The purpose of this policy is to provide………………………….
Aim
To ……..
To
To
To have
To
To
And
Principle
‘Occupational Health and Safety” requires a person to ensure health and safety in workplaces “so far as
is reasonably practicable”.
Expectations
That all employees, contractors, suppliers and visitors to the site………………….
Our Commitment
In consultation with the HSR’s and people who will be working/present on the building site, a “Safety
Assessment” relevant and specific to the subject workplace will be undertaken1.. This will be done
before ………………
1
The “Safety Assessment template” supplied will be used for the consultation process and assessment and any necessary
actions will be undertaken.
3
Antony Kuypers Melbourne Polytechnic
Site Safety Management – Cooper Constructions Pty Ltd
Introduction
The site specific safety management plan is to be used by all Cooper Construction employees and
subcontractors for the life of the project.
The project is for the construction of one double storey unit at …………Street, Thornbury, Victoria
Safety Assessment
Site safety induction will take place for all employees and contractors (the workers), who will be working
or present themselves on-site, as part of the general site induction. Others (including any members of the
public who might enter the site) will have the plan explained at the earliest possible opportunity.
4
Antony Kuypers Melbourne Polytechnic
How information about the plan can be accessed
Who is responsible for maintaining the plan
Workers must acquaint themselves with the plan and have a full understanding of the procedures. Any
queries can be addressed to the contractor or supervisor. Any changes made to the plan, due to changes in
work or duties, will be notified to the workers as soon as they are made and regular tool box meetings will
be held to inform and/or discuss health and safety issues. Information will also be posted on the notice
board
5
Antony Kuypers Melbourne Polytechnic
6
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
Principle Contractor:
Contractor address:
Contractor representative:
Contract description:
Location of works:
2. Responsibilities
1
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
First contact
Second contact
Third contact
2
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
Complete the following section outlining how you will ensure that all employees and subcontractors understand the Safe Work Method
Statements (SWMS). Attach copies of the relevant SWMS.
A first aid program for contractors is outlined in the First Aid Plan. Please describe below any additional first aid needs for this contract:
3
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
7. Emergency Procedures
4
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
Describe how incidents will be reported and investigated during the contract.
5
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
Training and inductions for contractors are to be completed in accordance with the Induction Guidelines. List any relevant communication
or training methods used during the works in relation to safety, for example weekly toolbox meetings or safe procedure training:
6
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
List any ongoing inspections, hazard management or incident reporting or investigation processes to be used during the works, if relevant.
Complete the attached Subcontractor List detailing the subcontractors to be used and the details of the subcontractor management:
Sub Contractor Name Sub Contractor Representative Description of Work Date of Local
Name Induction
Jim’s Concrete Supplies Jim Pouring Concrete Footings 24/04/2008
7
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
This Safety Management Plan and any attachments incorporate all the safety requirements outlined in the contract.
Name: Position:
Signature: Date:
8
Antony Kuypers Melbourne Polytechnic
Site Safety Management Plan
Contractor signature:
Date:
Site Safety Management Plan
Contractor signature:
Date:
Site Safety Management Plan
Key steps Equipment or Plant Possible Hazards Risk Safety controls including personal Licences, qualifications
Required Score protective equipment (PPE) or
work permits
Key steps Equipment or Plant Possible Hazards Risk Safety controls including personal Licences, qualifications
Required Score protective equipment (PPE) or
work permits