - - - - - 137.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-19 Staircase outside & SH-37 CP IAP 1 22.40 4.00 4.00 89.60 - - - - - - - - - - 89.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-09 Staircase outside CP IAP 1 9.40 4.00 4.00 37.60 - - - - - - - - - - 37.60 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-20 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
ST-21 Staircase outside, SH-40 & SH-43 CP IAP 1 39.60 4.00 4.00 158.40 - - - - - - - - - - 158.40 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
All Cutouts outside CP IAP 1 134.60 4.00 4.00 538.40 - - - - - - - - - - 538.40 - - - - - - -
Columns - - - - - - - - - - - - - - - - - - -
C2 - Column CP IAP 26.00 3.74 4.00 4.00 388.96 - - - - - - - - - - 388.96 - - - - - - -
C5 - Column CP IAP 10.00 5.20 4.00 4.00 208.00 - - - - - - - - - - 208.00 - - - - - - -
Internal columns CP IAP 20.00 3.60 4.00 4.00 288.00 - - - - - - - - - - 288.00 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.00 - 64.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Eighth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Wet Cladding on Lobby area-1.20m height CGW 1 26.60 1.20 - - 31.92 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.60 2.80 2.80 74.48 - - - - - - - - - - - 74.48 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.00 - 62.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.80 2.80 65.24 - - - - - - - - - - - 65.24 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 2.80 2.80 75.04 - - - - - - - - - - 75.04 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 10.50 4.00 - 42.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -4 1.20 2.40 - -11.52 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 4 6.00 0.20 - 4.80 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 22.40 1.20 - - 26.88 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 22.40 2.80 2.80 62.72 - - - - - - - - - - - 62.72 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Eighth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.80 2.80 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase - ST-05 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-06 CGW 1 27.10 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.10 2.80 2.80 75.88 - - - - - - - - - - 75.88 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-20 CGW 1 25.30 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.30 2.80 2.80 70.84 - - - - - - - - - - 70.84 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Staircase ST-21 CGW 1 24.40 1.20 - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 24.40 2.80 2.80 68.33 - - - - - - - - - - 68.33 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CP IAP 1 18.60 4.00 4.00 74.40 - - - - - - - - - - 74.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
ST-01 Services- AHU & Services Room CP IAP 1 56.50 4.00 4.00 226.00 - - - - - - - - - - 226.00 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 55.00 0.10 - - - - - - - - - - - - - - - - 5.50 - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-01 Pantry Room CP IAP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - 70.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Services- AHU CP IAP 1 26.70 4.00 4.00 106.80 - - - - - - - - - - 106.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
ST-02 Pantry Room CP IAP 1 18.10 4.00 4.00 72.40 - - - - - - - - - - 72.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-03 Services- Electrical Room CP IAP 1 14.70 4.00 4.00 58.80 - - - - - - - - - - 58.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 13.20 0.10 - - - - - - - - - - - - - - - - 1.32 - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08, ST-09, ST-19 CP IAP 1 94.30 4.00 4.00 377.20 - - - - - - - - - - 377.20 - - - - - -
Skirting - ST-07, ST-08, ST-09, ST-19 CGS 1 94.30 0.10 0.10 - - - - - - - - - - - - - - - 9.43 - -
Deduct D1a CP IAP -4 2.20 2.10 2.10 -18.48 - - - - - - - - - - -18.48 - - - - - - -
e Toilets - - - - - -
ST-01 Toilet inside CP IAP 1 103.20 4.00 4.00 412.80 - - - - - - - - - - 412.80 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-04 Toilet inside CP IAP 1 86.00 4.00 4.00 344.00 - - - - - - - - - - 344.00 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Toilet inside CP IAP 1 99.10 4.00 4.00 396.40 - - - - - - - - - - 396.40 - - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Eighth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
h Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 101.30 4.00 4.00 405.20 - - - - - - - - - - 405.20 - - - - - - -
Parapet Walls CP IAP 1 190.70 1.20 1.20 228.84 - - - - - - - - - - 228.84 - - - - - - -
i OHT - - - - - - - - - - - - - - - - - - -
OHT inside - Bottom CCT 1 66.40 1.00 - - - 66.40 - - - - - - - - - - - - - - -
OHT inside - Bsides CCT 1 32.70 3.00 - - - 98.10 - - - - - - - - - - - - - - -
OHT Outside CP IAP 1 34.00 3.00 3.00 102.00 - - - - - - - - - - 102.00 - - - - - - -
j Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-06 CP ICP 1 18.70 1.20 1.20 22.44 - - - - - - - - - - - - 22.44 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-08 CP ICP 1 4.60 1.20 1.20 5.52 - - - - - - - - - - - - 5.52 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-14 CP ICP 1 8.40 1.20 1.20 10.08 - - - - - - - - - - - - 10.08 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 4 4.60 4.00 4.00 73.60 - - - - - - - - - - - - 73.60 - - - - -
SH-21 CP ICP 6 4.60 1.20 1.20 33.12 - - - - - - - - - - - - 33.12 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-27 CP ICP 3 4.60 1.20 1.20 16.56 - - - - - - - - - - - - 16.56 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-31 CP ICP 1 10.50 1.20 1.20 12.60 - - - - - - - - - - - - 12.60 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-37 CP ICP 1 17.90 1.20 1.20 21.48 - - - - - - - - - - - - 21.48 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-40 CP ICP 3 4.60 1.20 1.20 16.56 - - - - - - - - - - - - 16.56 - - - - -
SH-41 CP ICP 10 8.00 1.20 1.20 96.00 - - - - - - - - - - - - 96.00 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 10,020.55 179.76 239.16 164.50 - - - - - - - 6,878.11 256.24 2,886.20 - 9.43 11.05 - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ninth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 102.50 4.00 4.00 410.00 - - - - - - - - - - 410.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1.5 1.00 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 71.70 4.00 4.00 286.80 - - - - - - - - - - 286.80 - - - - - - -
Deduct D1b CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1b CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Deduct D4 CP IAP -1 1.00 2.10 2.10 -2.10 - - - - - - - - - - -2.10 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 5.70 0.10 0.10 0.57 - - - - - - - - - - 0.57 - - - - - - -
Staircase ST-07 outside CP IAP 1 24.70 4.00 4.00 98.80 - - - - - - - - - - 98.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Staircase ST-08 outside CP IAP 1 16.00 4.00 4.00 64.00 - - - - - - - - - - 64.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Building-A - lobby for office, ST-03 & Service CP IAP 1 28.30 4.00 4.00 113.20 - - - - - - - - - - 113.20 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Building-A - lobby for HSR, ST-04 & Services CP IAP 1 29.00 4.00 4.00 116.00 - - - - - - - - - - 116.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Columns - - - - - - - - - - - - - - - - - - -
C2 - Column CP IAP 26.00 3.74 4.00 4.00 388.96 - - - - - - - - - - 388.96 - - - - - - -
C5 - Column CP IAP 10.00 5.20 4.00 4.00 208.00 - - - - - - - - - - 208.00 - - - - - - -
Internal columns CP IAP 20.00 3.60 4.00 4.00 288.00 - - - - - - - - - - 288.00 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 16.00 4.00 - 64.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 26.60 1.20 - - 31.92 - - - - - - - - - - - - - - - -
Deduct D3 CGW -1 1.50 1.20 - - -1.80 - - - - - - - - - - - - - - - -
Add jams for D3 CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 26.60 2.80 2.80 74.48 - - - - - - - - - - - 74.48 - - - - - -
Deduct D3 CP IDP -1 1.50 0.90 0.90 -1.35 - - - - - - - - - - - -1.35 - - - - - -
Add jams for D3 CP IDP 1 3.30 0.10 0.10 0.33 - - - - - - - - - - - 0.33 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Dry Cladding on Lift Opening Area CGD 1 15.50 4.00 - 62.00 - - - - - - - - - - - - - - - - -
Deduct Lift Openings CGD -5 1.20 2.40 - -14.40 - - - - - - - - - - - - - - - - -
Add Jams for lift opening CGD 5 6.00 0.20 - 6.00 - - - - - - - - - - - - - - - - -
Wet Cladding on Lobby area-1.20m height CGW 1 23.30 1.20 - - 27.96 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Deduct D1b CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1b CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Designer Paint above wet cladding area CP IDP 1 23.30 2.80 2.80 65.24 - - - - - - - - - - - 65.24 - - - - - -
Deduct D1a CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ninth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Add jams for D1a CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Deduct D1b CP IDP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - - -1.98 - - - - - -
Add jams for D1b CP IDP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - - 0.40 - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-03 - - - - - - -
Staircase - ST-03 CGW 1 26.80 1.20 - - 32.16 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 26.80 2.80 2.80 75.04 - - - - - - - - - - 75.04 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for Office & Staircase ST-04 - - - - - - -
Staircase - ST-04 CGW 1 25.70 1.20 - - 30.84 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.70 2.80 2.80 71.96 - - - - - - - - - - 71.96 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Services Area - - - - - - -
ST-01 Services Electrical Room CP IAP 1 18.60 4.00 4.00 74.40 - - - - - - - - - - 74.40 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 17.10 0.10 - - - - - - - - - - - - - - - - 1.71 - -
ST-01 Services- AHU & Services Room CP IAP 1 56.50 4.00 4.00 226.00 - - - - - - - - - - 226.00 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 55.00 0.10 - - - - - - - - - - - - - - - - 5.50 - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-01 Pantry Room CP IAP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - 70.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Services- AHU CP IAP 1 26.70 4.00 4.00 106.80 - - - - - - - - - - 106.80 - - - - - - -
Deduct D3 CP IAP -1 1.50 2.10 2.10 -3.15 - - - - - - - - - - -3.15 - - - - - - -
Add jams for D3 CP IAP 1 4.20 0.10 0.10 0.42 - - - - - - - - - - 0.42 - - - - - - -
Granite skirting KS 1 25.20 0.10 - - - - - - - - - - - - - - - - 2.52 - -
ST-02 Pantry Room CP IAP 1 18.10 4.00 4.00 72.40 - - - - - - - - - - 72.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
d Other Staircases - - - - - -
Staircase ST-07, ST-08 CP IAP 1 47.80 4.00 4.00 191.20 - - - - - - - - - - 191.20 - - - - - -
Skirting - ST-07, ST-08 CGS 1 47.80 0.10 0.10 - - - - - - - - - - - - - - - 4.78 - -
Deduct D1a CP IAP -2 2.20 2.10 2.10 -9.24 - - - - - - - - - - -9.24 - - - - - - -
e Toilets - - - - - -
ST-01 Toilet inside CP IAP 1 103.20 4.00 4.00 412.80 - - - - - - - - - - 412.80 - - - - - - -
Deduct D5 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
ST-02 Toilet inside CP IAP 1 99.10 4.00 4.00 396.40 - - - - - - - - - - 396.40 - - - - - - -
Deduct D4 CP IAP -0.5 1.00 2.10 2.10 -1.05 - - - - - - - - - - -1.05 - - - - - - -
h Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 101.30 4.00 4.00 405.20 - - - - - - - - - - 405.20 - - - - - - -
Parapet Walls CP IAP 1 104.20 1.20 1.20 125.04 - - - - - - - - - - 125.04 - - - - - - -
i Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 4.00 4.00 82.00 - - - - - - - - - - - - 82.00 - - - - -
SH-02 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-03 CP ICP 1 11.60 4.00 4.00 46.40 - - - - - - - - - - - - 46.40 - - - - -
SH-04 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
SH-05 CP ICP 1 13.40 4.00 4.00 53.60 - - - - - - - - - - - - 53.60 - - - - -
SH-07 CP ICP 1 21.00 4.00 4.00 84.00 - - - - - - - - - - - - 84.00 - - - - -
SH-09 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-10 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Ninth Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-11 CP ICP 1 8.00 4.00 4.00 32.00 - - - - - - - - - - - - 32.00 - - - - -
SH-12 CP ICP 1 8.10 4.00 4.00 32.40 - - - - - - - - - - - - 32.40 - - - - -
SH-13 CP ICP 1 8.14 4.00 4.00 32.56 - - - - - - - - - - - - 32.56 - - - - -
SH-15 CP ICP 1 7.80 4.00 4.00 31.20 - - - - - - - - - - - - 31.20 - - - - -
SH-16 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-17 CP ICP 1 6.60 4.00 4.00 26.40 - - - - - - - - - - - - 26.40 - - - - -
SH-18 CP ICP 1 7.70 4.00 4.00 30.80 - - - - - - - - - - - - 30.80 - - - - -
SH-19 CP ICP 1 7.40 4.00 4.00 29.60 - - - - - - - - - - - - 29.60 - - - - -
SH-20 CP ICP 1 8.40 4.00 4.00 33.60 - - - - - - - - - - - - 33.60 - - - - -
SH-21 CP ICP 4 4.60 4.00 4.00 73.60 - - - - - - - - - - - - 73.60 - - - - -
SH-22 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-23 CP ICP 1 5.20 4.00 4.00 20.80 - - - - - - - - - - - - 20.80 - - - - -
SH-24 CP ICP 1 11.20 4.00 4.00 44.80 - - - - - - - - - - - - 44.80 - - - - -
SH-25 CP ICP 1 5.00 4.00 4.00 20.00 - - - - - - - - - - - - 20.00 - - - - -
SH-26 CP ICP 1 4.60 4.00 4.00 18.40 - - - - - - - - - - - - 18.40 - - - - -
SH-28 CP ICP 2 5.00 4.00 4.00 40.00 - - - - - - - - - - - - 40.00 - - - - -
SH-29 CP ICP 1 10.80 4.00 4.00 43.20 - - - - - - - - - - - - 43.20 - - - - -
SH-30 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-32 CP ICP 1 17.60 4.00 4.00 70.40 - - - - - - - - - - - - 70.40 - - - - -
SH-33 CP ICP 1 10.84 4.00 4.00 43.36 - - - - - - - - - - - - 43.36 - - - - -
SH-34 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-35 CP ICP 2 19.72 4.00 4.00 157.76 - - - - - - - - - - - - 157.76 - - - - -
SH-36 CP ICP 1 15.36 4.00 4.00 61.44 - - - - - - - - - - - - 61.44 - - - - -
SH-38 CP ICP 1 3.44 4.00 4.00 13.76 - - - - - - - - - - - - 13.76 - - - - -
SH-39 CP ICP 1 3.60 4.00 4.00 14.40 - - - - - - - - - - - - 14.40 - - - - -
SH-42 CP ICP 1 6.20 4.00 4.00 24.80 - - - - - - - - - - - - 24.80 - - - - -
SH-43 CP ICP 2 4.60 4.00 4.00 36.80 - - - - - - - - - - - - 36.80 - - - - -
Lift Shafts inside CP ICP 1 278.40 4.00 4.00 1,113.60 - - - - - - - - - - - - 1,113.60 - - - - -
Total Quantity 7,066.35 109.20 168.72 - - - - - - - - 4,280.55 133.96 2,651.84 - 4.78 9.73 - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Terrace Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
a Waiting Area
Building-A - lobby for office, ST-01 & Service CP IAP 1 75.00 4.00 4.00 300.00 - - - - - - - - - - 300.00 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
Building-A - lobby for HSR, ST-02 & Services CP IAP 1 64.70 4.00 4.00 258.80 - - - - - - - - - - 258.80 - - - - - - -
Deduct D1a CP IAP -1 2.20 2.10 2.10 -4.62 - - - - - - - - - - -4.62 - - - - - - -
Add jams for D1a CP IAP 1 6.40 0.10 0.10 0.64 - - - - - - - - - - 0.64 - - - - - - -
b Lift Lobbies - - - - - - -
Building - 01 Lobby for Office & Staircase ST-01 - - - - - - -
Staircase - ST-01 CGW 1 27.60 1.20 - - 33.12 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 27.60 2.80 2.80 77.28 - - - - - - - - - - 77.28 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
Building - 01 Lobby for HSR & Staircase ST-02 - - - - - - -
Staircase - ST-02 CGW 1 25.90 1.20 - - 31.08 - - - - - - - - - - - - - - - -
Deduct D1a CGW -1 2.20 1.20 - - -2.64 - - - - - - - - - - - - - - - -
Add jams for D1a CGW 1 2.40 0.10 - - 0.24 - - - - - - - - - - - - - - - -
Acrylic Paint above wet cladding area CP IAP 1 25.90 2.80 2.80 72.52 - - - - - - - - - - 72.52 - - - - - - -
Deduct D1a CP IAP -1 2.20 0.90 0.90 -1.98 - - - - - - - - - - -1.98 - - - - - - -
Add jams for D1a CP IAP 1 4.00 0.10 0.10 0.40 - - - - - - - - - - 0.40 - - - - - - -
c Brickwall Plastering - - - - - - - - - - - - - - - - - - -
Brickwall Plastering inside CP IAP 1 95.10 4.00 4.00 380.40 - - - - - - - - - - 380.40 - - - - - - -
Parapet Walls CP IAP 1 200.00 1.20 1.20 240.00 - - - - - - - - - - 240.00 - - - - - - -
d OHT - - - - - - - - - - - - - - - - - - -
OHT inside - Bottom CCT 1 66.40 1.00 - - - 66.40 - - - - - - - - - - - - - - -
OHT inside - Bsides CCT 1 32.70 3.00 - - - 98.10 - - - - - - - - - - - - - - -
OHT Outside CP IAP 1 34.00 3.00 3.00 102.00 - - - - - - - - - - 102.00 - - - - - - -
e Inside Ducts - - - - - - - - - - - - - - - - - -
SH-01 CP ICP 1 20.50 1.20 1.20 24.60 - - - - - - - - - - - - 24.60 - - - - -
SH-02 CP ICP 1 3.60 1.20 1.20 4.32 - - - - - - - - - - - - 4.32 - - - - -
SH-03 CP ICP 1 11.60 1.20 1.20 13.92 - - - - - - - - - - - - 13.92 - - - - -
SH-04 CP ICP 2 4.60 1.20 1.20 11.04 - - - - - - - - - - - - 11.04 - - - - -
SH-05 CP ICP 1 13.40 1.20 1.20 16.08 - - - - - - - - - - - - 16.08 - - - - -
SH-07 CP ICP 1 21.00 1.20 1.20 25.20 - - - - - - - - - - - - 25.20 - - - - -
SH-09 CP ICP 1 4.60 1.20 1.20 5.52 - - - - - - - - - - - - 5.52 - - - - -
SH-10 CP ICP 1 4.60 1.20 1.20 5.52 - - - - - - - - - - - - 5.52 - - - - -
SH-11 CP ICP 1 8.00 1.20 1.20 9.60 - - - - - - - - - - - - 9.60 - - - - -
SH-12 CP ICP 1 8.10 1.20 1.20 9.72 - - - - - - - - - - - - 9.72 - - - - -
SH-13 CP ICP 1 8.14 1.20 1.20 9.77 - - - - - - - - - - - - 9.77 - - - - -
SH-15 CP ICP 1 7.80 1.20 1.20 9.36 - - - - - - - - - - - - 9.36 - - - - -
SH-16 CP ICP 1 7.40 1.20 1.20 8.88 - - - - - - - - - - - - 8.88 - - - - -
SH-17 CP ICP 1 6.60 1.20 1.20 7.92 - - - - - - - - - - - - 7.92 - - - - -
SH-18 CP ICP 1 7.70 1.20 1.20 9.24 - - - - - - - - - - - - 9.24 - - - - -
SH-19 CP ICP 1 7.40 1.20 1.20 8.88 - - - - - - - - - - - - 8.88 - - - - -
SH-20 CP ICP 1 8.40 1.20 1.20 10.08 - - - - - - - - - - - - 10.08 - - - - -
SH-21 CP ICP 4 4.60 1.20 1.20 22.08 - - - - - - - - - - - - 22.08 - - - - -
SH-22 CP ICP 2 5.00 1.20 1.20 12.00 - - - - - - - - - - - - 12.00 - - - - -
SH-23 CP ICP 1 5.20 1.20 1.20 6.24 - - - - - - - - - - - - 6.24 - - - - -
SH-24 CP ICP 1 11.20 1.20 1.20 13.44 - - - - - - - - - - - - 13.44 - - - - -
SH-25 CP ICP 1 5.00 1.20 1.20 6.00 - - - - - - - - - - - - 6.00 - - - - -
SH-26 CP ICP 1 4.60 1.20 1.20 5.52 - - - - - - - - - - - - 5.52 - - - - -
SH-28 CP ICP 2 5.00 1.20 1.20 12.00 - - - - - - - - - - - - 12.00 - - - - -
SH-29 CP ICP 1 10.80 1.20 1.20 12.96 - - - - - - - - - - - - 12.96 - - - - -
SH-30 CP ICP 1 6.20 1.20 1.20 7.44 - - - - - - - - - - - - 7.44 - - - - -
SH-32 CP ICP 1 17.60 1.20 1.20 21.12 - - - - - - - - - - - - 21.12 - - - - -
SH-33 CP ICP 1 10.84 1.20 1.20 13.01 - - - - - - - - - - - - 13.01 - - - - -
SH-34 CP ICP 2 19.72 1.20 1.20 47.33 - - - - - - - - - - - - 47.33 - - - - -
SH-35 CP ICP 2 19.72 1.20 1.20 47.33 - - - - - - - - - - - - 47.33 - - - - -
SH-36 CP ICP 1 15.36 1.20 1.20 18.43 - - - - - - - - - - - - 18.43 - - - - -
SH-38 CP ICP 1 3.44 1.20 1.20 4.13 - - - - - - - - - - - - 4.13 - - - - -
Client: NCC Limited
Consultant : Epitome Project Management Consultancy Services,Chennai
Project : Sabarmati Terminal - Fitout Work
Item: Wall Finishes - Terrace Floor
CLADDING WORKS WALL FINISHES COUNTER/COPPING

Putty/P Only Cement Polished Polished 6mm


Plaster Plaster/ Granite Granite Ceramic Vitrified Solid Granite
ing/Cla Paint Length Cladding OP Plaster Stone Dry Stone Wet Tiles Tiles Aluminium Lacquerred Senester Acrylic Epoxy Paint Only Putty Acrylic Designer Cement Coping Granite Kota Steel Granite Remarks
Sl.No Work Description/Location Nos /Paint composite saint Stone Emulsion & Paint & Skirting Skirting Skirting Counter
dding Type (m) Height Height Cladding Cladding Cladding & Cladding & panels gobain Cladding Surface & with Primer Works Putty POP Paint Works & Works Works Works Works
Type (m) 30mm & 18mm & Plaster Plaster Plaster Plaster
(m) Plaster Plaster cladding

CP CGD CGW CCT CVT CACP CLG CSS CAC IEP Putty IAP IDP ICP CGC CGS KS SS CGP
SH-39 CP ICP 1 3.60 1.20 1.20 4.32 - - - - - - - - - - - - 4.32 - - - - -
SH-42 CP ICP 1 6.20 1.20 1.20 7.44 - - - - - - - - - - - - 7.44 - - - - -
SH-43 CP ICP 2 4.60 1.20 1.20 11.04 - - - - - - - - - - - - 11.04 - - - - -
Lift Shafts inside CP ICP 1 278.40 1.20 1.20 334.08 - - - - - - - - - - - - 334.08 - - - - -
Total Quantity 2,215.43 - 59.40 164.50 - - - - - - - 1,419.88 - 795.55 - - - - - -