REKAPITULASI AKHIR
UNIT PRICE
NO JENIS PEKERJAAN UNIT VOL
(RP)
1 WOSA ls 1 941,324,519.87
Sub Total
PPn 10%
Total
Andy Sugiarto
AKO - KALIMANTAN TENGAH
Rev 2
TOTAL PRICE
(RP)
941,324,519.87
471,863,728.94
1,413,188,248.81
141,318,824.88
1,554,507,073.69
PROYEK : PEMBANGUNAN WORKSHOP FACILITY
PAKET PEKERJAAN : WOSA
LOKASI : PT. PAMAPERSADA NUSANTARA DISTRICT BRCB, BERAU - KALIMANTAN TIMUR
REKAPITULASI AKHIR
I. BANGUNAN WOSA
1. PEKERJAAN TANAH ls 1.00 11,508,920.00 11,508,920.00
2. PEKERJAAN STRUKTUR ls 1.00 204,298,377.50 204,298,377.50
2. PEKERJAAN BAJA ls 1.00 193,329,657.39 193,329,657.39
3. PEKERJAAN ATAP ls 1.00 104,803,936.68 104,803,936.68
4. PEKERJAAN DINDING DAN PLAFOND ls 1.00 58,895,181.66 58,895,181.66
5. PEKERJAAN PASANGAN PINTU / JENDELA ls 1.00 24,796,168.67 24,796,168.67
II. PEKERJAAN SARANA LUAR ls 1.00 217,226,253.87 217,226,253.87
III. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL ls 1.00 56,466,024.10 56,466,024.10
IV. PEKERJAAN PERSIAPAN ls 1.00 70,000,000.00 70,000,000.00
REKAPITULASI AKHIR
VOL UNIT PRICE TOTAL PRICE
NO JENIS PEKERJAAN UNIT
GP (RP) (RP)
I. BANGUNAN WOSA
REKAPITULASI AKHIR
VOL UNIT PRICE TOTAL PRICE
NO JENIS PEKERJAAN UNIT
GP (RP) (RP)
B ELEKTRIKAL
1 Lampu TKO V Shape FL 1 x 36watt unit 8.00 550,000.00 4,400,000.00
2 Lampu Fitting + Bohlam 10 Watt unit 3.00 250,000.00 750,000.00
3 STOP KONTAK 1phase 16A Waterproof bh 1.00 150,000.00 150,000.00
4 STOP KONTAK 3phase 32A Waterproof bh 1.00 500,000.00 500,000.00
5 Saklar Waterproof bh 1.00 350,000.00 350,000.00
6 Saklar SAKLAR Engkel bh 1.00 75,000.00 75,000.00
7 Saklar SAKLAR SERI bh 1.00 125,000.00 125,000.00
8 Instalasi Kabel NYM 3x2,5 mm2 + conduit Lampu bh 11.00 475,000.00 5,225,000.00
9 Instalasi kabel stopkontak 1 ph/ 16 A ls 1.00 475,000.00 475,000.00
10 Instalasi Kabel Stopkontak 3phase 32A ls 1.00 475,000.00 475,000.00
11 Material bantu ls 1.00 5,000,000.00 5,000,000.00
12 Panel PP WOSA bh 1.00 17,500,000.00 17,500,000.00
REKAPITULASI AKHIR
I. PEKERJAAN STRUKTUR ls
Sub Total
REKAPITULASI AKHIR
NO JENIS PEKERJAAN SPESIFIKASI UNIT
I PEKERJAAN STRUKTUR
1 Siku Pelindung Pelat Lantai L 70.70.5 m'
2 Rangka Atap dan Oil Storage WS m2
3 Rangka Atap dan Atap Oil Storage WOSA CNP 125.50.20.2.3 m2
4 Rabat Beton Oil Storage - t=7cm Uk. 1800x900 m3
5 Menara Air - H=150cm Uk. 100x100 unit
6 Tanki Air 550 liter unit
7 Railing Oil Trap Uk. 5500x1700x1000 m'
II PEKERJAAN ARSITEKTUR
1 Pintu P2 - Uk. 900x2150 unit
2 Pintu J2 - Uk. 1550x1350 unit
3 Pintu J3 - Uk. 800x1350 unit
4 Partisi Gypsum - t=9mm m2
5 Loket - Uk. 700x400 unit
6 Jendela J4 - Uk. 800x800 unit
7 Grounding Bangunan - Uk. 40x40 unit
471,863,728.94
Pembulatan 471,000,000.00
LIMANTAN TIMUR
294,365,615.94
60 60 122,850 7,371,000.00
163 163 1,041,773 113,205,996.81
20 20 1,041,773 20,835,459.53
3.78 3.78 2,909,302 10,997,162.79
1 1 7,500,000 7,500,000.00
1 1 10,000,000 10,000,000.00
14.9 14.9 755,034 11,250,000.00
51,828,163.00
18 22 4 3,924,107 15,696,428.00
20 22 2 5,591,690 11,183,380.00
4 5 1 3,529,166 3,529,166.00
650.02 671.02 21 250,000 5,250,000.00
2 2 1,116,666 2,233,332.00
1 1 3,435,857 3,435,857.00
2 5 3 3,500,000 10,500,000.00
125,669,950.00
21 80 59 80,000 4,720,000.00
101 101 175,000 17,675,000.00
5 5 175,000 875,000.00
21 80 59 375,000 22,125,000.00
101 101 375,000 37,875,000.00
5 5 375,000 1,875,000.00
57 57 90,350 5,149,950.00
57 57 375,000 21,375,000.00
2 2 4,800,000 9,600,000.00
2 2 2,200,000 4,400,000.00