ACTION CODES:
( R ): Responsible – to approve (A ):Accountable – to consolidate ( C ):Consulted – to review ( I ) : Information
NOTES:
Review/Approval from Company does not constitute acceptance of design details, calculations, test methods or materials
developed or selected by Supplier/Contractor nor does relieve Supplier/Contractor from full compliance with contractual or
other obligations
DOCUMENT REVIEW STATUS SIGNATURE (RESPONSIBLE
1 Not Approved. Revise and Re-Issue Incorporating Comments PERSON):
COMMENTS:
DOCUMENT TRANSMITTAL
No. of
No. Doc./Drawings No. Rev. Status Document Title
Copies
Rurita Sari
By Rurita Sari
Signature Date 24-Jan-2018 Document Controller
Remarks :
Please acknowledge the receipt and return the original
Page 1 of 1
Project Report ID-F-MA-CC0-PRT-JY-00-0001_R0B
Soil Investigation
Medco E&P Natuna Ltd. Page 2 of 26
Revision Sheet
Contents
Contents ....................................................................................................................................................... 3
List of Figures ............................................................................................................................................. 3
List of Tables ............................................................................................................................................... 3
1 INTRODUCTION ...................................................................................................................... 4
1.1 Project Overview ....................................................................................................................... 4
1.2 Terminology .............................................................................................................................. 4
1.3 Objective of Soil Investigation................................................................................................... 4
1.4 Scope of Soil Investigation Work .............................................................................................. 4
1.5 Project Location ........................................................................................................................ 5
1.6 Terms and Abbreviation ............................................................................................................ 5
1.7 Codes, Standards, and References.......................................................................................... 6
1.8 Units .......................................................................................................................................... 6
2 Investigation Methodology .................................................................................................... 6
2.1 Geotechnical Drilling ................................................................................................................. 6
2.2 Standard Penetration Test (SPT) ............................................................................................. 6
2.3 Laboratory Testing .................................................................................................................... 8
3 SOIL INVESTIGATION RESULTS........................................................................................... 8
3.1 Subsurface condition based on soil investigation results ......................................................... 8
3.2 Laboratory Test Result ............................................................................................................. 9
4 DESIGN SOIL PARAMETER ................................................................................................. 10
4.1 Soil Parameter ........................................................................................................................ 10
5 PILE CAPACITY OF BORED PILE ....................................................................................... 17
5.1 Axial Capacity ......................................................................................................................... 17
5.2 Lateral Capacity ...................................................................................................................... 18
6 CLOSURE AND LIMITATION ................................................................................................ 20
List of Figures
Figure 1 Location of Matak Jetty ................................................................................................................... 5
Figure 2 Borehole Location Relative to Jetty Refurbishment Plan ............................................................... 7
Figure 3 Drilling Activity and Core Box depth 0.0 – 5.0 m of BH-01 ............................................................. 8
Figure 4 Drilling Activity and Core Box depth 25.0 – 30.0 m of BH-03 ......................................................... 9
Figure 5 Distribution of Unit Weight ............................................................................................................ 12
Figure 6 Distribution of Effective Stress Parameters (Geotechnical Drilling) ............................................. 13
Figure 7 Distribution of Total Stress Parameters (Geotechnical Drilling) ................................................... 14
Figure 8 Distribution of Soil Modulus .......................................................................................................... 15
Figure 9 Soil Profile at Matak Jetty ............................................................................................................. 16
Figure 10 Load-Transfer Mechanism: a) Axial Compressive Loads; b) Axial Tension Loads; c) Lateral
Loads ................................................................................................................................................... 17
Figure 11 Axial Pile Capacity of Bored Pile (OD 1000m) ........................................................................... 19
Figure 12 Lateral Pile Capacity of Bored Pile (Free Head) ......................................................................... 20
Figure 13 Lateral Pile Capacity of Bored Pile (Fixed Head) ....................................................................... 20
List of Tables
Table 1 Summary Laboratory Test Result .................................................................................................... 9
Table 2 Design Soil Parameter for BH-01 and BH-03 ................................................................................ 11
Table 3 Summary of Bored Pile Axial Capacity .......................................................................................... 18
Table 4 Structural Properties of Existing Bored Pile ................................................................................... 18
Table 5 Summary of Lateral Pile Capacity of Bored Pile ............................................................................ 18
Appendix
Appendix A Boreholo Location
Appendix B Soil Profile
Appendix C Borelog
Appendix D Soil Laboratory Test Result
Appendix E Field Work Documentation
Project Report ID-F-MA-CC0-PRT-JY-00-0001_R0B
Soil Investigation
Medco E&P Natuna Ltd. Page 4 of 26
1 INTRODUCTION
1.1 Project Overview
Medco Energy (COMPANY) operates a jetty at Matak Island in the South China Sea, which
are used by general cargo vessels berthing at the Natuna Logistics Base. The Main Jetty
was constructed in 1993 and consists of a tied back sheet pile wall with a steel plate coping,
also a piled fender system connected to and braced back to the face of sheet pile wall. The
jetty loads behind the coping are carried by a concrete deck supported on bored concrete
piles, the deck and piles are independent from the sheet pile jetty wall.
Currently, the dock is still operating and Medco energy (COMPANY) is planning to add dock
capacity that can accommodate 3,500 DWT vessel (max). Therefore Medco energy
(COMPANY) asked Zekon Indonesia (SUBCONTRACTOR) for review whether the element
elements can endure of design load or not.
The soil investigation is carried out to determine soil strength parameter for design review.
Two (2) boreholes have been successfully completed and a borehole was terminated due to
a operational reason for approval from COMPANY. Each completed borehole is located as
follow:
1.2 Terminology
In this document, the following words and terms shall have the meanings hereby assigned to
them, unless noted otherwise.
COMPANY : Medco Energy (MEDCO) or CLIENT, as the ultimate user and owner or
the authorized representative of COMPANY.
CONTRACTOR : PT. Shaftindo Energi
SUB CONTRACTOR : PT. Zekon Indonesia
(c) Geotechnical assessment and recommendations regarding but not limited to foundation
and settlement analysis.
b. Strength Properties
3. Perform Geotechnical Assessment and Recommendation
4. Provide Soil Investigation Report
PI Plasticity Index
SPT Standard Penetration Test
Sr Degree of Saturation of Soil
UDS Undisturbed Sample
Wn Natural Water (Moisture) Content of Soil
WL Liquid Limit of Soil
WP Plastic Limit of Soil
Handbooks
[1.] Bowles, J.E. (1996). Foundation Analysis and Design, 5th Edition, McGraw Hill.
[2.] Coduto, D.P. (2001). Foundation Design-Principles and Practices, 2nd Edition,
Prentice Hall.
[3.] Das, B.M. (2011). Principles of Foundation Engineering, 7th Edition, Cengage
Learning.
[4.] Look, Burt G. (2007). Handbook of Geotechnical Investigation and Design Tables,
published by Taylor & Francis Group.
1.8 Units
All units are in SI (Système international d'unités), unless noted otherwise.
2 Investigation Methodology
2.1 Geotechnical Drilling
The drilling is performed with Modified TOHO-1 rotary drilling machine with tag equipment
SDK-03. Deep boring was done according to American Standard Testing Method (ASTM)
D1452, ASTM D 420, ASTM 2488. Full coring method was conducted.
Figure 3 Drilling Activity and Core Box depth 0.0 – 5.0 m of BH-01
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy Page 9 of 26
BH-3
Below the concrete deck, the Fill Material (Silty SAND with GRAVEL has a brown colour)
was encountered. The Fill material has very loose to loose density with SPT value around
10. The thickness of Fill material is 5.0 m. Below the Fill Material is CORAL with Clayey
SAND and trace of ROCK (Granite) was encountered. The CORAL a has grey colour. The
density of the CORAL is mostly Very Loose with some lenses of Very Dense CORAL. The
thickness of CORAL is about 10 m. Beneath the CORAL layer, Sandy SILT with very soft
consistency appeared with 10 m thickness. At the end of drilling, the Sandy GRAVEL with
Very Dense densities has appeared.
Figure 4 Drilling Activity and Core Box depth 25.0 – 30.0 m of BH-03
The table below is the summary result of the laboratory test for BH-03. The laboratory test on
BH-01 is still in progress:
Table 1 Summary Laboratory Test Result
Sample Index Properties
Hole
No Depth m d Void Ratio Porosity Sr
ID Wn (%) Gs
(m) (gr/cm3) (gr/cm3) (e) (n) (%)
1 BH-03 3.00 – 3.45 21.33 1.59 1.31 1.1 0.52 53.51 2.754
2 BH-03 4.50 – 4.95 18.93 1.63 1.37 0.97 0.49 52.89 2.704
3 BH-03 7.50 – 7.95 17.36 1.7 1.44 0.91 0.48 52.61 2.76
4 BH-03 9.00 – 9.45 21.73 1.62 1.33 1.08 0.52 55.63 2.769
5 BH-03 22.50 – 22.95 20.67 1.73 1.43 0.87 0.47 63.52 2.687
6 BH-03 25.50 – 25.95 32.51 1.75 1.32 1.03 0.51 84.81 2.677
7 BH-03 27.00 – 27.45 12.76 1.88 1.67 0.62 0.38 55.48 2.715
8 BH-03 28.50 – 28.95 28.1 1.63 1.28 1.11 0.53 68.21 2.69
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy Page 10 of 26
It must be emphasized that calculations based on correlation can never be substituted for
proper testing. In general, all correlations must be considered approximate since various
factors such as sensitivity, stress history, and ageing can significantly influence soil
properties. Soil parameters will consist of total stress parameters, effective stress
parameters, modulus of elasticity and unit weight.
The summary of correlated soil parameters with field exploration data will be presented in
tables and charts. The table shows the typical value of soil parameter whilst charts present
the soil parameter value distribution according to soil type and depth of exploration.
Tables and charts of soil parameters from each point of field exploration are viewed as follow.
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy Page 11 of 26
GRAVEL with SAND 0.00 3.00 9.8 18.6 8.6 - - - 30.9 11700 11700
CORAL with SAND 3.00 7.95 31.1 19.6 9.6 - - - 39.5 37350 37350
CORAL with SAND 7.95 9.45 25.5 19.6 9.6 - - - 37.7 30600 30600
SAND 9.45 15.00 21.1 19.6 9.6 - - - 36.0 25269 25269
Sandy SILT 15.00 28.50 4.3 18.1 8.1 - - - 26.9 5152 5152
SAND trace of CORAL 28.50 30.00 23.1 19.6 9.6 - - - 36.8 27672 27672
BH-03
Depth (m) Unit Weight Total Stress Effective Stress Modulus of Elasticity
Soil Layer Seabed (N1)60 sat ' Eundrained Edrained
' (kN/m3) c (kN/m2) c' (kN/m2)
From To (kN/m3) ( °) ( °) (kN/m2) (kN/m2)
Silty SAND with
0.00 5.00
GRAVEL 6.8 18.3 8.3 - - - 29.1 8100 8100
CORAL with Clayey
5.00 7.50
SAND 6.0 18.2 8.2 - - - 28.6 7200 7200
CORAL with Clayey
7.50 11.00
SAND 29.3 19.6 9.6 - - - 38.7 35100 35100
CORAL with Clayey
11.00 15.00
SAND 2.0 17.7 7.7 - - - 25.0 2454 2454
Sandy SILT with
15.00 19.00
CORAL 6.0 18.2 8.2 36.0 - 17.3 14.7 7200 6480
Sandy SILT with
19.00 25.00
CORAL 1.5 17.6 7.6 9.0 - 4.0 9.0 1800 1620
Sandy CLAY trace of
25.00 27.00
CORAL 12.0 18.9 8.9 72.0 - 36.0 23.0 14400 12960
Clayey SAND 27.00 30.00 23.3 19.6 9.6 - - - 36.9 27918 27918
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy Page 12 of 26
2. Lateral loads
Those that act perpendicular to the axis of the foundation. This category includes shear and
moment loads.
In this analysis, 1000 mm of diameter is used for calculating bored pile bearing capacity. The
allowable bearing capacities of the bored pile for each borehole references are given in the
following table, and also presented graphically in Figure 11.
The program contains default p-y curves that can be used for different types of soils. As an
alternative, the program also allows the user to input p-y curves developed using other
formulations. In the analyses, the piles were discretized into 100 elements.
Limitation of lateral deflection of a deep foundation shall be divided into two (2) categories in
order to determine its lateral capacity. We suggest limiting the deflection of 0.25 in for static
condition and 0.5 in for seismic condition.
A series of p-y analyses were carried out using the default p-y curves embedded in the
LPILE program for different types of soils. The default p-y curves recommended by Reese
and Matlock were selected the model of these soils.
The lateral capacities of the concrete bored pile on the free head and fixed are given in the
following table and also presented graphically in the next Figure 12 and Figure 13.
Table 5 Summary of Lateral Pile Capacity of Bored Pile
Unanticipated soil conditions are commonly encountered that cannot fully be determined by a
limited number of explorations or soil samples. Such unexpected conditions frequently result
in additional project cost in order to build the project as designed. Therefore, a contingency
for unanticipated conditions should be included in the construction budget and schedule.
Our professional services have been performed, our findings derived, and our
recommendations prepared in accordance with generally accepted geotechnical engineering
principles and standards. Zekon Indonesia is not responsible for the conclusions, opinions,
or recommendations of others based on this data.
Our investigation did not include any assessment or evaluation of environmental conditions or
contamination in the soil.
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy
APPENDIX A
Borehole location Layout
BORE HOLES COORDINATES
UTM : ZONE 48 N
Easting Northing
BH-01 640060 370195
BH-03 640057 370293
BH-03
BH-01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
MEDCO ENERGI B - - -
DESIGNED
- -
DATE APPROVAL
-
DATE
FOR
BORE HOLES LOCATION
C - - REVIEW PLAN
Oil & Gas ZEKON D - -
-
SHEET
- -
TOTAL SHEET
-
SCALE PRINT REVISION DRAWING NO.
DESIGN & BUILD E - - 01 00 1 : 1 (A3) 00 -
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED OR RECORDED
FOR THE PURPOSE OF OTHER THAN THIS PROJECT IN ANY FORM OR OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF PT. ZEKON INDONESIA
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy
APPENDIX B
Soil Profile
LEGEND
Clayey SAND
BH-01 BH-03
0.00 +0.000
Deck with Thickness Slab : 0.4 m 0.00 +0.000
10.00 10.00
20.00 20.00
30.00 30.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00 60.00 65.00 70.00 75.00 80.00 85.00 90.00 95.00 100.00
SECTION A
SCALE 1 : 300 -
MEDCO ENERGI B - - -
DESIGNED
- -
DATE APPROVAL
-
DATE
FOR SOIL PROFILE
C - - REVIEW
Oil & Gas ZEKON D - -
-
SHEET
- -
TOTAL SHEET
-
SCALE PRINT REVISION DRAWING NO.
DESIGN & BUILD E - - 01 00 1 : 1 (A3) 00 -
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED OR RECORDED
FOR THE PURPOSE OF OTHER THAN THIS PROJECT IN ANY FORM OR OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF PT. ZEKON INDONESIA
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy
APPENDIX C
Borelogs
GEOTECHNICAL LOG HOLE ID
ZEKON
GEOTECHNICAL INVESTIGATION SERVICES BH-01
DESIGN & BUILD MATAK JETTY REPAIR PROJECT
Client : PT. MEDCO ENERGI System Zone : WGS 84; Zone 48N Drilled by : WM
Project : Soil Investigation Matak Jetty Integrity Surface RL : Logged by : DT
Location : Matak, Riau Islands Inclination : 90° Rig / Hammer Type : TOHO-01
Easting : 640060 m Scale : at scale Date Commence : December 19th, 2017
Northing : 370195 m Total Depth : 30.00 m (0.00-20.00 m) Date Complete : December 26th, 2017
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
CONSISTENCY /
USCS Symbol
RECOVERED
REL. DENSITY
MOISTURE
METHOD
GRAPHIC
(metres)
RQD (%)
SAMPLE
CONTENT, %
( gdry , kN/m3 )
N-SPT Value
GWL
PLASTICITY
DEPTH
DEPTH
gsat , kN/m3
(MSL)
p c , kg/cm²
FIELD TESTED
INDEX, %
( f' , deg )
( f , deg )
( f , deg )
( f , deg )
LOG
FINEST
c , kPa
c', kPa
c , kPa
RL
RL
(C r )
0 10 20 30 40 50 60 70 80
Cc
Fill Material (GRAVEL with SAND), medium brown. W MD
Will Updated after Laboratory Test has been Completed
SPT 1.50-1.95m
5,3,10 N=13
2 Rec. 0.45m
3.00
3 SPT 3.00-3.45m CORAL with medium grained SAND, brown. Mixture W Ds
9,26,14 N=40
Rec. 0.45m with Granite
SPT 7.50-7.95m
7.95 14,17,26 N=43
8 Rec. 0.45m
CORAL with fine grained SAND, white. W MD
9
FULL CORING
SPT 9.00-9.45m
9.45 12,15,19 N=34
Rec. 0.45m
Fine grained SAND, whitish gray W MD
10
SPT 10.50-10.95m
14,17,20 N=37
11 Rec. 0.45m
12 SPT 12.00-12.45m
12,12,17 N=29
Rec. 0.45m
13
SPT 13.50-13.95m
9,11,14 N=25
14 Rec. 0.45m
15.00
15 SPT 15.00-15.45m
8,8,7 N=15 Sandy SILT, light gray. W Ls
Rec. 0.45m
16
SPT 16.50-16.95m
5,6,5 N=11
17 Rec. 0.45m
18 SPT 18.00-18.45m
11,5,3 N=8
Rec. 0.45m
19
SPT 19.50-19.95m
4,3,3 N=6
20 Rec. 0.45m
Note : - VSt = Very Soft - MS = Med. Stiff - VSf = Very Stiff - VH = Very Hard - Ls = Loose - Ds = Dense -W = Wet -D = Dry - TUU = Triaxial UU - UCT = Unconfined Compression Test
- St = Soft - Sf = Stiff - Hd = Hard - VL = Very Loose - MD = Med. Dense - VD = Very Dense -M = Moist - TCU = Triaxial CU - DST = Direct Shear Test
GEOTECHNICAL LOG HOLE ID
ZEKON
GEOTECHNICAL INVESTIGATION SERVICES BH-01
DESIGN & BUILD MATAK JETTY REPAIR PROJECT
Client : PT. MEDCO ENERGI System Zone : WGS 84; Zone 48N Drilled by : WM
Project : Soil Investigation Matak Jetty Integrity Surface RL : Logged by : DT
Location : Matak, Riau Islands Inclination : 90° Rig / Hammer Type : TOHO-01
Easting : 640060 m Scale : at scale Date Commence : December 19th, 2017
Northing : 370195 m Total Depth : 30.00 m (20.00-30.00 m) Date Complete : December 26th, 2017
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
CONSISTENCY /
USCS Symbol
RECOVERED
REL. DENSITY
MOISTURE
METHOD
GRAPHIC
(metres)
(metres)
RQD (%)
SAMPLE
CONTENT, %
( gdry , kN/m3 )
SOIL / ROCK MATERIAL DESCRIPTION N-SPT Value
PLASTICITY
DEPTH
DEPTH
gsat , kN/m3
(MSL)
p c , kg/cm²
FIELD TESTED
INDEX, %
( f' , deg )
( f , deg )
( f , deg )
( f , deg )
GWL
LOG
FINEST
c , kPa
c', kPa
c , kPa
RL
RL
(C r )
0 10 20 30 40 50 60 70 80
Cc
Ditto.
21 SPT 21.00-21.45m
3,3,1 N=4
Rec. 0.45m
22
SPT 22.50-22.95m
6,6,6 N=12
23 Rec. 0.45m
24.00
24 SPT 24.00-24.45m
3,3,4 N=7 Sandy SILT, dark brown. W Ls
Rec. 0.45m
25
SPT 25.50-25.95m
3,3,2 N=5
26 Rec. 0.45m
27 SPT 27.00-27.45m
2,1,1 N=2
Rec. 0.45m
28
28.50
SPT 28.50-28.95m
50
5 ,-,- N=50
SAND trace of CORAL, dark brown. W VD
29 Rec. 0.45m
FULL CORING
30 30.03
SPT 30.00-30.03m
50
3 ,-,- N=50 End of Drilling at Depth of 30.03 meters.
Rec. 0.45m
31
32
33
34
35
36
37
38
39
40
Note : - VSt = Very Soft - MS = Med. Stiff - VSf = Very Stiff - VH = Very Hard - Ls = Loose - Ds = Dense -W = Wet -D = Dry - TUU = Triaxial UU - UCT = Unconfined Compression Test
- St = Soft - Sf = Stiff - Hd = Hard - VL = Very Loose - MD = Med. Dense - VD = Very Dense -M = Moist - TCU = Triaxial CU - DST = Direct Shear Test
GEOTECHNICAL LOG HOLE ID
ZEKON
GEOTECHNICAL INVESTIGATION SERVICES BH-03
DESIGN & BUILD MATAK JETTY REPAIR PROJECT
Client : PT. MEDCO ENERGI System Zone : WGS 84; Zone 48N Drilled by : WM
Project : Soil Investigation Matak Jetty Integrity Surface RL : Logged by : DT
Location : Matak, Riau Islands Inclination : 90° Rig / Hammer Type : TOHO-01
Easting : 640057 m Scale : at scale Date Commence : October 18th, 2017
Northing : 370293 m Total Depth : 30.00 m (0.00-20.00 m) Date Complete : October 28th, 2017
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
CONSISTENCY /
USCS Symbol
RECOVERED
REL. DENSITY
MOISTURE
METHOD
GRAPHIC
(metres)
RQD (%)
SAMPLE
CONTENT, %
( gdry , kN/m3 )
N-SPT Value
GWL
PLASTICITY
DEPTH
DEPTH
gsat , kN/m3
(MSL)
p c , kg/cm²
FIELD TESTED
INDEX, %
( f' , deg )
( f' , deg )
( f , deg )
( f , deg )
LOG
FINEST
c , kPa
c', kPa
c', kPa
c , kPa
RL
RL
(C r )
0 10 20 30 40 50 60 70 80
Cc
0.40 Concrete.
SM Fill Material (Silty SAND with Gravel), brown. W VL
1
6 SPT 6.00-6.45m
12,5,3 N=8
Rec. 0.45m
7.50
SPT 7.50-7.95m 6.30
5,12,25 SC CORAL with Clayey SAND, gray. 35.90 18.85 - - - - -
1 N=50 W Ds (32.73)
8 Rec. 0.45m (14.40)
9
FULL CORING
10
11.00
11
SC CORAL with Clayey SAND, gray. W VL
12
13
SPT 13.50-13.95m
3,2,1 N=3
14 Rec. 0.45m
15.00
15 SPT 15.00-15.95m
3,2,4 N=6 ML Sandy SILT with CORAL, gray. W MS
Rec. 0.45m
16
SPT 16.50-16.95m
14,4,7 N=11
17 Rec. 0.45m
18 SPT 18.00-18.45m
4,3,4 N=7
Rec. 0.45m
19.00
19
ML Sandy SILT with CORAL, gray. W St
SPT 19.50-19.95m
3,1,1 N=2
20 Rec. 0.45m
Note : - VSt = Very Soft - MS = Med. Stiff - VSf = Very Stiff - VH = Very Hard - Ls = Loose - Ds = Dense -W = Wet -D = Dry - TUU = Triaxial UU - UCT = Unconfined Compression Test
- St = Soft - Sf = Stiff - Hd = Hard - VL = Very Loose - MD = Med. Dense - VD = Very Dense -M = Moist - TCU = Triaxial CU - DST = Direct Shear Test
GEOTECHNICAL LOG HOLE ID
ZEKON
GEOTECHNICAL INVESTIGATION SERVICES BH-03
DESIGN & BUILD MATAK JETTY REPAIR PROJECT
Client : PT. MEDCO ENERGI System Zone : WGS 84; Zone 48N Drilled by : WM
Project : Soil Investigation Matak Jetty Integrity Surface RL : Logged by : DT
Location : Matak, Riau Islands Inclination : 90° Rig / Hammer Type : TOHO-01
Easting : 640057 m Scale : at scale Date Commence : October 18th, 2017
Northing : 370293 m Total Depth : 30.00 m (20.00-30.00 m) Date Complete : October 28th, 2017
DRILLING SAMPLING FIELD MATERIAL DESCRIPTION
CONSISTENCY /
USCS Symbol
RECOVERED
REL. DENSITY
MOISTURE
METHOD
GRAPHIC
(metres)
(metres)
RQD (%)
SAMPLE
CONTENT, %
( gdry , kN/m3 )
SOIL / ROCK MATERIAL DESCRIPTION N-SPT Value
PLASTICITY
DEPTH
DEPTH
gsat , kN/m3
(MSL)
p c , kg/cm²
FIELD TESTED
INDEX, %
( f' , deg )
( f' , deg )
( f , deg )
( f , deg )
GWL
LOG
FINEST
c , kPa
c', kPa
c', kPa
c , kPa
RL
RL
(C r )
0 10 20 30 40 50 60 70 80
Cc
Ditto.
21.00
21 SPT 21.00-21.45m
4,1,2 N=3 ML Sandy SILT trace of CORAL, gray. W St
Rec. 0.45m
22
24 SPT 24.00-24.45m
1
45 ,-,- N=1
Rec. 0.45m
25.00
25
CL Sandy CLAY trace of CORAL, gray. W Sf
SPT 25.50-25.95m 7.60
13,11,5 N=16 63.54 17.93 18.56 - - - -
(23.80)
26 Rec. 0.45m (13.20)
27.00
27 SPT 27.00-27.45m 4.50
34
26,16,12 N=50 SC Clayey SAND, brown. W VD 31.49 20.16 - - - - (33.71)
-
Rec. 0.45m (16.70)
28
31
32
33
34
35
36
37
38
39
40
Note : - VSt = Very Soft - MS = Med. Stiff - VSf = Very Stiff - VH = Very Hard - Ls = Loose - Ds = Dense -W = Wet -D = Dry - TUU = Triaxial UU - UCT = Unconfined Compression Test
- St = Soft - Sf = Stiff - Hd = Hard - VL = Very Loose - MD = Med. Dense - VD = Very Dense -M = Moist - TCU = Triaxial CU - DST = Direct Shear Test
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy
APPENDIX D
Soil Laboratory Test Result
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 1
Document No : - Sample Depth : 3.00 – 3.45 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 1
Document No : - Sample Depth : 3.00 – 3.45 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 2
Document No : - Sample Depth : 4.50 – 4.95 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 2
Document No : - Sample Depth : 4.50 – 4.95 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 4
Document No : - Sample Depth : 7.50 – 7.95 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 4
Document No : - Sample Depth : 7.50 – 7.95 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 5
Document No : - Sample Depth : 9.00 – 9.45 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 5
Document No : - Sample Depth : 9.00 – 9.45 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 12
Document No : - Sample Depth : 22.50 – 22.95 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 12
Document No : - Sample Depth : 22.50 – 22.95 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 14
Document No : - Sample Depth : 25.50 – 25.95 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 14
Document No : - Sample Depth : 25.50 – 25.95 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 15
Document No : - Sample Depth : 27.00 – 27.45 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 15
Document No : - Sample Depth : 27.00 – 27.45 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 16
Document No : - Sample Depth : 28.50 – 28.95 meters
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
PARTICLE SIZE ANALYSIS AND HYDROMETER TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 16
Document No : - Sample Depth : 28.50 – 28.95 meters
100
90
80
70
Percent Passing (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter (mm)
COBBLE
SAND GRAVEL
CLAY SILT
Fine Medium Coarse Fine Coarse
0.001 0.005 0.075 0.425 2 4.75 19 76
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
ATTERBERG LIMIT WITH LINEAR SHRINKAGE
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Borehole ID : BH – 05
Project No : - Sample ID : SPT – 14
Document No : - Sample Depth : 25.50 – 25.95 meters
60
1.00 2.00 3.00 4.00
50 16.00 21.00 26.00 36.00 99.00 4.00
41.25 46.47 43.27 40.30 37.40 167.44 41.86
40 2.77 3.04 3.26 3.58 12.66 3.16
Water Content (%)
0
10 100
Number of Blows (n)
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
ATTERBERG LIMIT WITH LINEAR SHRINKAGE
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Borehole ID : BH – 05
Project No : - Sample ID : SPT – 14
Document No : - Sample Depth : 25.50 – 25.95 meters
100
90
80
70
Platicity Index (%)
60
50 CH
40
30
20
CL MH or OH
10
CL or ML ML or OL
0
0 10 20 30 40 50 60 70 80 90 100 110 120
Tatang Suhanda Dyas Tedja S., S.T. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 1
Document No : - Sample Depth : 3.00 – 3.45 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 2
Document No : - Sample Depth : 4.50 – 4.95 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 4
Document No : - Sample Depth : 7.50 – 7.95 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 5
Document No : - Sample Depth : 9.00 – 9.45 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 12
Document No : - Sample Depth : 22.50 – 22.95 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 14
Document No : - Sample Depth : 25.50 – 25.96 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 15
Document No : - Sample Depth : 27.00 – 27.45 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
INDEX PROPERTIES
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 16
Document No : - Sample Depth : 28.50 – 28.95 meters
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 1
Document No : - Sample Depth : 3.00 – 3.45 meters
1.5
0.5
0
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 2
Document No : - Sample Depth : 4.50 – 4.95 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 4
Document No : - Sample Depth : 7.50 – 7.95 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 5
Document No : - Sample Depth : 9.00 – 9.45 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 12
Document No : - Sample Depth : 22.50 – 22.95 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 14
Document No : - Sample Depth : 25.50 – 25.95 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 15
Document No : - Sample Depth : 27.00 – 27.45 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
LABORATORY OF SOIL MECHANICS
DIRECT SHEAR TEST
Project : Matak Jetty Integrity Date of Entry : November, 5th 2017
Location : Matak, Riau Islands Date of Completion : November, 15th 2017
Client : PT. Medco Energi Internasional Borehole ID : BH – 03
Project No : - Sample ID : SPT – 16
Document No : - Sample Depth : 28.50 – 28.95 meters
1.500
1.000
0.500
0.000
0.00 0.50 1.00 1.50 2.00 2.50
Normal Stress (kg/cm2)
TEST SUMMARY
Tatang Suhanda Fadli Ahmad Naufal, S.Si. Nanto Satrio, S.T., M.T.
New fender selection load calculation
DED of Matak Jetty Integrity ID-F-MA-CC0-CAL-JY-00-0001
Medco Energy
APPENDIX E
Field Work Documentation
Core Recovery at BH-01 (0.00 m – 5.00 m)