Weekly Coordination Meeting Agenda

1. Distribution Planning Issues (LV & MV)


Project
No. Project Name Stage Comments
No.
 KM-E to respond for the design enquiry sent on 6th August 2015 by providing the design of LV, MV and HV network layouts including
QS028 Birkat Al Awammer D
1.1 Primary Substation details.

 KM-E to respond for the design enquiry sent on 31 st. August 2015 by providing the design of LV, MV and HV network layouts including
1.2 QS004 Wadi Abi Saleel P Primary Substation details.

 KM-E to respond for the design enquiry sent on 9 th September 2015 by providing the latest existing / proposed electrical Network ( HV /
EHV, LV, MV and any other related information).
1.3 QS036 Al Wukair South T
 New Transmission requirements raised from previous meeting dated 14th. September 2015 to be discussed.

2. HV/EHV Existing Transmission Issues (O&M)

3. HV/EHV Planning Transmission Issues


3.1