METRADOS

OBRA : "CONSTRUCCION DE INFRAESTUCTURA PARA USOS MULTIPLES" - DISTRITO SAN JOSE DE LOURDES
PROPIETARIO :MUNICIPALIDAD DISTRITAL SAN JOSE DE LOURDES UBICACIÓN
HOJA : ESTRUCTURAS LUGAR SAN JOSE DE LOURDES
DISTRITO SAN JOSE DE LOURDES
PROVINCIA SAN IGNACIO
DPTO. CAJAMARCA
1.00.00 Obras Preliminares.
CODIGO DESCRIPCION UND CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
1.01.00 Cartel de Obra UND 1.00 1.00 1.00
1.00
1.02.00 Limpieza de Terreno m2 1.00 1.00 26.50 18.00 477.00
477.00
1.03.00 Trazo y Replanteo. m2 1.00 1.00 26.50 18.00 477.00
477.00

2.00.00 MOVIMIENTO DE TIERRAS.


CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
2.01.00 Zapatas.
Z1 m3 4.00 1.00 1.95 1.95 1.25 19.01
Z2 m3 6.00 1.00 1.55 1.55 1.25 18.02
Z3 m3 3.00 1.00 1.70 1.70 1.25 10.84
Z4 m3 2.00 1.00 2.00 2.00 1.25 10.00
Z5 m3 5.00 1.00 1.30 1.30 1.25 10.56
Z6 m3 1.00 1.00 1.00 1.00 1.25 1.25
69.68
2.02.00 Excavacion de Cimientos
Eje A-A m3 1.00 1.00 3.76 0.50 1.10 2.07
Eje B-B m3 1.00 1.00 8.85 0.50 1.10 4.87
Eje B-B - solado m3 1.00 1.00 1.65 0.50 0.70 0.58
Eje C-C m3 1.00 1.00 7.11 0.50 1.10 3.91
Eje C-C - solado m3 1.00 1.00 2.35 0.50 0.70 0.82
Eje D-D m3 1.00 1.00 11.61 0.50 1.10 6.39
Eje 1 m3 1.00 1.00 3.22 0.50 1.30 2.09
Eje 1 - solado m3 1.00 1.00 3.20 0.50 0.90 1.44
Eje 2 m3 1.00 1.00 3.80 0.50 0.90 1.71
Eje 2 - solado m3 1.00 1.00 0.60 0.50 1.30 0.39
Eje 3 m3 1.00 1.00 3.80 0.50 0.90 1.71
Eje 4 - A-B m3 1.00 1.00 2.45 0.50 1.30 1.59
Eje 4 - B-D m3 1.00 1.00 4.25 0.50 1.30 2.76
Eje 5 m3 1.00 1.00 6.45 0.50 1.30 4.19
Eje 6 - A-B m3 1.00 1.00 3.50 0.50 1.10 1.93
Eje 6 m3 1.00 1.00 6.60 0.50 1.30 4.29
Entre Eje.1 Y B-C m3 1.00 1.00 5.69 0.50 1.10 3.13
Entre Eje.1-2 Y C-D m3 1.00 1.00 4.23 0.50 0.80 1.69
Entre Eje.3-4 Y B-D m3 1.00 1.00 9.70 0.50 0.80 3.88
Entre Eje.A-B Y 4-6 m3 1.00 1.00 6.10 0.50 0.80 2.44
Entre Eje.5-6 Y B-D m3 1.00 1.00 5.83 0.50 0.80 2.33
Excavacion en escalera m3 1.00 1.00 0.50 1.60 0.55 0.44
54.65

CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO ANCHO ALTURA
2.03.00 Relleno Con Material Propio seleccionado
Z1 m3 4.00 1.00 1.70 1.70 0.80 9.25
Z2 m3 6.00 1.00 1.30 1.30 0.80 8.11
Z3 m3 3.00 1.00 1.45 1.45 0.80 5.05
Z4 m3 2.00 1.00 1.75 1.75 0.80 4.90
Z5 m3 5.00 1.00 1.05 1.05 0.80 4.41
Z6 m3 1.00 1.00 0.75 0.75 0.80 0.45
Eje A-A m3 1.00 1.00 3.76 0.20 0.60 0.45
Eje B-B m3 1.00 1.00 8.85 0.20 0.60 1.06
Eje B-B - solado m3 1.00 1.00 1.65 0.20 0.60 0.20
Eje C-C m3 1.00 1.00 7.11 0.20 0.60 0.85
Eje C-C - solado m3 1.00 1.00 2.35 0.20 0.60 0.28
Eje D-D m3 1.00 1.00 11.61 0.20 0.60 1.39
Eje 1 m3 1.00 1.00 3.22 0.20 0.60 0.39
Eje 1 - solado m3 1.00 1.00 3.20 0.20 0.60 0.38
Eje 2 m3 1.00 1.00 3.80 0.20 0.60 0.46
Eje 2 - solado m3 1.00 1.00 0.60 0.20 0.60 0.07
Eje 3 m3 1.00 1.00 3.80 0.20 0.60 0.46
Eje 4 - A-B m3 1.00 1.00 2.45 0.20 0.60 0.29
Eje 4-B-D m3 1.00 1.00 4.25 0.20 0.60 0.51
Eje 5 m3 1.00 1.00 6.45 0.20 0.60 0.77
Eje 6 - A-B m3 1.00 1.00 3.50 0.20 0.60 0.42
Eje 6 m3 1.00 1.00 6.60 0.20 0.60 0.79
Entre Eje.1 Y B-C m3 1.00 1.00 5.69 0.35 0.30 0.60
Entre Eje.1-2 Y C-D m3 1.00 1.00 4.23 0.35 0.30 0.44
Entre Eje.3-4 Y B-D m3 1.00 1.00 9.70 0.35 0.30 1.02
Entre Eje.A-B Y 4-6 m3 1.00 1.00 6.10 0.35 0.30 0.64
Entre Eje.5-6 Y B-D m3 1.00 1.00 5.83 0.35 0.30 0.61
44.26

CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES INDICE PARCIAL TOTAL
PERIMETRO
2.04.00 Eliminacion de Material Exedente.
Material de Excavacion m3 80.32
80.32

3.00.00 OBARAS DE CONCRETO SIMPLE.


CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
3.01.00 SOLADO PARA ZAPATAS E=4", 1:12 C:H
S1 Z1 m2 4.00 1.00 1.95 1.95 15.21
S2 Z2 m2 6.00 1.00 1.55 1.55 14.42
S3 Z3 m2 3.00 1.00 1.70 1.70 8.67
S4 Z4 m2 2.00 1.00 2.00 2.00 8.00
S5 Z5 m2 5.00 1.00 1.30 1.30 8.45
S6 Z6 m2 1.00 1.00 1.00 1.00 1.00
Eje A-A - solado m2 1.00 1.00 1.00 0.30 0.30
Eje B-B - solado m2 1.00 1.00 3.35 0.30 1.01
Eje C-C - solado m2 1.00 1.00 10.00 0.30 3.00
Eje D-D - solado m2 1.00 1.00 3.00 0.30 0.90
Eje 1 - solado m2 1.00 1.00 3.20 0.30 0.96
Eje 2 - solado m2 1.00 1.00 3.80 0.30 1.14
Eje 3 - solado m2 1.00 1.00 3.80 0.30 1.14
Eje 4 - solado m2 1.00 1.00 0.40 0.30 0.12
Eje 5 - solado m2 1.00 1.00 2.08 0.30 0.62
64.93

CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO ANCHO ALTURA
3.02.00 CIMIENTOS CORRIDOS MEZCLA =1:10 CEM-HORM. + 20% PIEDRA.
Eje A-A m3 1.00 1.00 3.76 0.50 0.50 0.94
Eje B-B m3 1.00 1.00 8.75 0.50 0.50 2.19
Eje C-C m3 1.00 1.00 6.00 0.50 0.50 1.50
Eje D-D m3 1.00 1.00 11.71 0.50 0.50 2.93
Eje 1 m3 1.00 1.00 8.22 0.50 0.50 2.06
Eje 2 m3 1.00 1.00 0.60 0.50 0.50 0.15
Eje 4 m3 1.00 1.00 6.70 0.50 0.50 1.68
Eje 5 m3 1.00 1.00 6.45 0.50 0.50 1.61
Eje 6 m3 1.00 1.00 10.09 0.50 0.50 2.52
Entre Eje.A-B 4-6 m3 1.00 1.00 6.20 0.50 0.50 1.55
Entre Eje.B-C 3-6 m3 1.00 1.00 16.44 0.50 0.50 4.11
Entre Eje.C-D 1-2 m3 1.00 1.00 5.51 0.50 0.50 1.38
Entre Eje.D 2-3 m3 1.00 1.00 0.60 0.50 0.50 0.15
22.76

CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO ANCHO ALTURA
3.03.00 SOBRECIMIENTOS DE CONCRETO 1:8 C:H+25% PM
Eje A-A m3 1.00 1.00 6.75 0.15 0.55 0.56
Eje B-B m3 1.00 1.00 15.35 0.15 0.55 1.27
Eje C-C m3 1.00 1.00 8.70 0.15 0.55 0.72
Eje D-D m3 1.00 1.00 15.55 0.15 0.55 1.28
Eje 1 m3 1.00 1.00 3.38 0.15 0.55 0.28
Eje 2 m3 1.00 1.00 0.60 0.15 0.55 0.05
Eje 4 m3 1.00 1.00 4.20 0.15 0.55 0.35
Eje 4 m3 1.00 1.00 6.30 0.25 0.55 0.87
Eje 5 m3 1.00 1.00 1.65 0.15 0.55 0.14
Eje 5 m3 1.00 1.00 6.30 0.25 0.55 0.87
Eje 6 m3 1.00 1.00 5.99 0.15 0.55 0.49
Eje 6 m3 1.00 1.00 8.10 0.25 0.55 1.11
Entre Eje.A-B 4-6 m3 1.00 1.00 6.85 0.15 0.55 0.57
Entre Eje.B-C 1 m3 1.00 1.00 5.35 0.15 0.55 0.44
Entre Eje.B-C 3-6 m3 1.00 1.00 19.85 0.15 0.55 1.64
Entre Eje.C-D 1-2 m3 1.00 1.00 4.85 0.15 0.55 0.40
Entre Eje.D 2-3 m3 1.00 1.00 0.60 0.15 0.55 0.05
11.02

CODIGO DESCRIPCION UND. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO CARAS ANCHO
3.04.00 Encofrado de Sobrecimiento.
Eje A-A m2 1.00 6.75 2.00 0.55 7.43
Eje B-B m2 1.00 15.35 2.00 0.55 16.89
Eje C-C m2 1.00 8.70 2.00 0.55 9.57
Eje D-D m2 1.00 15.55 2.00 0.55 17.11
Eje 1 m2 1.00 3.38 2.00 0.55 3.72
Eje 2 m2 1.00 0.60 2.00 0.55 0.66
Eje 4 m2 1.00 10.50 2.00 0.55 11.55
Eje 5 m2 1.00 7.95 2.00 0.55 8.75
Eje 6 m2 1.00 14.09 2.00 0.55 15.50
Entre Eje.A-B 4-6 m2 1.00 6.85 2.00 0.55 7.54
Entre Eje.B-C 1 m2 1.00 5.35 2.00 0.55 5.89
Entre Eje.B-C 3-6 m2 1.00 19.85 2.00 0.55 21.84
Entre Eje.C-D 1-2 m2 1.00 4.85 2.00 0.55 5.34
Entre Eje.D 2-3 m2 1.00 0.60 2.00 0.55 0.66
132.41

4.00.00 OBARAS DE CONCRETO ARMADO.


4.01.00 ZAPATAS
CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
4.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2
Z1 m3 4.00 1.00 1.95 1.95 0.50 7.61
Z2 m3 6.00 1.00 1.55 1.55 0.50 7.21
Z3 m3 3.00 1.00 1.70 1.70 0.50 4.34
Z4 m3 2.00 1.00 2.00 2.00 0.50 4.00
Z5 m3 5.00 1.00 1.30 1.30 0.50 4.23
Z6 m3 1.00 1.00 1.00 1.00 0.50 0.50
27.87

CODIGO DESCRIPCION CANT. REP. CANT.


DIMENSIONES LONGITUD TOTAL POR DISEÑO.
Ø
ELEMENT LONG. UND. 1/4" 3/8" 1/2"
4.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS FY=4200 KG/CM2 0.25 0.58 1.60
Z1 1/2" 4.00 22.00 1.87 ml. 164.56
Z2 1/2" 6.00 18.00 1.47 ml. 158.76
Z3 1/2" 3.00 18.00 1.62 ml. 87.48
Z4 1/2" 2.00 22.00 1.92 ml. 84.48
Z5 1/2" 5.00 14.00 1.22 ml. 85.40
Z6 1/2" 1.00 10.00 0.92 ml. 9.20
LONGITUD TOTAL POR DIAMETRO 589.88
KILOGRAMO POR DIAMETRO 943.81
Nº VARILLAS 65.54
TOTAL EN KG 943.81

4.02.00 VIGAS DE CIMENTACION


CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
4.02.01 CONCRETO EN VIGAS DE CIMENTACION F¨C = 210 KG/CM2.
Eje. A m3 1.00 1.00 6.75 0.30 0.30 0.61
Eje. B-C m3 2.00 1.00 18.70 0.30 0.30 3.37
Eje. D m3 1.00 1.00 18.45 0.30 0.30 1.66
Eje. 1 m3 1.00 1.00 9.75 0.30 0.50 1.46
Eje 2 m3 1.00 1.00 8.70 0.30 0.50 1.31
Eje 3 m3 1.00 1.00 7.70 0.30 0.50 1.16
Eje 4-6(A-B) m3 2.00 1.00 4.20 0.30 0.30 0.76
Eje 4-6(B-D) m3 2.00 1.00 7.70 0.30 0.50 2.31
Eje 5(A-B) m3 1.00 1.00 4.25 0.30 0.50 0.64
Eje 5(B-D) m3 1.00 1.00 9.85 0.30 0.50 1.48
Entre Eje.B-C 1 m3 1.00 1.00 5.35 0.30 0.30 0.48
15.22

CODIGO DESCRIPCION CANT. REP. CANT. DIMENSIONES LONGITUD TOTAL POR DISEÑO.
Ø
ELEMENT LONG. UND. 1/4" 3/8" 1/2" 5/8"
4.02.02 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION FY=4200 KG/CM2 0.25 0.58 1.02 1.60
* VC 02 Eje. 1 5/8" 1.00 6.00 12.18 ml. 73.08
VC 02 Eje. 1 1/2" 1.00 2.00 11.14 ml. 22.28
Estribos 3/8" 1.00 75.00 1.32 ml. 99.00
* VC 02 Eje. 2 5/8" 1.00 6.00 11.06 ml. 66.36
VC 02 Eje. 2 1/2" 1.00 2.00 10.00 ml. 20.00
Estribos 3/8" 1.00 63.00 1.32 ml. 83.16
* VC 02 Eje. 3 5/8" 1.00 6.00 10.46 ml. 62.76
VC 02 Eje. 3 1/2" 1.00 2.00 8.90 ml. 17.80
Estribos 3/8" 1.00 60.00 1.32 ml. 79.20
* VC 01 - VC 02 Eje. 4 5/8" 1.00 3.00 14.76 ml. 44.28
VC 01 Eje. 4 5/8" 1.00 2.00 5.36 ml. 10.72
VC 02 Eje. 4 5/8" 1.00 3.00 10.46 ml. 31.38
VC 02 Eje. 4 1/2" 1.00 2.00 8.90 ml. 17.80
Estribos Eje. A-B 3/8" 1.00 30.00 0.97 ml. 29.10
Estribos Eje. B-D 3/8" 1.00 60.00 1.32 ml. 79.20
* VC 02 Eje. 5 5/8" 1.00 6.00 15.60 ml. 93.60
VC 02 Eje. 5 1/2" 1.00 2.00 15.14 ml. 30.28
Estribos. 3/8" 1.00 90.00 1.32 ml. 118.80
* VC 01 - VC 02 Eje. 5 5/8" 1.00 3.00 16.50 ml. 49.50
VC 01 Eje. 5 5/8" 1.00 2.00 5.36 ml. 10.72
VC 02 Eje. 5 5/8" 1.00 3.00 12.20 ml. 36.60
VC 02 Eje. 5 1/2" 1.00 2.00 10.64 ml. 21.28
Estribos Eje. A-B 3/8" 1.00 30.00 0.97 ml. 29.10
Estribos Eje. B-D 3/8" 1.00 76.00 1.32 ml. 100.32
LONGITUD TOTAL POR DIAMETRO 617.88 129.44 479.00
KILOGRAMO POR DIAMETRO 358.37 132.03 766.40
Nº VARILLAS 68.65 14.38 53.22
TOTAL EN KG 1256.80

CODIGO DESCRIPCION UND. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO CARAS ANCHO
4.02.03 Encofrado en Vigas.
Eje. A m2 1.00 6.75 2.00 0.30 4.05
Eje. B-C m2 1.00 18.70 2.00 0.30 11.22
Eje. D m2 1.00 18.45 2.00 0.30 11.07
Eje. 1 m2 1.00 9.75 2.00 0.50 9.75
Eje 2 m2 1.00 8.70 2.00 0.50 8.70
Eje 3 m2 1.00 7.70 2.00 0.50 7.70
Eje 4-6(A-B) m2 2.00 4.20 2.00 0.30 5.04
Eje 4-6(B-D) m2 2.00 7.70 2.00 0.50 15.40
Eje 5(A-B) m2 1.00 4.25 2.00 0.50 4.25
Eje 5(B-D) m2 1.00 9.85 2.00 0.50 9.85
Entre Eje.B-C 1 m2 1.00 5.35 2.00 0.30 3.21
90.24

4.03.00 COLUMNAS.
CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
4.03.01 COLUMNAS DE CONCRETO F'C= 210 KG/CM2 1 PISO
C1 m3 7.00 1.00 0.30 0.30 3.80 2.39
C2 m3 6.00 1.00 0.50 0.30 3.80 3.42
C3 m3 6.00 1.00 0.30 0.30 3.80 2.05
C4 m3 4.00 1.00 0.15 0.25 3.60 0.54
C5 m3 1.00 1.00 0.25 0.25 3.80 0.24
C6 m3 1.00 1.00 0.05 3.80 0.19
COLUMNAS DE CONCRETO F'C= 210 KG/CM2 2 PISO
C1 m3 5.00 1.00 0.30 0.30 3.30 1.49
C2 m3 6.00 1.00 0.50 0.30 3.00 2.70
C3 m3 6.00 1.00 0.30 0.30 3.30 1.78
C5 m3 1.00 1.00 0.25 0.25 3.30 0.21
C6 m3 1.00 1.00 0.05 3.30 0.17
15.17
CODIGO DESCRIPCION NºREPET. CANT. DIMENSIONES LONGITUD TOTAL POR DISEÑO.
Ø
ELEMENT LONG. UND. 1/4" 3/8" 1/2" 5/8"
4.03.02 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS FY=4200 KG/CM2 0.25 0.58 1.02 1.60
C-1 5/8" 4.00 4.00 8.61 ml. 137.76
C-1 1/2" 4.00 2.00 8.61 ml. 68.88
ESTRIBOS C-1 3/8" 4.00 46.00 0.97 ml. 178.48
C-1 5/8" 3.00 4.00 4.99 ml. 59.88
C-1 1/2" 3.00 2.00 4.99 ml. 29.94
ESTRIBOS C-1 3/8" 3.00 25.00 0.97 ml. 72.75
C-2 5/8" 6.00 4.00 8.61 ml. 206.64
C-2 1/2" 6.00 4.00 8.61 ml. 206.64
ESTRIBOS C-2 3/8" 6.00 46.00 1.37 ml. 378.12
C-3 5/8" 5.00 4.00 8.61 ml. 172.20
ESTRIBOS C-3 3/8" 5.00 46.00 0.97 ml. 223.10
C-4 1/2" 4.00 4.00 4.54 ml. 72.64
ESTRIBOS C-4 3/8" 4.00 41.00 0.49 ml. 80.36
C-5 1/2" 1.00 4.00 8.61 ml. 34.44
ESTRIBOS C-5 3/8" 1.00 46.00 0.77 ml. 35.42
C-6 1/2" 1.00 4.00 8.61 ml. 34.44
ESTRIBOS C-6 3/8" 1.00 46.00 0.80 ml. 36.80
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS FY=4200 KG/CM2 2º PISO
C-1 5/8" 4.00 4.00 8.61 ml. 137.76
C-1 1/2" 4.00 2.00 8.61 ml. 68.88
ESTRIBOS C-1 3/8" 4.00 46.00 0.97 ml. 178.48
C-1 5/8" 3.00 4.00 4.99 ml. 59.88
C-1 1/2" 3.00 2.00 4.99 ml. 29.94
ESTRIBOS C-1 3/8" 3.00 25.00 0.97 ml. 72.75
C-2 5/8" 6.00 4.00 8.61 ml. 206.64
C-2 1/2" 6.00 4.00 8.61 ml. 206.64
ESTRIBOS C-2 3/8" 6.00 46.00 1.37 ml. 378.12
C-3 5/8" 5.00 4.00 8.61 ml. 172.20
ESTRIBOS C-3 3/8" 5.00 46.00 0.97 ml. 223.10
C-4 1/2" 4.00 4.00 4.54 ml. 72.64
ESTRIBOS C-4 3/8" 4.00 41.00 0.49 ml. 80.36
C-5 1/2" 1.00 4.00 8.61 ml. 34.44
ESTRIBOS C-5 3/8" 1.00 46.00 0.77 ml. 35.42
C-6 1/2" 1.00 4.00 8.61 ml. 34.44
ESTRIBOS C-6 3/8" 1.00 46.00 0.80 ml. 36.80
LONGITUD TOTAL POR DIAMETRO 2010.06 893.96 1152.96
KILOGRAMO POR DIAMETRO 1165.83 911.84 1844.74
Nº VARILLAS 223.34 99.33 128.11
TOTAL EN KG 3922.41

CODIGO DESCRIPCION UND. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO CARAS ANCHO
4.03.03 Encofrado en Columnas 1 PISO
C1 m3 7.00 3.80 2.00 0.60 31.92
C2 m3 6.00 3.80 2.00 0.80 36.48
C3 m3 6.00 3.80 2.00 0.60 27.36
C4 m3 4.00 3.60 2.00 0.40 11.52
C5 m3 1.00 3.80 2.00 0.50 3.80
C6 m3 1.00 3.80 4.00 0.25 3.80
Encofrado en Columnas 2 PISO
C1 m3 7.00 3.30 2.00 0.60 27.72
C2 m3 6.00 3.00 2.00 0.80 28.80
C3 m3 6.00 3.30 2.00 0.60 23.76
C5 m3 1.00 3.30 2.00 0.50 3.30
C6 m3 1.00 3.30 4.00 0.25 3.30
201.76

4.04.00 ESCALERAS
CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
ALTURA LARGO ANCHO
4.04.01 ESCALERA DE CONCRETO F'C= 210 KG/CM2
1º Escalon-Fondo m3 1.00 1.00 0.38 1.60 0.61
2º Escalon m3 1.00 1.00 0.04 1.60 0.07
Escalones Intermedios 1ºParte m3 8.00 1.00 0.07 1.60 0.87
Escalon- Antes 1ºDescanso m3 1.00 1.00 0.08 1.60 0.12
1º Descanso m3 1.00 1.00 0.15 4.10 0.62
2º Descanso m3 1.00 1.00 0.15 2.22 0.33
Escalon-Despues 2ºDescanso m3 1.00 1.00 0.07 1.60 0.11
Escalones Intermedios 2ºParte m3 5.00 1.00 0.27 1.60 2.16
Escalon Fin de Escalera m3 1.00 1.00 0.07 1.60 0.11
4.99

CODIGO DESCRIPCION NºREPET. CANT. DIMENSIONES LONGITUD TOTAL POR DISEÑO.


Ø
ELEMENT LONG. UND. 1/4" 3/8" 1/2" 5/8"
4.04.02 ACERO ESTRUCTURAL TRABAJADO PARA ESCALERAS FY=4200 KG/CM2 0.25 0.58 1.02 1.60
Inferior 1ºParte Escalera @0.15 1/2" 1.00 11.00 2.01 ml 22.11
Inferior 1ºParte Escalera @0.15 1/2" 1.00 11.00 1.81 ml 19.91
Inferior 1ºParte Escalera @0.20 1/2" 1.00 14.00 1.60 ml 22.40
Superior 1ºParte Escalera@0.15 1/2" 1.00 11.00 3.78 ml 41.58
Superior 1ºParte Escalera@0.15 1/2" 1.00 11.00 3.78 ml 41.58
Superior 1ºParte Escalera@0.20 1/2" 1.00 16.00 1.60 ml 25.60

1ºDescanso-Inferior @0.20 1/2" 1.00 10.00 1.76 ml 17.60


1ºDescanso-Inferior @0.20 1/2" 1.00 10.00 1.44 ml 14.40
1ºDescanso-Superior@0.20 1/2" 1.00 10.00 2.40 ml 24.00
1ºDescanso-Inferior @0.20 1/2" 1.00 9.00 2.10 ml 18.90
1ºDescanso-Superior@0.20 1/2" 1.00 9.00 2.10 ml 18.90

2ºDescanso-Inferior @0.20 1/2" 1.00 8.00 2.27 ml 18.16


2ºDescanso-Inferior @0.20 1/2" 1.00 8.00 1.44 ml 11.52
2ºDescanso-Superior@0.20 1/2" 1.00 8.00 2.01 ml 16.08
2ºDescanso-Inferior @0.20 1/2" 1.00 10.00 1.60 ml 16.00
2ºDescanso-Superior@0.20 1/2" 1.00 10.00 1.60 ml 16.00

Inferior 2ºParte Escalera @0.15 1/2" 1.00 11.00 0.71 ml 7.81


Inferior 2ºParte Escalera @0.15 1/2" 1.00 11.00 1.02 ml 11.22
Inferior 2ºParte Escalera @0.20 1/2" 1.00 9.00 1.60 ml 14.40
Superior 2ºParte Escalera@0.15 1/2" 1.00 11.00 1.73 ml 19.03
Superior 2ºParte Escalera@0.20 1/2" 1.00 9.00 1.60 ml 14.40
LONGITUD TOTAL POR DIAMETRO 411.60
KILOGRAMO POR DIAMETRO 419.83
Nº VARILLAS 45.73
TOTAL EN KG 419.83

CODIGO DESCRIPCION UND. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LARGO ANCHO CARAS
4.04.03 Encofrado en Escalera
fondo de escalera tramo nº1 m2 1.00 2.99 1.60 1.00 4.78
fondo de escalera tramo nº2 m2 1.00 1.74 1.60 1.00 2.78
pimer peldano o costado m2 1.00 0.25 0.18 1.00 0.05
segundo peldaño o costado 1º Parte m2 8.00 0.07 1.00 0.56
Segundo peldaño o costado 2º Parte m2 5.00 0.07 1.00 0.34
1º Descanso m3 1.00 4.10 1.00 4.10
2º Descanso m3 1.00 2.22 1.00 2.22
14.83

4.05.00 VIGAS.
CODIGO DESCRIPCION UND. CANT. REP. Nº ELEM. DIMENSIONES PARCIAL TOTAL
LARGO ANCHO ALTURA
4.05.01 VIGAS DE CONCRETO F'C= 210 KG/CM2 1 PISO
VP - Eje. 1 m3 1.00 1.00 5.50 0.30 0.30 0.50
VP101 - Eje. 2-3-4-5 B-C m3 1.00 4.00 5.50 0.30 0.40 2.64
VP101 - Eje. 2-3-4-5 C-D m3 1.00 4.00 3.50 0.30 0.30 1.26
VP - Eje. 6 m3 1.00 1.00 9.00 0.30 0.30 0.81
VP - Eje 4-5 A-B m3 1.00 2.00 4.50 0.30 0.30 0.81
V-P - Eje. 6 m3 1.00 1.00 4.50 0.25 0.30 0.34
V-A - Eje. A m3 1.00 1.00 7.60 0.25 0.30 0.57
V-A - Eje. B-C-D m3 1.00 3.00 18.70 0.25 0.30 4.21
V-CH Eje. 1-2 C-D m3 1.00 1.00 3.25 0.25 0.20 0.16
V-CH Eje.5-6 A-B m3 1.00 1.00 4.25 0.20 0.20 0.17
VB Eje. 1-3 B-D m3 1.00 1.00 15.20 0.15 0.20 0.46
VIGAS DE CONCRETO F'C= 210 KG/CM2 2 PISO
VP - Eje. 1-1 m3 1.00 1.00 9.40 0.30 0.30 0.85
VP - Eje. 2 m3 1.00 1.00 9.00 0.30 0.40 1.08
VP201 - Eje. 3 m3 1.00 1.00 9.00 0.30 0.60 1.62
VP201 - Eje. 4-5 m3 1.00 2.00 13.50 0.30 0.60 4.86
V-A - Eje. 6 m3 1.00 1.00 13.50 0.30 0.30 1.22
V-A - Eje. A m3 1.00 1.00 6.75 0.25 0.30 0.51
V-A - Eje. B-D m3 1.00 2.00 18.70 0.25 0.30 2.81
V-CH Eje.5-6 A-B m3 1.00 1.00 4.25 0.20 0.20 0.17
VB Eje. 1-3 B-D m3 1.00 1.00 15.20 0.15 0.20 0.46
* VIGA EN ESCALERA
VIGA V-1 m3 1.00 1.00 1.83 0.25 0.25 0.11
VIGA V-1 m3 1.00 1.00 1.83 0.25 0.25 0.43
26.02

CODIGO DESCRIPCION CANT. REP. CANT. DIMENSIONES LONGITUD TOTAL POR DISEÑO.
Ø
ELEMENT LONG. UND. 3/8" 1/2" 5/8" 3/4" 1"
4.05.02 ACERO PARA VIGAS FY=4200 KG/CM2 1 PISO 0.58 1.02 1.60 2.28 4.05
* VP Eje. 1 3/4" 1.00 2.00 5.86 ml. 11.72
VP Eje. 1 5/8" 1.00 2.00 5.86 ml. 11.72
Refuerzo + 3/4" 1.00 2.00 2.13 ml. 4.26
Refuerzo - 5/8" 1.00 1.00 3.00 ml. 3.00
Estribos. 3/8" 1.00 31.00 0.97 ml. 30.07

* VP Eje. 6 3/4" 1.00 2.00 10.26 ml. 20.52


VP Eje. 6 5/8" 1.00 2.00 10.26 ml. 20.52
Refuerzo + 3/4" 1.00 2.00 3.26 ml. 6.52
Refuerzo - 5/8" 1.00 1.00 3.00 ml. 3.00
Estribos. 3/8" 1.00 62.00 0.97 ml. 60.14

* VP Eje. 2-3 5/8" 2.00 2.00 10.46 ml. 41.84


VP Eje. 2-3 5/8" 2.00 2.00 6.06 ml. 24.24
VP Eje. 2-3 5/8" 2.00 2.00 4.16 ml. 16.64
Refuerzo + 1" 2.00 3.00 7.24 ml. 43.44
Refuerzo - 1/2" 2.00 1.00 2.90 ml. 5.80
Estribos. 3/8" 2.00 62.00 1.17 ml. 145.08
* VP201 Eje. 4-5 3/4" 2.00 2.00 14.06 ml. 56.24 56.24
VP201 Eje. 4-5 5/8" 2.00 2.00 4.92 ml. 19.68
VP201 Eje. 4-5 5/8" 2.00 2.00 6.06 ml. 24.24
VP201 Eje. 4-5 5/8" 2.00 2.00 4.16 ml. 16.64
Refuerzo + 5/8" 1.00 2.00 9.22 ml. 18.44
Refuerzo + 5/8" 1.00 1.00 4.46 ml. 4.46
Refuerzo - 5/8" 2.00 2.00 2.90 ml. 11.60
Estribos. 3/8" 1.00 92.00 1.57 ml. 144.44

* VA Eje. A 1/2" 1.00 4.00 7.96 ml. 31.84


Estribos. 3/8" 1.00 48.00 1.57 ml. 75.36

* VA Eje. B-D 1/2" 3.00 4.00 21.16 ml. 253.92


Estribos. 3/8" 3.00 129.00 1.57 ml. 607.59

* V CH Eje.1-2 C-D 1/2" 1.00 4.00 3.91 ml. 15.64


Estribos. 3/8" 1.00 28.00 0.57 ml. 15.96

* V CH Eje.5-6 A-B 1/2" 1.00 4.00 4.91 ml. 19.64


Estribos. 3/8" 1.00 30.00 0.57 ml. 17.10

* V-B Eje.1-3 B-D 1/2" 1.00 2.00 15.49 ml. 30.98


Estribos. 3/8" 1.00 76.00 0.36 ml. 27.36
CODIGO DESCRIPCION CANT. REP. CANT. DIMENSIONES LONGITUD TOTAL POR DISEÑO.
Ø
ELEMENT LONG. UND. 3/8" 1/2" 5/8" 3/4" 1"
ACERO PARA VIGAS FY=4200 KG/CM2 2 PISO 0.58 1.02 1.60 2.28 4.05
* VP Eje. 1-6 3/4" 2.00 2.00 10.26 ml. 41.04
VP Eje. 1-6 5/8" 2.00 2.00 10.06 ml. 40.24
Refuerzo + 5/8" 2.00 2.00 3.26 ml. 13.04
Refuerzo - 5/8" 2.00 1.00 3.00 ml. 6.00
Estribos. 3/8" 2.00 62.00 0.97 ml. 120.28

* VP Eje. 2 3/4" 1.00 2.00 10.46 ml. 20.92


VP Eje. 2 5/8" 1.00 2.00 10.26 ml. 20.52
Refuerzo + 5/8" 1.00 3.00 6.32 ml. 18.96
Refuerzo - 5/8" 1.00 1.00 3.00 ml. 3.00
Estribos. 3/8" 1.00 62.00 1.17 ml. 72.54
* VP201 Eje. 3 1" 1.00 2.00 10.96 ml. 21.92
VP201 Eje. 3 3/4" 1.00 2.00 10.86 ml. 21.72
VP201 Eje. 3 5/8" 1.00 4.00 10.66 ml. 42.64
VP201 Eje. 3 1/2" 1.00 2.00 10.46 ml. 20.92
Refuerzo + 5/8" 1.00 2.00 6.32 ml. 12.64
Refuerzo - 5/8" 1.00 2.00 4.80 ml. 9.60
Estribos. 3/8" 1.00 53.00 1.57 ml. 83.21

* VP201 Eje. 4-5 1" 1.00 2.00 15.27 ml. 30.54


VP201 Eje. 4-5 3/4" 1.00 2.00 15.27 ml. 30.54
VP201 Eje. 4-5 5/8" 1.00 4.00 15.27 ml. 61.08
Refuerzo + 5/8" 1.00 2.00 7.40 ml. 14.80
Refuerzo - 5/8" 1.00 2.00 9.70 ml. 19.40
VP201 Eje. 4-5 1/2" 1.00 2.00 15.27 ml. 30.54
Estribos. 3/8" 1.00 85.00 1.57 ml. 133.45

* VA Eje. A 1/2" 1.00 4.00 7.96 ml. 31.84


Estribos. 3/8" 1.00 48.00 1.57 ml. 75.36
* VA Eje. B-D 1/2" 1.00 4.00 21.16 ml. 84.64
Estribos. 3/8" 1.00 129.00 1.57 ml. 202.53

* V CH Eje.5-6 A-B 1/2" 1.00 4.00 4.91 ml. 19.64


Estribos. 3/8" 1.00 29.00 0.57 ml. 16.53
* V-B Eje.1-3 B-D 1/2" 1.00 2.00 15.49 ml. 30.98
Estribos. 3/8" 1.00 76.00 0.36 ml. 27.36
* VIGA V-1 ESCALERA 1/2" 1.00 2.00 2.59 ml. 5.18
VIGA V-1 ESCALERA 1/2" 1.00 2.00 4.07 ml. 8.14
VIGA V-1 ESCALERA 1/2" 1.00 2.00 2.05 ml. 4.10
VIGA V-1 ESCALERA 1/2" 1.00 2.00 4.25 ml. 8.49
Etribos VIGA V-1 ESCALERA 3/8" 1.00 16.00 0.78 ml. 12.48
Etribos VIGA V-1 ESCALERA 3/8" 1.00 6.00 1.13 ml. 6.78
LONGITUD TOTAL POR DIAMETRO 1873.62 602.29 477.94 213.48 152.14
KILOGRAMO POR DIAMETRO 1086.70 614.34 764.70 486.73 616.17
Nº VARILLAS 208.18 66.92 53.10 23.72 16.90
TOTAL EN KG 3568.64

CODIGO DESCRIPCION UND. Nº ELEM. DIMENSIONES PARCIAL TOTAL


LONG. ALTURA CARAS
4.05.03 Encofrado en Vigas. 1 PISO
* VP - Eje. 1 Lados m2 1.00 4.90 0.10 2.00 0.98
VP - Eje. 1 Fondo m2 1.00 4.90 0.30 1.00 1.47
* VP101 -Eje. 2-3-4-5 B-C Lados m2 4.00 4.90 0.20 2.00 7.84
VP101 -Eje. 2-3-4-5 B-C Fondo m2 4.00 4.90 0.30 1.00 5.88
* VP101 -Eje. 2-3-4-5 C-D Lados m2 4.00 3.50 0.10 2.00 2.80
VP101 -Eje. 2-3-4-5 C-D Fondo m2 4.00 3.50 0.30 1.00 4.20
* VP - Eje. 6 lados m2 1.00 8.40 0.20 2.00 3.36
VP - Eje. 6 Fondo m2 1.00 8.40 0.30 1.00 2.52
* VP - Eje 4-5 A-B Lados m2 2.00 4.20 0.10 2.00 1.68
VP - Eje 4-5 A-B Fondo m2 2.00 4.20 0.30 1.00 2.52
* VP - Eje. 6 Lados m2 1.00 4.25 0.10 2.00 0.85
VP - Eje. 6 Fondo m2 1.00 4.25 0.30 1.00 1.28
* V-A - Eje. A m2 1.00 6.70 0.20 2.00 2.68
V-A - Eje. A m2 1.00 6.70 0.40 1.00 2.68
* V-A - Eje. B-C-D m2 3.00 12.20 0.10 2.00 7.32
V-A - Eje. B-C-D m2 3.00 12.20 0.30 1.00 10.98
* Fondo V-CH Eje.5-6 A-B m2 1.00 4.25 0.20 1.00 0.85
Fondo V-CH Eje. 1-2 C-D m3 1.00 3.25 0.20 1.00 0.65
* FONDO V-B. m2 1.00 15.20 0.15 1.00 2.28
FRISO V-B. m2 1.00 15.20 0.20 1.00 3.04
Encofrado en Vigas. 2 PISO
* Lados VP Eje. 1-6 m2 2.00 8.15 0.10 2.00 3.26
Fondo VP Eje. 1-6 m2 2.00 8.15 0.30 1.00 4.89
* Lados VP - Eje. 2 m2 1.00 8.15 0.20 2.00 3.26
Fondo VP - Eje. 2 m2 1.00 8.15 0.30 1.00 2.45
* Lados VP201 - Eje. 3 m2 1.00 8.00 0.40 2.00 6.40
Fondo VP201 - Eje. 3 m2 1.00 8.00 0.30 1.00 2.40
* Lados VP201 - Eje. 4-5 m2 2.00 12.20 0.40 2.00 19.52
Fondo VP201 - Eje. 4-5 m2 2.00 12.20 0.30 1.00 7.32
* Lados V-A - Eje. 6 m2 1.00 4.25 0.10 2.00 0.85
Fondo V-A - Eje. 6 m2 1.00 4.25 0.25 1.00 1.06
* Lados V-A - Eje. A m2 1.00 6.75 0.10 2.00 1.35
Fondo V-A - Eje. A m2 1.00 6.75 0.25 1.00 1.69
* Lados V-A - Eje. B-D m2 2.00 18.70 0.10 2.00 7.48
Fondo V-A - Eje. B-D m2 2.00 18.70 0.25 1.00 9.35
* Fondo V-CH Eje.5-6 A-B m2 1.00 4.25 0.20 1.00 0.85
* FONDO V-B. m2 1.00 15.20 0.15 1.00 2.28
FRISO V-B. m2 1.00 15.20 0.20 1.00 3.04
* Viga V-1 Lados m2 1.00 1.58 0.10 2.00 0.32
Viga V-1 Fondo m2 1.00 3.25 0.25 1.00 0.81
Viga V-1 Lados m2 1.00 1.73 0.10 2.00 0.35
144.77