Anda di halaman 1dari 51

UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.

061) PULAU PINANG


Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

LOH RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)


NO. TENDER : KeTTHAPPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
Bill No.22 -MECHANICAL WORKS (ALL PROVISIONAL)
STATUS
RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY

22.0/1/A Penstock for 1800mm dia pipe (On-Seat) 2 nr 41,978.00 83,956.00 ü

To Collection 271,450.00

22.0 /1 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY

Main Inlet Penstock


22.0/3/A Penstock for 1800mm dia pipe (Off-Seat) 1 nr 41,978.00 41,978.00 ü

To Collection 1,301,699.00

22.0 /2 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY

Screen Channel Inlet Penstocks (Channel Mounted)


22.0/3/C Penstocks W1,500mm x H2,600mm 6 nr 39,667.00 238,002.00 ü

Screen Channel Outlet Penstocks (Channel Mounted)


22.0/3/E Penstocks W1,500mm x H2,600mm 6 nr 39,667.00 238,002.00 ü

22.0/3/G Penstock 1000mm x 1000mm (On-Seat) 7 nr 18,667.00 130,669.00 ü

22.0/3/K Actuator for Inter-connection Penstock 1 nr 11,247.00 11,247.00 ü

To Collection 916,802.00

22.0 /3 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY

SCREENING CHAMBER
Mechanically Raked Coarse Screens
22.0/4/A Mechanically raked coarse screens of stainless steel 304 2 nr 166,667.00 333,334.00 ü
construction, installed in a channel 2000mm wide x 3000mm
depth as shown in drawing. All components of screen must be
of minimum SS304 material. Screens to be of 10mm Bar size
with 25mm clear spacing, 75° inclination to horizontal c/w wall
guides, cleaning rakes, rake wiper, sprockets, shafts, bearings,
chains, drive unit complete with reducer motor and overload
device, side frames, bar rack dead plate, discharge chute, head
section, anchor bolts, platform, etc.

To Collection 421,557.00

22.0 /4 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY

Dewatering Pumps
22.0/6/A Submersible dewatering sump pumps of capacity 0.5 m3/min 4 nr 3,946.00 15,784.00 ü
per pump at a total head of 15m complete with cabling to the
control panel. Rate shall include fixing accessories, built-in float
switches and other items necessary for the complete
installation and successful operation of the unit.

To Collection 15,784.00

22.0 /5 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

RATE TOTAL
ITEM DESCRIPTION QTY UNIT
(RM) (RM) ORDER DELIVERY

22.0/10/F Actuator for Slide Gate 2 nr 9,382.00 18,764.00 ü

22.0/10/H Actuator for Slide Gate 2 nr 9,382.00 18,764.00 ü

22.0/10/K Actuator for Slide Gate 3 nr 9,382.00 28,146.00 ü

To Collection 536,058.00

Grit Classifier Inlet Valve


22.0/13/A Stainless steel 100mm dia actuated heavy duty knife gate 2 nr 9,036.00 18,072.00 ü
valve capable of working against 6.5m water Head and
handling abrasive slurry-mix type fluid. Inclusive of all
necessary accessories.

To Collection 103,912.00

PRIMARY CLARIFIER
Primary Clarifier Distribution System
22.0/20/A Penstock for opening W600mm x H600 16 nr 9,001.00 144,016.00 ü

22.0/20/B Actuator for Penstock 16 nr 7,524.00 120,384.00 ü


To Collection 2,481,160.00
Primary Sludge Pump to P-SHT

22.0/21/B Non-clog Type Sludge Pumps (2 duty, 2 standby) of capacity 4 nr 6,938.00 27,752.00 ü
0.7 m3/min and 10m H each, complete with SS304 type
guide rails, stainless steel lifting chain and all other 22.0 /6 of 51
associated parts and fixing accessories as per pecification
for the complete installation and successful operation of the
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

STATUS

70%

83,956.00 58,769.20

83,956.00 58,769.20

22.0 /7 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

70%

41,978.00 29,384.60

41,978.00 29,384.60

22.0 /8 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

70%

238,002.00 166,601.40

119,001.00 83,300.70

130,669.00 91,468.30

11,247.00 7,872.90

498,919.00 349,243.30

22.0 /9 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

70%

333,334.00 233,333.80

333,334.00 233,333.80

22.0 /10 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

70%

15,784.00 11,048.80

15,784.00 11,048.80

22.0 /11 of 51
UPGRADING OF EXISTING BAYAN BARU REGIONAL PLANT (PEG.061) PULAU PINANG
Bill No. 22 : MECHANICAL WORKS (ALL PROVISIONAL)

70%

18,764.00 13,134.80

18,764.00 13,134.80

28,146.00 19,702.20

65,674.00 45,971.80

18,072.00 12,650.40

18,072.00 12,650.40

144,016.00 100,811.20

120,384.00 84,268.80
264,400.00 185,080.00

27,752.00 19,426.40

22.0 /12 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

INSTRUMENTATION

Supply, deliver, install, test and commission the


following equipment/instrument. Supply to
include all ancillaries such as weatherproof
instrument panel, analyser, transmitter,
probes, surge & lightning protection for
both instruments and power and signal
cabling, etc for complete installation. The
instrument signal shall be linked to the

SCADA system.

Main Inlet Pump Station (MIPS)

24.0/1/A Ultrasonic Level Sensors 1 Lot

24.0/1/B Float Switches (Redundancy) 1 Lot

24.0/1/C Electromagnetic Flowmeter (Force Main) 1 Lot

24.0/1/D Gas Detection System 1 Lot

Preliminary Treatment Works

24.0/1/E Ultrasonic Level Sensors (Drum Screen 1 Lot

24.0/1/F Air Flowmeter (Grease Tank Air Line) 1 Lot

Primary and Secondary Clarifier

24.0/1/G Sludge Density Meter (Primary Sludge 2 nos

24.0/1/H Sludge Density Meter (WAS Discharge Line) 2 Lot

AS-MBBR

24.0/10 pH/ Temperature Meter 4 lot

24.0 /13 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

24.0/1/K Dissolved Oxygen Sensor & Transmitter/ 8 lot


Analyser

24.0/1/L ORP Meter 4 lot

24.0/1/M MLSS meter 8 lot

24.0/1/N Hydrostatic Level Sensor 4 Set

To Collection :

24.0 /14 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

AS-MBBR (continued)
24.0/2/A Air Flowmeter (Aeration Tank Line) 4 lot
24.0/2/B Magnetic Flowmeter (RAS Line) 4 lot
UV/ Reclaim Water System
24.0/2/C Electromagnetic Flowmeter (Reclaimed 2 Lot
Water)
24.0/2/D Ultrasonic Level sensors (UV Channel) 2 Lot
Effluent Discharge
24.0/2/E Ultrasonic Flowmeter 1 Lot
Sludge Treatment
24.0/2/F Ultrasonic Level Sensors 5 Lot
24.0/2/G Electromagnetic Flowmeter (Thickener Feed 2 Lot
Line)
24.0/2/H Electromagnetic Flowmeter (Centrifuge Feed 1 Lot
Line)
24.0/2/J Pressure Sensors 3 Lot
24.0/2/K Electromagnetic Flowmeter (Polymer Line) 3 Lot
Digester
24.0/2/L Ultrasonic Level Sensors 2 Lot
24.0/2/M Electromagnetic Flowmeter (Digested Sludge 2 Lot
Transfer Line)
24.0/2/N Pressure Sensors 2 Lot
24.0/2/P Gas Sampler (Gas Holder) 3 Lot
24.0/2/Q Gas Sampler (Post Combustion) 1 Lot
24.0/2/R Gas Leak Sensor 2 Lot
24.0/2/S Automatic Sampler 2 Set

To Collection

24.0 /15 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

24.0/3/A Instrumentation & Equipment Signal 1 Lot


Cabling
Supply, install, test and commission signal cabling
from all instrument equipment to SCADA using
screen cable.
Other Items
Any other items or works for this section not
24.0/3/B stated but required for full completion and
hand over shall be itemised and priced
accordingly;
NO3 meter 4 Lot

To Collection :

24.0 /16 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

SUPPLY OF SPARE PART


24.0/4/A Trip amplifiers 10 nr
24.0/4/B Signal isolator 10 nr
24.0/4/C Interposing relays 10 nr
24,0/4/D Converter for magnetic flow meter 1 nr
24.0/4/E Level relays 3 nr
24.0/4/F Pressure transducer complete 1 nr
24.0/4/G Digital indicators 10 nr
24.0/4/H Alarm enunciators 10 nr
24.0/4/I Analogue signal transmitters 5 nr
24.0/4/J Lightning arrestor 10 nr
24.0/4/K Simulator for magnetic flow meter 1 nr
24,0/4/L Ultrasonic level sensor complete 1 set
24.0/4/M Float switches 1 set
24.0/4/N Gas detection system spares 1 set
24,0/4/0 Sludge density meter spares 1 set
24.0/4/P pH/Temperature meter spares 1 set
24.0/4/Q DO meter spares 1 set
24.0/4/R ORP meter spares 1 set
24.0/4/S MLSS meter spares 1 set
24.0/4/T Gas leak sensor spares 1 set
To Collection

24.0 /17 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

PLC and SCADA Control System for STP


Complete programming and configuration
works of the local RTU for the automatic
control and monitoring of all process
equipment and instruments including M&E
Building services, as per Tender specification.

Works to include all interfacing works of the


local OS, programming, power and signal
cabling and all necessary for full completion
and operation of the system. Works to include
but not limited to the following;
Outstation equipment including PLCs, modems, 1 Lot
I/O modules, software and all ancillary
equipment including power supply units, power
cabling, fibre optic cabling, signal cabling from
respective switchboard, instrument panel,
marshalling panel, etc. for:
24.0/5/A Outstation 0/S 1 - MIPS
24.0/5/B Outstation 0/S 2 - MBBR/BH
24.0/5/C Outstation 0/S 3 - Sludge Treatment
24.0/5/D Outstation 0/S 4 - Disinfection Facility
24.0/5/E Outstation 0/S 5 - TSRF
24.0/5/F Outstation 0/S 6 - Electrical Plant
24.0/5/G Outstation 0/5 7 - Admin
To Collection

24.0 /18 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

PLC and SCADA Control System for STP


(continued)
24.0/6/A Dual SCADA system master station equipment 1 Lot
including dual data servers on hot standby,
engineering workstations, 2 nos. 60" LED
screens, fiber optic network cables, hubs,
communication directors, interwiring, etc., and all
other items necessary for a complete working
system.

24.0/6/6 CMMS servers, software, communication links and 1 Lot


all other items necessary for a complete working
system.
24.0/6/C Bulk data storage devices 1 Lot
24.0/6/D Control desk incorporating man machine 1 set
interfaces (MMI), keyboards, etc. at the
Control Room
24.0/6/E Report printer including table with paper catch 5 set
etc. at the Control Room
24.0/6/F Multi colored video hard copier (colour trend 1 set
recorder) including table with paper catch at the
Control Room Operator workstations complete
with power and signal cabling, table and chair,
etc.
24.0/6/G Uninterruptible power supply for the master
station and its ancillary equipment at the
Control Room including inverter, converter,
charger, batteries, battery rack, interwiring,
power cabling to UPS, DB and master station
equipment, etc.
24.0/6/H All cabling between the master station equipment
and the control desk, MMIs, data loggers, video
hard copier, radio transmitter/ receiver and all
ancillary equipment in the
Process Unit control room, etc. inclusive of all cable
glands termination materials, etc. .
To Collection :

24.0 /19 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

PLC and SCADA Control System for STP


(continued)
All SCADA cabling between the master station
and the following outstations inclusive of cable
glands and termination materials, etc.:
24.0/7/A Outstation 0/S 1 - MIPS 1 Lot
24.0/7/B Outstation 0/S 2 - MBBR/BH 1 Lot
24.0/7/C Outstation 0/S 3 - Sludge Treatment 1 Lot
24.0/7/D Outstation 0/S 4 - Disinfection Facility 1 Lot
24.0/7/E Outstation 0/S 5 - TSRF 1 Lot
24.0/7/F Outstation 0/S 6 - Electrical Plant 1 Lot
24.0/7/G Outstation 0/S 7 - Admin 1 Lot
Uninterruptible power supplies for the following
outstations , associated instrumentation and all
other ancillary equipment including inverters,
converters, chargers, batteries, battery rack,
interwiring, power cabling from nearest MCC/DB,
power distribution to outstations, instrumentation
arid other ancillary equipment, etc.:

24.0/7/H Outstation 0/S 1 - MIPS 1 Lot


24.0/7/I Outstation 0/S 2 - MBBR/BH 1 Lot
24.0/7/J Outstation 0/S 3 - Sludge Treatment 1 Lot
24.0/7/K Outstation 0/S 4 - Disinfection Facility 1 Lot
24.0/7/L Outstation 0/S 5 - TSRF 1 Lot
24.0/7/M Outstation 0/5 6 - Electrical Plant 1 Lot
24.0/7/N Outstation 0/S 7 - Admin 1 Lot
To Collection :

24.0 /20 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

PLC and SCADA Control System for STP

(continued)

24.0/8/A 1 Lot
SCADA system software complete with user and
development licenses

24.0/8/8 SCADA earthing system 1 lot


24.0/8/C All other cables, cable ladder, trays, trunkings, 1 Lot
accessories and items of equipment not listed but
are necessary for compliance with the
requirements of the
Specification and for a complete and efficient
system. (Each item to be detailed and priced
separately)
ERECTION
24.0/8/D All the above plant and equipment supplied. 1 Lot
To Collection

24.0 /21 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

PLC and SCADA Control System for STP

(continued)
SUPPLY OF SPARE PART
Master Station
24.0/9/A Power supply units 3 nr
24.0/9/B Transmission boards 2 nr
24.0/9/C Storage disks 30 nr
24.0/9/D Printer ribbon 5 nr
24.0/9/E Toner (bottles) 10 nr
24.0/9/F Keyboard 2 nr
24.0/9/G Computer paper 20 lot
24.0/9/H Colour ink cartridges 10 nr
Outstation
24.0/9/I Digital input modules. 5 nr
24.0/9/J Digital output modules. 5 nr
24.0/9/K Analogue input modules. 5 nr
24.0/9/L Analogue output modules. 5 nr
24.0/9/M PLC complete unit. 2 nr
24.0/9/N Power supply unit. 2 nr
24.0/9/0 Communication module. 1 nr
24.0/9/P Modems. 2 nr
24.0/9/Q Other recommended spares.
(Each item to be detailed and priced separately
below)
To Collection

24.0 /22 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

PLC and SCADA Control System for STP

(continued)

SUPPLY OF TOOLS
24.0/10/A Test programs for CPU, data peripherals and 2 nr
I/O devices.
24.0/10/B Laptop computers. 1 nr
24.0/10/C Other recommended tools.
(Each item to be detailed and priced separately
below)
To Collection

24.0 /23 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

Collection
Electrical Works (All Provisional)
24.0/1
24.0/2
24.0/3
24.0/4
24.0/5
24.0/6
24.0/7
24.0/8
24.0/9
24.0/10

24.0 /24 of 51
LOJI RAWATAN KUMBAHAN SERANTAU DI BAYAN BARU, PULAU PINANG (FASA 2)
NO. TENDER : KeTTHA/JPP/BAYAN BARU STP FASA 2/RMK 10/14/T15
BILL NO. 24 - INSTRUMENTATION

ITEM DESCRIPTION QTY UNIT

To Summary :

24.0 /25 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

6,867.00 6,867.00
6,867.00
ü
2,956.00 2,956.00

197,624.00 197,624.00
197,624.00
ü
9,756.00 9,756.00
9,756.00
ü

13,734.00 13,734.00
13,734.00
ü
8,700.00 8,700.00
8,700.00
ü

28,645.00 57,290.00
57,290.00
ü
28,645.00 57,290.00
57,290.00
ü

3,789.00 15,156.00
15,156.00
ü

24.0 /26 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

12,295.00 98,360.00 98,360.00


ü

7,578.00 30,312.00
30,312.00
ü
12,767.00 102,136.00
102,136.00
ü
4,600.00 18,400.00
18,400.00
ü
To Collection : 618,581.00
615,625.00

24.0 /27 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

10,534.00 42,136.00 ü 42,136.00


25,645.00 102,580.00 ü 102,580.00

8,589.00 17,178.00 ü 17,178.00

7,056.00 14,112.00 ü 14,112.00

10,312.00 10,312.00 ü 10,312.00

6,867.00 34,335.00 ü 34,335.00


8,589.00 17,178.00 ü 17,178.00

7,700.00 7,700.00 ü 7,700.00

2,756.00 8,268.00 ü 8,268.00


7,700.00 23,100.00 ü 23,100.00

17,289.00 34,578.00 ü 34,578.00


9,756.00 19,512.00 ü 19,512.00

2,756.00 5,512.00 ü 5,512.00


41,667.00 125,001.00
41,667.00 41,667.00
9,756.00 19,512.00 ü ü
Not required as
per tender
clarification

To Collection 522,681.00 336,501.00

24.0 /28 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

288,167.00 288,167.00

40,828.00 163,312.00

To Collection : 451,479.00

24.0 /29 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

2,443.00 24,430.00
1,222.00 12,220.00
245.00 2,450.00
2,784.00 2,784.00
245.00 735.00
4,885.00 4,885.00
2,443.00 24,430.00
611.00 6,110.00
977.00 4,885.00
489.00 4,890.00
2,443.00 2,443.00
5,129.00 5,129.00
464.00 464.00
16,118.00 16,118.00
25,959.00 25,959.00
10,257.00 10,257.00
16,814.00 16,814.00
10,489.00 10,489.00
25,959.00 25,959.00
14,667.00 14,667.00
To Collection 216,118.00

24.0 /30 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

272,223.00 272,223.00

To Collection 272,223.00

24.0 /31 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

35,556.00 35,556.00

14,445.00 14,445.00

3,889.00 3,889.00
8,334.00 8,334.00

3,000.00 15,000.00

8,334.00 8,334.00

22,223.00 22,223.00

1,112.00

To Collection : 108,893.00

24.0 /32 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00
19,604.00 19,604.00

5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
5,556.00 5,556.00
To Collection : 176,120.00

24.0 /33 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

50,000.00 50,000.00

2,778.00 2,778.00
1,112.00 1,112.00

22,223.00 22,223.00
To Collection 76,113.00

24.0 /34 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

556.00 1,668.00
556.00 1,112.00
6.00 180.00
56.00 280.00
389.00 3,890.00
167.00 334.00
56.00 1,120.00
334.00 3,340.00

334.00 1,670.00
445.00 2,225.00
1,223.00 6,115.00
1,500.00 7,500.00
3,889.00 7,778.00
556.00 1,112.00
5,000.00 5,000.00
1,667.00 3,334.00

To Collection 46,658.00

24.0 /35 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

834.00 1,668.00

3,334.00 3,334.00

To Collection 5,002.00

24.0 /36 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

24.0/1 618,581.00
24.0/2 522,681.00
24.0/3 451,479.00
24.0/4 216,118.00
24.0/5 272,223.00
24.0/6 108,893.00
24.0/7 176,120.00
24.0/8 76,113.00
24.0/9 46,658.00
24.0/10 5,002.00

24.0 /37 of 51
AU PINANG (FASA 2)

STATUS
RATE(RM) TOTAL (RM)
ORDER DELIVERY

2,493,868.00

24.0 /38 of 51
ATUS

70%

4,806.90

138,336.80

6,829.20

9,613.80

6,090.00

40,103.00

40,103.00

10,609.20

24.0 /39 of 51
ATUS

70%

68,852.00

21,218.40

71,495.20

12,880.00

430,937.50

24.0 /40 of 51
ATUS

70%

29,495.20
71,806.00

12,024.60

9,878.40

7,218.40

24,034.50
12,024.60

5,390.00

5,787.60
16,170.00

24,204.60
13,658.40

3,858.40

235,550.70

24.0 /41 of 51
ATUS

70%

24.0 /42 of 51
ATUS

70%

24.0 /43 of 51
ATUS

70%

24.0 /44 of 51
ATUS

70%

24.0 /45 of 51
ATUS

70%

24.0 /46 of 51
ATUS

70%

24.0 /47 of 51
ATUS

70%

24.0 /48 of 51
ATUS

70%

24.0 /49 of 51
ATUS

70%

24.0 /50 of 51
ATUS

70%

24.0 /51 of 51

Anda mungkin juga menyukai