To Collection 271,450.00
22.0 /1 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY
To Collection 1,301,699.00
22.0 /2 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY
To Collection 916,802.00
22.0 /3 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY
SCREENING CHAMBER
Mechanically Raked Coarse Screens
22.0/4/A Mechanically raked coarse screens of stainless steel 304 2 nr 166,667.00 333,334.00 ü
construction, installed in a channel 2000mm wide x 3000mm
depth as shown in drawing. All components of screen must be
of minimum SS304 material. Screens to be of 10mm Bar size
with 25mm clear spacing, 75° inclination to horizontal c/w wall
guides, cleaning rakes, rake wiper, sprockets, shafts, bearings,
chains, drive unit complete with reducer motor and overload
device, side frames, bar rack dead plate, discharge chute, head
section, anchor bolts, platform, etc.
To Collection 421,557.00
22.0 /4 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY
Dewatering Pumps
22.0/6/A Submersible dewatering sump pumps of capacity 0.5 m3/min 4 nr 3,946.00 15,784.00 ü
per pump at a total head of 15m complete with cabling to the
control panel. Rate shall include fixing accessories, built-in float
switches and other items necessary for the complete
installation and successful operation of the unit.
To Collection 15,784.00
22.0 /5 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY
To Collection 536,058.00
To Collection 103,912.00
PRIMARY CLARIFIER
Primary Clarifier Distribution System
22.0/20/A Penstock for opening W600mm x H600 16 nr 9,001.00 144,016.00 ü
22.0/21/B Non-clog Type Sludge Pumps (2 duty, 2 standby) of capacity 4 nr 6,938.00 27,752.00 ü
0.7 m3/min and 10m H each, complete with SS304 type
guide rails, stainless steel lifting chain and all other 22.0 /6 of 51
associated parts and fixing accessories as per pecification
for the complete installation and successful operation of the
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
STATUS
70%
83,956.00 58,769.20
83,956.00 58,769.20
22.0 /7 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
70%
41,978.00 29,384.60
41,978.00 29,384.60
22.0 /8 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
70%
238,002.00 166,601.40
119,001.00 83,300.70
130,669.00 91,468.30
11,247.00 7,872.90
498,919.00 349,243.30
22.0 /9 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
70%
333,334.00 233,333.80
333,334.00 233,333.80
22.0 /10 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
70%
15,784.00 11,048.80
15,784.00 11,048.80
22.0 /11 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)
70%
18,764.00 13,134.80
18,764.00 13,134.80
28,146.00 19,702.20
65,674.00 45,971.80
18,072.00 12,650.40
18,072.00 12,650.40
144,016.00 100,811.20
120,384.00 84,268.80
264,400.00 185,080.00
27,752.00 19,426.40
22.0 /12 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
INSTRUMENTATION
SCADA system.
AS-MBBR
24.0 /13 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
To Collection :
24.0 /14 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
AS-MBBR (continued)
24.0/2/A Air Flowmeter (Aeration Tank Line) 4 lot
24.0/2/B Magnetic Flowmeter (RAS Line) 4 lot
UV/ Reclaim Water System
24.0/2/C Electromagnetic Flowmeter (Reclaimed 2 Lot
Water)
24.0/2/D Ultrasonic Level sensors (UV Channel) 2 Lot
Effluent Discharge
24.0/2/E Ultrasonic Flowmeter 1 Lot
Sludge Treatment
24.0/2/F Ultrasonic Level Sensors 5 Lot
24.0/2/G Electromagnetic Flowmeter (Thickener Feed 2 Lot
Line)
24.0/2/H Electromagnetic Flowmeter (Centrifuge Feed 1 Lot
Line)
24.0/2/J Pressure Sensors 3 Lot
24.0/2/K Electromagnetic Flowmeter (Polymer Line) 3 Lot
Digester
24.0/2/L Ultrasonic Level Sensors 2 Lot
24.0/2/M Electromagnetic Flowmeter (Digested Sludge 2 Lot
Transfer Line)
24.0/2/N Pressure Sensors 2 Lot
24.0/2/P Gas Sampler (Gas Holder) 3 Lot
24.0/2/Q Gas Sampler (Post Combustion) 1 Lot
24.0/2/R Gas Leak Sensor 2 Lot
24.0/2/S Automatic Sampler 2 Set
To Collection
24.0 /15 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
To Collection :
24.0 /16 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
24.0 /17 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
24.0 /18 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
24.0 /19 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
24.0 /20 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
(continued)
24.0/8/A 1 Lot
SCADA system software complete with user and
development licenses
24.0 /21 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
(continued)
SUPPLY OF SPARE PART
Master Station
24.0/9/A Power supply units 3 nr
24.0/9/B Transmission boards 2 nr
24.0/9/C Storage disks 30 nr
24.0/9/D Printer ribbon 5 nr
24.0/9/E Toner (bottles) 10 nr
24.0/9/F Keyboard 2 nr
24.0/9/G Computer paper 20 lot
24.0/9/H Colour ink cartridges 10 nr
Outstation
24.0/9/I Digital input modules. 5 nr
24.0/9/J Digital output modules. 5 nr
24.0/9/K Analogue input modules. 5 nr
24.0/9/L Analogue output modules. 5 nr
24.0/9/M PLC complete unit. 2 nr
24.0/9/N Power supply unit. 2 nr
24.0/9/0 Communication module. 1 nr
24.0/9/P Modems. 2 nr
24.0/9/Q Other recommended spares.
(Each item to be detailed and priced separately
below)
To Collection
24.0 /22 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
(continued)
SUPPLY OF TOOLS
24.0/10/A Test programs for CPU, data peripherals and 2 nr
I/O devices.
24.0/10/B Laptop computers. 1 nr
24.0/10/C Other recommended tools.
(Each item to be detailed and priced separately
below)
To Collection
24.0 /23 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
Collection
Electrical Works (All Provisional)
24.0/1
24.0/2
24.0/3
24.0/4
24.0/5
24.0/6
24.0/7
24.0/8
24.0/9
24.0/10
24.0 /24 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION
To Summary :
24.0 /25 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
6,867.00 6,867.00
6,867.00
ü
2,956.00 2,956.00
197,624.00 197,624.00
197,624.00
ü
9,756.00 9,756.00
9,756.00
ü
13,734.00 13,734.00
13,734.00
ü
8,700.00 8,700.00
8,700.00
ü
28,645.00 57,290.00
57,290.00
ü
28,645.00 57,290.00
57,290.00
ü
3,789.00 15,156.00
15,156.00
ü
24.0 /26 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
7,578.00 30,312.00
30,312.00
ü
12,767.00 102,136.00
102,136.00
ü
4,600.00 18,400.00
18,400.00
ü
To Collection : 618,581.00
615,625.00
24.0 /27 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
24.0 /28 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
288,167.00 288,167.00
40,828.00 163,312.00
To Collection : 451,479.00
24.0 /29 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
2,443.00 24,430.00
1,222.00 12,220.00
245.00 2,450.00
2,784.00 2,784.00
245.00 735.00
4,885.00 4,885.00
2,443.00 24,430.00
611.00 6,110.00
977.00 4,885.00
489.00 4,890.00
2,443.00 2,443.00
5,129.00 5,129.00
464.00 464.00
16,118.00 16,118.00
25,959.00 25,959.00
10,257.00 10,257.00
16,814.00 16,814.00
10,489.00 10,489.00
25,959.00 25,959.00
14,667.00 14,667.00
To Collection 216,118.00
24.0 /30 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
272,223.00 272,223.00
To Collection 272,223.00
24.0 /31 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
35,556.00 35,556.00
14,445.00 14,445.00
3,889.00 3,889.00
8,334.00 8,334.00
3,000.00 15,000.00
8,334.00 8,334.00
22,223.00 22,223.00
1,112.00
To Collection : 108,893.00
24.0 /32 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
To Collection : 176,120.00
24.0 /33 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
50,000.00 50,000.00
2,778.00 2,778.00
1,112.00 1,112.00
22,223.00 22,223.00
To Collection 76,113.00
24.0 /34 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
556.00 1,668.00
556.00 1,112.00
6.00 180.00
56.00 280.00
389.00 3,890.00
167.00 334.00
56.00 1,120.00
334.00 3,340.00
334.00 1,670.00
445.00 2,225.00
1,223.00 6,115.00
1,500.00 7,500.00
3,889.00 7,778.00
556.00 1,112.00
5,000.00 5,000.00
1,667.00 3,334.00
To Collection 46,658.00
24.0 /35 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
834.00 1,668.00
3,334.00 3,334.00
To Collection 5,002.00
24.0 /36 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
24.0/1 618,581.00
24.0/2 522,681.00
24.0/3 451,479.00
24.0/4 216,118.00
24.0/5 272,223.00
24.0/6 108,893.00
24.0/7 176,120.00
24.0/8 76,113.00
24.0/9 46,658.00
24.0/10 5,002.00
24.0 /37 of 51
AU PINANG (FASA 2)
STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY
2,493,868.00
24.0 /38 of 51
ATUS
70%
4,806.90
138,336.80
6,829.20
9,613.80
6,090.00
40,103.00
40,103.00
10,609.20
24.0 /39 of 51
ATUS
70%
68,852.00
21,218.40
71,495.20
12,880.00
430,937.50
24.0 /40 of 51
ATUS
70%
29,495.20
71,806.00
12,024.60
9,878.40
7,218.40
24,034.50
12,024.60
5,390.00
5,787.60
16,170.00
24,204.60
13,658.40
3,858.40
235,550.70
24.0 /41 of 51
ATUS
70%
24.0 /42 of 51
ATUS
70%
24.0 /43 of 51
ATUS
70%
24.0 /44 of 51
ATUS
70%
24.0 /45 of 51
ATUS
70%
24.0 /46 of 51
ATUS
70%
24.0 /47 of 51
ATUS
70%
24.0 /48 of 51
ATUS
70%
24.0 /49 of 51
ATUS
70%
24.0 /50 of 51
ATUS
70%
24.0 /51 of 51