DAFTAR HARGA BAHAN DAN UPAH KERJA

TAHUN ANGGARAN 2019


Jenis Pekerjaan
Satuan / Unit
Analisa

Wilayah Wilayah
NO URAIAN SATUAN Dalam Kota Daratan
( Rp ) ( Rp )

1 2 3 4 5
BAHAN TOKO
I SEMEN
1 Semen / PC (50 Kg) Kg 1,600.00 1,620.00
2 Semen / PC (Zak) Zak 80,000.00 81,000.00
3 Semen Warna Putih/PC (40 Kg) Kg 2,500.00 2,600.00
4 Kapur Pasang Kg 500.00 600.00
II BAHAN BESI DAN KAWAT
1 Besi Beton / Baja Tulangan Polos U 24 Kg 13,000.00 14,000.00
2 Kawat Beton (Kawat Bindrat) Kg 25,000.00 26,000.00
3 Baut/Mur Kg 30,500.00 40,000.00
4 Paku Campuran (5, 7, 10 cm) Kg 18,500.00 19,000.00
5 Paku Seng Kg 35,500.00 36,000.00
6 Paku Triplek Kg 45,500.00 50,000.00
III BAHAN KERAMIK
1 Keramik Putih 40 x 40 cm Dos 74,000.00 74,500.00
2 Keramik Warna 40 x 40 cm Dos 74,000.00 74,500.00
3 Keramik Putih 20 x 20 cm Dos 74,000.00 74,500.00
4 Keramik Warna 20 x 20 cm Dos 74,000.00 74,500.00
5 Keramik Putih 20 x 25 cm Dos 74,000.00 74,500.00
6 Keramik Warna 20 x 25 cm Dos 74,000.00 74,500.00
IV BAHAN KACA
1 Kaca Bening 5 mm m2 230,000.00 231,000.00
2 Kaca Bening 3 mm m2 200,000.00 201,000.00
V BAHAN LANGIT-LANGIT
1 Triplek 3 mm Lembar 66,500.00 67,000.00
2 Triplek 9 mm Lembar 152,500.00 153,000.00
3 Polywood 9 mm Lembar 305,000.00 306,000.00
VI LIST PROFIL PLAFOND
1
2 3 x 3 cm panjang 4 m Batang 121,500.00 122,000.00
VII BAHAN ATAP
1 Genteng Soka Abadi (80 x 140 cm) Lembar 77,000.00 77,500.00
2 Paku Genteng Kg 35,000.00 36,000.00
3 Nok Genteng Soka Abadi Std (P=110 cm) Buah 46,000.00 47,000.00
VIII BAHAN CAT DAN MINYAK
1 Minyak Cat Kg 30,500.00 31,000.00
2 Cat Tembok Mowilex Kg 32,000.00 32,500.00
3 Cat Tembok Aqualastik Kg 46,000.00 46,500.00
4 Cat Meny Kayu/Besi Kg 40,500.00 41,500.00
5 Cat Kilap Kayu (Sejenis Avian) Kg 56,000.00 56,500.00
6 Lem Kayu (Fox) Kg 31,000.00 32,000.00
7 Plamur Tembok Boyo Kg 10,500.00 11,000.00
8 Amplas Halus Kayu Lembar 6,000.00 7,000.00
9 Kwas Rol Buah 30,500.00 31,000.00
10 Minyak Bekisting Ltr 7,000.00 8,000.00
IX KUNCI - KUNCI
1 Kunci Tanam 2 Kali Putar T Buah 15,500.00 16,000.00
2 Grendel Pintu Kuningan Buah 41,000.00 42,000.00
3 Engsel Pintu H Kupu-kupu Kuningan Psg 21,000.00 22,000.00
4 Hak Angin Biasa Buah 11,000.00 12,000.00
BAHAN LOKAL
I TANAH TIMBUNAN
1 Tanah Timbunan Pilihan m3 126,000.00 126,500.00
2 Tanah Timbunan Biasa m3 63,000.00 63,500.00
3 Air Liter 100.00 100.00
II PASIR
1 Pasir Urug m3 177,000.00 177,000.00
2 Pasir pasang m3 202,000.00 202,000.00
3 Pasir Beton (Maligano) m3 262,000.00 262,000.00
III BATU
1 Batu Merah Biji 1,000.00 1,000.00
2 Batu Gunung M3 160,000.00 170,000.00
3 Kerikil Pecah (Maligano Pecah manual) M3 480,000.00 480,500.00
IV BAHAN KAYU
1 Papan Kayu Jati M3 4,200,000.00 4,200,000.00
5 Papan Perancah M7 1,350,000.00 1,350,000.00
6 Balok Kayu Jati M8 4,200,000.00 4,200,000.00
9 Balok Kayu Klas II A (Sejenis) M11 1,900,000.00 1,900,000.00
10 Balok Kayu Klas II (Sejenis) M12 1,750,000.00 1,750,000.00
11 Balok Perancah (Balok Kayu Kls III) M13 1,350,000.00 1,350,000.00
12 Dolken Ø 5 Cm Batang 9,000.00 9,000.00
13 Dolken Ø 8 Cm Batang 12,000.00 12,000.00
14 Dolken Ø 10 Cm Batang 15,000.00 15,000.00
V ALAT BANTU
1 Alat Bantu Set 2,500.00 2,500.00
UPAH KERJA
1 Mandor Org/Hari 100,000.00 100,000.00
2 Kepala Tukang Org/Hari 120,000.00 120,000.00
3 Tukang
- Tukang Listrik Org/Hari 100,000.00 100,000.00
- Tukang Batu Org/Hari 100,000.00 100,000.00
- Tukang Kayu Org/Hari 100,000.00 100,000.00
- Tukang Besi Org/Hari 100,000.00 100,000.00
- Tukang Cat Org/Hari 100,000.00 100,000.00
4 Pekerja
- Pekerja Terlatih Org/Hari 85,000.00 85,000.00
- Pekerja Agak terlatih Org/Hari 75,000.00 75,000.00
- Pekerja Tak terlatih Org/Hari 70,000.00 70,000.00
5 Sopir Org/Hari 100,000.00 100,000.00
6 Pembantu Sopir Org/Hari 75,000.00 75,000.00
7 Operator Alat Berat Org/Hari 350,000.00 350,000.00
8 Pembantu Operator Alat Berat Org/Hari 100,000.00 100,000.00
9 Mekanik Org/Hari 150,000.00 150,000.00
10 Penjaga Malam Org/Hari 50,000.00 50,000.00

Keterangan :
1. Harga BBM Merupakan Harga Industri (Sumber Pertamina)
2. Harga Kayu Diperoleh Dari Penjual Kayu
3. Harga Satuan Belum Termasuk Keuntungan, Over Head dan PPn
Wilayah
Sebrang
( Rp )

1,640.00
82,000.00
2,700.00
700.00

15,000.00
27,000.00
40,500.00
19,500.00
36,500.00
50,500.00

75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00

232,000.00
202,000.00

67,500.00
153,500.00
307,000.00

122,500.00

78,000.00
37,000.00
48,000.00

31,500.00
33,000.00
47,000.00
42,500.00
57,000.00
33,000.00
12,000.00
8,000.00
31,500.00
9,000.00

17,000.00
43,000.00
23,000.00
13,000.00
127,000.00
64,000.00
100.00

177,000.00
202,000.00
262,000.00

1,000.00
180,000.00
481,000.00

4,200,000.00
1,350,000.00
4,200,000.00
1,900,000.00
1,750,000.00
1,350,000.00
9,000.00
12,000.00
15,000.00

2,500.00

100,000.00
120,000.00

100,000.00
100,000.00
100,000.00
100,000.00
100,000.00

85,000.00
75,000.00
70,000.00
100,000.00
75,000.00
350,000.00
100,000.00
150,000.00
50,000.00
Jenis Pekerjaan : Pengukuran Dan Pemasangan Bowplank
Satuan / Unit : m1
Analisa : AHSP PU A.2.2.1.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)
A TENAGA :
Pekerja L.01 OH 0.1000 85,000.00 8,500.00
Tukang L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 20,200.00
B BAHAN :
Kayu Balok 5/7 Cm m3 0.1200 1,900,000.00 228,000.00
Paku Campuran (5,7,10 Cm) Kg 0.0200 18,500.00 370.00
Kayu Papan 3/20 Cm m3 0.0070 1,900,000.00 13,300.00
Jumlah Harga Bahan 241,670.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 261,870.00
E OVERHEAD ₰ PROVIT (10 % x D) 26,187.00
F HARGA SATUAN PEKERJAAN (D + E) 288,057.00
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 m
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.1

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.7500 85,000.00 63,750.00
Mandor L.02 OH 0.0250 100,000.00 2,500.00

Jumlah Tenaga Kerja 66,250.00


B BAHAN :

Jumlah Harga Bahan 0.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 66,250.00
E OVERHEAD ₰ PROVIT (10 % x D) 6,625.00
F HARGA SATUAN PEKERJAAN (D + E) 72,875.00
Jenis Pekerjaan : Pengurugan Kembali Galian Tanah
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.5000 85,000.00 42,500.00
Mandor L.02 OH 0.0500 100,000.00 5,000.00

Jumlah Tenaga Kerja 47,500.00


B BAHAN :

Jumlah Harga Bahan 0.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 47,500.00
E OVERHEAD ₰ PROVIT (10 % x D) 4,750.00
F HARGA SATUAN PEKERJAAN (D + E) 52,250.00
Jenis Pekerjaan : Pengurugan Kembali Galian Tanah
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.11.a

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.5000 85,000.00 42,500.00
Mandor L.02 OH 0.0500 100,000.00 5,000.00

Jumlah Tenaga Kerja 47,500.00


B BAHAN :
Tanah Timbunan Pilihan m3 1.2000 126,000.00 151,200.00

Jumlah Harga Bahan 151,200.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 198,700.00
E OVERHEAD ₰ PROVIT (10 % x D) 19,870.00
F HARGA SATUAN PEKERJAAN (D + E) 218,570.00
Jenis Pekerjaan : Urugan Pasir
Satuan / Unit : m3
Analisa : AHSP PU A.2.3.1.11

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Mandoor L.02 OH 0.0100 100,000.00 1,000.00

Jumlah Tenaga Kerja 26,500.00


B BAHAN :
Pasir Urug m3 1.2000 177,000.00 212,400.00

Jumlah Harga Bahan 212,400.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 238,900.00
E OVERHEAD ₰ PROVIT (10 % x D) 23,890.00
F HARGA SATUAN PEKERJAAN (D + E) 262,790.00
Jenis Pekerjaan : Pemasangan Batu Kosong (Anstamping)
Satuan / Unit : m3
Analisa : AHSP PU A.3.2.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.7800 85,000.00 66,300.00
Tukang L.02 OH 0.3900 100,000.00 39,000.00
Kepala Tukang L.03 OH 0.0390 120,000.00 4,680.00
Mandor L.04 OH 0.0390 100,000.00 3,900.00
Jumlah Tenaga Kerja 113,880.00
B BAHAN :
Batu Gunung m3 1.2000 160,000.00 192,000.00
Pasir Urug Kg 0.4320 177,000.00 76,464.00

Jumlah Harga Bahan 268,464.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 382,344.00
E OVERHEAD ₰ PROVIT (10 % x D) 38,234.40
F HARGA SATUAN PEKERJAAN (D + E) 420,578.40
Jenis Pekerjaan : Pemasangan Fondasi Batu Gunung Camp 1Pc : 4Ps
Satuan / Unit : m3
Analisa : AHSP PU A.3.2.1.2

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.5000 85,000.00 127,500.00
Tukang L.02 OH 0.7500 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
Jumlah Tenaga Kerja 219,000.00
B BAHAN :
Batu Gunung m3 1.20 160,000.00 192,000.00
Semen Portland Zak 3.26 80,000.00 260,800.00
Pasir Pasang m3 0.52 202,000.00 105,040.00
Jumlah Harga Bahan 557,840.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 776,840.00
E OVERHEAD ₰ PROVIT (10 % x D) 77,684.00
F HARGA SATUAN PEKERJAAN (D + E) 854,524.00

Semen Portland = 163 Kg = 3.26 Zak


163.00 3.2600
Jenis Pekerjaan : Pemasangan Fondasi Batu Gunung Camp 1Pc : 5Ps
Satuan / Unit : m3
Analisa : AHSP PU A.3.2.1.3

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.5000 85,000.00 127,500.00
Tukang L.02 OH 0.7500 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
Jumlah Tenaga Kerja 219,000.00
B BAHAN :
Batu Gunung m3 1.20 160,000.00 192,000.00
Semen Portland Zak 2.72 80,000.00 217,600.00
Pasir Pasang m3 0.54 202,000.00 109,080.00
Jumlah Harga Bahan 518,680.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 737,680.00
E OVERHEAD ₰ PROVIT (10 % x D) 73,768.00
F HARGA SATUAN PEKERJAAN (D + E) 811,448.00

Semen Portland = 136.00 Kg = 2.72 Zak


Jenis Pekerjaan : Pas. Bata Merah 5x11x22 Cm , 1/2 Batu C
Satuan / Unit : m2
Analisa : AHSP PU A.3.2.1.7

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 38,200.00
B BAHAN :
Bata Merah Buah 70.0000 1,000.00 70,000.00
Semen Portland Zak 0.3790 80,000.00 30,320.00
Pasir Pasang m3 0.0380 202,000.00 7,676.00
Jumlah Harga Bahan 107,996.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 146,196.00
E OVERHEAD ₰ PROVIT (10 % x D) 14,619.60
F HARGA SATUAN PEKERJAAN (D + E) 160,815.60

Semen Portland = 18.95 Kg = 0.379 Zak


Jenis Pekerjaan : Pas. Bata Merah 5x11x22 Cm , 1/2 Batu Camp 1 : 4
Satuan / Unit : m2
Analisa : AHSP PU A.3.2.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 38,200.00
B BAHAN :
Batu Gunung m3 70.0000 160,000.00 11,200,000.00
Semen Portland Zak 0.2330 80,000.00 18,640.00
Pasir Pasang m3 0.0430 202,000.00 8,686.00
Jumlah Harga Bahan 11,227,326.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 11,265,526.00
E OVERHEAD ₰ PROVIT (10 % x D) 1,126,552.60
F HARGA SATUAN PEKERJAAN (D + E) 12,392,078.60

Semen Portland = 11.50 Kg = 0.23 Zak


Jenis Pekerjaan : Pas. Bata Merah 5x11x22 Cm , 1/2 Batu Camp 1 : 5
Satuan / Unit : m2
Analisa : AHSP PU A.3.2.1.10

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 38,200.00
B BAHAN :
Batu Gunung m3 70.0000 160,000.00 11,200,000.00
Semen Portland Zak 0.1936 80,000.00 15,488.00
Pasir Pasang m3 0.0450 202,000.00 9,090.00
Jumlah Harga Bahan 11,224,578.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 11,262,778.00
E OVERHEAD ₰ PROVIT (10 % x D) 1,126,277.80
F HARGA SATUAN PEKERJAAN (D + E) 12,389,055.80

Semen Portland = 9.68 Kg = 0.1936 Zak


Jenis Pekerjaan : Membat Beton Mutu f ʹc = 7,4 Mpa (K 100), Slump (12 **2) Cm, W/C =
0,87
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.1

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 4.9400 80,000.00 395,200.00
Pasir Beton m3 0.6207 262,000.00 162,627.14
Kerikil (Max 30 mm) m3 0.7400 480,000.00 355,200.00
Air Liter 50.0000 100.00 5,000.00
Jumlah Harga Bahan 918,027.14
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,097,437.14
E OVERHEAD ₰ PROVIT (10 % x D) 109,743.71
F HARGA SATUAN PEKERJAAN (D + E) 1,207,180.86

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 869.00 Kg

Kerikil (Max 30 mm) = 999.00 Kg


1.6500
0.2750
0.0280
0.0830

247.00
869.00
999.00
215.00
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 9,8 Mpa (K 125), Slump (12 **2) Cm, W/C =
0,78
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.2

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 5.2000 80,000.00 416,000.00
Pasir Beton m3 0.5914 262,000.00 154,954.29
Kerikil (Max 30 mm) m3 0.7496 480,000.00 359,822.22
Air Liter 50.0000 100.00 5,000.00
Jumlah Harga Bahan 935,776.51
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,115,186.51
E OVERHEAD ₰ PROVIT (10 % x D) 111,518.65
F HARGA SATUAN PEKERJAAN (D + E) 1,226,705.16

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 828.00 Kg

Kerikil (Max 30 mm) = 1,012.00 Kg


1.6500
0.2750
0.0280
0.0830

276.00
828.00
1,012.00
50.00
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 12,2 Mpa (K 150), Slump (12 **2) Cm, W/C =
0,78
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.3

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 5.9800 80,000.00 478,400.00
Pasir Beton m3 0.5707 262,000.00 149,527.14
Kerikil (Max 30 mm) m3 0.7533 480,000.00 361,600.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,011,027.14
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,190,437.14
E OVERHEAD ₰ PROVIT (10 % x D) 119,043.71
F HARGA SATUAN PEKERJAAN (D + E) 1,309,480.86

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 799.00 Kg

Kerikil (Max 30 mm) = 1,017.00 Kg


1.6500
0.2750
0.0280
0.0830

299.00
799.00
1,017.00
215.00
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 14,5 Mpa K.175 Slump 120 ± 20 mm

Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.5

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 5.9800 80,000.00 478,400.00
Pasir Beton m3 0.5429 262,000.00 142,228.57
Kerikil (Max 30 mm) m3 0.7622 480,000.00 365,866.67
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,007,995.24
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,187,405.24
E OVERHEAD ₰ PROVIT (10 % x D) 118,740.52
F HARGA SATUAN PEKERJAAN (D + E) 1,306,145.76

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 760.00 Kg

Kerikil (Max 30 mm) = 1,029.00 Kg


1.6500
0.2750
0.0280
0.0830

326.0000
760.0000
1,029.000
215.0000
Jenis Pekerjaan :
Membat Beton Mutu f ʹc = 16,9 Mpa K.200 Slump (12 ** 2) Cm,W/C = 0,61
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.6

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 7.0400 80,000.00 563,200.00
Pasir Beton m3 0.5221 262,000.00 136,801.43
Kerikil (Max 30 mm) m3 0.7637 480,000.00 366,577.78
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,088,079.21
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,267,489.21
E OVERHEAD ₰ PROVIT (10 % x D) 126,748.92
F HARGA SATUAN PEKERJAAN (D + E) 1,394,238.13

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 731.00 Kg

Kerikil (Max 30 mm) = 1,031.00 Kg


1.6500
0.2750
0.0280
0.0830

352.0000
731.0000
1,031.000
215.0000
Jenis Pekerjaan :
Membat Beton Mutu f ʹc = 19,3 Mpa K.225 Slump (12 ** 2) Cm,W/C = 0,58
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.7

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 7.4200 80,000.00 593,600.00
Pasir Beton m3 0.4986 262,000.00 130,625.71
Kerikil (Max 30 mm) m3 0.7756 480,000.00 372,266.67
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,117,992.38
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,297,402.38
E OVERHEAD ₰ PROVIT (10 % x D) 129,740.24
F HARGA SATUAN PEKERJAAN (D + E) 1,427,142.62

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 698.00 Kg

Kerikil (Max 30 mm) = 1,047.00 Kg


1.6500
0.2750
0.0280
0.0830

371.0000
698.0000
1,047.000
215.0000
Jenis Pekerjaan :
Membat Beton Mutu f ʹc = 21,7 Mpa K.250 Slump (12 ** 2) Cm,W/C = 0,56
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.8

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 7.6800 80,000.00 614,400.00
Pasir Beton m3 0.4943 262,000.00 129,502.86
Kerikil (Max 30 mm) m3 0.7696 480,000.00 369,422.22
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,134,825.08
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,314,235.08
E OVERHEAD ₰ PROVIT (10 % x D) 131,423.51
F HARGA SATUAN PEKERJAAN (D + E) 1,445,658.59

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 692.00 Kg

Kerikil (Max 30 mm) = 1,039.00 Kg


1.650
0.275
0.028
0.083

384.000
692.000
1,039.000
215.000
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 24,00 Mpa K.275 Slump (12 ** 2) Cm,W/C =
0,53
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.9

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 8.1200 80,000.00 649,600.00
Pasir Beton m3 0.4886 262,000.00 128,005.71
Kerikil (Max 30 mm) m3 0.7600 480,000.00 364,800.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,163,905.71
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,343,315.71
E OVERHEAD ₰ PROVIT (10 % x D) 134,331.57
F HARGA SATUAN PEKERJAAN (D + E) 1,477,647.29

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 684.00 Kg

Kerikil (Max 30 mm) = 1,026.00 Kg


1.6500
0.2750
0.0280
0.0830

406.0000
684.0000
1,026.000
215.0000
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 26,40 Mpa K.300 Slump (12 ** 2) Cm,W/C =
0,52
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.10

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.6500 85,000.00 140,250.00
Tukang L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 179,410.00
B BAHAN :
Semen Portland Zak 8.2600 80,000.00 660,800.00
Pasir Beton m3 0.4864 262,000.00 127,444.29
Kerikil (Max 30 mm) m3 0.7563 480,000.00 363,022.22
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,172,766.51
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,352,176.51
E OVERHEAD ₰ PROVIT (10 % x D) 135,217.65
F HARGA SATUAN PEKERJAAN (D + E) 1,487,394.16

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 681.00 Kg

Kerikil (Max 30 mm) = 1,021.00 Kg


1.6500
0.2750
0.0280
0.0830

413.0000
681.0000
1,021.000
215.0000
Jenis Pekerjaan :
Membat Beton Mutu f ʹc = 28,8 Mpa K.325 Slump (12 ** 2) Cm,W/C = 0,49
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.11

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 2.1000 85,000.00 178,500.00
Tukang L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
Jumlah Tenaga Kerja 228,200.00
B BAHAN :
Semen Portland Zak 8.7800 80,000.00 702,400.00
Pasir Beton m3 0.4071 262,000.00 106,671.43
Kerikil (Max 30 mm) m3 0.7452 480,000.00 357,688.89
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,188,260.32
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,416,460.32
E OVERHEAD ₰ PROVIT (10 % x D) 141,646.03
F HARGA SATUAN PEKERJAAN (D + E) 1,558,106.35

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 667.00 Kg

Kerikil (Max 30 mm) = 1,000.00 Kg


2.1000
0.3500
0.0350
0.1050

439.0000
570.0000
1,006.000
215.0000
Jenis Pekerjaan : Membat Beton Mutu f ʹc = 31,20 Mpa K.350 Slump (12 ** 2) Cm,W/C =
0,48
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.12

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 2.1000 85,000.00 178,500.00
Tukang L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
Jumlah Tenaga Kerja 228,200.00
B BAHAN :
Semen Portland Zak 8.9600 80,000.00 716,800.00
Pasir Beton m3 0.4764 262,000.00 124,824.29
Kerikil (Max 30 mm) m3 0.7407 480,000.00 355,555.56
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga Bahan 1,218,679.84
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,446,879.84
E OVERHEAD ₰ PROVIT (10 % x D) 144,687.98
F HARGA SATUAN PEKERJAAN (D + E) 1,591,567.83

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 667.00 Kg

Kerikil (Max 30 mm) = 1,000.00 Kg


2.1000
0.3500
0.0350
0.1050

448.0000
667.0000
1,000.000
215.0000
Jenis Pekerjaan : Membat Lantai Kerja Beton Mutu f ʹc = 7,4 Mpa (3-6 Cm) Slump (12 **2)
Cm, W/C = 0,87
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 1.2000 85,000.00 102,000.00
Tukang L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
Jumlah Tenaga Kerja 130,400.00
B BAHAN :
Semen Portland Zak 4.6000 80,000.00 368,000.00
Pasir Beton m3 0.6379 262,000.00 167,118.57
Kerikil (Max 30 mm) m3 0.7607 480,000.00 365,155.56
Air Liter 200.0000 100.00 20,000.00
Jumlah Harga Bahan 920,274.13
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 1,050,674.13
E OVERHEAD ₰ PROVIT (10 % x D) 105,067.41
F HARGA SATUAN PEKERJAAN (D + E) 1,155,741.54

Wc Faktor Pasir 1.400 Kg, dan Kerikil = 1.350 Kg

Pasir Beton = 893.00 Kg

Kerikil (Max 30 mm) = 1,027.00 Kg


1.2000
0.2000
0.0200
0.0600

230.0000 4.60000000000000000000
893.0000 0.63785714285714300000
1,027.000 0.76074074074074100000
200.0000
Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos
Satuan / Unit : m3
Analisa : AHSP PU A.4.1.1.4

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.0070 85,000.00 595.00
Tukang L.02 OH 0.0070 100,000.00 700.00
Kepala Tukang L.03 OH 0.0007 120,000.00 84.00
Mandor L.04 OH 0.0004 100,000.00 40.00
Jumlah Tenaga Kerja 1,419.00
B BAHAN :
Besi Beton Polos Kg 1.0500 13,000.00 13,650.00
Kawat Bendrat Kg 0.0150 25,000.00 375.00

Jumlah Harga Bahan 14,025.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 15,444.00
E OVERHEAD ₰ PROVIT (10 % x D) 1,544.40
F HARGA SATUAN PEKERJAAN (D + E) 16,988.40

Konversi Ke Harga
Besi 6 = 0.22 Kg/m 2.64 Kg/12m Rp 4,924.24
Besi 8 = 0.39 Kg/m 4.68 Kg/12m Rp 2,777.78
Besi 10 = 0.62 Kg/m 7.44 Kg/12m Rp 1,747.31
Besi 12 = 0.89 Kg/m 10.68 Kg/12m Rp 1,217.23
Besi 14 = 1.54 Kg/m 18.48 Kg/12m Rp 703.46
Besi 16 = 2.01 Kg/m 24.12 Kg/12m Rp 538.97

Konversi Ke Batang
Besi 6 = 0.22 Kg/m 2.64 Kg/12m 0.40 Btg
Besi 8 = 0.39 Kg/m 4.68 Kg/12m 0.22 Btg
Besi 10 = 0.62 Kg/m 7.44 Kg/12m 0.14 Btg
Besi 12 = 0.89 Kg/m 10.68 Kg/12m 0.10 Btg
Besi 14 = 1.54 Kg/m 18.48 Kg/12m 0.06 Btg
Besi 16 = 2.01 Kg/m 24.12 Kg/12m 0.04 Btg
Jenis Pekerjaan : Pemasangan Bekisting Untuk Fondasi
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.20

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.5200 85,000.00 44,200.00
Tukang L.02 OH 0.2600 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.0260 120,000.00 3,120.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
Jumlah Tenaga Kerja 75,920.00
B BAHAN :
Kayu Kelas III m3 0.0400 1,350,000.00 54,000.00
Paku Campuran (5, 7, 10 cm) Kg 0.3000 18,500.00 5,550.00
Minyak Bekisting Liter 0.1000 7,000.00 700.00

Jumlah Harga Bahan 60,250.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 136,170.00
E OVERHEAD ₰ PROVIT (10 % x D) 13,617.00
F HARGA SATUAN PEKERJAAN (D + E) 149,787.00
Jenis Pekerjaan : Pemasangan Bekisting Untuk Sloof
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.21

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.5200 85,000.00 44,200.00
Tukang L.02 OH 0.2600 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.0260 120,000.00 3,120.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
Jumlah Tenaga Kerja 75,920.00
B BAHAN :
Kayu Kelas III m3 0.0450 1,350,000.00 60,750.00
Paku Campuran (5, 7, 10 cm) Kg 0.3000 18,500.00 5,550.00
Minyak Bekisting Liter 0.1000 7,000.00 700.00

Jumlah Harga Bahan 67,000.00


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 142,920.00
E OVERHEAD ₰ PROVIT (10 % x D) 14,292.00
F HARGA SATUAN PEKERJAAN (D + E) 157,212.00
Jenis Pekerjaan : Pemasangan Bekisting Untuk Kolok
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.22

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tukang L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 96,360.00
B BAHAN :
Balok Kayu Kelas III m3 0.0400 1,350,000.00 54,000.00
Paku Campuran (5, 7, 10 cm) Kg 0.4000 18,500.00 7,400.00
Minyak Bekisting Ltr 0.2000 7,000.00 1,400.00
Balok Kayu Klas II A (Sejenis) m3 0.0150 1,900,000.00 28,500.00
Plywood Tebal 9 mm Lbr 0.3500 305,000.00 106,750.00
Dolken @ 4 -10 Pnj 4 m Btg 2.0000 15,000.00 30,000.00
Jumlah Harga Bahan 228,050.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 324,410.00
E OVERHEAD ₰ PROVIT (10 % x D) 32,441.00
F HARGA SATUAN PEKERJAAN (D + E) 356,851.00
Jenis Pekerjaan : Pemasangan Bekisting Untuk Balok
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.23

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tukang L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 96,360.00
B BAHAN :
Balok Kayu Kelas III m3 0.0400 1,350,000.00 54,000.00
Paku Campuran (5, 7, 10 cm) Kg 0.4000 18,500.00 7,400.00
Minyak Bekisting Ltr 0.2000 7,000.00 1,400.00
Balok Kayu Klas II A (Sejenis) m3 0.0180 1,900,000.00 34,200.00
Plywood Tebal 9 mm Lbr 0.3500 305,000.00 106,750.00
Dolken @ 4 -10 Pnj 4 m Btg 2.0000 15,000.00 30,000.00
Jumlah Harga Bahan 233,750.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 330,110.00
E OVERHEAD ₰ PROVIT (10 % x D) 33,011.00
F HARGA SATUAN PEKERJAAN (D + E) 363,121.00
Jenis Pekerjaan : Pemasangan Bekisting Untuk Palat
Satuan / Unit : m2
Analisa : AHSP PU A.4.1.1.24

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.6600 85,000.00 56,100.00
Tukang L.02 OH 0.3300 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 96,360.00
B BAHAN :
Balok Kayu Kelas III m3 0.0400 1,350,000.00 54,000.00
Paku Campuran (5, 7, 10 cm) Kg 0.4000 18,500.00 7,400.00
Minyak Bekisting Ltr 0.2000 7,000.00 1,400.00
Balok Kayu Klas II A (Sejenis) m3 0.0150 1,900,000.00 28,500.00
Plywood Tebal 9 mm Lbr 0.3500 305,000.00 106,750.00
Dolken @ 4 -10 Pnj 4 m Btg 6.0000 15,000.00 90,000.00
Jumlah Harga Bahan 288,050.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 384,410.00
E OVERHEAD ₰ PROVIT (10 % x D) 38,441.00
F HARGA SATUAN PEKERJAAN (D + E) 422,851.00
Jenis Pekerjaan : Membuat Kolom Praktis Ukr. 11 x 11 Cm
Satuan / Unit : m1
Analisa : AHSP PU A.4.1.1.35

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.1800 85,000.00 15,300.00
Tukang Batu L.02 OH 0.0200 100,000.00 2,000.00
Tukang Kayu L.02 OH 0.0200 100,000.00 2,000.00
Tukang Besi L.02 OH 0.0200 100,000.00 2,000.00
Kepala Tukang L.03 OH 0.0060 120,000.00 720.00
Mandor L.04 OH 0.0090 100,000.00 900.00
Jumlah Tenaga Kerja 22,920.00
B BAHAN :
Balok Kayu Kelas III m3 0.0020 1,350,000.00 2,700.00
Paku Campuran (5, 7, 10 cm) Kg 0.0100 18,500.00 185.00
Minyak Bekisting Ltr 1.0000 7,000.00 7,000.00
Besi Beton Polos Kg 3.0000 13,000.00 39,000.00
Kawat Beton Kg 0.4500 25,000.00 11,250.00
Semen Portland Zak 0.0800 80,000.00 6,400.00
Pasir Beton m3 0.0060 262,000.00 1,572.00
Kerikil m3 0.0090 480,000.00 4,320.00
Jumlah Harga Bahan 72,427.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 95,347.00
E OVERHEAD ₰ PROVIT (10 % x D) 9,534.70
F HARGA SATUAN PEKERJAAN (D + E) 104,881.70

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Semen Portland = 4.00 Kg = 0.0800 Zak


Jenis Pekerjaan : Membuat Ring Balok Beton Bertulang
Satuan / Unit : m1
Analisa : AHSP PU A.4.1.1.36

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.2970 85,000.00 25,245.00
Tukang Batu L.02 OH 0.0330 100,000.00 3,300.00
Tukang Kayu L.02 OH 0.0330 100,000.00 3,300.00
Tukang Besi L.02 OH 0.0330 100,000.00 3,300.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 37,845.00
B BAHAN :
Balok Kayu Kelas III m3 0.0030 1,350,000.00 4,050.00
Paku Campuran (5, 7, 10 cm) Kg 0.0200 18,500.00 370.00
Minyak Bekisting Ltr 1.0000 7,000.00 7,000.00
Besi Beton Polos Kg 3.6000 13,000.00 46,800.00
Kawat Beton Kg 0.0500 25,000.00 1,250.00
Semen Portland Zak 0.1100 80,000.00 8,800.00
Pasir Beton m3 0.0090 262,000.00 2,358.00
Kerikil m3 0.0150 480,000.00 7,200.00
Jumlah Harga Bahan 77,828.00
C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 115,673.00
E OVERHEAD ₰ PROVIT (10 % x D) 11,567.30
F HARGA SATUAN PEKERJAAN (D + E) 127,240.30

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Semen Portland = 5.50 Kg = 0.11 Zak


Jenis Pekerjaan : Plesteran 1 Sp : 2 Pp, Tebal 15 mm
Satuan / Unit : m2
Analisa : AHSP PU A.4.4.2.2

HARGA JUMLAH
NO. URAIAN KODE SAT KOEF SAT HARGA
(Rp) (Rp)

A TENAGA :
Pekerja L.01 OH 0.3000 85,000.00 25,500.00
Tukang L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 43,800.00
B BAHAN :
Semen Portland Zak 0.2045 160,000.00 32,716.80
Pasir Pasangan m3 0.0200 177,000.00 3,540.00

Jumlah Harga Bahan 36,256.80


C PERALATAN :

Jumlah Peralatan 0.00

D JUMLAH A + B + C 80,056.80
E OVERHEAD ₰ PROVIT (10 % x D) 8,005.68
F HARGA SATUAN PEKERJAAN (D + E) 88,062.48

Semen Portland = 10.224 Kg


Pasir Pasangan = 0.02 m3