Anda di halaman 1dari 20

GRUNDFOS ALLDOS INSTRUCTIONS

Vaccuperm VGS-147, -148


Vacuum regulator
Service instructions
Contents

1. Of general interest ............................................................................................................ 3


1.1 Structure of the documentation .........................................................................................................3
1.2 About this manual .............................................................................................................................3
1.3 User/target groups ............................................................................................................................3
1.4 Responsibilities of the operator .........................................................................................................4
1.5 Maintenance and service personnel ..................................................................................................4
1.6 Correct usage ...................................................................................................................................4
1.7 Inappropriate usage ..........................................................................................................................4
2. Technical Data ................................................................................................................... 5
2.1 General data .....................................................................................................................................5
2.2 Dimensioned drawings......................................................................................................................6
3. Installation ......................................................................................................................... 7
3.1 Transport and storage.......................................................................................................................7
3.2 Unpacking ........................................................................................................................................7
3.3 Mounting...........................................................................................................................................7
4. Commissioning ............................................................................................................... 10
4.1 Preparations for commissioning ......................................................................................................10
4.2 Checks before commissioning ........................................................................................................10
5. Maintenance .................................................................................................................... 13
5.1 Possible faults ................................................................................................................................13
5.2 Disassembling and cleaning the vacuum regulator..........................................................................14
5.3 Spare part sets ...............................................................................................................................18
5.4 Drawings Vacuum regulator ............................................................................................................18

2 / 20
Warning
These operating instructions are also available on www.Grundfosalldos.com.
Prior to installation, read these installation and operating instructions. Installation and operation
must comply with local regulations and accepted codes of good practice.

1. Of general interest
1.1 Structure of the documentation
The Grundfos Alldos Vacuum regulator VGS-147 / VGS-148 is a state-of-the-art solution, which complies with
recognised safety regulations.
Conformity with applicable standards, directives and laws has been verified.
Nevertheless, certain risks which cannot be prevented by the manufacturer are associated with the use of the system.
Purpose of this manual:
• Inform users of optimum use.
• Warn users of possible residual risks when using correctly and identify measures that should be taken to avoid
damage.
• Caution users against obvious misuse or inappropriate use and inform them of the necessary care that must be
taken when operating the system.

1.2 About this manual


This manual contains the following standardised safety instructions about possible residual risks:

Warning
If these safety instructions are not observed, it may result in personal injury!

If these safety instructions are not observed, it may result in malfunction or damage to the
Caution
equipment!

Note Notes or instructions that make the job easier and ensure safe operation.
Information about possible residual risks is provided:
• On warning signs displayed in the installation location.
• At the start of each section in this manual.
• Directly before any operating procedures that could involve residual risks.

1.3 User/target groups


Users are persons who are responsible for operating and monitoring the Vacuum regulator VGS-147 / VGS-148 at the
installation location. The system may only be operated by trained and qualified personnel. Personnel must have
appropriate technical knowledge and be familiar with the basic principles of measuring and control technology.

1.3.1 Responsibilities of the users


The users’ responsibilities:
• Read this manual before operating the VGS-147 / VGS-148.
• Be trained by qualified personnel from Grundfos Alldos in the operation of the system.
• Observe the recognised regulations governing safety in the workplace and accident prevention.
• Wear appropriate protective clothing in accordance with national regulations for the prevention of accidents when
operating the system and handling chemicals (German GUV-V D05).

3 / 20
1.4 Responsibilities of the operator
The owner of the building or operator of the VGS-147 / VGS-148 is responsible for the following:
• Consider this manual to be part of the product and ensure that it is kept clearly accessible in the immediate vicinity
of the system for the entire service life of the system.
• Meet the installation requirements specified by the manufacturer (required water connections and fittings,
environmental conditions, electrical connection, protective pipe for dosing line if necessary, audible or optical
warning device for alarm messages if necessary).
• Ensure that water lines and fixings are regularly checked, serviced and maintained.
• Obtain official approval for storing chemicals, if necessary.
• Train users in the operation of the system.
• Ensure that the regulations for the prevention of accidents are observed in the installation location (German GUV-
V D05 regulation for the prevention of accidents, "Chlorination of Water" dated January 1997).
• Provide all users and service personnel with protective clothing in accordance with GUV-V D05 (face mask, gloves,
protective apron).

1.5 Maintenance and service personnel


The system may only be maintained and serviced by authorised service personnel from Grundfos Alldos.

1.6 Correct usage


The Grundfos Alldos VGS-147 / VGS-148 may be used for dosing chlorine (Cl2) as being described in this manual.

1.7 Inappropriate usage


Applications other than those listed in section 1.6 Correct usage are considered not to be in accordance with the
intended use and are not permitted. The manufacturer, Grundfos Alldos, accepts no liability for any damage resulting
from incorrect use.
The system comprises state-of-the-art components and has undergone safety-related testing.
Warning
Unauthorised structural modifications to the system may result in serious damage to
equipment and personal injury.
It is forbidden to open, modify, change the structure of, bridge, remove, bypass or disable
components, especially safety equipment.

4 / 20
2. Technical Data
2.1 General data
Permissible medium Cl2

2.1.1 Pressure connection

VGS-147: DN 20
Vacuum line connection (outlet)
VGS 148: DN 40
VGS-147: DN 20, PVC-pipe
Vacuum line to be used
VGS-148: DN 40, PVC-pipe
Pressure line connection (flange) (inlet) DN 25
Overpressure valve connection 8/11, PE tube
Overpressure line to be used 8/11, PE tube
G1, seamless drawn steel pipes
Pressure line to be used
according to DIN 2441

2.1.2 Flow range

Type Flow range


VGS-147 1 - 40 kg/h 50 - 2100 #/day
3.5 - 70 kg/h 200 - 3700 #/day
VGS-148 6 - 120 kg/h 400 - 6200 #/day
10 - 200 kg/h 500 - 10500 #/day

2.1.3 Admission pressure

Minimal admission pressure 2 bar


Maximum admission pressure 11 bar

2.1.4 Accessories (not including)

Holding plate for wall fixing at change of container


Installation material in 3 lengths
Test medium for leak search

2.1.5 Between vacuum regulator and dosing regulator

Length of the Dosing quantity (g/h)


vacuum line in (m) 2000 4000 10000 20000 40000 70000 120000 200000
0 DN 8 DN 10 DN 15 DN 20 DN 25 DN 32 DN 40 DN 40
10 DN 8 DN 10 DN 15 DN 20 DN 25 DN 32 DN 40 DN 50
20 DN 10 DN 15 DN 20 DN 25 DN 32 DN 40 DN 40 DN 50
30 DN 10 DN 15 DN 20 DN 25 DN 32 DN 40 DN 50 DN 65
40 DN 15 DN 15 DN 20 DN 25 DN 32 DN 40 DN 50 DN 65
50 DN 15 DN 15 DN 20 DN 25 DN 32 DN 40 DN 50 DN 65
75 DN 15 DN 15 DN 25 DN 32 DN 40 DN 50 DN 65 DN 65
100 DN 15 DN 20 DN 25 DN 32 DN 40 DN 50 DN 65 DN 80

Grundfos Alldos company standard calculated with pressure drop p=12.5 mbar
The indications in this table result from pressure loss observations. They do not take into consideration the
possible influence of length and diameter of lines on the operational reliability of the system.

5 / 20
2.2 Dimensioned drawings
Note According to the design, the measures may vary slightly.

2.2.1 Vacuum regulator VGS-147

209
52 DN 20
105.5

175
170.5

TM04_0862
128
DN 25

Fig. 1 Dimensional drawing of VGS-147

2.2.2 Vacuum regulator VGS-148

206
125
DN 40 245

6.6

170
245
50

170

TM04_0863

DN 25
Fig. 2 Dimensional drawing of VGS-148

6 / 20
3. Installation
3.1 Transport and storage
• Handle with care, do not throw!
• Dry and cool storage place.

3.2 Unpacking
• Observe when unpacking:
– No humidity should get into gas-leading parts!
– No foreign matter should get into gas-leading parts!
– Remove plugs not until the connections shall be made!
• Mount as soon as possible after unpacking.

3.3 Mounting

Warning
Please read Installation and operating instruction, Chapter 2: Handling Chlorine.

3.3.1 Requirements for mounting


• Installations at the pressure side from the containers resp. the evaporator are present and checked for tightness
• Piping has been rinsed with nitrogen
– no more soiling present
• Filter and liquid gas trap and pressure reducing valve has been installed directly before the vacuum regulator
• Directly before the vacuum regulator the highest temperature in the course of the pressure gas lines is present.
– If necessary, wrap a heater band around the pressure line connection of the vacuum regulator.
Warning
Ensure that all container valves are closed before mounting.
Only use the intended line types!

Do not install the vacuum regulator on walls, plates or something similar. Danger of distortion!
The device will only be carried by the connection with the pressure line.
Caution
Ensure that all piping is free of distortion.
Do not mount the device in a distorted manner.

7 / 20
3.3.2 Pressure line connection

Note Ensure that the pressure lines are as short as possible.


Required tools and accessories
• 2 fork wrenches 19 mm
With connection set
• Put it flat gasket.
• Screw the pressure line into the connection piece
– tighten with hemp or weld the threat

TM04 0864

Fig. 3 Pressure line with connection set


Without connection set
• Put in flat gasket.
• Screw the pressure line connection (flange) to the flange of the pressure line resp. the flange of the component
before.
TM04 0865

Fig. 4 Pressure line without connection set

8 / 20
3.3.3 Vacuum line connection
• Push the union nut onto the pipe (in the right direction)
• Place the union end in the pipe
– glue together with PVC glue
• If not yet present, place the o-ring on the connection
• Place the pipe on the connection
• Tighten the union nut by hand

TM04 0866

Fig. 5 Vacuum line connection

3.3.4 Overpressure line connection


• Push the union nut onto the tube (in the right direction)
• Put the tube onto the branch neck of the overpressure valve
• Tighten the union nut by hand
TM04 0867

Fig. 6 Overpressure line connection

Warning
The overpressure line has to lead downwards, as chlorine is heavier than air.
Do connect the overpressure line to a suitable absorption vessel! The overpressure line must not dip into
the absorption fluid!
The overpressure line must end in the room and not lead in the open air!

9 / 20
4. Commissioning
4.1 Preparations for commissioning
4.1.1 Vacuum connections

Warning
Before connecting, ensure that the valves of all gas containers are closed.
Only use the intended line types!

Danger of damages!
Caution Maximum length of the vacuum line, see chapter 2.1.5 Between vacuum regulator and dosing
regulator
• At the vacuum regulator, connect the vacuum line and connect it to the dosing regulators.

Warning
Lead the overpressure line downwards, as chlorine is heavier than air.
Connect the overpressure line to a suitable adsorption device. If using a gas warning device:
Mount the sensor in a distance of about 10 cm from the outlet hole of the adsorption device.
The overpressure line must end in the room, never lead to the open air!
• Connect the overpressure line to the overpressure connection.
• Connect the vacuum line to the injector.

4.1.2 Pressure line connection

Note Ensure that the pressure lines are as short as possible.


• Slightly apply grease to the gasket, if necessary
• Connect the pressure line to the pressure line connection

4.2 Checks before commissioning


Check tightness of the total plant before start-up.
– Observe manual of the gas dosing regulators!

Warning
Check the tightness not until the total plant is ready for start-up.
Danger of gas leakage!

Warning
Before checking the tightness:
Start running the optional built-in liquid trap or the seperate liquid trap!
Danger of gas leakage!

4.2.1 Checking the tightness of pressure gas lines


Pressure gas lines are all lines from the gas containers to the vacuum regulator.
• If the plant is equipped with a nitrogen rinsing device: Check tightness roughly with nitrogen
• Detailed checking: with ammonia

10 / 20
4.2.2 Checking the tightness with nitrogen
• Close all container valves
• Open container connection valves and all shut-off valves up to the gas dosing system
• Open the connection valve of the nitrogen cylinder
• Slowly open the valve of the nitrogen cylinder, until the lines have a pressure of about 10 bar (read at the
manometer of the vacuum regulator).
Warning
Maximum nitrogen pressure 16 bar!
Danger of damages and gas leakage when being exceeded!
• Apply leakage spray or soap water to all components under pressure
– Formation of bubbles and/or pressure drop at manometer
-->Leakage in pressure lines!
• Depressurize the plant!
• Eliminate leakage!
• Check tightness again!
– No formation of bubbles, pressure at manometer does not drop significantly within one hour
--> Pressure lines are tight.

11 / 20
4.2.3 Checking the tightness with ammonia
• Open all container valves and container connection valves and quickly close them again
• Slowly pass the open ammonia bottle along pressure-gas leading parts
– Formation of white mist: Leakage in pressure lines!
• Depressurize the plant!
• Eliminate leakage!
• Check tightness again!

TM04 0849 0908

Fig. 7 Formation of white mist: Leakage in pressure lines!


– No formation of white mist: Pressure lines are tight.
TM04 0697 0908

Fig. 8 Pressure lines are tight

Warning
Liquid ammonia must not come in contact with parts of the plant!
Danger of leakages by corrosion!
TM04 0698 0908

Fig. 9 Liquid ammonia makes leakages by corrosion

12 / 20
5. Maintenance
Rates for cleaning and maintenance:
• at least every 12 months
• in case of malfunction
Warning
Switch off the whole plant before doing cleaning and maintenance work!
Danger of gas break-out!

5.1 Possible faults


Fault To be recognized by Cause Correction
Gas odour
Check connections and retighten
Formation of mist at the connections Connections not tight
them
when checking the tightness
Gas escapes at the overpressure line Clean the inlet valve, replace
Gas leakage Inlet valve not tight
while the plant is not running damaged parts, use better gas
Loss of pressure at the manometer Clean the inlet valve or the
Inlet valve or
while the plant is not running and the connections, replace damaged
connections not tight
gas supply is closed parts, use better gas.
Replace or clean the spring. Do not
Vacuum present in the overpressure Spring corroded or soiled remove the suspension wire of the
Overpressure valve not spring!
line while the plant is running (to be
tight
felt by putting on a finger) O-ring (19) defective Replace o-ring (19)
Diaphragm defective Replace diaphragm
Mount the diaphragm correctly,
Diaphragm distored or
Disturbed regulation Vibrations and booming of the device slightly apply teflon grease to the
mounted incorrectly
guide tappet
Vacuum present in the overpressure
line while the plant is running (to be Diaphragm damaged Replace the diaphragm
felt by putting on a finger)
Admission pressure too
Desired dosing flow is not Clean the filter
low (< 2 bar)
reached
Pressure gauge of the vacuum Gas container empty Replace gas containers by full ones
regulator Shut-off valves in the
pressure lines closed or Open the shut-off valves
not perfectly open
Wrap a heater band around the filter
Temperature at the
and/or the pressure line connection
pressure line connection
and warm them up. Close gas
lower than the
supply before the filter, adjust the
temperature of the other
Formation of ice on filter or pressure gas dosing system to minimal
pressure gas lines
line connection during start-up, dosing flow and start the plant
Re-liquefaction of the gas
damages of PVC enclosure parts Heating of the liquid trap
(only visible when the device is open) not connected or Connect the heating or repair it
defective
Vacuum regulator
Use a vacuum regulator with a liquid
without liquid trap used
trap
with gas drum

13 / 20
5.2 Disassembling and cleaning the vacuum regulator
Note Position number in parenthesis, see drawings in chapter 5.4, fig. 10 and fig. 11

5.2.1 Switching off the plant


• Set system to low dosing flow
• While the plant is still running: Close the container valves
• Let the plant run until the measuring tube shows no more gas flow
• Switch off the system
– Observe operation manual of the Gas Dosing System.

5.2.2 Demounting the vacuum regulator


Required tools and accessories
• 2 fork wrenches 19 mm
Procedure
• Remove overpressure line:
– Loosen the union nut
– Take off the tube
• Remove vacuum line:
– Loosen the union nut
– Take off the pipe with the union end
• Remove pressure gas line and take off the vacuum regulator:
– Hold the vacuum regulator!
– Loosen the screws at the flange
– Take off the vacuum regulator and the gasket

5.2.3 Unscrew the inlet valve support


Required tools and accessories
• Allan key 5 mm
Procedure
• Unscrew hexagon screws (3.3)
• Take off the pipe clip (3.2)
• Unscrew hexagon screws (34)
• Take out the inlet valve
• Take out the O-ring (18)

5.2.4 Disassembling the inlet valve


Required tools and accessories
• fork wrench 36 mm
• screwdriver
Procedure
• Unscrew the inlet valve with the fork wrench from the inlet valve support
• Unscrew the valve cone (15) with the screwdriver
– hold up the spring seat (4) with the finger in the course of this
Do not damage the sealing surface of the valve cone!
Caution Do not threat plastic parts with tools.
Danger of deformation and damages!

14 / 20
5.2.5 Cleaning the Parts of the Inlet Valve
Required tools and accessories
• Hot water (ca. 40°C)
• Soft brush
Procedure
• Clean all parts with hot water, use brush if necessary:
– Inner side of the inlet valve support
– Valve seat (1.1)
– Valve cone (15)
– Screw Part (1.2)
– Spring (17)
– Spring seat (24)
Replace damaged parts, if necessary. Suggestion
– Replace valve seat (1.1) and spring (17) (spare parts set)
• Check the sealing surface of the valve cone (15)
– replace it in case of being damaged
Warning
Replace the valve cone even in case of most little damages!
Danger of gas break-out!
• Dry all parts well

Caution Danger of corrosion when mounting moist parts!

5.2.6 Re-assembling the Inlet Valve


All sealing surfaces must be clean and free from desposits.
Caution
Lay down the inlet valve in order not to bend the tappet of the valve cone (15)!
• Insert the valve into seat and screw part
• Insert spring from the lower side
• Screw on the spring seat from the lower side until the limit stop
– hold up the valve cone with the screwdriver in the course of this
• Put new O-ring (16) into the inlet valve support
• Screw in the inlet valve

5.2.7 Disassembling and cleaning the vacuum connection (only GS 148)


Required tools and accessories
• Allan key 5 mm
• Hot water (ca. 40°C)
• Soft brush
Procedure
• Unscrew hexagon screws (35)
• Take off the vacuum connection
• Clean the inner side of the vacuum connection with hot water, use brush if necessary
• Dry all parts well

Caution Danger of corrosion when mounting moist parts!

15 / 20
5.2.8 Disassembling the vacuum regulator
Required tools and accessories
• Allan key 5 mm
Procedure
• Unscrew hexagon screws (35)
• Take off upper section
• Take out diaphragm (29) with diaphragm disk (6) and diaphragm ring (7)
• Disassemble valve cone (20) and spring (21) by unscrewing the nut (25)
• Unscrew diaphragm ring and take out the diaphragm
• Unscrew the screw part (23) from the lower section

5.2.9 Cleaning the parts of the vacuum regulator


Required tools and accessories
• Hot water (ca. 40°C)
• Soft brush
Procedure
• Clean all parts with hot water, use brush if necessary:
– Inner sides of upper and lower section
– Diaphragm disk (27)
– Diaphragm ring(26)
– Nut (25)
– Spring (21)

Caution Do not remove the suspension wire of the spring!


– Guide bush (22)
– Screw part (23)
• Replace damaged parts, if necessary
• Dry all parts well

Caution Danger of corrosion when mounting moist parts!

16 / 20
5.2.10 Re-assembling the vacuum regulator
• Put new O-ring in the diaphragm disk
• Put new diaphragm (29) onto the diaphragm disk (27)

Caution Observe fitting position!


• Screw on diaphragm ring (26)
• Slightly apply teflon grease onto the guide bush and screw it into the diaphragm disk
• Put new O-ring (19) into the valve cone (20)
– Do not damage the valve cone!
• Put in the valve cone (20)
• Put in the spring (21)
• Screw in the nut (25), until the surface of the valve cone (20) is on the same level as the surface of the nut
– Clearing hole must be in the dircetion of the spring
• Put new O-ring (18) into the screw part (23)
• Screw in the screw part (23)
• Place the assembled diaphragm disk in the lower section and align it
Warning
The diaphragm disk must easily move in the screw part.
Danger of gas break-out in case of sluggish or sticking movement!
– Press down the diaphragm disk (27) by hand. The valve cone (20) of the overpressure valve must open. In non-
operated condition it must tighten well.
• Place new O-ring (30) in the upper section
• Put upper section onto lower section
– Observe position of the overpressure valve!
• Put in hexagonal screws (35) and disks (36)
• Put on disks (36) and cap nuts (37)
• Tighten the hexagonal screws (35) crosswise
– Torque: 200 Ncm
• Mount the inlet valve support:
– Put in new O-ring (18)
– Put on lower part of the pipe clip (3.2)
– Put on inlet valve support
• The tappet of the valve cone (15) must dip into the hole of the valve
– cone (29) without using force
– Put in disks and hexagonal screws
– Tighten the hexagonal screws without distorting the inlet valve support
• Remount the vacuum connection: (only GS 148-070, GS 148-120, GS 148-200)
– Put in new O-ring (18)
– Put on vacuum connection
– Put in disks and hexagonal screws
– Tighten the hexagonal screws

5.2.11 Remounting the vacuum regulator


• Remount the vacuum regulator according to chap. 4
– Sealing surfaces must be clean
• Use a new flat gasket
Warning
Check the tightness before restarting (observe operation manual)!
Danger of gas break-out!

17 / 20
5.3 Spare part sets
We suggest to store some spare part sets to ensure fast replacing of wearing parts (only by authorized personnel), if
necessary. Spare part sets, consisting of valve seat spring, diaphragm and 1 set of o-rings

Oder no. Description


96688764 (553-1082) Spare part set VGS-147 (1-40 kg/h)
96688765 (553-1083) Spare part set VGS-148 (3.5-70 kg/h)
96688766 (553-1084) Spare part set VGS-148 (6-120 kg/h)
96688767 (553-1085) Spare part set VGS-148 (10-200 kg/h)

5.4 Drawings Vacuum regulator


5.4.1 Vacuum Regulator VGS-147

35
3.3 2.1
14.1
34 14.2
4.1
3.5
3.2
36
3.1

16
14.3 15 3.4

1.1
33
1.2
17
27
18
28
24
20

30
19

29

26

40

3.6 3.7

31

22
37
21
25
38
TM03 6896 4506

23
(12.5043-100
Fig. 10 Assembly drawing VGS-147

18 / 20
5.4.2 Spare part sets Vacuum Regulator VGS-147

14.1
14.2
36 18
35
3.5 35
3.4 18
2.1
36
3.3 4.1 32
3.6
3.2 34
3.7
3.1
30 33
16
14.3
15
27
1.1
1.2 28
17
29
24
20
26
19
31

36
37

22
21

TM03 6896 4506


25
18

23 (12.4253-100)

Fig. 11 Assembly drawing VGS-148

19 / 20
Argentina Denmark Korea Slovenia
Bombas GRUNDFOS de Argentina S.A. GRUNDFOS DK A/S GRUNDFOS Pumps Korea Ltd. GRUNDFOS PUMPEN VERTRIEB
Ruta Panamericana km. 37.500 Lote 34A Martin Bachs Vej 3 6th Floor, Aju Building 679-5 Ges.m.b.H.,
1619 - Garin DK-8850 Bjerringbro Yeoksam-dong, Kangnam-ku, 135-916 Podružnica Ljubljana
Pcia. de Buenos Aires Tlf.: +45-87 50 50 50 Seoul, Korea Blatnica 1, SI-1236 Trzin
Phone: +54-3327 414 444 Telefax: +45-87 50 51 51 Phone: +82-2-5317 600 Phone: +386 01 568 0610
Telefax: +54-3327 411 111 E-mail: info_GDK@grundfos.com Telefax: +82-2-5633 725 Telefax: +386 01 568 0619
www.grundfos.com/DK E-mail: slovenia@grundfos.si
Australia Latvia
Grundfos Alldos Estonia SIA GRUNDFOS Pumps Latvia South Africa
Dosing & Disinfection GRUNDFOS Pumps Eesti OÜ Deglava biznesa centrs Grundfos Alldos
ALLDOS Oceania Pty. Ltd. Peterburi tee 92G Augusta Deglava ielā 60, LV-1035, Rīga, Dosing & Disinfection
Unit 3 / 74 Murdoch Circuit 11415 Tallinn Tālr.: + 371 714 9640, 7 149 641 ALLDOS (Pty) LTD
Acacia Ridge QLD 4100 Tel: + 372 606 1690 Fakss: + 371 914 9646 98 Matroosberg Road, Waterkloof Park
Phone: +61 (0)7 3712 6888 Fax: + 372 606 1691 P.O. Box 36505, Menlo Park 0102
Lithuania
Telefax: +61 (0)7 3272 5188 0181 ZA Pretoria
Finland GRUNDFOS Pumps UAB
E-mail: alldos.au@alldos.com E-mail: alldos.za@alldos.com
OY GRUNDFOS Pumput AB Smolensko g. 6
Australia Mestarintie 11 LT-03201 Vilnius Spain
GRUNDFOS Pumps Pty. Ltd. FIN-01730 Vantaa Tel: + 370 52 395 430 Bombas GRUNDFOS España S.A.
P.O. Box 2040 Phone: +358-3066 5650 Fax: + 370 52 395 431 Camino de la Fuentecilla, s/n
Regency Park Telefax: +358-3066 56550 E-28110 Algete (Madrid)
Malaysia
South Australia 5942 Tel.: +34-91-848 8800
France GRUNDFOS Pumps Sdn. Bhd.
Phone: +61-8-8461-4611 Telefax: +34-91-628 0465
Grundfos Alldos 7 Jalan Peguam U1/25
Telefax: +61-8-8340 0155 Dosing & Disinfection Glenmarie Industrial Park Sweden
Austria ALLDOS S.A.R.L. 40150 Shah Alam GRUNDFOS AB
GRUNDFOS Pumpen Vertrieb Ges.m.b.H. 7, rue Gutenberg Selangor (Box 333) Lunnagårdsgatan 6
Grundfosstraße 2 F-67610 La Wantzenau Phone: +60-3-5569 2922 431 24 Mölndal
A-5082 Grödig/Salzburg Tél.: +33-3 88 59 26 26 Telefax: +60-3-5569 2866 Tel.: +46(0)771-32 23 00
Tel.: +43-6246-883-0 Télécopie: +33-3 88 59 26 00 Telefax: +46(0)31-331 94 60
México
Telefax: +43-6246-883-30 E-mail : alldos.fr@alldos.com
Bombas GRUNDFOS de México S.A. de Switzerland
Belgium France C.V. Grundfos Alldos
N.V. GRUNDFOS Bellux S.A. Pompes GRUNDFOS Distribution S.A. Boulevard TLC No. 15 Dosing & Disinfection
Boomsesteenweg 81-83 Parc d’Activités de Chesnes Parque Industrial Stiva Aeropuerto ALLDOS International AG
B-2630 Aartselaar 57, rue de Malacombe Apodaca, N.L. 66600 Schönmattstraße 4
Tél.: +32-3-870 7300 F-38290 St. Quentin Fallavier (Lyon) Phone: +52-81-8144 4000 CH-4153 Reinach
Télécopie: +32-3-870 7301 Tél.: +33-4 74 82 15 15 Telefax: +52-81-8144 4010 Tel.: +41-61-717 5555
Télécopie: +33-4 74 94 10 51 Telefax: +41-61-717 5500
Belorussia Netherlands
E-mail: alldos.ch@alldos.com
Представительство ГРУНДФОС в Минске Germany Grundfos Alldos
220123, Минск, Grundfos Alldos Dosing & Disinfection Switzerland
ул. В. Хоружей, 22, оф. 1105 Dosing & Disinfection ALLDOS BV GRUNDFOS Pumpen AG
Телефон: (37517) 233-97-65 ALLDOS Eichler GmbH Leerlooiersstraat 6 Bruggacherstrasse 10
Факс: (37517) 233-97-69 Reetzstraße 85 NL-8601 WK Sneek CH-8117 Fällanden/ZH
D-76327 Pfinztal (Söllingen) Tel.: +31-51 54 25 789 Tel.: +41-1-806 8111
Bosnia/Herzegovina Tel.: +49 7240 61-0 Telefax: +31-51 54 30 550 Telefax: +41-1-806 8115
GRUNDFOS Sarajevo Telefax: +49 7240 61-177 E-mail: alldos.nl@alldos.com
Paromlinska br. 16, Taiwan
E-mail: alldos.de@alldos.com
BiH-71000 Sarajevo Netherlands GRUNDFOS Pumps (Taiwan) Ltd.
Phone: +387 33 713290 Germany GRUNDFOS Netherlands 7 Floor, 219 Min-Chuan Road
Telefax: +387 33 231795 GRUNDFOS GMBH Veluwezoom 35 Taichung, Taiwan, R.O.C.
Schlüterstr. 33 1326 AE Almere Phone: +886-4-2305 0868
Brazil D-40699 Erkrath Postbus 22015 Telefax: +886-4-2305 0878
Mark GRUNDFOS Ltda. Tel.: +49-(0) 211 929 69-0 1302 CA ALMERE
Av. Humberto de Alencar Castelo Branco, Thailand
Telefax: +49-(0) 211 929 69-3799 Tel.: +31-88-478 6336
630 GRUNDFOS (Thailand) Ltd.
E-mail: infoservice@grundfos.de Telefax: +31-88-478 6332
CEP 09850 - 300 92 Chaloem Phrakiat Rama 9 Road,
Service in Deutschland: e-mail: info_gnl@grundfos.com
São Bernardo do Campo - SP Dokmai, Pravej, Bangkok 10250
E-mail: kundendienst@grundfos.de
Phone: +55-11 4393 5533 New Zealand Phone: +66-2-725 8999
Telefax: +55-11 4343 5015 Greece GRUNDFOS Pumps NZ Ltd. Telefax: +66-2-725 8998
GRUNDFOS Hellas A.E.B.E. 17 Beatrice Tinsley Crescent
Bulgaria Turkey
20th km. Athinon-Markopoulou Av. North Harbour Industrial Estate
GRUNDFOS Pumpen Vertrieb GRUNDFOS POMPA San. ve Tic. Ltd. Sti.
P.O. Box 71 Albany, Auckland
Representative Office - Bulgaria Gebze Organize Sanayi Bölgesi
GR-19002 Peania Phone: +64-9-415 3240
Bulgaria, 1421 Sofia Ihsan dede Caddesi,
Phone: +0030-210-66 83 400 Telefax: +64-9-415 3250
Lozenetz District 2. yol 200. Sokak No. 204
Telefax: +0030-210-66 46 273
105-107 Arsenalski blvd. Norway 41490 Gebze/ Kocaeli
Phone: +359 2963 3820, 2963 5653 Hong Kong GRUNDFOS Pumper A/S Phone: +90 - 262-679 7979
Telefax: +359 2963 1305 GRUNDFOS Pumps (Hong Kong) Ltd. Strømsveien 344 Telefax: +90 - 262-679 7905
Unit 1, Ground floor Postboks 235, Leirdal E-mail: satis@grundfos.com
Canada Siu Wai Industrial Centre N-1011 Oslo
GRUNDFOS Canada Inc. Ukraine
29-33 Wing Hong Street & Tlf.: +47-22 90 47 00
2941 Brighton Road ТОВ ГРУНДФОС УКРАЇНА
68 King Lam Street, Cheung Sha Wan Telefax: +47-22 32 21 50
Oakville, Ontario 01010 Київ, Вул. Московська 8б,
Kowloon
L6H 6C9 Poland Тел.:(+38 044) 390 40 50
Phone: +852-27861706 / 27861741
Phone: +1-905 829 9533 GRUNDFOS Pompy Sp. z o.o. Фах.: (+38 044) 390 40 59
Telefax: +852-27858664
Telefax: +1-905 829 9512 ul. Klonowa 23 E-mail: ukraine@grundfos.com
Hungary Baranowo k. Poznania
China United Arab Emirates
GRUNDFOS Hungária Kft. PL-62-081 Przeźmierowo
Grundfos Alldos GRUNDFOS Gulf Distribution
Park u. 8 Tel: (+48-61) 650 13 00
Dosing & Disinfection P.O. Box 16768
H-2045 Törökbálint, Fax: (+48-61) 650 13 50
ALLDOS (Shanghai) Water Technology Co. Jebel Ali Free Zone
Phone: +36-23 511 110
Ltd. Portugal Dubai
Telefax: +36-23 511 111
West Unit, 1 Floor, No. 2 Building (T 4-2) Bombas GRUNDFOS Portugal, S.A. Phone: +971-4- 8815 166
278 Jinhu Road, Jin Qiao Export Processing India Rua Calvet de Magalhães, 241 Telefax: +971-4-8815 136
Zone GRUNDFOS Pumps India Private Limited Apartado 1079
United Kingdom
Pudong New Area 118 Old Mahabalipuram Road P-2770-153 Paço de Arcos
Grundfos Alldos
Shanghai, 201206 Thoraipakkam Tel.: +351-21-440 76 00
Dosing & Disinfection
Phone: +86 21 5055 1012 Chennai 600 096 Telefax: +351-21-440 76 90
ALLDOS Ltd.
Telefax: +86 21 5032 0596 Phone: +91-44 2496 6800
România 39 Gravelly Industrial Park, Tyburn Road
E-mail: alldos.cn@alldos.com Indonesia GRUNDFOS Pompe România SRL Birmingham B24 8TG
China PT GRUNDFOS Pompa Bd. Biruintei, nr 103 Phone: +44-121-3283336
GRUNDFOS Pumps (Shanghai) Co. Ltd. Jl. Rawa Sumur III, Blok III / CC-1 Pantelimon county Ilfov Telefax: +44-121-3284332
22 Floor, Xin Hua Lian Building Kawasan Industri, Pulogadung Phone: +40 21 200 4100 E-mail: alldos.uk@alldos.com
755-775 Huai Hai Rd, (M) Jakarta 13930 Telefax: +40 21 200 4101
United Kingdom
Shanghai 200020 Phone: +62-21-460 6909 E-mail: romania@grundfos.ro
GRUNDFOS Pumps Ltd.
PRC Telefax: +62-21-460 6910 / 460 6901
Russia Grovebury Road
Phone: +86-512-67 61 11 80 Ireland ООО Грундфос Leighton Buzzard/Beds. LU7 8TL
Telefax: +86-512-67 61 81 67 GRUNDFOS (Ireland) Ltd. Россия, 109544 Москва, ул. Школьная 39 Phone: +44-1525-850000
Croatia Unit A, Merrywell Business Park Тел. (+7) 495 737 30 00, 564 88 00 Telefax: +44-1525-850011
GRUNDFOS predstavništvo Zagreb Ballymount Road Lower Факс (+7) 495 737 75 36, 564 88 11
U.S.A.
Cebini 37, Buzin Dublin 12 E-mail grundfos.moscow@grundfos.com
GRUNDFOS Pumps Corporation
HR-10010 Zagreb Phone: +353-1-4089 800
Serbia 17100 West 118th Terrace
Phone: +385 1 6595 400 Telefax: +353-1-4089 830
GRUNDFOS Predstavništvo Beograd Olathe, Kansas 66061
Telefax: +385 1 6595 499 Italy Dr. Milutina Ivkovića 2a/29 Phone: +1-913-227-3400
Czech Republic GRUNDFOS Pompe Italia S.r.l. YU-11000 Beograd Telefax: +1-913-227-3500
GRUNDFOS s.r.o. Via Gran Sasso 4 Phone: +381 11 26 47 877 / 11 26 47 496
Usbekistan
Čapkovského 21 I-20060 Truccazzano (Milano) Telefax: +381 11 26 48 340
Представительство ГРУНДФОС в
779 00 Olomouc Tel.: +39-02-95838112
Singapore Ташкенте
Phone: +420-585-716 111 Telefax: +39-02-95309290 / 95838461
GRUNDFOS (Singapore) Pte. Ltd. 700000 Ташкент ул.Усмана Носира 1-й
Telefax: +420-585-716 299 Japan 24 Tuas West Road тупик 5
GRUNDFOS Pumps K.K. Jurong Town Телефон: (3712) 55-68-15
Gotanda Metalion Bldg. 5F, Singapore 638381 Факс: (3712) 53-36-35
5-21-15, Higashi-gotanda Phone: +65-6865 1222
Shiagawa-ku, Tokyo, Telefax: +65-6861 8402
141-0022 Japan
Phone: +81 35 448 1391
Telefax: +81 35 448 9619
Addresses revised 18.12.2008

15.710336 V1.0 95 714304 0209


Sust.
15.710070 V. 1.0
Sust.
96 681332 1004 GB
15.710001 V. 1.0 96 681297 1004
20

Anda mungkin juga menyukai