Anda di halaman 1dari 81

REPORTE DE MONITOREO DE HITOS - TAJO HUAMANLOMA

EMPRESA: APUMAYO S.A.C. ELABORADO POR: M.L.Q / W.V.B


UNIDAD MINERA: APUMAYO AREA: GEOTECNIA
COMPONENTE TAJO HUAMANLOMA FECHA: 2/3/2019

CUADRO DE DESPLAZAMIENTOS REGISTRADOS POR PRISMAS - TAJO HUAMANLOMA


FECHA FECHA DESPLAZAMIENTO VELOCIDAD
HITO UBICACIÓN TIEMPO INSTALADO EN OBSERVACIÓN
INICIAL FINAL (m) (mm/día)

HUA-01 BC 4112 23/11/2018 03/02/2019 71.992 0.02 0.27 TIPO SUELO

HUA-02 BC 4112 23/11/2018 03/02/2019 71.990 0.01 0.18 TIPO SUELO

HUA-03 BC 4112 26/12/2018 03/02/2019 39.375 0.09 2.35 TIPO SUELO

HUA-04 BC 4112 26/12/2018 03/02/2019 39.375 0.05 1.28 TIPO SUELO

HUA-05 BC 4128 26/12/2018 03/02/2019 39.375 0.04 1.02 TIPO SUELO

HUA-06 BC 4080 02/01/2019 03/02/2019 32.321 0.04 1.35 TIPO ROCA

HUA-07 BC 4096 09/01/2019 03/02/2019 25.313 0.10 3.94 TIPO ROCA

HUA-08 BC 4096 09/01/2019 03/02/2019 25.313 0.09 3.43 TIPO ROCA


HUA-01
HUA-02
HUA-03
HUA-04
HUA-05
HUA-06
HUA-07
HUA-08
TAJO HUAMANLOMA

PLANO DE UBICACIÓN
Cliente: APUMAYO S.A.C.
Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA
Cod. Informe:
Elaborado M.L.Q.
Aprobado W.V.B.
Fecha 26-04-19
Rev Rev. B
Unidad: APUMAYO S.A.C.

Anexo X.a Registro de Control Topográfico


OTÉCNICA
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
Prisma Topográfico: HUA-01 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 106 m U
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 405 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
E
Z
L
I
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades M
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
A
(mm) (mm)
B
U
S
N Fecha TA Norte Este Elevacion Δ Horizontal Δ Vertical Δ Total Δ Horizontal Δ Vertical Δ Total VA VR D
O
11/23/2018 0 8348105.73 615405.08 4112.92 L
1 11/24/2018 1 8348105.73 615405.10 4112.93 20.1090 7.2000 21.3591 20.1090 7.2000 21.3591 22.9359 22.9359 D Norte
U
T
2 11/25/2018 2 8348105.75 615405.08 4112.91 22.6221 -12.4000 25.7977 29.1343 -19.6000 35.1137 13.1780 34.2109 ###
O
3 11/26/2018 3 8348105.77 615405.11 4112.92 46.2281 0.1000 46.2282 31.7238 12.5000 34.0977 14.8128 29.3138 ###
4 11/27/2018 3 8348105.77 615405.11 4112.92 47.5723 1.9500 47.6122 2.5298 1.8500 3.1341 14.4097 17.0950 ###
5 11/28/2018 4 8348105.79 615405.11 4112.91 66.2873 -5.9000 66.5493 22.4143 -7.8500 23.7492 15.4616 23.7492 ###
6 11/29/2018 5 8348105.80 615405.10 4112.85 66.4713 -65.5667 93.3672 8.0623 -59.6667 60.2089 17.6026 60.2089 ###
7 11/30/2018 6 8348105.79 615405.11 4112.85 69.1107 -65.5667 95.2642 9.3868 0.0000 9.3868 15.1113 9.3868 ###
8 12/1/2018 7 8348105.82 615405.12 4112.85 98.0537 -71.3000 121.2362 29.0372 -5.7333 29.5978 16.5982 29.5978 ###
9 12/2/2018 8 8348105.84 615405.12 4112.85 114.5541 -71.3000 134.9308 18.3000 0.0000 18.3000 16.2486 18.3000 ###
10 12/3/2018 9 8348105.84 615405.12 4112.85 116.1143 -71.3000 136.2579 1.7000 0.0000 1.7000 14.6448 1.7000 ###
11 12/5/2018 11 8348105.84 615405.12 4112.88 116.0733 -44.1000 124.1685 6.3325 27.2000 27.9274 10.9843 13.9637 ###
12 12/6/2018 12 8348105.81 615405.08 4112.91 76.6799 -14.3000 78.0019 48.7311 29.8000 57.1206 6.3395 57.1206 ###
13 12/7/2018 13 8348105.903 615405.069 4112.903 170.8781 -17.1000 171.7316 94.7761 -2.8000 94.8174 12.9081 94.8174 ###
14 12/8/2018 15 8348105.927 615405.069 4112.901 195.1723 -18.5000 196.0472 24.3033 -1.4000 24.3436 13.4317 18.8466 ###
15 12/9/2018 16 8348105.769 615405.079 4112.907 37.0653 -12.9000 39.2460 158.3419 5.6000 158.4409 2.5164 158.4409 ###
16 12/9/2018 16 8348105.823 615405.081 4112.901 91.0969 -18.5000 92.9564 54.0370 -5.6000 54.3264 5.8356 162.9793 ###
17 12/10/2018 17 8348105.788 615405.071 4112.900 55.8616 -20.3000 59.4358 36.6786 -1.8000 36.7227 3.5806 54.7987 ###
18 12/11/2018 18 8348105.846 615405.105 4112.902 117.3873 -18.4000 118.8206 67.3894 1.9000 67.4162 6.7427 65.9058 ###
19 12/11/2018 18 8348105.851 615405.106 4112.882 122.4827 -38.4000 128.3611 5.1352 -20.0000 20.6487 7.1549 64.9218 ###
20 12/12/2018 19 8348105.760 615405.112 4112.897 44.5880 -23.3000 50.3088 91.1783 15.1000 92.4202 2.7061 142.0332 ###
21 12/13/2018 20 8348105.775 615405.072 4112.895 43.5437 -25.3000 50.3601 42.1732 -2.0000 42.2206 2.5660 40.8038 ###
22 12/14/2018 21 8348105.804 615405.081 4112.886 72.1224 -34.2000 79.8203 30.0188 -8.9000 31.3104 3.8646 30.4436 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
Prisma Topográfico: HUA-01 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 106 m U
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 405 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
E
Z
L
I
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades M
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
A
(mm) (mm)
B
U
S
23 12/15/2018 22 8348105.784 615405.076 4112.903 52.0116 -17.1000 54.7505 20.6903 17.1000 26.8421 2.5234 25.7341 ### D
O
24 12/16/2018 23 8348105.873 615405.078 4112.886 141.3035 -34.3000 145.4069 89.3247 -17.2000 90.9656 6.4186 95.0584 ### L
25 12/17/2018 24 8348105.817 615405.076 4112.913 85.0099 -7.4000 85.3314 56.3470 26.9000 62.4387 3.6100 63.4970 ### U
T
26 12/18/2018 25 8348105.760 615405.080 4112.898 28.1397 -22.3000 35.9045 57.1473 -14.9000 59.0578 1.4588 60.5721 ### O
27 12/19/2018 26 8348105.815 615405.079 4112.917 82.6086 -3.1000 82.6668 54.5669 19.2000 57.8463 3.2217 55.2378 ###
28 12/20/2018 27 8348105.778 615405.072 4112.897 45.9210 -22.9000 51.3142 37.5504 -19.8000 42.4509 1.9253 42.7477 ###
29 12/21/2018 28 8348105.725 615405.076 4112.890 6.9354 -30.2000 30.9861 52.7371 -7.3000 53.2399 1.1177 49.7505 ###
30 12/22/2018 28 8348105.687 615405.071 4112.898 45.4251 -21.6000 50.2991 38.4949 8.6000 39.4439 1.7690 55.4680 ###
31 12/23/2018 30 8348105.762 615405.080 4112.886 30.2592 -34.1000 45.5898 75.6736 -12.5000 76.6991 1.5390 64.5133 ###
32 12/24/2018 31 8348105.768 615405.076 4112.902 36.2233 -17.5000 40.2291 7.5213 16.6000 18.2244 1.2928 12.2005 ###
33 12/25/2018 32 8348105.821 615405.101 4112.847 92.2314 -72.9000 117.5630 58.6352 -55.4000 80.6675 3.7176 159.1250 ###
34 12/26/2018 33 8348105.806 615405.062 4112.888 75.8970 -32.2000 82.4451 41.8306 40.7000 58.3634 2.5272 58.3634 ###
35 12/27/2018 34 8348105.765 615405.062 4112.905 36.3324 -14.7000 39.1935 41.4005 17.5000 44.9472 1.1657 44.9472 ###
36 12/28/2018 35 8348105.760 615405.112 4112.897 44.5880 -23.3000 50.3088 50.1499 -8.6000 50.8819 1.4530 50.8466 ###
37 12/29/2018 36 8348105.787 615405.070 4112.908 55.4939 -11.7000 56.7138 49.3974 11.6000 50.7411 1.5920 50.7764 ###
38 12/30/2018 37 8348105.799 615405.068 4112.893 67.5625 -26.9000 72.7207 12.0839 -15.2000 19.4180 1.9856 19.4180 ###
39 12/31/2018 38 8348105.777 615405.113 4112.878 57.7533 -42.0000 71.4104 50.0001 -15.1000 52.2305 1.8980 52.2305 ###
40 1/1/2019 39 8348105.781 615405.078 4112.888 49.1261 -31.8000 58.5202 34.8421 10.2000 36.3044 1.5138 35.0861 ###
41 1/2/2019 40 8348105.795 615405.073 4112.920 63.1145 0.0000 63.1145 14.9121 31.8000 35.1228 1.5924 35.9977 ###
42 1/3/2019 41 8348105.804 615405.074 4112.894 72.0667 -26.2000 76.6815 9.0272 -26.2000 27.7115 1.8863 27.2387 ###
43 1/4/2019 42 8348105.822 615405.078 4112.908 90.2109 -12.2000 91.0321 18.7481 14.0000 23.3985 2.1852 23.2371 ###
44 1/4/2019 42 8348105.730 615405.081 4112.899 4.8754 -21.2000 21.7534 92.3487 -9.0000 92.7863 0.5180 272.6780 ###
45 1/5/2019 43 8348105.826 615405.063 4112.906 95.0815 -13.5000 96.0351 97.9025 7.7000 98.2048 2.2535 158.8932 ###
46 1/5/2019 43 8348105.823 615405.079 4112.908 90.5160 -12.4000 91.3614 16.3783 1.1000 16.4152 2.1254 44.5999 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
Prisma Topográfico: HUA-01 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 106 m U
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 405 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
E
Z
L
I
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades M
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
A
(mm) (mm)
B
U
S
47 1/6/2019 44 8348105.776 615405.066 4112.892 45.2342 -28.2000 53.3045 48.4757 -15.8000 50.9856 1.2221 80.6805 ### D
O
48 1/6/2019 44 8348105.775 615405.065 4112.892 44.7303 -28.4000 52.9845 0.6708 -0.2000 0.7000 1.2046 1.9019 ###
L
49 1/7/2019 45 8348105.756 615405.071 4112.903 24.7631 -16.5000 29.7567 19.9722 11.9000 23.2487 0.6664 34.9458 ### U
T
50 1/7/2019 45 8348105.758 615405.071 4112.904 26.6175 -15.8000 30.9537 2.0396 0.7000 2.1564 0.6879 6.1856 ###
O
51 1/8/2019 46 8348105.757 615405.076 4112.908 25.0288 -11.5000 27.5443 4.6098 4.3000 6.3040 0.6034 9.6777 ###
52 1/8/2019 46 8348105.757 615405.071 4112.904 25.6640 -16.4000 30.4565 4.6000 -4.9000 6.7209 0.6619 18.5403 ###
53 1/9/2019 47 8348105.831 615405.066 4112.920 99.5448 0.1000 99.5448 74.1428 16.5000 75.9566 2.1325 113.9349 ###
54 1/10/2019 48 8348105.803 615405.060 4112.897 73.1469 -23.1000 76.7077 28.4233 -23.2000 36.6896 1.6088 36.6896 ###
55 1/11/2019 49 8348105.776 615405.054 4112.874 49.0667 -46.3000 67.4628 28.4233 -23.2000 36.6896 1.3882 40.0250 ###
56 1/11/2019 49 8348105.878 615405.069 4112.887 146.1303 -32.5000 149.7007 103.4215 13.8000 104.3382 3.0726 834.7052 ###
57 1/11/2019 49 8348105.740 615405.064 4112.891 15.0950 -29.0000 32.6934 138.4867 3.5000 138.5309 0.6682 664.9485 ###
58 1/12/2019 50 8348105.803 615405.068 4112.884 71.6674 -36.4000 80.3814 63.7320 -7.4000 64.1602 1.6194 90.5791 ###
59 1/12/2019 50 8348105.703 615405.078 4112.897 28.6142 -22.7000 36.5248 100.1903 13.7000 101.1226 0.7315 346.7062 ###
60 1/13/2019 51 8348105.799 615405.072 4112.879 66.6730 -40.6000 78.0618 95.2707 -17.9000 96.9377 1.5416 136.8532 ###
61 1/13/2019 51 8348105.727 615405.071 4112.897 7.8102 -23.0000 24.2899 71.5101 17.6000 73.6441 0.4769 252.4940 ###
62 1/14/2019 52 8348105.757 615405.063 4112.893 28.4788 -27.3000 39.4503 30.8551 -4.3000 31.1533 0.7621 37.3840 ###
63 1/14/2019 52 8348105.733 615405.062 4112.900 14.7167 -20.0000 24.8310 24.1102 7.3000 25.1911 0.4778 120.9171 ###
64 1/15/2019 53 8348105.744 615405.066 4112.905 16.0112 -14.9000 21.8717 12.0208 5.1000 13.0579 0.4156 19.8978 ###
65 1/16/2019 54 8348105.807 615405.121 4112.915 87.2592 -4.5000 87.3751 83.7618 10.4000 84.4050 1.6296 85.2934 ###
66 1/17/2019 55 8348105.744 615405.068 4112.929 14.9030 9.3000 17.5667 82.4457 13.8000 83.5927 0.3216 83.5927 ###
67 1/18/2019 56 8348105.722 615405.097 4112.921 22.7653 0.8000 22.7794 36.5601 -8.5000 37.5352 0.4094 36.6445 ###
68 1/19/2019 57 8348105.785 615405.071 4112.893 53.4492 -26.8000 59.7918 68.3854 -27.6000 73.7450 1.0564 76.9513 ###
69 1/19/2019 57 8348105.728 615405.055 4112.885 21.7892 -34.7000 40.9739 59.2109 -7.9000 59.7356 0.7239 #DIV/0! ###
70 1/20/2019 58 8348105.763 615405.072 4112.916 30.9071 -3.9000 31.1522 38.2899 30.8000 49.1402 0.5411 50.3643 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
Prisma Topográfico: HUA-01 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 106 m U
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 405 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
E
Z
L
I
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades M
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
A
(mm) (mm)
B
U
S
71 1/21/2019 59 8348105.768 615405.096 4112.901 40.1241 -18.9000 44.3526 24.2217 -15.0000 28.4902 0.7560 26.1644 ### D
O
72 1/22/2019 60 8348105.800 615405.072 4112.909 67.8918 -10.6000 68.7143 40.0410 8.3000 40.8922 1.1515 40.5542 ### L
73 1/23/2019 61 8348105.753 615405.075 4112.911 20.8777 -9.0000 22.7350 47.0160 1.6000 47.0432 0.3753 51.5150 ### U
T
74 1/24/2019 62 8348105.723 615405.059 4112.896 20.3934 -24.0000 31.4943 34.0630 -15.0000 37.2195 0.5109 34.9616 ### O
75 1/25/2019 63 8348105.7423 615405.0717 4112.904 11.4935 -15.9000 19.6191 23.3823 8.1000 24.7455 0.3136 26.9951 ###
76 1/26/2019 64 8348105.7689 615405.0759 4112.8943 36.9110 -25.6000 44.9197 26.9295 -9.7000 28.6232 0.7054 25.7609 ###
77 1/27/2019 65 8348105.714 615405.114 4112.905 41.3260 -14.9000 43.9301 66.8253 10.7000 67.6765 0.6801 73.7172 ###
78 1/28/2019 66 8348105.743 615405.063 4112.8944 17.6477 -25.5000 31.0111 58.6686 -10.6000 59.6185 0.4729 60.8438 ###
79 1/29/2019 67 8348105.7374 615405.0772 4112.9016 5.4148 -18.3000 19.0843 15.2643 7.2000 16.8772 0.2861 15.0020 ###
80 1/31/2019 69 8348105.773 615405.087 4112.9 42.2497 -19.9000 46.7017 36.9242 -1.6000 36.9589 0.6809 19.5953 ###
81 1/31/2019 69 8348105.737 615405.095 4112.917 18.8743 -2.9000 19.0958 36.8782 17.0000 40.6079 0.2770 113.1051 ###
82 2/1/2019 70 8348105.739 615405.092 4112.908 16.7344 -11.9000 20.5341 3.6056 -9.0000 9.6954 0.2952 15.6342 ###
83 2/1/2019 70 8348105.702 615405.096 4112.898 35.6180 -21.9000 41.8121 37.2156 -10.0000 38.5357 0.5982 117.5665 ###
84 2/2/2019 71 8348105.774 615405.098 4112.879 47.0472 -40.9000 62.3398 72.0278 -19.0000 74.4916 0.8829 104.3462 ###
85 2/2/2019 71 8348105.739 615405.087 4112.898 12.3709 -21.9000 25.1525 36.6879 19.0000 41.3159 0.3544 111.8324
86 2/3/2019 72 8348105.722 615405.089 4112.891 15.7747 -28.9000 32.9249 17.1172 -7.0000 18.4932 0.4597 28.9145
87 2/3/2019 72 8348105.739 615405.094 4112.915 18.5699 -4.9000 19.2055 17.7200 24.0000 29.8329 0.2668 79.5543
88
89
90
91
92
93
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
8 348 091 m U
Prisma Topográfico: HUA-02 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este:
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 442 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
Z
E
I
L
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo A
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
(mm) (mm) B
U
S
0 11/23/2018 0 8348090.51 615441.67 4113.41 D Norte
O
D
L
1 11/24/2018 1 8348090.50 615441.66 4113.42 4.8021 16.8000 17.4728 4.8021 16.8000 17.4728 18.8048 18.8048 ###
U
2 11/25/2018 2 8348090.54 615441.66 4113.40 31.9002 -6.1000 32.4781 33.7337 -22.9000 40.7722 16.5846 39.6167 ### T
3 11/26/2018 3 8348090.55 615441.67 4113.35 41.6389 -56.8000 70.4276 11.7618 -50.7000 52.0464 22.5619 44.7444 ### O

4 11/27/2018 4 8348090.56 615441.67 4113.35 51.9362 -56.8000 76.9650 12.6210 0.0000 12.6210 18.6739 12.6210 ###
5 11/28/2018 5 8348090.57 615441.67 4113.35 57.9014 -56.8000 81.1099 6.0000 0.0000 6.0000 15.7092 5.7600 ###
6 11/29/2018 6 8348090.57 615441.67 4113.35 57.9014 -56.8000 81.1099 0.0000 0.0000 0.0000 13.1604 0.0000 ###
7 11/30/2018 7 8348090.57 615441.69 4113.37 63.5718 -41.8000 76.0829 21.0000 15.0000 25.8070 10.6214 25.8070 ###
8 12/1/2018 7 8348090.63 615441.70 4113.35 122.9449 -59.5000 136.5859 61.9323 -17.7000 64.4120 18.7033 461.4588 ###
9 12/2/2018 8 8348090.65 615441.69 4113.35 140.5664 -59.5000 152.6406 22.1730 0.0000 22.1730 18.3843 22.1730 ###
10 12/3/2018 9 8348090.66 615441.70 4113.35 152.2677 -59.5000 163.4800 14.2914 0.0000 14.2914 17.5732 14.2914 ###
11 12/5/2018 11 8348090.6345 615441.6960 4113.3750 130.3442 -32.8000 134.4078 22.4000 26.7000 34.8518 11.8916 17.4259 ###
12 12/6/2018 12 8348090.6040 615441.6628 4113.3950 96.6957 -12.8000 97.5392 45.0831 20.0000 49.3203 7.9282 49.3203 ###
13 12/7/2018 13 8348090.7001 615441.6564 4113.3990 192.9968 -8.8000 193.1974 96.3129 4.0000 96.3959 14.5231 96.3959 ###
14 12/8/2018 14 8348090.7574 615441.6443 4113.3999 251.0375 -7.9000 251.1618 58.5636 0.9000 58.5706 17.5604 58.5706 ###
15 12/9/2018 16 8348090.582 615441.655 4113.399 75.5119 -8.4000 75.9777 175.7509 -0.5000 175.7516 4.8721 136.0657 ###
16 12/9/2018 16 8348090.623 615441.636 4113.400 119.6844 -7.9000 119.9449 45.3154 0.5000 45.3182 7.5305 135.9546 ###
17 12/10/2018 17 8348090.584 615441.658 4113.391 76.7031 -16.4000 78.4368 44.9245 -8.5000 45.7215 4.7257 68.2270 ###
18 12/11/2018 18 8348090.642 615441.697 4113.380 138.2173 -27.4000 140.9070 70.9474 -11.0000 71.7951 7.9966 70.1866 ###
19 12/11/2018 18 8348090.565 615441.694 4113.366 63.5718 -41.8000 76.0829 77.3662 -14.4000 78.6949 4.2412 247.4251 ###
20 12/12/2018 19 8348090.549 615441.687 4113.383 46.2014 -25.2000 52.6271 17.3851 16.6000 24.0375 2.8309 36.9019 ###
21 12/13/2018 20 8348090.556 615441.647 4113.387 52.5235 -21.2000 56.6406 41.0669 4.0000 41.2612 2.8861 39.8766 ###
22 12/14/2018 21 8348090.580 615441.662 4113.383 72.7720 -24.4000 76.7536 28.6845 -3.2000 28.8624 3.7163 28.0634 ###
23 12/15/2018 22 8348090.562 615441.658 4113.397 55.3864 -11.0000 56.4681 18.5065 13.4000 22.8484 2.6026 21.8907 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
8 348 091 m U
Prisma Topográfico: HUA-02 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este:
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 442 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
Z
E
I
L
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo A
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
(mm) (mm) B
U
S
24 12/16/2018 23 8348090.640 615441.653 4113.377 133.2802 -30.4000 136.7032 78.0668 -19.4000 80.4412 6.0345 84.1215 ### O
D
L
25 12/17/2018 24 8348090.627 615441.653 4113.387 120.4638 -20.5000 122.1956 12.9000 9.9000 16.2610 5.1697 16.5366 ###
U
26 12/18/2018 25 8348090.552 615441.659 4113.387 44.8377 -20.6000 49.3435 75.7624 -0.1000 75.7625 2.0049 77.7051 ### T
27 12/19/2018 26 8348090.612 615441.656 4113.404 104.7914 -3.9667 104.8664 60.1939 16.6333 62.4498 4.0869 59.6337 ### O

28 12/20/2018 27 8348090.579 615441.658 4113.394 72.3266 -13.5000 73.5757 32.5593 -9.5333 33.9263 2.7606 34.1635 ###
29 12/21/2018 28 8348090.530 615441.657 4113.389 24.5416 -18.9000 30.9758 49.2009 -5.4000 49.4964 1.1174 46.2823 ###
30 12/22/2018 28 8348090.483 615441.644 4113.404 33.6942 -3.8000 33.9078 49.1240 15.1000 51.3924 1.1925 72.2001 ###
31 12/23/2018 30 8348090.548 615441.658 4113.385 41.6832 -23.3000 47.7533 67.0153 -19.5000 69.7947 1.6121 58.7058 ###
32 12/24/2018 31 8348090.557 615441.644 4113.381 54.3909 -26.4000 60.4593 16.6709 -3.1000 16.9567 1.9431 11.3571 ###
33 12/25/2018 32 8348090.627 615441.686 4113.341 121.0841 -66.8000 138.2881 82.2164 -40.4000 91.6062 4.3731 180.7027 ###
34 12/26/2018 33 8348090.584 615441.651 4113.375 77.7844 -32.8000 84.4172 55.8323 34.0000 65.3701 2.5877 65.3701 ###
35 12/27/2018 34 8348090.580 615441.662 4113.383 72.7720 -24.4000 76.7536 11.6387 8.4000 14.3534 2.2828 14.3534 ###
36 12/28/2018 35 8348090.562 615441.658 4113.397 55.3864 -11.0000 56.4681 18.5065 13.4000 22.8484 1.6310 22.8484 ###
37 12/29/2018 36 8348090.640 615441.653 4113.377 133.2802 -30.4000 136.7032 78.0668 -19.4000 80.4412 3.8376 80.4412 ###
38 12/30/2018 37 8348090.587 615441.653 4113.379 80.8920 -28.7000 85.8325 52.9000 1.7000 52.9273 2.3437 52.9273 ###
39 12/31/2018 38 8348090.531 615441.687 4113.359 30.8058 -48.4000 57.3721 65.6174 -19.7000 68.5108 1.5250 68.5108 ###
40 1/1/2019 39 8348090.586 615441.659 4113.383 79.3354 -24.9000 83.1511 62.0298 23.5000 66.3321 2.1506 63.6788 ###
41 1/2/2019 40 8348090.583 615441.670 4113.399 75.6518 -8.5000 76.1279 11.5802 16.4000 20.0764 1.9207 20.6795 ###
42 1/3/2019 41 8348090.619 615441.664 4113.385 111.6327 -23.1000 113.9976 36.4177 -14.6000 39.2353 2.8044 38.6449 ###
43 1/4/2019 42 8348090.622 615441.669 4113.403 114.8157 -4.7000 114.9119 5.6036 18.4000 19.2343 2.7590 19.2343 ###
44 1/4/2019 42 8348090.528 615441.658 4113.406 22.7161 -1.5000 22.7655 94.5190 3.2000 94.5732 0.5421 272.3708 ###
45 1/5/2019 43 8348090.612 615441.670 4113.391 104.6520 -16.5000 105.9448 84.5845 -15.0000 85.9042 2.4861 138.9910 ###
46 1/5/2019 43 8348090.623 615441.667 4113.403 115.7000 -4.6000 115.7915 11.6090 11.9000 16.6247 2.6939 45.1689 ###
47 1/6/2019 44 8348090.579 615441.643 4113.396 75.6738 -12.2000 76.6510 50.1678 -7.6000 50.7402 1.7574 80.2922 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
8 348 091 m U
Prisma Topográfico: HUA-02 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este:
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 442 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
Z
E
I
L
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo A
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
(mm) (mm) B
U
S
48 1/6/2019 44 8348090.579 615441.643 4113.395 75.8027 -12.5000 76.8264 0.4000 -0.3000 0.5000 1.7467 1.3585 ###
O
D
L
49 1/7/2019 45 8348090.540 615441.651 4113.395 36.6715 -12.4000 38.7112 39.7549 0.1000 39.7550 0.8670 59.7570 ###
U
50 1/7/2019 45 8348090.541 615441.651 4113.396 36.7642 -12.2000 38.7356 0.5000 0.2000 0.5385 0.8608 1.5447 ###
T
51 1/8/2019 46 8348090.553 615441.659 4113.389 46.3855 -18.6000 49.9757 14.5774 -6.4000 15.9204 1.0948 24.4407 ### O

52 1/8/2019 46 8348090.541 615441.650 4113.395 37.1648 -12.4000 39.1788 15.0602 6.2000 16.2865 0.8515 44.9283 ###
53 1/9/2019 47 8348090.638 615441.645 4113.394 132.6207 -13.6000 133.3162 97.8279 -1.2000 97.8352 2.8561 146.7528 ###
54 1/10/2019 48 8348090.707 615441.659 4113.397 199.5811 -11.2000 199.8951 69.8965 2.4000 69.9377 4.1917 69.2167 ###
55 1/11/2019 49 8348090.564 615441.648 4113.368 59.6091 -39.7000 71.6194 143.2852 -28.5000 146.0921 1.4738 161.2051 ###
56 1/11/2019 49 8348090.681 615441.650 4113.368 174.8285 -39.4000 179.2132 117.5170 0.3000 117.5174 3.6785 940.1392 ###
57 1/11/2019 49 8348090.519 615441.652 4113.401 18.8215 -7.2000 20.1517 162.9099 32.2000 166.0617 0.4119 797.0962 ###
58 1/12/2019 50 8348090.586 615441.643 4113.366 82.5361 -41.4000 92.3373 68.4551 -34.2000 76.5228 1.8603 108.0322 ###
59 1/12/2019 50 8348090.480 615441.648 4113.389 33.8514 -18.8000 38.7216 106.6867 22.6000 109.0542 0.7756 373.9000 ###
60 1/13/2019 51 8348090.6067 615441.6496 4113.3686 100.8303 -39.2000 108.1822 126.9174 -20.4000 128.5464 2.1365 181.4773 ###
61 1/13/2019 51 8348090.5106 615441.6388 4113.3872 28.4803 -20.6000 35.1495 96.7050 18.6000 98.4775 0.6902 337.6370 ###
62 1/14/2019 52 8348090.5349 615441.6466 4113.3827 34.3001 -25.1000 42.5031 25.5212 -4.5000 25.9149 0.8211 31.0978 ###
63 1/14/2019 52 8348090.5095 615441.6495 4113.3904 17.7248 -17.4000 24.8381 25.5650 7.7000 26.6994 0.4779 128.1573 ###
64 1/15/2019 53 8348090.5246 615441.6358 4113.3914 35.7146 -16.4000 39.3000 20.3887 1.0000 20.4132 0.7468 31.0074 ###
65 1/16/2019 54 8348090.5907 615441.6912 4113.4047 86.7162 -3.1000 86.7716 86.2460 13.3000 87.2655 1.6184 88.3701 ###
66 1/17/2019 55 8348090.5361 615441.6457 4113.4201 35.8001 12.3000 37.8542 71.0733 15.4000 72.7226 0.6931 72.7226 ###
67 1/18/2019 56 8348090.4942 615441.652 4113.4132 20.0562 5.4000 20.7704 42.3710 -6.9000 42.9291 0.3733 41.9105 ###
68 1/19/2019 57 8348090.5738 615441.6507 4113.3823 68.3953 -25.5000 72.9943 79.6106 -30.9000 85.3971 1.2897 89.1100 ###
69 1/19/2019 57 8348090.5171 615441.6382 4113.3899 30.4844 -17.9000 35.3512 58.0615 7.6000 58.5568 0.6246 #DIV/0! ###
70 1/20/2019 58 8348090.5523 615441.6517 4113.4172 47.4676 9.4000 48.3894 37.7000 27.3000 46.5465 0.8405 47.7061 ###
71 1/21/2019 59 8348090.5789 615441.6922 4113.3952 75.7777 -12.6000 76.8181 48.4542 -22.0000 53.2148 1.3095 48.8707 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q. A


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B. Z
Componente: TAJO HUAMANLOMA Fecha: 26-04-19 I
M
8 348 091 m U
Prisma Topográfico: HUA-02 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este:
T
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 442 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 113 msnm D
A
Z
E
I
L
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad A
Norte (m) Este (m) Elevación (m) Absoluto Relativo A
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día) L
(mm) (mm) B
U
S
72 1/22/2019 60 8348090.5914 615441.6499 4113.399 85.7429 -8.8000 86.1933 44.1083 3.8000 44.2717 1.4445 43.9058 ### O
D
L
73 1/23/2019 61 8348090.554 615441.6462 4113.3961 51.0722 -11.7000 52.3952 37.5826 -2.9000 37.6943 0.8648 41.2774 ###
U
74 1/24/2019 62 8348090.521 615441.6412 4113.3796 29.2535 -28.2000 40.6326 33.3766 -16.5000 37.2324 0.6591 34.9737 ### T
75 1/25/2019 63 8348090.5358 615441.6493 4113.3943 33.5172 -13.5000 36.1338 16.8716 14.7000 22.3772 0.5775 24.4115 ### O

76 1/26/2019 64 8348090.5663 615441.6519 4113.3763 60.8297 -31.5000 68.5018 30.6106 -18.0000 35.5107 1.0758 31.9596 ###
77 1/27/2019 65 8348090.51 615441.696 4113.407 29.0167 -0.8000 29.0277 71.5157 30.7000 77.8267 0.4494 84.7734 ###
78 1/28/2019 66 8348090.532 615441.6442 4113.3896 33.6091 -18.2000 38.2205 56.2782 -17.4000 58.9067 0.5829 60.1174 ###
79 1/29/2019 67 8348090.5141 615441.6641 4113.3844 7.3410 -23.4000 24.5245 26.7660 -5.2000 27.2665 0.3677 24.2369 ###
80 1/31/2019 69 8348090.55 615441.663 4113.375 42.7968 -32.8000 53.9204 35.9168 -9.4000 37.1265 0.7862 19.6842 ###
81 1/31/2019 69 8348090.52 615441.671 4113.408 13.1898 0.2000 13.1913 31.0483 33.0000 45.3100 0.1913 126.2021 ###
82 2/1/2019 70 8348090.505 615441.674 4113.415 7.3055 7.2000 10.2572 15.2971 7.0000 16.8226 0.1474 27.1272 ###
83 2/1/2019 70 8348090.494 615441.673 4113.396 14.6414 -11.8000 18.8045 11.0454 -19.0000 21.9773 0.2690 67.0493 ###
84 2/2/2019 71 8348090.574 615441.674 4113.37 66.9565 -37.8000 76.8896 80.0062 -26.0000 84.1249 1.0890 117.8403
85 2/2/2019 71 8348090.52 615441.664 4113.389 12.9757 -18.8000 22.8432 54.9181 19.0000 58.1120 0.3218 157.2955
86 2/3/2019 72 8348090.537 615441.671 4113.378 29.8558 -29.8000 42.1831 18.3848 -11.0000 21.4243 0.5890 33.4973
87 2/3/2019 72 8348090.513 615441.665 4113.396 5.9808 -11.8000 13.2291 24.7386 18.0000 30.5941 0.1838 81.5843
88
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-03 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 012 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 473 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 125 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm) E
L
0 12/26/2018 0 8348012.37 615473.43 4124.83 D Este
A
T
1 12/28/2018 2 8348012.31 615473.41 4124.85 58.8480 22.2000 62.8962 58.8480 22.2000 62.8962 31.4481 31.4481 ###
I
2 12/29/2018 3 8348012.32 615473.43 4124.86 50.7035 30.7000 59.2734 21.9317 8.5000 23.5213 19.4872 22.5804 ### V
3 12/30/2018 4 8348012.34 615473.43 4124.82 27.0150 -5.5000 27.5692 23.7474 -36.2000 43.2941 6.7654 41.8975 ### O

4 12/31/2018 5 8348012.35 615473.47 4124.84 42.4393 6.3000 42.9043 40.6133 11.8000 42.2928 8.5809 45.7219 ###
5 1/1/2019 6 8348012.35 615473.43 4124.85 15.8824 15.8000 22.4029 37.3066 9.5000 38.4971 3.7042 36.7368 ###
6 1/2/2019 7 8348012.33 615473.43 4124.87 36.0555 41.3000 54.8242 20.3039 25.5000 32.5960 7.8119 33.5993 ###
7 1/3/2019 8 8348012.39 615473.45 4124.86 27.8108 28.9000 40.1080 57.3118 -12.4000 58.6379 4.9918 57.6766 ###
8 1/4/2019 9 8348012.40 615473.45 4124.87 36.4232 38.4000 52.9265 12.8004 9.5000 15.9405 5.8581 15.9405 ###
9 1/4/2019 9 8348012.29 615473.41 4124.88 77.8042 55.0000 95.2811 113.1220 16.6000 114.3335 10.1709 343.0003 ###
10 1/5/2019 10 8348012.39 615473.44 4124.83 18.6550 4.8000 19.2627 96.4591 -50.2000 108.7401 1.9276 173.9841 ###
11 1/5/2019 10 8348012.3985 615473.4502 4124.8674 36.3090 38.0000 52.5580 19.3724 33.2000 38.4387 5.0692 102.5031 ###
12 1/6/2019 11 8348012.3312 615473.4282 4124.8589 36.8718 29.5000 47.2205 70.8046 -8.5000 71.3130 4.2955 114.1008 ###
13 1/6/2019 11 8348012.3313 615473.4283 4124.8585 36.7659 29.1000 46.8886 0.1414 -0.4000 0.4243 4.1246 1.1314 ###
14 1/7/2019 12 8348012.3201 615473.4205 4124.8514 48.9327 22.0000 53.6508 13.6484 -7.1000 15.3847 4.4585 23.1253 ###
15 1/7/2019 12 8348012.3280 615473.4209 4124.8525 41.1359 23.1000 47.1781 7.9101 1.1000 7.9862 3.8102 22.9087 ###
16 1/8/2019 13 8348012.344 615473.427 4124.860 24.3148 30.3000 38.8497 16.9850 7.2000 18.4480 2.9808 28.3211 ###
17 1/8/2019 13 8348012.320 615473.421 4124.851 48.6368 22.0000 53.3811 24.3526 -8.3000 25.7282 3.9849 70.9743 ###
18 1/9/2019 14 8348012.404 615473.433 4124.854 36.4858 24.8000 44.1163 84.9518 2.8000 84.9979 3.1372 127.4969 ###
19 1/10/2019 15 8348012.471 615473.447 4124.826 104.2145 -3.2000 104.2636 67.9577 -28.0000 73.5000 6.9173 72.7423 ###
20 1/11/2019 16 8348012.322 615473.428 4124.822 46.5474 -7.9000 47.2130 150.5534 -4.7000 150.6267 2.9547 166.2088 ###
21 1/11/2019 16 8348012.458 615473.449 4124.831 91.9998 1.4000 92.0105 138.1595 9.3000 138.4722 5.7135 1107.7773 ###
22 1/11/2019 16 8348012.277 615473.415 4124.840 92.1303 10.1000 92.6823 184.1045 8.7000 184.3099 5.6817 884.6875 ###
23 1/12/2019 17 8348012.341 615473.427 4124.818 27.0897 -11.9000 29.5882 65.0920 -22.0000 68.7093 1.7384 97.0014 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-03 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 012 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 473 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 125 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm) E
L
24 1/12/2019 17 8348012.238 615473.401 4124.847 133.2520 18.0000 134.4623 106.3544 29.9000 110.4774 7.7668 378.7797 ### A
T
25 1/13/2019 18 8348012.369 615473.430 4124.820 1.3000 -9.7000 9.7867 134.3125 -27.7000 137.1391 0.5431 193.6082 ###
I
26 1/13/2019 18 8348012.277 615473.408 4124.846 93.7402 16.2000 95.1297 94.7849 25.9000 98.2598 5.1948 336.8906 ### V
27 1/14/2019 19 8348012.321 615473.414 4124.865 49.3974 35.2000 60.6559 44.7200 19.0000 48.5889 3.1681 58.3067 ### O

28 1/14/2019 19 8348012.286 615473.415 4124.851 83.7841 21.1000 86.4002 35.6022 -14.1000 38.2927 4.4642 183.8049 ###
29 1/15/2019 20 8348012.292 615473.407 4124.847 79.7414 17.6000 81.6606 9.9020 -3.5000 10.5024 4.0788 15.7536 ###
30 1/16/2019 21 8348012.360 615473.476 4124.875 46.1637 45.5000 64.8177 97.1574 27.9000 101.0840 3.0866 103.2347 ###
31 1/17/2019 22 8348012.317 615473.415 4124.875 53.0540 45.3000 69.7626 74.4691 -0.2000 74.4693 3.1710 74.4693 ###
32 1/18/2019 23 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 39.7122 -6.4000 40.2246 4.3527 39.2701 ###
33 1/19/2019 24 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 0.0000 0.0000 0.0000 4.1788 0.0000 ###
34 1/19/2019 24 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 0.0000 0.0000 0.0000 4.1788 #DIV/0! ###
35 1/20/2019 25 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 0.0000 0.0000 0.0000 4.0154 0.0000 ###
36 1/21/2019 26 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 0.0000 0.0000 0.0000 3.8476 0.0000 ###
37 1/22/2019 27 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 0.0000 0.0000 0.0000 3.7042 0.0000 ###
38 1/23/2019 28 8348012.278 615473.411 4124.868 92.3604 38.9000 100.2181 0.0000 0.0000 0.0000 3.5832 0.0000 ###
39 1/31/2019 36 8348012.309 615473.446 4124.857 61.0020 27.6000 66.9553 46.8796 -11.3000 48.2223 1.8614 6.0267 ###
40 1/31/2019 36 8348012.286 615473.437 4124.884 82.2572 54.6000 98.7290 24.6982 27.0000 36.5923 2.7176 101.9207 ###
41 2/1/2019 37 8348012.260 615473.432 4124.871 108.0104 41.6000 115.7446 26.4764 -13.0000 29.4958 3.1325 47.5632 ###
42 2/1/2019 37 8348012.257 615473.436 4124.861 111.1362 31.6000 115.5414 5.0000 -10.0000 11.1803 3.0995 34.1095 ###
43 2/2/2019 38 8348012.340 615473.448 4124.837 33.0189 7.6000 33.8823 83.8630 -24.0000 87.2296 0.8919 122.1893 ###
44 2/2/2019 38 8348012.282 615473.433 4124.853 86.0363 23.6000 89.2144 59.9083 16.0000 62.0081 2.3257 167.8414 ###
45 2/3/2019 39 8348012.303 615473.442 4124.876 66.0095 46.6000 80.8011 22.8473 23.0000 32.4191 2.0718 50.6879 ###
46 2/3/2019 39 8348012.286 615473.446 4124.869 83.4521 39.6000 92.3710 17.4642 -7.0000 18.8149 2.3459 50.1730 ###
47 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-03 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 348 012 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 473 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 125 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm) E
L
48 ###
A
T
49 ###
I
V
O
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-04 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 973 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 451 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 130 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

0 12/26/2018 0 8347972.86 615451.30 4130.01 D Norte


1 12/28/2018 2 8347972.84 615451.28 4130.03 23.5646 15.0000 27.9337 23.5646 15.0000 27.9337 13.9668 13.9668
2 12/29/2018 3 8347972.82 615451.29 4130.03 32.8544 17.1000 37.0381 17.3217 2.1000 17.4485 12.1078 16.4760
3 12/30/2018 4 8347972.87 615451.30 4130.01 13.2412 -2.8000 13.5340 45.7458 -19.9000 49.8868 3.3145 48.7030
4 12/31/2018 5 8347972.85 615451.33 4129.99 36.6531 -18.7000 41.1478 34.1766 -15.9000 37.6942 8.2296 41.1209
5 1/1/2019 6 8347972.85 615451.30 4130.02 9.8995 8.0000 12.7279 35.4295 26.7000 44.3637 2.1045 42.3352
6 1/2/2019 7 8347972.83 615451.29 4130.03 24.5098 18.5000 30.7080 15.2122 10.5000 18.4840 4.3747 19.0258
7 1/3/2019 8 8347972.89 615451.31 4130.02 32.2233 6.7000 32.9125 56.2360 -11.8000 57.4607 4.0963 56.5960
8 1/4/2019 9 8347972.90 615451.31 4130.04 46.4431 25.5000 52.9831 14.3339 18.8000 23.6411 5.8644 23.6411
9 1/4/2019 9 8347972.82 615451.27 4130.07 41.3088 55.3000 69.0254 87.2574 29.8000 92.2057 7.3682 276.6172
10 1/5/2019 10 8347972.90 615451.30 4130.01 45.6169 -2.7000 45.6967 85.4962 -58.0000 103.3131 4.5728 165.3010
11 1/5/2019 10 8347972.899 615451.312 4130.038 46.1728 25.9000 52.9409 7.3546 28.6000 29.5305 5.1062 78.7480
12 1/6/2019 11 8347972.846 615451.306 4130.036 13.8852 24.1000 27.8138 52.7311 -1.8000 52.7618 2.5301 84.4189
13 1/6/2019 11 8347972.846 615451.305 4130.036 13.5207 23.9000 27.4594 0.4123 -0.2000 0.4583 2.4155 1.2220
14 1/7/2019 12 8347972.832 615451.286 4130.017 25.5157 5.4000 26.0808 24.4610 -18.5000 30.6690 2.1674 46.0996
15 1/7/2019 12 8347972.831 615451.286 4130.018 25.8683 5.8000 26.5106 0.5831 0.4000 0.7071 2.1411 2.0284
16 1/8/2019 13 8347972.835 615451.306 4130.033 22.9473 20.8000 30.9713 20.4561 15.0000 25.3663 2.3763 38.9419
17 1/8/2019 13 8347972.831 615451.286 4130.017 25.9417 5.5000 26.5183 20.6526 -15.3000 25.7025 1.9796 70.9035
18 1/9/2019 14 8347972.929 615451.313 4130.018 75.3331 6.5000 75.6130 101.0844 1.0000 101.0893 5.3769 151.6340
19 1/10/2019 15 8347972.982 615451.331 4129.992 131.8531 -20.2000 133.3915 56.6365 -26.7000 62.6145 8.8497 61.9690
20 1/11/2019 16 8347972.855 615451.292 4129.994 2.8636 -17.5000 17.7327 133.2149 2.7000 133.2423 1.1097 147.0259
21 1/11/2019 16 8347972.963 615451.327 4130.003 112.3760 -8.5000 112.6970 113.7624 9.0000 114.1179 6.9980 912.9430
22 1/11/2019 16 8347972.800 615451.276 4130.020 58.4406 8.4000 59.0412 170.7757 16.9000 171.6098 3.6194 823.7273
23 1/12/2019 17 8347972.848 615451.290 4129.994 8.8238 -17.8000 19.8671 50.2207 -26.2000 56.6442 1.1672 79.9682
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-04 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 973 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 451 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 130 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

24 1/12/2019 17 8347972.768 615451.265 4130.009 92.8522 -2.7000 92.8915 84.5792 15.1000 85.9165 5.3656 294.5710
25 1/13/2019 18 8347972.875 615451.304 4129.994 21.4555 -18.0000 28.0061 114.2618 -15.3000 115.2816 1.5541 162.7505
26 1/13/2019 18 8347972.791 615451.277 4130.018 66.8809 6.2000 67.1676 88.2021 24.2000 91.4617 3.6679 313.5831
27 1/14/2019 19 8347972.840 615451.290 4130.035 16.6087 23.1000 28.4510 50.3287 16.9000 53.0904 1.4860 63.7085
28 1/14/2019 19 8347972.804 615451.278 4130.012 54.7083 -0.1000 54.7084 38.1058 -23.2000 44.6127 2.8267 214.1408
29 1/15/2019 20 8347972.811 615451.281 4130.010 46.5816 -2.2000 46.6336 8.1541 -2.1000 8.4202 2.3293 12.6303
30 1/16/2019 21 8347972.843 615451.359 4130.034 64.7975 22.0000 68.4304 84.2711 24.2000 87.6770 3.2586 89.5424
31 1/17/2019 22 8347972.822 615451.282 4130.053 35.9912 41.1000 54.6313 79.3832 19.1000 81.6486 2.4832 81.6486
32 1/18/2019 23 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 28.1299 -15.4000 32.0695 2.9771 31.3085
33 1/19/2019 24 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 0.0000 0.0000 0.0000 2.8581 0.0000
34 1/19/2019 24 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 0.0000 0.0000 0.0000 2.8581 #DIV/0!
35 1/20/2019 25 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 0.0000 0.0000 0.0000 2.7464 0.0000
36 1/21/2019 26 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 0.0000 0.0000 0.0000 2.6316 0.0000
37 1/22/2019 27 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 0.0000 0.0000 0.0000 2.5335 0.0000
38 1/23/2019 28 8347972.794 615451.280 4130.037 63.5446 25.7000 68.5449 0.0000 0.0000 0.0000 2.4508 0.0000
39 1/31/2019 36 8347972.822 615451.314 4130.005 38.2404 -6.7000 38.8229 44.5449 -32.4000 55.0818 1.0793 6.8840
40 1/31/2019 36 8347972.802 615451.306 4130.057 54.3832 45.3000 70.7787 21.5407 52.0000 56.2850 1.9483 156.7706
41 2/1/2019 37 8347972.750 615451.292 4130.041 105.3486 29.3000 109.3472 53.8516 -16.0000 56.1783 2.9594 90.5898
42 2/1/2019 37 8347972.775 615451.296 4130.036 80.3040 24.3000 83.9001 25.3180 -5.0000 25.8070 2.2507 78.7331
43 2/2/2019 38 8347972.848 615451.315 4129.999 21.1028 -12.7000 24.6297 75.4321 -37.0000 84.0179 0.6483 117.6904
44 2/2/2019 38 8347972.808 615451.308 4130.014 49.0013 2.3000 49.0553 40.6079 15.0000 43.2897 1.2788 117.1752
45 2/3/2019 39 8347972.815 615451.313 4130.030 44.0560 18.3000 47.7056 8.6023 16.0000 18.1659 1.2232 28.4027
46 2/3/2019 39 8347972.808 615451.310 4130.021 49.5614 9.3000 50.4264 7.6158 -9.0000 11.7898 1.2807 31.4395
47
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-04 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 973 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 451 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 130 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

48
49
50
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-05 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 950 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 321 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 129 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

0 12/26/2018 0 8347950.25 615321.06 4128.58 D Norte


1 12/28/2018 2 8347950.23 615321.04 4128.61 23.8472 25.3000 34.7675 23.8472 25.3000 34.7675 17.3838 17.3838
2 12/29/2018 3 8347950.22 615321.06 4128.60 29.3782 15.3000 33.1236 24.7324 -10.0000 26.6775 10.8183 25.1247
3 12/30/2018 4 8347950.25 615321.06 4128.57 2.9069 -7.2000 7.7647 30.9104 -22.5000 38.2322 1.9016 37.4265
4 12/31/2018 5 8347950.22 615321.08 4128.58 35.1592 1.8000 35.2053 34.9794 9.0000 36.1187 7.0411 39.4022
5 1/1/2019 6 8347950.25 615321.07 4128.59 13.8924 6.4000 15.2958 32.1573 4.6000 32.4846 2.5317 31.1852
6 1/2/2019 7 8347950.23 615321.09 4128.60 33.7464 21.4000 39.9597 26.0219 15.0000 30.0356 5.6922 30.6965
7 1/3/2019 8 8347950.27 615321.08 4128.60 33.3174 19.7000 38.7058 36.6553 -1.7000 36.6947 4.8173 36.1672
8 1/4/2019 9 8347950.28 615321.09 4128.61 49.7821 27.1000 56.6804 16.5303 7.4000 18.1110 6.2688 17.9861
9 1/4/2019 9 8347950.23 615321.05 4128.62 17.9368 42.0000 45.6698 66.9899 14.9000 68.6270 4.8714 205.8809
10 1/5/2019 10 8347950.28 615321.08 4128.58 37.7044 -2.0000 37.7574 55.5558 -44.0000 70.8692 3.7757 113.3908
11 1/5/2019 10 8347950.2802 615321.0938 4128.6085 49.6389 27.1000 56.5547 15.3375 29.1000 32.8945 5.4547 89.3738
12 1/6/2019 11 8347950.2360 615321.0723 4128.5955 16.3637 14.1000 21.6005 49.1517 -13.0000 50.8418 1.9637 80.4530
13 1/6/2019 11 8347950.2320 615321.0725 4128.5953 19.0276 13.9000 23.5640 4.0050 -0.2000 4.0100 2.0728 10.8951
14 1/7/2019 12 8347950.2393 615321.0523 4128.5755 8.6371 -5.9000 10.4599 21.4786 -19.8000 29.2125 0.8692 43.9102
15 1/7/2019 12 8347950.232 615321.051 4128.575 15.0950 -6.3000 16.3570 7.3824 -0.4000 7.3932 1.3210 21.2077
16 1/8/2019 13 8347950.239 615321.072 4128.599 14.8142 17.2000 22.7002 22.1359 23.5000 32.2839 1.7417 49.5616
17 1/8/2019 13 8347950.239 615321.052 4128.575 8.6313 -6.0000 10.5119 19.8010 -23.2000 30.5011 0.7847 84.1411
18 1/9/2019 14 8347950.296 615321.083 4128.594 56.1293 12.2000 57.4399 64.2620 18.2000 66.7895 4.0846 100.1843
19 1/10/2019 15 8347950.336 615321.103 4128.567 100.8556 -14.9000 101.9503 44.7264 -27.1000 52.2959 6.7638 51.7568
20 1/11/2019 16 8347950.268 615321.074 4128.564 27.5409 -17.7000 32.7382 73.6775 -2.8000 73.7307 2.0488 81.3580
21 1/11/2019 16 8347950.302 615321.097 4128.571 68.8962 -10.6000 69.7069 41.3566 7.1000 41.9616 4.3285 335.6932
22 1/11/2019 16 8347950.225 615321.048 4128.588 22.9872 6.3000 23.8348 91.7445 16.9000 93.2881 1.4611 447.7829
23 1/12/2019 17 8347950.236 615321.060 4128.570 9.2071 -11.2000 14.4986 16.4073 -17.5000 23.9885 0.8518 33.8662
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-05 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 950 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 321 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 129 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

24 1/12/2019 17 8347950.193 615321.028 4128.581 60.6664 -0.1000 60.6665 53.8033 11.1000 54.9364 3.5042 188.3534
25 1/13/2019 18 8347950.268 615321.074 4128.578 27.7627 -3.9000 28.0353 88.3912 -3.8000 88.4728 1.5557 124.9028
26 1/13/2019 18 8347950.213 615321.043 4128.587 35.5542 5.8000 36.0242 63.1839 9.7000 63.9242 1.9672 219.1686
27 1/14/2019 19 8347950.258 615321.065 4128.600 14.1824 19.0000 23.7095 49.7305 13.2000 51.4525 1.2384 61.7430
28 1/14/2019 19 8347950.226 615321.054 4128.587 20.2781 5.1000 20.9096 34.2348 -13.9000 36.9490 1.0804 177.3553
29 1/15/2019 20 8347950.231 615321.051 4128.587 16.6481 5.3000 17.4714 5.7306 0.2000 5.7341 0.8727 8.6012
30 1/16/2019 21 8347950.239 615321.109 4128.613 50.4822 31.7000 59.6099 58.7041 26.4000 64.3672 2.8386 65.7367
31 1/17/2019 22 8347950.238 615321.054 4128.613 8.3762 31.3000 32.4014 54.7058 -0.4000 54.7073 1.4728 54.7073
32 1/18/2019 23 8347950.216 615321.046 4128.599 31.6190 17.2000 35.9944 23.4094 -14.1000 27.3278 1.5633 26.6794
33 1/19/2019 24 8347950.237 615321.069 4128.568 12.5877 -13.7000 18.6048 30.7729 -30.9000 43.6094 0.7758 45.5055
34 1/19/2019 24 8347950.210 615321.048 4128.594 37.2249 13.0000 39.4296 34.6808 26.7000 43.7681 1.6441 #DIV/0!
35 1/20/2019 25 8347950.229 615321.055 4128.602 16.7147 20.9000 26.7617 20.6129 7.9000 22.0749 1.0723 22.6248
36 1/21/2019 26 8347950.218 615321.093 4128.593 44.0900 11.7000 45.6160 39.9170 -9.2000 40.9635 1.7513 37.6196
37 1/22/2019 27 8347950.273 615321.088 4128.601 40.2419 19.1000 44.5446 55.3940 7.4000 55.8861 1.6464 55.4243
38 1/23/2019 28 8347950.238 615321.069 4128.598 12.7315 16.5000 20.8408 39.6769 -2.6000 39.7620 0.7451 43.5417
39 1/24/2019 29 8347950.230 615321.055 4128.585 15.4780 3.2000 15.8054 15.9881 -13.3000 20.7969 0.5444 19.5352
40 1/25/2019 30 8347950.197 615321.051 4128.582 48.7444 0.3000 48.7454 33.3054 -2.9000 33.4314 1.6276 36.4706
41 1/26/2019 31 8347950.269 615321.091 4128.589 40.0251 7.6000 40.7403 82.1623 7.3000 82.4860 1.3116 74.2374
42 1/27/2019 32 8347950.212 615321.097 4128.616 50.6211 34.6000 61.3161 56.9067 27.0000 62.9871 1.9174 68.6092
43 1/28/2019 33 8347950.226 615321.059 4128.588 19.6003 6.4000 20.6187 40.7039 -28.2000 49.5182 0.6256 50.5359
44 1/29/2019 34 8347950.232 615321.052 4128.573 14.7248 -8.1000 16.8057 9.6897 -14.5000 17.4396 0.4931 15.5019
45 1/31/2019 36 8347950.234 615321.090 4128.587 33.2099 5.6000 33.6788 38.4422 13.7000 40.8104 0.9363 21.6373
46 1/31/2019 36 8347950.214 615321.069 4128.604 32.7613 22.6000 39.8003 29.0000 17.0000 33.6155 1.0955 93.6292
47 2/1/2019 37 8347950.194 615321.068 4128.602 51.9394 20.6000 55.8754 20.0250 -2.0000 20.1246 1.5122 32.4518
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-05 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 950 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 321 m
Fecha de instalación: 23-11-18 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 129 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

48 2/1/2019 37 8347950.200 615321.058 4128.591 45.1054 9.6000 46.1157 11.6619 -11.0000 16.0312 1.2371 48.9088
49 2/2/2019 38 8347950.247 615321.100 4128.561 41.3437 -20.4000 46.1027 63.0317 -30.0000 69.8069 1.2135 97.7840
50 2/2/2019 38 8347950.219 615321.072 4128.587 29.2933 5.6000 29.8238 39.5980 26.0000 47.3709 0.7775 128.2219
51 2/3/2019 39 8347950.214 615321.084 4128.593 40.0911 11.6000 41.7356 13.0000 6.0000 14.3178 1.0701 22.3862
52 2/3/2019 39 8347950.224 615321.090 4128.595 37.7478 13.6000 40.1231 11.6619 2.0000 11.8322 1.0190 31.5524
53
54
55
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-06 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 991 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 410 m
Fecha de instalación: 02-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 081 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (cm) (cm) (cm) (cm) Absoluta (mm/día) Relativa (cm/día)
(cm) (cm) E
L
0 1/2/2019 0 8347991.45 615409.90 4080.64 D Este
A
T
1 1/2/2019 0 8347991.41 615409.89 4080.66 38.4708 20.2000 43.4516 38.4708 20.2000 43.4516 144.8386 144.8386 ###
I
2 1/3/2019 1 8347991.48 615409.90 4080.63 34.0993 -5.9000 34.6059 69.7220 -26.1000 74.4471 34.6059 106.3530 ### V
3 1/3/2019 1 8347991.40 615409.88 4080.65 57.2087 9.7000 58.0253 87.6986 15.6000 89.0752 53.1529 971.7300 ### O

4 1/3/2019 1 8347991.40 615409.88 4080.65 55.9464 9.8000 56.7982 1.2806 0.1000 1.2845 47.6351 12.7566 ###
5 1/3/2019 1 8347991.40 615409.88 4080.65 57.2087 9.4000 57.9759 1.2806 -0.4000 1.3416 43.8934 10.4430 ###
6 1/4/2019 2 8347991.41 615409.87 4080.64 50.3254 -1.3000 50.3422 9.4726 -10.7000 14.2906 25.8718 22.8649 ###
7 1/4/2019 2 8347991.41 615409.88 4080.66 45.3194 19.6000 49.3762 5.3009 20.9000 21.5618 23.8436 172.4942 ###
8 1/4/2019 2 8347991.39 615409.87 4080.66 67.3905 19.7000 70.2109 22.6753 0.1000 22.6755 31.9746 181.4043 ###
9 1/4/2019 2 8347991.40 615409.88 4080.65 50.8434 10.6000 51.9366 17.1292 -9.1000 19.3964 22.4591 166.2548 ###
10 1/5/2019 3 8347991.41 615409.88 4080.66 46.5576 18.4000 50.0617 4.7518 7.8000 9.1335 17.2379 15.4368 ###
11 1/5/2019 3 8347991.4300 615409.8852 4080.6509 24.6108 11.4000 27.1229 23.4785 -7.0000 24.4998 8.7142 117.5990 ###
12 1/5/2019 3 8347991.4350 615409.8870 4080.6501 20.1646 10.6000 22.7809 5.3141 -0.8000 5.3740 7.1206 61.9086 ###
13 1/5/2019 3 8347991.4370 615409.8860 4080.6510 20.0352 11.5000 23.1011 2.2361 0.9000 2.4104 6.9856 22.3933 ###
14 1/6/2019 4 8347991.4272 615409.8829 4080.6505 28.1858 11.0000 30.2562 10.2786 -0.5000 10.2908 7.7497 17.2311 ###
15 1/6/2019 4 8347991.4069 615409.8732 4080.6632 49.7122 23.7000 55.0726 22.4984 12.7000 25.8354 13.3915 124.0101 ###
16 1/6/2019 4 8347991.406 615409.873 4080.663 50.3870 23.6000 55.6400 0.7280 -0.1000 0.7348 13.2498 8.4654 ###
17 1/6/2019 4 8347991.406 615409.874 4080.664 49.6203 24.0000 55.1196 1.0198 0.4000 1.0954 12.7978 10.1770 ###
18 1/7/2019 5 8347991.426 615409.876 4080.654 34.1810 14.8000 37.2476 19.4487 -9.2000 21.5149 7.4786 31.9396 ###
19 1/7/2019 5 8347991.425 615409.877 4080.655 34.0037 15.4000 37.3284 0.7810 0.6000 0.9849 7.3014 7.4644 ###
20 1/7/2019 5 8347991.360 615409.855 4080.662 98.7320 22.7000 101.3079 68.5298 7.3000 68.9175 19.3300 536.4388 ###
21 1/7/2019 5 8347991.361 615409.854 4080.663 98.5648 23.0000 101.2127 0.9220 0.3000 0.9695 19.0717 14.6961 ###
22 1/8/2019 6 8347991.442 615409.881 4080.654 23.4438 14.3000 27.4609 85.3185 -8.7000 85.7609 4.5917 127.3151 ###
23 1/8/2019 6 8347991.450 615409.881 4080.654 23.1145 14.6000 27.3393 7.8058 0.3000 7.8115 4.4727 59.2032 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-06 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 991 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 410 m
Fecha de instalación: 02-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 081 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (cm) (cm) (cm) (cm) Absoluta (mm/día) Relativa (cm/día)
(cm) (cm) E
L
24 1/8/2019 6 8347991.445 615409.882 4080.655 22.4321 15.0000 26.9852 5.0160 0.4000 5.0319 4.3456 51.7567 ### A
T
25 1/8/2019 6 8347991.444 615409.882 4080.654 22.1097 14.5000 26.4403 1.0770 -0.5000 1.1874 4.1647 8.5495 ###
I
26 1/9/2019 7 8347991.504 615409.899 4080.672 58.5496 32.0000 66.7237 62.7360 17.5000 65.1311 9.5206 98.7250 ### V
27 1/9/2019 7 8347991.496 615409.897 4080.671 50.7425 31.4000 59.6721 8.3433 -0.6000 8.3648 8.1977 30.8854 ### O

28 1/10/2019 8 8347991.453 615409.877 4080.645 27.3339 5.2000 27.8241 47.5085 -26.2000 54.2540 3.5063 82.6728 ###
29 1/10/2019 8 8347991.386 615409.860 4080.664 74.6684 24.0000 78.4307 69.3193 18.8000 71.8235 9.5156 233.9950 ###
30 1/11/2019 9 8347991.466 615409.881 4080.640 30.1788 0.4000 30.1815 83.1736 -23.6000 86.4570 3.3817 126.6511 ###
31 1/11/2019 9 8347991.541 615409.906 4080.652 95.4170 12.4000 96.2193 79.2497 12.0000 80.1531 10.6320 641.2248 ###
32 1/11/2019 9 8347991.412 615409.867 4080.659 49.8143 19.9000 53.6421 134.8532 7.5000 135.0616 5.7939 648.2956 ###
33 1/12/2019 10 8347991.384 615409.857 4080.656 77.2602 16.1000 78.9199 29.5439 -3.8000 29.7872 7.9184 42.0526 ###
34 1/12/2019 10 8347991.384 615409.857 4080.656 77.2602 16.1000 78.9199 0.0000 0.0000 0.0000 7.6932 0.0000 ###
35 1/13/2019 11 8347991.463 615409.881 4080.654 28.7406 14.7000 32.2817 82.2010 -1.4000 82.2129 2.9436 116.0653 ###
36 1/13/2019 11 8347991.401 615409.861 4080.656 62.8103 16.2000 64.8659 65.7784 1.5000 65.7955 5.7616 225.5846 ###
37 1/14/2019 12 8347991.441 615409.870 4080.658 34.0262 18.2000 38.5878 41.9142 2.0000 41.9619 3.1913 50.3543 ###
38 1/14/2019 12 8347991.416 615409.864 4080.659 50.2800 19.7000 54.0016 26.3154 1.5000 26.3581 4.3904 126.5189 ###
39 1/15/2019 13 8347991.423 615409.866 4080.664 44.2295 24.7000 50.6591 7.7492 5.0000 9.2223 3.9069 13.8334 ###
40 1/16/2019 14 8347991.454 615409.912 4080.659 11.1803 19.6000 22.5646 55.0568 -5.1000 55.2925 1.6180 56.4689 ###
41 1/17/2019 15 8347991.438 615409.868 4080.664 36.6521 24.0000 43.8107 46.3372 4.4000 46.5457 2.9333 47.0356 ###
42 1/18/2019 16 8347991.429 615409.864 4080.654 43.3077 14.4000 45.6390 9.3477 -9.6000 13.3993 2.8578 12.9496 ###
43 1/19/2019 17 8347991.453 615409.870 4080.656 34.8518 16.9000 38.7332 24.5204 2.5000 24.6475 2.2880 25.7191 ###
44 1/19/2019 17 8347991.434 615409.861 4080.647 44.5467 7.5000 45.1737 21.1206 -9.4000 23.1180 2.6685 #DIV/0! ###
45 1/20/2019 18 8347991.427 615409.861 4080.658 46.5130 18.3000 49.9835 6.9116 10.8000 12.8222 2.7917 13.1417 ###
46 1/21/2019 19 8347991.427 615409.897 4080.650 20.2082 10.4000 22.7273 35.9006 -7.9000 36.7595 1.1966 33.7587 ###
47 1/21/2019 19 8347991.432 615409.860 4080.647 46.3605 7.1000 46.9011 37.8060 -3.3000 37.9497 2.4583 444.2892 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-06 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 991 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 410 m
Fecha de instalación: 02-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 081 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (cm) (cm) (cm) (cm) Absoluta (mm/día) Relativa (cm/día)
(cm) (cm) E
L
48 1/22/2019 20 8347991.427 615409.859 4080.648 49.1386 8.7000 49.9028 4.6840 1.6000 4.9497 2.4950 5.3632 ###
A
T
49 1/22/2019 20 8347991.428 615409.857 4080.648 50.7027 8.5000 51.4102 2.1541 -0.2000 2.1633 2.5618 32.4500 ###
I
50 1/22/2019 20 8347991.436 615409.862 4080.656 43.3896 16.7000 46.4925 9.1837 8.2000 12.3118 2.3675 -28.5951 ### V
51 1/23/2019 21 8347991.433 615409.861 4080.659 44.3570 19.0000 48.2549 2.2361 2.3000 3.2078 2.3072 2.5118 O
###
52 1/23/2019 21 8347991.416 615409.853 4080.651 58.8093 11.2000 59.8663 18.9644 -7.8000 20.5059 2.8412 131.2375 ###
53 1/23/2019 21 8347991.417 615409.854 4080.656 57.5421 16.0000 59.7251 1.2806 4.8000 4.9679 2.8076 24.5834 ###
54 1/24/2019 22 8347991.420 615409.856 4080.657 54.5015 17.7000 57.3036 3.4986 1.7000 3.8897 2.6072 5.5076 ###
55 1/24/2019 22 8347991.473 615409.872 4080.659 41.8688 19.3000 46.1030 55.3336 1.6000 55.3568 2.0916 885.7080 ###
56 1/24/2019 22 8347991.434 615409.859 4080.660 46.4759 20.9000 50.9590 41.0781 1.6000 41.1092 2.3002 365.4155 ###
57 1/25/2019 23 8347991.392 615409.845 4080.646 79.9340 6.6000 80.2060 44.0218 -14.3000 46.2862 3.4967 59.0887 ###
58 1/25/2019 23 8347991.393 615409.845 4080.647 79.0939 7.4000 79.4393 0.8602 0.8000 1.1747 3.4247 4.5474 ###
59 1/26/2019 24 8347991.451 615409.861 4080.645 43.0035 5.9000 43.4063 60.1931 -1.5000 60.2118 1.8081 74.2337 ###
60 1/26/2019 24 8347991.415 615409.852 4080.660 60.4190 20.6000 63.8342 37.3263 14.7000 40.1166 2.6481 406.8160 ###
61 1/26/2019 24 8347991.463 615409.832 4080.638 74.3463 -1.9000 74.3706 52.2337 -22.5000 56.8736 3.0540 230.6987 ###
62 1/27/2019 25 8347991.399 615409.884 4080.665 51.0393 25.5000 57.0549 82.7010 27.4000 87.1219 2.2891 152.0673 ###
63 1/27/2019 25 8347991.437 615409.898 4080.678 10.7615 38.5000 39.9757 40.4969 13.0000 42.5323 1.6012 1020.7762 ###
64 1/27/2019 25 8347991.453 615409.898 4080.656 9.1548 16.5000 18.8696 16.0000 -22.0000 27.2029 0.7545 652.8706 ###
65 1/27/2019 25 8347991.476 615409.906 4080.663 30.0734 23.5000 38.1662 24.3516 7.0000 25.3377 1.5236 608.1053 ###
66 1/27/2019 25 8347991.433 615409.885 4080.633 22.9393 -6.5000 23.8424 47.8539 -30.0000 56.4801 0.9502 1355.5220 ###
67 1/27/2019 25 8347991.408 615409.882 4080.653 43.8590 13.5000 45.8897 25.1794 20.0000 32.1559 1.8264 926.0891 ###
68 1/28/2019 26 8347991.419 615409.855 4080.667 56.0045 27.8000 62.5247 29.0429 14.3000 32.3725 2.4136 41.5847 ###
69 1/28/2019 26 8347991.423 615409.853 4080.657 55.5325 17.0000 58.0763 4.4944 -10.8000 11.6979 2.2240 56.1497 ###
70 1/28/2019 26 8347991.420 615409.854 4080.666 56.8032 26.8000 62.8080 3.1016 9.8000 10.2791 2.3900 61.6746 ###
71 1/29/2019 27 8347991.421 615409.854 4080.658 56.1701 18.2000 59.0451 1.0198 -8.6000 8.6603 2.1844 11.5470 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-06 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 991 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 410 m
Fecha de instalación: 02-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 081 msnm A
###
Z
I
M
Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades
U
Tiempo T
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo R
Absoluto (cm) (cm) (cm) (cm) Absoluta (mm/día) Relativa (cm/día)
(cm) (cm) E
L
72 1/29/2019 27 8347991.440 615409.859 4080.659 45.4251 19.9000 49.5928 19.6987 1.7000 19.7719 1.8291 237.2634 ### A
T
73 1/31/2019 29 8347991.430 615409.890 4080.663 21.1946 23.5000 31.6459 32.6075 3.6000 32.8056 1.0944 18.1973 ###
I
74 1/31/2019 29 8347991.418 615409.891 4080.691 30.8287 51.5000 60.0222 12.0416 28.0000 30.4795 2.0503 84.8945 ### V
75 2/1/2019 30 8347991.392 615409.880 4080.672 59.0526 32.5000 67.4052 28.2312 -19.0000 34.0294 2.2547 54.8738 ### O

76 2/2/2019 31 8347991.457 615409.896 4080.658 13.5429 18.5000 22.9273 66.9403 -14.0000 68.3886 0.7411 65.6531 ###
77 2/2/2019 31 8347991.413 615409.883 4080.668 39.0616 28.5000 48.3535 45.8803 10.0000 46.9574 1.5445 127.1028 ###
78 2/3/2019 32 8347991.413 615409.888 4080.677 36.6307 37.5000 52.4219 5.0000 9.0000 10.2956 1.6410 16.0974 ###
79 2/3/2019 32 8347991.424 615409.891 4080.675 25.5031 35.5000 43.7111 11.4018 -2.0000 11.5758 1.3524 30.8689 ###
80 ###
81 ###
82 ###
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-07 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 986 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 421 m
Fecha de instalación: 09-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 096 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

0 1/9/2019 0 8347986.08 615420.77 4096.27 D Norte


1 1/9/2019 0 8347986.07 615420.76 4096.27 11.3225 1.0000 11.3666 11.3225 1.0000 11.3666 40.9198 40.9198
2 1/10/2019 1 8347986.02 615420.75 4096.24 62.4648 -33.6000 70.9282 51.1505 -34.6000 61.7538 76.4496 95.0058
3 1/10/2019 1 8347985.95 615420.73 4096.27 139.3012 -4.7000 139.3805 76.9268 28.9000 82.1763 112.8841 267.7236
4 1/11/2019 2 8347986.03 615420.75 4096.24 46.1395 -31.0000 55.5864 93.1679 -26.3000 96.8088 28.9911 141.8155
5 1/11/2019 2 8347986.11 615420.78 4096.25 31.4282 -18.3000 36.3678 77.5578 12.7000 78.5908 17.8068 628.7262
6 1/11/2019 2 8347985.98 615420.74 4096.25 102.6258 -18.9000 104.3516 134.0449 -0.6000 134.0463 46.3642 643.4220
7 1/12/2019 3 8347985.94 615420.73 4096.27 141.8748 -5.9000 141.9974 39.2747 13.0000 41.3703 47.9879 58.4051
8 1/12/2019 3 8347985.94 615420.73 4096.27 141.8748 -5.9000 141.9974 0.0000 0.0000 0.0000 43.6822 0.0000
9 1/13/2019 4 8347986.03 615420.75 4096.25 51.8652 -18.5000 55.0659 90.0169 -12.6000 90.8945 13.9089 128.3216
10 1/13/2019 4 8347985.97 615420.73 4096.26 118.4214 -12.7000 119.1004 66.5596 5.8000 66.8118 28.0190 229.0691
11 1/14/2019 5 8347986.0119 615420.7425 4096.2564 70.6644 -15.1000 72.2597 47.9270 -2.4000 47.9871 14.2131 57.5845
12 1/14/2019 5 8347985.9817 615420.7380 4096.2723 100.7842 0.8000 100.7874 30.5334 15.9000 34.4253 19.0439 165.2414
13 1/15/2019 6 8347985.9983 615420.7409 4096.2656 84.0610 -5.9000 84.2678 16.8514 -6.7000 18.1345 14.1412 27.2017
14 1/16/2019 7 8347986.0269 615420.7867 4096.2627 55.3565 -8.8000 56.0516 53.9963 -2.9000 54.0741 8.0787 55.2246
15 1/17/2019 8 8347986.002 615420.741 4096.262 80.0063 -9.9000 80.6164 51.5009 -1.1000 51.5126 10.1680 52.0184
16 1/18/2019 9 8347985.995 615420.738 4096.254 87.8875 -17.9000 89.6918 8.0131 -8.0000 11.3230 10.0075 10.9504
17 1/19/2019 10 8347986.025 615420.746 4096.244 57.5306 -27.9000 63.9389 30.4690 -10.0000 32.0681 6.4449 33.4623
18 1/19/2019 10 8347985.964 615420.725 4096.245 122.1049 -26.1000 124.8632 64.6060 1.8000 64.6310 12.5851 93068.6826
19 1/20/2019 11 8347985.993 615420.736 4096.249 90.5493 -22.3000 93.2548 31.5691 3.8000 31.7970 8.5582 32.6123
20 1/21/2019 12 8347986.006 615420.776 4096.234 72.8093 -37.7000 81.9908 41.6472 -15.4000 44.4033 6.8409 40.7785
21 1/21/2019 12 8347985.992 615420.734 4096.242 92.1940 -29.3000 96.7379 44.3668 8.4000 45.1550 8.0142 528.6434
22 1/22/2019 13 8347986.005 615420.737 4096.240 78.9580 -31.6000 85.0466 13.2966 -2.3000 13.4941 6.5452 14.6211
23 1/22/2019 13 8347986.009 615420.738 4096.239 75.6387 -32.7000 82.4046 3.5057 -1.1000 3.6742 6.3095 55.1135
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-07 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 986 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 421 m
Fecha de instalación: 09-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 096 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

24 1/22/2019 13 8347985.997 615420.735 4096.248 86.8586 -23.8000 90.0603 11.4140 8.9000 14.4738 7.1307 -33.6165
25 1/23/2019 14 8347986.005 615420.739 4096.243 78.2538 -28.9000 83.4198 8.6331 -5.1000 10.0270 5.9984 7.8515
26 1/23/2019 14 8347985.978 615420.730 4096.255 106.5218 -16.2000 107.7466 28.2733 12.7000 30.9947 7.6616 198.3659
27 1/23/2019 14 8347985.978 615420.729 4096.256 107.2334 -15.4000 108.3336 0.8602 0.8000 1.1747 7.5942 5.8131
28 24-Jan-19 15 8347985.982 615420.732 4096.257 102.2202 -15.0000 103.3149 5.3263 0.4000 5.3413 6.9008 7.5630
29 24-Jan-19 15 8347986.046 615420.751 4096.257 35.7038 -14.2000 38.4240 66.7608 0.8000 66.7656 2.5558 1068.2490
30 24-Jan-19 15 8347985.996 615420.733 4096.245 88.8369 -26.4000 92.6766 53.2094 -12.2000 54.5901 6.1187 485.2454
31 1/25/2019 16 8347985.953 615420.721 4096.236 133.1264 -35.1000 137.6759 44.4243 -8.7000 45.2682 8.6426 57.7892
32 1/25/2019 16 8347985.954 615420.722 4096.237 132.3151 -34.4000 136.7138 1.1180 0.7000 1.3191 8.4453 5.1062
33 1/26/2019 17 8347986.029 615420.743 4096.239 54.9812 -32.2000 63.7163 77.7325 2.2000 77.7636 3.7482 95.8730
34 1/26/2019 17 8347985.975 615420.727 4096.245 110.5011 -26.2000 113.5647 55.8032 6.0000 56.1249 6.6420 569.1535
35 1/26/2019 17 8347986.003 615420.738 4096.251 80.4195 -20.4000 82.9666 30.0832 5.8000 30.6372 4.7835 124.2750
36 1/27/2019 18 8347985.953 615420.756 4096.257 125.8305 -14.5000 126.6632 53.3634 5.9000 53.6885 7.0693 93.7109
37 1/27/2019 18 8347986.010 615420.777 4096.273 69.2165 1.5000 69.2327 60.7454 16.0000 62.8172 3.8550 1507.6127
38 1/27/2019 18 8347986.024 615420.776 4096.248 55.2406 -23.5000 60.0314 14.0357 -25.0000 28.6705 3.3349 688.0930
39 1/27/2019 18 8347986.047 615420.784 4096.253 35.9961 -18.5000 40.4718 24.3516 5.0000 24.8596 2.2432 596.6305
40 1/27/2019 18 8347986.014 615420.770 4096.229 64.5005 -42.5000 77.2436 35.8469 -24.0000 43.1393 4.2714 1035.3434
41 1/27/2019 18 8347985.977 615420.760 4096.249 101.6018 -22.5000 104.0633 38.3275 20.0000 43.2319 5.7434 1245.0797
42 1/28/2019 19 8347985.983 615420.732 4096.258 101.1305 -14.0000 102.0949 28.7000 8.5000 29.9323 5.4026 38.4500
43 1/28/2019 19 8347985.994 615420.732 4096.243 90.8982 -28.6000 95.2914 10.8074 -14.6000 18.1648 4.9876 87.1910
44 1/28/2019 19 8347985.987 615420.731 4096.256 98.3393 -15.7000 99.5846 7.6655 12.9000 15.0057 5.1673 90.0340
45 1/29/2019 20 8347985.985 615420.731 4096.248 99.4616 -23.7000 102.2463 1.2000 -8.0000 8.0895 5.1066 10.7860
46 1/29/2019 20 8347985.997 615420.734 4096.247 87.5743 -24.7000 90.9909 12.0075 -1.0000 12.0491 4.5257 144.5888
47 1/31/2019 22 8347985.993 615420.768 4096.253 85.4150 -18.5000 87.3955 34.1352 6.2000 34.6937 3.9891 19.2446
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-07 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 986 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 421 m
Fecha de instalación: 09-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 096 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

48 1/31/2019 22 8347985.971 615420.765 4096.286 107.4091 14.5000 108.3834 22.2036 33.0000 39.7744 4.8674 110.7835
49 2/1/2019 23 8347985.950 615420.756 4096.270 128.8205 -1.5000 128.8292 22.8473 -16.0000 27.8927 5.6288 44.9781
50 2/2/2019 24 8347986.021 615420.774 4096.247 57.9010 -24.5000 62.8711 73.2462 -23.0000 76.7724 2.6274 73.7015
51 2/2/2019 24 8347985.981 615420.763 4096.266 97.4593 -5.5000 97.6144 41.4849 19.0000 45.6289 4.0173 123.5069
52 2/3/2019 25 8347985.967 615420.759 4096.265 111.6455 -6.5000 111.8346 14.5602 -1.0000 14.5945 4.4845 22.8188
53 2/3/2019 25 8347985.979 615420.766 4096.281 99.4008 9.5000 99.8537 13.8924 16.0000 21.1896 3.9447 56.5057
54
55
56
57
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-08 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 970 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 367 m
Fecha de instalación: 09-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 097 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

0 1/9/2019 0 8347969.859 615366.801 4096.937 D Norte


1 1/9/2019 0 8347969.860 615366.802 4096.941 1.5264 3.7000 4.0025 1.5264 3.7000 4.0025 14.4090 14.4090
2 1/10/2019 1 8347969.812 615366.775 4096.900 53.5599 -36.5000 64.8144 54.8876 -40.2000 68.0345 69.8599 104.6684
3 1/10/2019 1 8347969.753 615366.756 4096.932 114.6079 -5.2000 114.7258 61.5419 31.3000 69.0441 92.9163 224.9401
4 1/11/2019 2 8347969.816 615366.779 4096.900 48.0321 -36.5000 60.3269 66.8031 -31.3000 73.7723 31.4635 108.0693
5 1/11/2019 2 8347969.892 615366.811 4096.906 34.0412 -30.8000 45.9069 81.7540 5.7000 81.9525 22.4773 655.6199
6 1/11/2019 2 8347969.774 615366.765 4096.928 92.7556 -9.1000 93.2009 126.6491 21.7000 128.4947 41.4098 616.7746
7 1/12/2019 3 8347969.750 615366.754 4096.920 119.2001 -16.6000 120.3504 26.4503 -7.5000 27.4931 40.6723 38.8138
8 1/12/2019 3 8347969.750 615366.754 4096.920 119.2001 -16.6000 120.3504 0.0000 0.0000 0.0000 37.0230 0.0000
9 1/13/2019 4 8347969.829 615366.786 4096.911 32.8732 -25.5000 41.6041 86.3704 -8.9000 86.8278 10.5087 122.5804
10 1/13/2019 4 8347969.766 615366.769 4096.911 98.3222 -26.0000 101.7018 65.7822 -0.5000 65.7841 23.9259 225.5455
11 1/14/2019 5 8347969.796 615366.776 4096.895 68.3176 -42.0000 80.1953 30.2218 -16.0000 34.1959 15.7740 41.0351
12 1/14/2019 5 8347969.762 615366.767 4096.915 102.5929 -21.7000 104.8627 34.4646 20.3000 39.9988 19.8140 191.9940
13 1/15/2019 6 8347969.787 615366.776 4096.913 76.2758 -24.2000 80.0227 26.3230 -2.5000 26.4414 13.4288 39.6622
14 1/16/2019 7 8347969.808 615366.824 4096.910 56.1050 -26.8000 62.1772 52.6966 -2.6000 52.7607 8.9616 53.8833
15 1/17/2019 8 8347969.783 615366.775 4096.906 80.2277 -30.7000 85.9010 55.3218 -3.9000 55.4591 10.8335 55.9643
16 1/18/2019 9 8347969.772 615366.772 4096.906 91.7066 -31.0000 96.8044 11.4983 -0.3000 11.5022 10.8011 11.1311
17 1/19/2019 10 8347969.856 615366.797 4096.894 4.4204 -42.9000 43.1271 88.0818 -11.9000 88.8820 4.3471 92.7464
18 1/19/2019 10 8347969.747 615366.752 4096.915 122.4301 -22.3000 124.4445 118.5879 20.6000 120.3638 12.5438 #DIV/0!
19 1/20/2019 11 8347969.775 615366.765 4096.908 91.7044 -29.1000 96.2108 30.7259 -6.8000 31.4693 8.8295 32.2533
20 1/21/2019 12 8347969.784 615366.805 4096.892 75.6400 -45.4000 88.2189 41.6405 -16.3000 44.7171 7.3605 41.0667
21 1/21/2019 12 8347969.778 615366.764 4096.904 88.9445 -33.4000 95.0089 41.2953 12.0000 43.0035 7.8709 503.4555
22 1/22/2019 13 8347969.786 615366.769 4096.908 79.2707 -29.2000 84.4777 9.7129 4.2000 10.5821 6.5014 11.4659
23 1/22/2019 13 8347969.788 615366.765 4096.907 79.9171 -30.0000 85.3624 4.2720 -0.8000 4.3463 6.5360 65.1939
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-08 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 970 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 367 m
Fecha de instalación: 09-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 097 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

24 1/22/2019 13 8347969.780 615366.766 4096.905 86.1725 -32.3000 92.0271 7.2250 -2.3000 7.5822 7.2865 -17.6103
25 1/23/2019 14 8347969.795 615366.771 4096.895 71.2200 -42.3000 82.8347 15.0217 -10.0000 18.0458 5.9564 14.1305
26 1/23/2019 14 8347969.766 615366.760 4096.907 101.1210 -30.2000 105.5343 29.9880 12.1000 32.3371 7.5043 206.9576
27 1/23/2019 14 8347969.768 615366.761 4096.907 99.7016 -29.8000 104.0598 1.4422 0.4000 1.4967 7.2946 7.4062
28 1/24/2019 15 8347969.770 615366.764 4096.913 96.4231 -24.2000 99.4135 3.5355 5.6000 6.6227 6.6402 9.3773
29 1/24/2019 15 8347969.827 615366.784 4096.893 36.0494 -43.7000 56.6502 60.5743 -19.5000 63.6357 3.7681 1018.1709
30 1/24/2019 15 8347969.791 615366.771 4096.904 74.3640 -33.3000 81.4794 38.4480 10.4000 39.8298 5.3794 354.0423
31 1/25/2019 16 8347969.760 615366.756 4096.897 108.9162 -40.4000 116.1676 34.5527 -7.1000 35.2746 7.2924 45.0315
32 1/25/2019 16 8347969.759 615366.756 4096.897 109.6679 -39.7000 116.6325 0.7810 0.7000 1.0488 7.2048 4.0599
33 1/26/2019 17 8347969.811 615366.777 4096.895 53.5337 -42.3000 68.2287 56.1933 -2.6000 56.2534 4.0136 69.3536
34 1/26/2019 17 8347969.767 615366.760 4096.903 101.1285 -33.5000 106.5327 47.6681 8.8000 48.4736 6.2307 491.5633
35 1/26/2019 17 8347969.790 615366.771 4096.906 75.0024 -31.0000 81.1564 26.1620 2.5000 26.2812 4.6791 106.6053
36 1/27/2019 18 8347969.743 615366.788 4096.912 116.6931 -24.9000 119.3202 49.8788 6.1000 50.2504 6.6595 87.7097
37 1/27/2019 18 8347969.783 615366.807 4096.926 76.2607 -10.9000 77.0357 44.2832 14.0000 46.4435 4.2895 1114.6443
38 1/27/2019 18 8347969.803 615366.809 4096.889 56.6117 -47.9000 74.1573 20.0998 -37.0000 42.1070 4.1197 1010.5682
39 1/27/2019 18 8347969.828 615366.823 4096.893 38.1876 -43.9000 58.1850 28.6531 4.0000 28.9310 3.2249 694.3428
40 1/27/2019 18 8347969.787 615366.808 4096.900 72.3691 -36.9000 81.2336 43.6578 7.0000 44.2154 4.4920 1061.1692
41 1/27/2019 18 8347969.763 615366.798 4096.904 96.0380 -32.9000 101.5170 26.0000 4.0000 26.3059 5.6029 757.6097
42 1/28/2019 19 8347969.786 615366.775 4096.911 77.4816 -25.8000 81.6642 32.1734 7.1000 32.9475 4.3215 42.3233
43 1/28/2019 19 8347969.783 615366.772 4096.904 81.0393 -32.5000 87.3133 4.0361 -6.7000 7.8218 4.5701 37.5445
44 1/28/2019 19 8347969.776 615366.770 4096.911 88.3082 -25.8000 91.9998 7.2732 6.7000 9.8889 4.7737 59.3333
45 1/29/2019 20 8347969.785 615366.774 4096.903 78.9856 -34.2000 86.0719 9.3520 -8.4000 12.5706 4.2988 16.7608
46 1/29/2019 20 8347969.788 615366.774 4096.899 76.4055 -37.6000 85.1561 2.9275 -3.4000 4.4866 4.2355 53.8398
47 1/31/2019 22 8347969.793 615366.812 4096.904 66.9604 -32.9000 74.6063 38.8769 4.7000 39.1599 3.4054 21.7220
Registro de Control Topográfico
APUMAYO S.A.C.

Cliente: APUMAYO S.A.C. Elaborado por: M.L.Q.


Proyecto: MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA Revisado por: W.V.B.
Componente: TAJO HUAMANLOMA Fecha: 26-04-19

Prisma Topográfico: HUA-08 Velocidad relativa leve : 0,0 - 0,5 cm/dia Este: 8 347 970 m
Datum: WGS-84 Velocidad relativa medianamente crítica : 0,5 - 2,0 cm/dia Norte: 615 367 m
Fecha de instalación: 09-01-19 Velocidad relativa crítica : 2,0 - 10,0 cm/dia Cota de terreno: 4 097 msnm

Coordenadas Desplazamientos Absolutos Desplazamientos Relativos Velocidades


Tiempo
Reg. N° Fecha Δ Horizontal Δ Horizontal
(días) Δ Vertical Δ Total Absoluto Δ Vertical Relativo Δ Total Relativo Velocidad Velocidad
Norte (m) Este (m) Elevación (m) Absoluto Relativo
Absoluto (mm) (mm) (mm) (mm) Absoluta (mm/día) Relativa (mm/día)
(mm) (mm)

48 1/31/2019 22 8347969.771 615366.805 4096.928 88.1050 -8.9000 88.5534 23.0868 24.0000 33.3017 3.9768 92.7551
49 2/1/2019 23 8347969.741 615366.792 4096.930 118.3203 -6.9000 118.5213 32.6956 2.0000 32.7567 5.1784 52.8215
50 2/2/2019 24 8347969.804 615366.816 4096.908 57.0884 -28.9000 63.9867 67.4166 -22.0000 70.9154 2.6740 68.0788
51 2/2/2019 24 8347969.757 615366.796 4096.907 102.1082 -29.9000 106.3960 51.0784 -1.0000 51.0882 4.3787 138.2837
52 2/3/2019 25 8347969.769 615366.806 4096.921 90.1559 -15.9000 91.5473 15.6205 14.0000 20.9762 3.6710 32.7966
53 2/3/2019 25 8347969.773 615366.807 4096.927 86.2304 -9.9000 86.7969 4.1231 6.0000 7.2801 3.4289 19.4136
54
55
Desplazamientos Absolutos Horizontales
140.00

Desplazamiento acumulado (cm)


120.00

100.00
Alerta 3

80.00

60.00
Alerta 2

40.00

Alerta 1
40.00

Alerta 1

20.00

0.00
24-Dec-18 25-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 30-Dec-18 31-Dec-18 1-Jan-19 2-Jan-19 3-Jan-19 5-Ja

Fecha de medición

0 APUMAYO S.A.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓ

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE DESPLAZAM
ABSOLUTOS PUNTOS TOPOGRÁFICO
REVISIÓN: Rev. B
Desplazamientos Absolutos Verticales
80.00

Desplazamiento acumulado (cm)


60.00

40.00

20.00

0.00

-20.00
-20.00

-40.00

-60.00
8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 9
c -1 c -1 c-1 c-1 c -1 c -1 c -1 c -1 c -1 c -1 c -1 c -1 n -1 n -1 n -1 n-1 n -1 n-1 n -1 n -1
e e e e e e e e e e e e a a a a a a a a a
D D D -D 3-D -D 8-D 0-D 3-D -D 8-D 0-D -J -J -J -J -J -J -J -J -J
4- 6- 8- 1 1 1 1 6 1 2 2 2 5 2Fecha
1
3 de medición
4 6 9 11 1 3 1 6 1 8 2 1

0 APUMAYO S.A.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓ

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE DESPLAZ
ABSOLUTOS PUNTOS TOPOGRÁFICO
REVISIÓN: Rev. B
Desplazamientos Absolutos Totales
300.00

Desplazamiento acumulado (cm)

250.00

Alerta 3
200.00

150.00

Alerta 2
100.00

Alerta 1

50.00
Alerta 1

50.00

0.00
4-Dec-18 5-Dec-18 6-Dec-18 7-Dec-18 8-Dec-18 9-Dec-18 10-Dec-18 11-Dec-18 12-D

Fecha de medición

0 APUMAYO S.A.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓ

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE DESPLAZAMIE
PUNTOS TOPOGRÁFICOS / TAJ
REVISIÓN: Rev. B
mientos Absolutos Horizontales

HUA-01
HUA-02
HUA-05
HUA-04
HUA-03
Alerta 1
Alerta 2
Alerta 3
HUA-06
Dec-18 31-Dec-18 1-Jan-19 2-Jan-19 3-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19

cha de medición

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE DESPLAZAMIENTOS HORIZONTALES


ABSOLUTOS PUNTOS TOPOGRÁFICOS / TAJO HUAMANLOMA
4.1
mientos Absolutos Verticales
HUA-01
HUA-02
HUA-05
HUA-04
HUA-03
HUA-07
HUA-08
8 8 9 9 9 9 9 9 9 9 9 9 9 9
c -1 c -1 n -1 n -1 n -1 n-1 n -1 n-1 n -1 n -1 n -1 n-1 n-1 n -1
e e a a a a a a a a a a a a
-D 1-J 4-J 6-J 9 -J 1 -J 3 -J 6-J 8-J 1 -J 3 -J 5 -J 8-J
cha 0
3 de medición 1 1 1 1 2 2 2 2

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE DESPLAZAMIENTOS VERTICALES


ABSOLUTOS PUNTOS TOPOGRÁFICOS / TAJO HUAMANLOMA
4.2
mientos Absolutos Totales

HUA-01

HUA-02

HUA-05

HUA-04

HUA-03

Alerta 1

Alerta 2

Alerta 3
Alerta 2

Alerta 3

Dec-18 9-Dec-18 10-Dec-18 11-Dec-18 12-Dec-18 13-Dec-18

cha de medición

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE DESPLAZAMIENTOS TOTALES ABSOLUTOS


PUNTOS TOPOGRÁFICOS / TAJO HUAMANLOMA
4.3
Velocidad de Movimiento
30.00

Velocidad Absoluta (cm/día) 28.00

26.00

24.00

22.00
Alerta 3 (20
20.00 mm/día)

18.00

16.00

14.00

12.00
Alerta 2 (10.0
10.00 mm/día)

8.00

6.00
8.00

6.00

4.00 Alerta 1 (3.0 mm/día)

2.00

0.00
3-Jan-19 8-Jan-19 13-Jan-19 18-Jan-19 23-Jan-19 28-Jan-19 2-Feb-1

Fecha de medición

0 APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE VELOCIDADES AB
TOPOGRÁFICOS / TAJO HUAMAN
REVISIÓN: Rev. B
Velocidad Relativa
1,200.00

Velocidad Relativa (cm/día)

1,000.00

800.00

600.00

400.00

200.00
200.00

0.00
4-Dec-18 9-Dec-18 14-Dec-18 19-Dec-18 24-Dec-18 29-Dec-18 3-Jan-19 8-Jan-19 13-J

Fecha de medición

0 APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE VELOCIDADES RE
TOPOGRÁFICOS / TAJO HUAMAN
REVISIÓN: Rev. B
ocidad de Movimiento
HUA-01
HUA-02
HUA-03
HUA-04
HUA-05
HUA-06
HUA-07
HUA-08
Alerta 1
Alerta 2
Alerta 3
n-19 23-Jan-19 28-Jan-19 2-Feb-19 7-Feb-19

a de medición

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE VELOCIDADES ABSOLUTAS PUNTOS


TOPOGRÁFICOS / TAJO HUAMANLOMA
1
ocidad Relativa
HUA-01
HUA-02
HUA-03
HUA-04
HUA-05
HUA-06
HUA-07
HUA-08
Dec-18 29-Dec-18 3-Jan-19 8-Jan-19 13-Jan-19 18-Jan-19

a de medición

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE VELOCIDADES RELATIVAS PUNTOS


TOPOGRÁFICOS / TAJO HUAMANLOMA
4.5
Trayectoria Horizontal
8,348,105.95

8,348,105.90

8,348,105.85

8,348,105.80
Norte

8,348,105.75

8,348,105.70

8,348,105.65
8,348,105.65

8,348,105.60

8,348,105.55
615,405.05 615,405.06 615,405.07 615,405.08 615,405.09 615,405.10 615,405.11 615,40

Este

APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
TOPOGRÁFICOS HUA-01 / TAJO HUA
REVISIÓN: Rev. B
Trayectoria Horizontal
8,348,090.80

8,348,090.75

8,348,090.70

8,348,090.65

8,348,090.60
Norte

8,348,090.55

8,348,090.50

8,348,090.45

8,348,090.40
8,348,090.40

8,348,090.35

8,348,090.30
615,441.60 615,441.64 615,441.68

Este

0 APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
TOPOGRÁFICOS HUA-02 / TAJO HUA
REVISIÓN: Rev. B
Trayectoria Horizontal
8,348,012.42

8,348,012.40

8,348,012.38

8,348,012.36
Norte

8,348,012.34

8,348,012.32

8,348,012.30

8,348,012.28
8,348,012.28

8,348,012.26

8,348,012.24
615,473.40 615,473.41 615,473.42 615,473.43 615,473.44 615,473.45 615,473.46 615,47

Este

0 APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
TOPOGRÁFICOS HUA-03 / TAJO HUA
REVISIÓN: Rev. B
8,347,972.92
Trayectoria Horizontal

8,347,972.90

8,347,972.88
Norte

8,347,972.86

8,347,972.84

8,347,972.82

8,347,972.80

8,347,972.78
8,347,972.78
615,451.27 615,451.28 615,451.29 615,451.30 615,451.31 615,451.32 615,451.3

Este

0 APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
TOPOGRÁFICOS HUA-04 / TAJO HUA
REVISIÓN: Rev. B
8,347,950.35
Trayectoria Horizontal

8,347,950.30

8,347,950.25
Norte

8,347,950.20

8,347,950.15

8,347,950.10
8,347,950.10
615,321.02 615,321.03 615,321.04 615,321.05 615,321.06 615,321.07 615,321.08 615,321.09 615,321.10 615

Este

0 APUMAYO S.A.C.
ELABORADO: M.L.Q. MONITOREO DE INSTRUMENTACIÓN GEOTÉC

APROBADO: W.V.B.
FECHA: 26-04-19
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
TOPOGRÁFICOS HUA-05 / TAJO HUA
REVISIÓN: Rev. B

8,347,991.60
Trayectoria Horizontal

8,347,991.55

8,347,991.50
SW
Norte

8,347,991.45

8,347,991.40
8,347,991.40

8,347,991.35

8,347,991.30

8,347,991.25
615,409.82 615,409.83 615,409.84 615,409.85 615,409.86 615,409.87 615,409.88 615,409.89 615,409.90 615

Este

ELABORADO: MONITOREO DE INSTRUMENTACIÓN G


ELABORADO: W.V.B. REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGR
APROBADO: 43581
FECHA: Rev. B
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
REVISIÓN: 12/30/1899
TOPOGRÁFICOS HUA-06 / TAJO HUA

8,347,986.15
Trayectoria Horizontal

SW
8,347,986.10

8,347,986.05
8,347,986.05

Norte

8,347,986.00

8,347,985.95

8,347,985.90

8,347,985.85
615,420.71 615,420.72 615,420.73 615,420.74 615,420.75 615,420.76 615,420.77 615,420.78 615,4

Este

ELABORADO: MONITOREO DE INSTRUMENTACIÓN G


ELABORADO: W.V.B. REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGR
APROBADO: 43581
FECHA: Rev. B
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
REVISIÓN: 12/30/1899
TOPOGRÁFICOS HUA-07 / TAJO HUA

8,347,969.95
Trayectoria Horizontal
8,347,969.95
Trayectoria Horizontal

8,347,969.90 SW

8,347,969.85
Norte

8,347,969.80

8,347,969.75

8,347,969.70

8,347,969.65
615,366.74 615,366.75 615,366.76 615,366.77 615,366.78 615,366.79 615,366.80 615,366.81 615,3
8,347,969.65
615,366.74 615,366.75 615,366.76 615,366.77 615,366.78 615,366.79 615,366.80 615,366.81 615,3

Este

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TO


ELABORADO:
ELABORADO: 43581 REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGR
APROBADO: Rev. B
FECHA: 30-12-99
REGISTRO HISTÓRICO DE TRAYECTORIAS HOR
REVISIÓN: 12/30/1899
TOPOGRÁFICOS HUA-07 / TAJO HUA
a Horizontal

HUA-01
Punto Inicial
Punto Final
615,405.09 615,405.10 615,405.11 615,405.12 615,405.13

Este

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-01 / TAJO HUAMANLOMA
4.6
a Horizontal

HUA-02
Punto Inicial
Punto Final
615,441.68 615,441.72

Este

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-02 / TAJO HUAMANLOMA
4.7
a Horizontal

HUA-03
Punto Inicial
Punto Final
615,473.44 615,473.45 615,473.46 615,473.47 615,473.48

Este

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-03 / TAJO HUAMANLOMA
4.8
a Horizontal

HUA-04
Punto Inicial
Punto Final
51.30 615,451.31 615,451.32 615,451.33 615,451.34

Este

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-04 / TAJO HUAMANLOMA
4.9
a Horizontal

HUA-05
Punto Inicial
Punto Final
6 615,321.07 615,321.08 615,321.09 615,321.10 615,321.11 615,321.12

Este

APUMAYO S.A.C. GRÁFICA Nº


MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-05 / TAJO HUAMANLOMA
4.10

a Horizontal

SW

HUA-06
Punto Inicial
Punto Final
6 615,409.87 615,409.88 615,409.89 615,409.90 615,409.91 615,409.92

Este

MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA GRÁFICA Nº


GISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGRÁFICOS HUA-05 / TAJO HUAMANLOMA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-06 / TAJO HUAMANLOMA
4.11
a Horizontal

SW
HUA-07
Punto Inicial
Punto Final

,420.75 615,420.76 615,420.77 615,420.78 615,420.79 615,420.80

Este

MONITOREO DE INSTRUMENTACIÓN GEOTÉCNICA GRÁFICA Nº


GISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGRÁFICOS HUA-05 / TAJO HUAMANLOMA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-07 / TAJO HUAMANLOMA
4.12

a Horizontal
a Horizontal

SW

HUA-08
Punto Inicial
Punto Final

,366.78 615,366.79 615,366.80 615,366.81 615,366.82 615,366.83


,366.78 615,366.79 615,366.80 615,366.81 615,366.82 615,366.83

Este

DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGRÁFICOS HUA-05 / TAJO HUAMANLOMA


GRÁFICA Nº
GISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS TOPOGRÁFICOS HUA-07 / TAJO HUAMANLOMA

REGISTRO HISTÓRICO DE TRAYECTORIAS HORIZONTALES PUNTOS


TOPOGRÁFICOS HUA-07 / TAJO HUAMANLOMA
4.12

Anda mungkin juga menyukai