11 Baut HTB 16
- Plat buhul Beam WF 400.200.8.13 64.00 18.00 1,152.00
- Plat buhul Beam WF 250.125.6.9 128.00 12.00 1,536.00
(Melintang)
- Plat buhul Beam WF 250.125.6.9 224.00 12.00 2,688.00
(Memanjang)
HARGA
JUMLAH HARGA
SATUAN
Rp. Rp.
28,000.00 591,360,000.00
28,000.00 354,816,000.00
28,000.00 116,793,600.00
28,000.00 116,793,600.00
28,000.00 116,793,600.00
28,000.00 116,793,600.00
28,000.00 53,222,400.00
28,000.00 53,222,400.00
28,000.00 53,222,400.00
28,000.00 53,222,400.00
28,000.00 38,438,400.00
28,000.00 38,438,400.00
28,000.00 38,438,400.00
28,000.00 38,438,400.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 126,551,040.00
28,000.00 9,798,566.40
28,000.00 49,896,000.00
28,000.00 32,766,406.04
28,000.00 19,858,427.90
28,000.00 17,310,800.64
28,000.00 22,993,969.15
28,000.00 30,293,901.12
8,500.00 9,792,000.00
8,500.00 13,056,000.00
8,500.00 22,848,000.00
TOTAL 3,021,015,991.26
REKAPITULASI ANGGARAN BIAYA
I PEKERJAAN STRUKTUR
1 PEKERJAAN PERSIAPAN 13,788,000.00
2 PEKERJAAN TANAH 22,931,565.56
3 PEKERJAAN STRUKTUR BETON 875,402,743.20
4 PEKERJAAN PASANGAN 1,179,751,152.00
5 PEKERJAAN STRUKTUR BAJA 3,021,015,991.26
TOTAL 5,112,889,452.02
PEMBULATAN 5,112,800,000.00
TERBILANG: # Lima milyar seratus dua belas juta delapan ratus ribu rupiah #
Bambang Ganda S.
Kontraktor
BILL of QUANTITY
(BQ)
Pekerjaan : Pembangunan Hotel
Lokasi : Jl. Sei Batang Hari - Medan
m' m' m²
I PEKERJAAN STRUKTUR
1 PEKERJAAN PERSIAPAN
a. Pembersihan lahan m² 450.00 15,000.00 6,750,000.00
b. Pengukuran dan bowplank m¹ 180.00 39,100.00 7,038,000.00
Sub Total 13,788,000.00
2 PEKERJAAN TANAH
a. Pekerjaan galian pondasi sumuran m³ 60.79 140,500.00 8,541,051.20
b. Galian tanah pondasi m³ 69.12 140,500.00 9,711,360.00
c. Galian tanah sloof m³ 17.96 140,500.00 2,523,380.00
d. Timbunan kembali m³ 56.94 23,400.00 1,332,405.36
`e. Pasir urug m³ 4.55 181,000.00 823,369.00
Sub Total 22,931,565.56
3 PEKERJAAN STRUKTUR BETON
a. Beton cyclop sumuran Ø 100 cm m³ 50.30 750,000.00 37,728,000.00
h = 200 cm
b. Beton pondasi tapak 120x120 cm m³ 17.28 3,038,150.60 52,499,242.35
c. Beton kolom pedestal 25x45 cm m³ 5.40 5,406,920.00 29,197,368.00
d. Beton sloof 20x40 cm m³ 17.96 3,989,085.00 71,643,966.60
e. Beton lantai kerja t = 5 cm lt. Dasar m² 474.07 55,050.00 26,097,278.25
f. Bondek t = 0.75 lantai - 1 m² 464.07 195,000.00 90,493,650.00
g. Wiremesh M-8 m² 464.07 88,500.00 41,070,195.00
h. Beton slab lantai 1 t = 12 cm Camp. 1:3:5 m³ 55.69 1,577,500.00 87,848,451.00
i. Bondek t = 0.75 lantai - 2 m¹ 464.07 195,000.00 90,493,650.00
j. Wiremesh M-8 m² 464.07 88,500.00 41,070,195.00
k. Beton slab lantai 2 t = 12 cm m³ 55.69 1,577,500.00 87,848,451.00
l. Bondek t = 0.75 lantai - 3 m¹ 464.07 195,000.00 90,493,650.00
m. Wiremesh M-8 m² 464.07 88,500.00 41,070,195.00
n. Beton slab lantai 3 t = 12 cm m³ 55.69 1,577,500.00 87,848,451.00
Sub Total 875,402,743.20
4 PEKERJAAN PASANGAN
a. Pasangan dinding 1/2 bata 5,294.40 108,010.00 571,848,144.00
b. Plasteran dinding bata 10,588.80 32,410.00 343,183,008.00
c. Acian 10,588.80 25,000.00 264,720,000.00
Sub Total 1,179,751,152.00
5 PEKERJAAN STRUKTUR BAJA
a. Baja IWF 400.200.8.13
- Kolom utama kg 33,792.00 28,000.00 946,176,000.00
- Beam Honeycomb up to 600 cm kg 16,684.80 28,000.00 467,174,400.00
b. Beam IWF 250.125.6.9
- Lantai 1 kg 12,312.96 28,000.00 344,762,880.00
- Lantai 2 kg 12,312.96 28,000.00 344,762,880.00
- Lantai 3 kg 12,312.96 28,000.00 344,762,880.00
- Lantai 4 kg 12,312.96 28,000.00 344,762,880.00
BILL of QUANTITY
(BQ)
Pekerjaan : Pembangunan Hotel
Lokasi : Jl. Sei Batang Hari - Medan
m' m' m²
14t 8 x 14 = 112 mm
ANALISA HARGA SATUAN
RUMAH GRAHA HELVETIA
2 1 m3 Galian Tanah
0.7500 hr Pekerja @ Rp. 90,000 = Rp.
0.0250 hr Mandor @ Rp. 110,000 = Rp.
3 1 m3 Urugan Pasir
1.0000 m3 Upah urug pasir @ Rp. 25,000.00 = Rp.
1.2000 m3 Pasir Urug @ Rp. 130,000.00 = Rp.
9 1 m3 Beton Cor 1 : 2 : 3
0.8500 m3 Kerikil @ Rp. 225,000 = Rp.
8.0000 zak Semen @ Rp. 52,000 = Rp.
0.6000 m3 Pasir Pasang @ Rp. 130,000 = Rp.
1.0000 m3 Upah cor @ Rp. 100,000.00 = Rp.
1.0000 lot Alat Bantu @ Rp. 5,000 = Rp.
66 1 m2 Pasangan bata 1 : 2
77.0000 bh Batu bata @ Rp. 600.00 = Rp.
0.7723 zak Semen @ Rp. 53,000 = Rp.
0.0500 m3 Pasir Pasang @ Rp. 150,000 = Rp.
1.0000 m2 Upah pasang dinding bata @ Rp. 20,000.00 = Rp.
1.0000 ls Alat bantu @ Rp. 5,000.00 = Rp.
67 1 m2 Pasangan bata 1 : 4
77.0000 bh Batu bata @ Rp. 600.00 = Rp.
0.4749 zak Semen @ Rp. 53,000 = Rp.
0.0609 m3 Pasir Pasang @ Rp. 150,000 = Rp.
1.0000 m2 Upah pasang dinding bata @ Rp. 25,000.00 = Rp.
1.0000 ls Alat bantu @ Rp. 2,500.00 = Rp.
45,500.00
50,657.89
1,200.00
8,000.00
Jumlah Rp. 105,357.89
Dibulatkan Rp. 105,360.00
67,500
2,750
Jumlah Rp. 70,250
Dibulatkan Rp. 70,250
25,000.00
156,000.00
Jumlah Rp. 181,000.00
Dibulatkan Rp. 181,000.00
201,667
164,648
52,780
100,000
Jumlah Rp. 519,094
Dibulatkan Rp. 519,090
1,417,500.00
150,000.00
5,000.00
Jumlah Rp. 1,572,500.00
Dibulatkan Rp. 1,572,500.00
430,500.00
60,000.00
5,000.00
Jumlah Rp. 495,500.00
Dibulatkan Rp. 495,500.00
191,250
260,000
78,000
100,000
5,000
Jumlah Rp. 634,250.00
Dibulatkan Rp. 634,250.00
11,250
17,214
4,086
20,000
2,500
Jumlah Rp. 55,049.36
Dibulatkan Rp. 55,050.00
191,250
416,000
78,000
100,000
5,000
Jumlah Rp. 790,250.00
Dibulatkan Rp. 790,250.00
166,667
582,400
61,936
282,800
10,000
Jumlah Rp. 1,103,802.38
Dibulatkan Rp. 1,103,800.00
388,500
80,000
10,000
Jumlah Rp. 478,500.00
Dibulatkan Rp. 478,500.00
1,417,500
150,000
10,000
Jumlah Rp. 1,577,500.00
Dibulatkan Rp. 1,577,500.00
12,650
280
1,000
Jumlah Rp. 13,930
6,000
140,000
Jumlah Rp. 146,000
146,000 Rp. 73,000
Rp. 65,000
Jumlah Rp. 138,000
Dibulatkan Rp. 138,000.00
6,000
140,000
Jumlah Rp. 146,000
146,000 Rp. 51,100
Rp. 65,000
Jumlah Rp. 116,100
Dibulatkan Rp. 116,100.00
829,762.50
1,427,314.23
766,666.67
Jumlah Rp. 3,023,743.40
Dibulatkan Rp. 3,023,740.00
829,762.50
1,104,258.96
2,208,000.00
Jumlah Rp. 4,142,021.46
Dibulatkan Rp. 4,142,020.00
829,762.50
3,126,170.60
1,840,000.00
Jumlah Rp. 5,795,933.10
Dibulatkan Rp. 5,795,930.00
829,762.50
2,241,949.92
1,840,000.00
Jumlah Rp. 4,911,712.42
Dibulatkan Rp. 4,911,710.00
829,762.50
1,887,035.19
1,840,000.00
Jumlah Rp. 4,556,797.69
Dibulatkan Rp. 4,556,800.00
829,762.50
1,710,381.12
1,380,000.00
Jumlah Rp. 3,920,143.62
Dibulatkan Rp. 3,920,140.00
829,762.50
2,101,828.05
1,380,000.00
Jumlah Rp. 4,311,590.55
Dibulatkan Rp. 4,311,590.00
829,762.50
1,732,817.71
1,104,000.00
Jumlah Rp. 3,666,580.21
Dibulatkan Rp. 3,666,580.00
829,762.50
1,456,297.92
1,104,000.00
Jumlah Rp. 3,390,060.42
Dibulatkan Rp. 3,390,060.00
829,762.50
1,615,434.24
1,104,000.00
Jumlah Rp. 3,549,196.74
Dibulatkan Rp. 3,549,200.00
829,762.50
1,680,812.37
1,840,000.00
Jumlah Rp. 4,350,574.87
Dibulatkan Rp. 4,350,570.00
829,762.50
1,884,318.70
552,000.00
Jumlah Rp. 3,266,081.20
Dibulatkan Rp. 3,266,080.00
829,762.50
1,520,459.50
460,000.00
Jumlah Rp. 2,810,222.00
Dibulatkan Rp. 2,810,220.00
829,762.50
2,701,897.63
460,000.00
Jumlah Rp. 3,991,660.13
Dibulatkan Rp. 3,991,660.00
829,762.50
3,062,671.23
2,123,076.92
Jumlah Rp. 6,015,510.65
Dibulatkan Rp. 6,015,510.00
829,762.50
2,983,663.13
3,043,076.92
Jumlah Rp. 6,856,502.55
Dibulatkan Rp. 6,856,500.00
829,762.50
2,944,159.08
2,813,076.92
Jumlah Rp. 6,586,998.50
Dibulatkan Rp. 6,587,000.00
829,762.50
2,505,667.30
2,710,310.97
Jumlah Rp. 6,045,740.77
Dibulatkan Rp. 6,045,740.00
829,762.50
2,473,839.42
2,675,076.92
Jumlah Rp. 5,978,678.84
Dibulatkan Rp. 5,978,680.00
829,762.50
3,577,049.88
2,760,000.00
Jumlah Rp. 7,166,812.38
Dibulatkan Rp. 7,166,810.00
829,762.50
2,356,781.88
2,760,000.00
Jumlah Rp. 5,946,544.38
Dibulatkan Rp. 5,946,540.00
829,762.50
1,545,417.42
2,300,000.00
Jumlah Rp. 4,675,179.92
Dibulatkan Rp. 4,675,180.00
829,762.50
2,996,923.42
2,300,000.00
Jumlah Rp. 6,126,685.92
Dibulatkan Rp. 6,126,690.00
829,762.50
3,819,973.75
2,208,000.00
Jumlah Rp. 6,857,736.25
Dibulatkan Rp. 6,857,740.00
829,762.50
1,516,338.54
1,610,000.00
Jumlah Rp. 3,956,101.04
Dibulatkan Rp. 3,956,100.00
829,762.50
1,570,076.42
1,380,000.00
Jumlah Rp. 3,779,838.92
Dibulatkan Rp. 3,779,840.00
829,762.50
2,068,430.88
1,725,000.00
Jumlah Rp. 4,623,193.38
Dibulatkan Rp. 4,623,190.00
829,762.50
4,488,710.33
2,530,000.00
Jumlah Rp. 7,848,472.83
Dibulatkan Rp. 7,848,470.00
829,762.50
2,267,246.80
1,840,000.00
Jumlah Rp. 4,937,009.30
Dibulatkan Rp. 4,937,010.00
829,762.50
1,735,538.70
1,853,142.86
Jumlah Rp. 4,418,444.06
Dibulatkan Rp. 4,418,440.00
829,762.50
2,170,990.50
1,853,142.86
Jumlah Rp. 4,853,895.86
Dibulatkan Rp. 4,853,900.00
829,762.50
2,282,012.60
1,426,000.00
Jumlah Rp. 4,537,775.10
Dibulatkan Rp. 4,537,780.00
829,762.50
2,603,647.01
1,840,000.00
Jumlah Rp. 5,273,409.51
Dibulatkan Rp. 5,273,410.00
829,762.50
2,039,475.82
1,564,000.00
Jumlah Rp. 4,433,238.32
Dibulatkan Rp. 4,433,240.00
829,762.50
2,378,160.56
1,564,000.00
Jumlah Rp. 4,771,923.06
Dibulatkan Rp. 4,771,920.00
829,762.50
2,180,648.63
1,633,000.00
Jumlah Rp. 4,643,411.13
Dibulatkan Rp. 4,643,410.00
829,762.50
1,430,688.39
1,150,000.00
Jumlah Rp. 3,410,450.89
Dibulatkan Rp. 3,410,450.00
829,762.50
1,598,461.93
1,380,000.00
Jumlah Rp. 3,808,224.43
Dibulatkan Rp. 3,808,220.00
829,762.50
1,164,919.47
1,346,105.26
Jumlah Rp. 3,340,787.23
Dibulatkan Rp. 3,340,790.00
829,762.50
1,616,228.25
1,449,000.00
Jumlah Rp. 3,894,990.75
Dibulatkan Rp. 3,894,990.00
829,762.50
2,116,454.55
1,288,000.00
Jumlah Rp. 4,234,217.05
Dibulatkan Rp. 4,234,220.00
829,762.50
2,501,131.50
1,288,000.00
Jumlah Rp. 4,618,894.00
Dibulatkan Rp. 4,618,890.00
829,762.50
1,972,139.75
1,311,000.00
Jumlah Rp. 4,112,902.25
Dibulatkan Rp. 4,112,900.00
829,762.50
2,335,949.56
1,116,266.67
Jumlah Rp. 4,281,978.73
Dibulatkan Rp. 4,281,980.00
829,762.50
1,348,075.75
1,150,000.00
Jumlah Rp. 3,327,838.25
Dibulatkan Rp. 3,327,840.00
829,762.50
2,164,722.00
1,150,000.00
Jumlah Rp. 4,144,484.50
Dibulatkan Rp. 4,144,480.00
829,762.50
1,847,814.50
2,070,000.00
Jumlah Rp. 4,747,577.00
Dibulatkan Rp. 4,747,580.00
829,762.50
1,423,733.06
2,932,500.00
Jumlah Rp. 5,185,995.56
Dibulatkan Rp. 5,186,000.00
829,762.50
1,803,447.45
1,380,000.00
Jumlah Rp. 4,013,209.95
Dibulatkan Rp. 4,013,210.00
829,762.50
2,335,066.00
1,840,000.00
Jumlah Rp. 5,004,828.50
Dibulatkan Rp. 5,004,830.00
829,762.50
2,189,796.00
2,123,076.92
Jumlah Rp. 5,142,635.42
Dibulatkan Rp. 5,142,640.00
99,571.50
26,050.24
27,860.00
1,000.00
Jumlah Rp. 154,481.74
Dibulatkan Rp. 154,480.00
99,571.50
13,746.05
27,860.00
1,000.00
Jumlah Rp. 142,177.55
Dibulatkan Rp. 142,180.00
58,083.38
27,080.24
27,860.00
1,000.00
Jumlah Rp. 114,023.62
Dibulatkan Rp. 114,020.00
170,100.00
67,763.16
27,860.00
1,000.00
150,000.00
Jumlah Rp. 266,723.16
Dibulatkan Rp. 266,720.00
829,762.50
3,297,231.00
690,000.00
Jumlah Rp. 4,816,993.50
Dibulatkan Rp. 4,816,990.00
829,762.50
1,314,313.67
1,840,000.00
Jumlah Rp. 3,984,076.17
Dibulatkan Rp. 3,984,080.00
829,762.50
1,442,757.96
138,000.00
Jumlah Rp. 2,410,520.46
Dibulatkan Rp. 2,410,520.00
25,500.00
900.00
117,000.00
Jumlah Rp. 143,400.00
Dibulatkan Rp. 143,400.00
27,000.00
1,100.00
132,000.00
Jumlah Rp. 160,100.00
Dibulatkan Rp. 160,100.00
46,200.00
40,932.17
7,492.50
20,000.00
5,000.00
Jumlah Rp. 119,624.67
Dibulatkan Rp. 119,620.00
46,200.00
25,172.09
9,135.00
25,000.00
2,500.00
Jumlah Rp. 108,007.09
Dibulatkan Rp. 108,010.00
13,554.75
2,223.00
20,000.00
2,500.00
Jumlah Rp. 38,277.75
Dibulatkan Rp. 38,280.00
9,699.00
2,710.50
17,500.00
2,500.00
Jumlah Rp. 32,409.50
Dibulatkan Rp. 32,410.00
13,000.00
13,000.00
15,000.00
2,500.00
Jumlah Rp. 43,500.00
Dibulatkan Rp. 43,500.00
1,651,125.00
-
276,000.00
-
35,000.00
5,000.00
Jumlah Rp. 1,967,125.00
Dibulatkan Rp. 1,967,125.00
201,666.67
164,647.60
52,780.00
75,000.00
Jumlah Rp. 494,094.27
Dibulatkan Rp. 494,090.00
45,600.00
4,000.00
3,000.00
4,000.00
Jumlah Rp. 56,600.00
Dibulatkan Rp. 56,600.00
15,675.00
3,000.00
5,000.00
2,500.00
Jumlah Rp. 26,175.00
Dibulatkan Rp. 26,180.00
116,000.00
15,000.00
-
-
-
-
Jumlah Rp. 131,000.00
Dibulatkan Rp. 131,000.00
20,300.00
15,600.00
4,940.00
35,000.00
Jumlah Rp. 75,840.00
Dibulatkan Rp. 75,840.00
80,000.00
1,200.00
15,000.00
Jumlah Rp. 96,200.00
Dibulatkan Rp. 96,200.00
35,000.00
24,000.00
1,200.00
8,000.00
Jumlah Rp. 68,200.00
Dibulatkan Rp. 68,200.00
70,000.00
24,000.00
1,200.00
8,000.00
Jumlah Rp. 103,200.00
Dibulatkan Rp. 103,200.00
94,500.00
24,000.00
1,200.00
8,000.00
Jumlah Rp. 127,700.00
Dibulatkan Rp. 127,700.00
DAFTAR HARGA
SATUAN UPAH & BAHAN
Kawasan Industri Medan Mas Karimun
B UPAH KERJA
1 Upah borong rangkai besi Rp. 450.00 /kg
2 Upah borong cor beton Rp. 60,000.00 /m3
3 Upah borong pasang bata Rp. 10,000.00 /m2
4 Upah borong plasteran Rp. 6,700.00 /m2
5 Upah galian tanah manual Rp. 31,300.00 /m3
6 Upah timbun tanah kembali Rp. 15,700.00 /m3
7 Upah bekisting Rp. 65,000.00 /m2
8 Upah trawel permukaan lantai beton Rp. 5,000.00 /m2
9 Upah bentang Wire Mesh Rp. 1,000.00 /m2
10 Upah pasang bata + plesteran + KP + RB Rp. 47,000.00 /m2
11 Upah pembesian ruko uk. 4m x 16m Rp. 800,000.00 /lantai
12 Rp.
13 Rp.
14 Rp.
HARGA
H & BAHAN
edan Mas Karimun
EDIT
KETERANGAN TANGGAL
3/8/2012
3/8/2012
Putih polos
Polos
American Standart
American Standart
American Standart
Terpasang
Terpasang
12,345.68 /m2
24,291.50 /m2
65,789.47 /m2
6,496.34 /kg 17-Nov-06
6,500.00 /kg 17-Nov-06
4,464.29 17-Nov-06
4,649.45 /kg
6,250.00 /kg 17-Nov-06
6,367.52 /kg 17-Nov-06
4,062.10 /kg
7,750.15 /kg 17-Nov-06
17-Nov-06
17-Nov-06