APARRI POLYTECHNIC INSTITUTE


INSTITUTIONAL DEVELOPMENT PLAN (2017-2021)

Executive Summary
Since its inception, Aparri Polytechnic Institute is the only operating TESDA
Technology Institution in the First Congressional District of Cagayan catering to its
ten municipalities which are Aparri, Camalaniugan, Lallo, Gattaran, Baggao, Alcala,
Buguey, Gonzaga, Sta. Ana and Sta. Teresita including the nearby municipalities of
the Second and Third Congressional Districts. Locals do not need to go anymore to
Tuguegarao City or even to Manila for technical education and training.

Because of the valuable tradition and culture that could be witnessed at API,
the vision that we project five years from now could also easily be attained for in the
journey for mission, everything will probably be worked fine.

The five year development plan aims to provide quality training and services
to its constituents and stakeholders both for local and international market. In order
for API to uplift the living condition of the people it serves, job seekers have better
chances to get employed when they are equipped with the necessary work
competencies contained in the certificate which TESDA issues to certified graduate-
workers in the different qualifications.

Over the years, TESDA-API has been keeping its commitment to national
economic and development goals through TVET and the Institute will always commit
to produce graduates who will cater to the market needs locally and even abroad.
These graduates contribute to nation building by lessening the woes of
unemployment.

Hence, the Institute, though it is established as training ground for future


competent workforce, is still in need of further development and this gives light for
this plan to be written up.

1
2

Introduction:

The TESDA-Aparri Polytechnic Institute is sited at Rizal Street Maura Aparri,


Cagayan and it is approximately 100 meters away from the brink of the town proper
or 200 meters away from the town capital.

This Training Institution was first created in 1928 by R.A. No. 948 as Aparri
Vocational High School (AVHS). As its name suggests, AVHS concentrated
on secondary education with elective vocational subjects. On June 22, 1963, R.A.
3732 converted the Aparri Vocational High School into Aparri School of Arts and
Trades (ASAT) maintaining the same curriculum. ASAT, in the 1970s, started to offer
Bachelor of Science in Industrial Technology with different major subjects/areas and
two-year Technical Courses aside from its regular Trade Secondary Education
Program. In 1978, P.D. 1436 caused the transfer of ASAT’s BSIT courses, its two-
year Technical Education Program, staff and facilities to the Cagayan State
University-Aparri due to the emergence of the University System. As a result, ASAT
in 1986 worked out its assessment and accreditation to offer Basic Secondary
Education and two-year Technical-Vocational Education and Training courses.

Then came the creation into law of the Technical Education and Skills
Development Authority (TESDA) on August 25, 1994 by R.A. 7796 or TESDA Act 0f
1994. ASAT again faced another challenge when it was included in the list of Tech-
Voc Schools in Region 02 to be absorbed by TESDA on March 21, 1997. The forging
of Memorandum of Agreement between the DECS and TESDA, on August 24, 2000
caused the transfer of schools with predominantly Post-Secondary Education
enrolment including qualified employees and their proportionate share of the budget
and other assets to TESDA. Both DECS and TESDA used the school name ASAT
which caused so much confusion to visitors, would-be-enrolees, and even in the
delivery of correspondences and other printed materials. Thanks to the combined
effort of the Houses of Representatives and the Senate that they spent time to
deliberate on the pros and cons of giving TESDA-ASAT a new name. Thus, on
October 18, 2012 President Benigno Aquino III signed R.A. No. 10227 to change the
name of TESDA-Aparri School of Arts and Trades into Aparri Polytechnic Institute.

The Institute is funded by the national government alongside with its own
Income Generating Projects (IGPs) and it is equally worthwhile to mention that the
land is owned by the Institute.

At present, the Institute has its new profile and it is offering different
qualifications as presented below

Profile:
TTI Administrator : RENATO D. UBIÑA
Name of Institution : Aparri Polytechnic Institute
Address : Rizal St. , Maura, Aparri, Cagayan

2
3

Region : 02
Total No. of Personnel : 36 Teaching staff
: 14 Non-Teaching staff
Phone : (078) 888-2015
: (078) 888 –0146
E-mail Address : api@tesda.gov.ph
Registered Programs : 25
Total Land Area : 4.1 hectares

Registered Training Programs


Automotive Servicing NC I
Automotive Servicing NC II
Driving NC II
Electronics Product Assembly and Servicing NCII
Computer System Servicing NC II
Electrical Installation and Maintenance NC II
SMAW NC II
Carpentry NC II
Plumbing NC II
Masonry NC II
Tile Setting NC II
Technical Drafting NC II
Bread and Pastry Production NC II
Cookery NC II
Housekeeping NC II
Housekeeping NC III
FBS NC II
Beauty Care(Nail Care) Services NC II
Hairdressing NC II
Bookkeeping NC III
Caregiving NC II
Dressmaking NC II
Tailoring NC II
DOMRAC NC II
Trainer’s Methodology (TM)I

3
4

SWOT Analysis

Elements Helpful Harmful


Internal Strengths Weaknesses

 Right qualification of people (as to  Limited plantilla items for


QS of CSC and PTTQF) hired for instructors (especially those
the position who will handle diploma
 Highly trained and competent pool of programs)
professionals/trainers  No funds for Capital and
 Willingness, dedication and Equipment Outlay to fund
commitment to work of personnel Infrastructure to
 Multi-skilled and highly-motivated accommodate growing
faculty and personnel students’ enrolment
 Provision of free tertiary education  Limited funds for MOOE
(UAQTEA) (Not allowed to collect fees
 Organizational Connection/Linkages to support training cost)
(with LGUs, NGOs, industry partners  Limited skills
and other stakeholders) upgrading/industry
 Training facilities (compliant); all immersion for trainers
programs are UTPRAS registered  Training facilities and
 Institutional independence (in terms equipment (old)
of GAA, separate budget)
 Relevant and responsive curricular
offerings
External Opportunities Threats
 The institution is the lone public
post-secondary TECHVOC school in  Changes in political
the district leadership would affect
 Strategic location (accessibility of continuity support for
transportation and communication) programs
 Increasing awareness on TESDA  Existence of established
programs and widening acceptance SUC’s
of technical vocational courses  Students’ preference for
 Strong LGU support of TVET degree courses (target
program group may have little/low
 Job opportunities for graduates interest in TVET programs)
 Avail of TESDA CO support  Fast-changing technology
 A huge number of OSY in the  Unacceptable weather
service area that could avail TVET condition
programs  Sea water corrosion
 Big population of HS graduates
(means sufficient enrolees)
 Presence of Cagayan Economic
Zone Authority

4
5

The Aparri Polytechnic Institute Vision, Mission, Goal, Objectives and Policy
Statement

Vision

“The Leading Technical Vocational Education and Training Provider in the


Province”

Mission

Develop globally competitive workforce trained upon uprightness towards


work in the service of God, humanity and country.

Goal
Produce competent workforce for local and global market.

Objectives:
1.1 Review and redesign curricular programs offered by the institution annually
that address the recent emerging needs of the broad masses and industry.
1.2 Strengthen capacity of human resources
1.3 Upgrade physical facilities to address demands of the program

Policy Statement:
“Commitment to One’s Duties: The Way to Quality Service”

Objectives, Strategies and Activities

Objectives Strategies Activities


Review and redesign Revising curricular 1. Conduct curricular
review of all offered
curricular programs programs responding to
programs to suit the
offered by the institution the needs of stakeholders demands of
stakeholders and
annually that address the and industry
industry.
recent emerging needs of 2. Conduct DACUM for
the particular course
the industry.
3. Develop and register at

5
6

least 2 diploma
program
4. Register at least 5
higher level qualification
5. Conduct benchmarking
activities for best
practices of schools
and industries among
faculty and staff at least
once a year.
6. Subject to third party
accreditation
Engage Experts from 1. Organize and conduct
Industry and academe industry forum/
consultation
2. Conduct Curriculum
validation by Industry
Experts
3. Conduct consultation
meeting with Academe
for diploma course
offering for credit
transfer scheme
4. Conduct industry visits
5. Forge MOA with
industries for in-plant
training of trainees
6. Install research and
development program
2. Strengthen capacity of 2.1Conduct training needs 2.1.1 Prepare TNA
human resources by 2021 assessment activity instrument
2.1.2 Distribute instrument
to respondents
2.1.3 Analyze data
2.1.4 Prepare staff
competency profile
2.1.5 Prepare and
implement Training and
Development Plan for staff
2.2 Identify program for 1.2.1 Identify potential staff
staff development development programs

6
7

offered by industries and


other institutions.
1.2.2 Develop in service
training program for staff.
2.3 Implement training and 2.3.1Identify staff who will
development plan based attend the staff
on TNA development program
2.3.2 Send staff to industry
immersion and skills
upgrading
2.3.3 Send non -teaching
staff for capability building
program
2.3.4 Recruit trainers that
will handle subjects for
higher level qualifications
2.3.5 Recruit job order
employees
3.Develop physical 3.1Perform regular 3.1.1Create FEM Team
facilities to address maintenance of facilities 3.1.2Prepare Action plan
demand of the program by and equipment for office and instructional
2021 facilities and equipment
maintenance
3.1.3 Conduct regular
inspection and preventive
maintenance of
instructional and office
facilities and equipment
3.1.4 Conduct equipment
repair and maintenance
activities
3.1.5 Strengthen IGP of
the school

7
8

3.2 Rehabilitate 3.2.1 Conduct inspection


Administration and of the buildings
Technology buildings 3.2.2 Prepare Term of
Reference for the
repair/maintenance
activities
3.2.3Procure supplies and
materials
3.2.4 Conduct repair and
maintenance of technology
workshop
3.3 Upgrade facilities and 3.3.1Determine the
equipment facilities for improvement
and upgrading
3.3.2 Construct new
buildings
33.2. Purchase new
equipment for higher level
qualifications
3.3.3 Replace
unserviceable tools and
equipment
3.3.4 Forge MOA with
industries for the use of
their equipment to our
trainees
3.3.5 Establish linkages
with LGU’s, NGO’s and
other government
agencies

8
9

2017-2021 Aparri Polytechnic Institute Operational/Financial Plan (Infrastructure Development, Human Resources, Tools
and Equipment, Repair and Maintenance, Governance and Management, Image Building)

Components( Key Expected Outputs Deadline Responsible (Who) Budget


Activities from (When) Requirement
Strategic Plan)
1. Construction of
New Buildings
and structures
Newly Constructed Canteen August 2018 VSA, VIS,FEM Team , 2,800,000.00
Project Manager ,AO,
Budget Officer,
Accountant
2 story operational dormitory March 2021 VSA, VIS,FEM Team, 6,200,000.00
catering for 70 occupants Project Manager ,AO,
Budget Officer,
Accountant
Concrete Water Tank December VSA, VIS,FEM Team , 250,000.00
Reservoir 2018 Project Manager ,AO,
Budget Officer,
Accountant
400m Functional Drainage September VSA, VIS,FEM Team , 600,000.00
Canal 2020 Project Manager ,AO,
Budget Officer,
Accountant
200m Functional Pathway December VSA, VIS,FEM Team , 1,200,000.00
(2.5 m) 2020 Project Manager ,AO,
Budget Officer,
Accountant
Newly Constructed Garage August 2020 VSA, VIS,FEM Team , 280,000.00
Project Manager ,AO,
Budget Officer,

9
10

Accountant
2. Repair and Refurbished Automotive October 2019 VSA, VIS,FEM Team , 1,000,000.00
Maintenance of Building Project Manager ,AO,
Technology Budget Officer,
Buildings and Accountant
Administration Refurbished Audio Visual September VSA, VIS,FEM Team , 800,000.00
building with the Room(function room) 2020 Project Manager ,AO,
following activities: Budget Officer,
1. Repair of Accountant
roofings Refurbished Hotel building November VSA, VIS,FEM Team , 700,000.00
2. Repair of 2021 Project Manager ,AO,
windows and Budget Officer,
doors Accountant
3. Repainting of Refurbished Related Subject October 2021 VSA, VIS, FEMT, 2,000,000.00
buildings Building Project Manager, AO ,
4. Repair of Budget Office
electrical Refurbished DAC Building Dec 2021 VSA, VIS,FEM Team , 1,200,000.00
circuits and Project Manager ,AO,
devices Budget Officer,
5. Water and Accountant
plumbing Refurbished ESF building ( February 2021 VSA, VIS,FEM Team , 650,000.00
system Electronics and RAC rooms) Project Manager ,AO,
Budget Officer,
Accountant
Refurbished Guard House February 2020 VSA, VIS,FEM Team , 450,000.00
Project Manager ,AO,
Budget Officer,
Accountant
Refurbished Administration November VSA, VIS,FEM Team , 2,000,000.00
Building 2021 Project Manager ,AO,
Budget Officer,
Accountant

10
11

3. Human Resources 35 Upgraded Technology October 2021 VSA, VIS, AO, Local 1,500,000.00
Development Trainers Selection Board

13 Upgraded Non-teaching October 2021 VSA, VIS, AO ,Local 300,000.00


Staff and Officials Selection Board
8 Newly Hired Trainers and September VSA, VIS, AO, Local
Staff 2020 Selection Board
Hired Job Orders December VSA, VIS, AO, Local 600,000.00
2021 Selection Board
4. Upgrade tools and Acquisition of Tools and December VSA, VIS, FEMT, AO ,
equipment Equipment for Higher Level 2021 Budget Officer,
Qualification and Diploma Accountant, Instructors
Course and Upgraded Tools
and Equipment
Automotive Servicing NC I 200,000.00
Automotive Servicing NC II 450,000.00
Driving NC II 250,000.00
Electronics Product 350,000.00
Assembly and Servicing II
Computer System Servicing 300,000.00
NC II
Electrical Installation and 250,000.00
Maintenance NC II

SMAW NC II 550,000.00
Carpentry NC II 150,000.00
Plumbing NC II 180,000.00
Masonry NC II 259,000.00
Tile Setting NC II 185,000.00
Technical Drafting NC II 355,000.00
Bread and Pastry Production 350,000.00

11
12

NC II
Cookery NC II 350,000.00
Housekeeping NC II 250,000.00
Housekeeping NC III 400,000.00
FBS NC II 480,000.00
Beauty Care(Nail Care) 290,000.00
Services NC II
Hairdressing NC II 150,000.00
Bookkeeping NC III 90,000.00
Caregiving NC II 350,000.00
Dressmaking NC II 280,000.00
Tailoring NC II 500,000.00
DOMRAC NC II 250,000.00
RAC-PACU CRE NC III * June 2020 580,000.00
FBS NC III* August 2019 280,000.00
Commercial Cooking NC III* October 2020 350,000.00
Carpentry NC III* June 2019 320,000.00
Electrical Installation and February 2019 350,000.00
Maintenance NC III*
Automotive Servicing NC III* March 2021 1,560,000.00
Front Office Services NC II* March 2019 200,000.00
5. Repair and Repaired and Maintained December VSA, VIS, FEMT, AO ,
maintenance of Instructional tools, 2021 Budget Officer,
Instructional Tools, equipment and office Accountant, Instructors
equipment , office equipment
equipment and
vehicles
Automotive Servicing NC I 250,000.00
Automotive Servicing NC II 174,000.00
Driving NC II 300,000.00
Electronics Product 190,000.00

12
13

Assembly and Servicing II


Computer System Servicing 457,000.00
NC II
Electrical Installation and 100,000.00
Maintenance NC II
SMAW NC II 190,000.00
Carpentry NC II 100,000.00
Plumbing NC II 150,000.00
Masonry NC II 100,000.00
Tile Setting NC II 150,000.00
Technical Drafting NC II 200,000.00
Bread and Pastry Production 110,000.00
NC II
Cookery NC II 150,000.00
Housekeeping NC II 200,000.00
Housekeeping NC III 190,000.00
FBS NC II 120,000.00
Beauty Care(Nail Care) 180,000.00
Services NC II
Hairdressing NC II 120,000.00
Bookkeeping NC III 90,000.00
Dressmaking NC II 200,000.00
Tailoring NC II 200,000.00
DOMRAC NC II 200,000.00
RAC-PACU CRE NC III * 150,000.00
FBS NC III* 100,000.00
Carpentry NC III* 120,000.00
Electrical Installation and 100,000.00
Maintenance NC III*
Automotive Servicing NC III* 200,000.00
Front Office Services NC II* 90,000.00

13
14

Office Equipment School ser 1,200,000.00


School Service Vehicles 250,000.00
6. Image Building Star Accredited in 4 VSA, VIS, Instructors 120,000.00
Plan Qualifications
APACC Accredited All Staff 250,000.00
Strengthened SMAC VSA, VIS, AO, 300,000.00
Guidance Counsellor,
Instructors
* for registration

Financial Plan

Component Required Budget Internal Contribution External Contribution Remarks


(TESDA, Other sources)
Infrastructure 11,330,000.00 IGP UAEQTEA FUND, Training-
Development Plan cum production, capital
outlay
Tools and Equipment 17,624,000.00 MOOE/ IGP UAEQTEA FUND,
Plan equipment outlay
Repair and 8,800,000.00 MOOE/IGP UAEQTEA FUND, Training-
Maintenance cum production
Image Building Plan 670,000.00 MOOE/IGP UAEQTEA FUND
Human Resources 2,600,000.00 Regular TESDA capability building
Plan fund/MOOE/IGP fund

Submitted by:

RENATO D. UBIÑA

14