Anda di halaman 1dari 1

19.

25
1.75 4.00 4.25 5.00 4.25
0.50
3.50 4.25 3.50 1.50 3.25 1.00
125
125

C2
1.50

125 125 125 125


125

125

125

125
NOTES
C2 C2 C2
C2
4.50

1- Steel fy not less than 460 N/mm2.


2- Concrete fcu should not be less
3.00

than 30N/mm2 for 28days strength.


3-Max-Aggregate size 20mm for
beams & col.s and 30mm for found.s.
125
4- Concrete cover for reinforcement
125

should not be less than


C2
1.25

25mm for beams & columns and


125 125
50mm for foundations.

125

125
125

125

C1 5- Over laps of steel should not be less


C1
125 125 C1 C2 than 45 times larger bar size &should
always be located within concrete
2.75

being under compression.


5.75

6- Construction joints shall be located


at onefifth of span of slabs.
125 125
7- All Dimensions are in mm.
125

125
8- Bearing Capacity= 180 KN/m2.
C1 C1
18.75
18.75

1.75

1,40
125 125 C2
125

125

125
C2 FC C1
2,30

1,80
2,00 2,00 125
2.50

5,40 125
4.25

Bilbaraka For Engineering Consultancy


125

250
Khartoum - Sudan

125
125
Almanshia - Altayeb A.Allah St.
C1 C2 Mob. : +249912910731
125 C1 Email: taha.elnour@gmail.com
1.75

125
125 19

250
RESIDENTIAL BUILDING
125

C2 C1 ‫ض‬/4
KHARTOUM WEST
2.50
2.50

MR. JAAFER SALIH ABDUL MUTA'AL

125

125

125

125

125
C2 C2 C2
C2 C2
1.75
1.75

125 125 125 125 125 LIFT FOUNDATION


Eng. NIVIN IBRAHIM
Eng. Sharif Abdallah Agban
Eng. Taha Elnour Isshage
LIFT FOUNDATION JULY-2018 ST-07

Anda mungkin juga menyukai