Anda di halaman 1dari 67

1

Namami Gange - Component wise Allocation

“Namami Gange – Integrated Ganga Conservation Mission”


approved by Cabinet on 13/05/2015
With an outlay of ₹ 20,000 Cr upto Dec 2020
Component A
Ongoing projects having remaining central liabilities of Rs.7,272 crore

This includes 33 sewerage Projects (630 MLD STP) and 24 Ghats &Crematoria projects.
Component B

New initiatives at an estimated cost of Rs.12,728 crore with 100% central assistance

This includes 102 sewerage Projects (3256 MLD STP) and 37 Ghats &Crematoria
projects.
2
Salient Features

100%
Centrally
funded
programme
Hybrid O&M cost
Annuity for 15 years
based PPP included for
model new
adopted projects

NAMAMI
GANGE
5 year Comprehen
dedicated sive
Budget integrated
allocation programme

Non-
lapsable
fund
3
Namami Gange Projects Overview
Sl Sanction Cost
Projects Undertaken No. of Projects
No (Rs in Cr)
Pollution Abatement Projects
Sewage Infrastructure (94 on Ganga, 8 on
1 102 16984
tributaries)
2 Bioremediation 8 26.94
3 Modular STPs –Decentralised Treatment 20 410
Upcoming Projects on Tributaries (7 states, 31
4 68 Under estimation
tributaries, 68 towns)
Sub total 198 17420.94
5 Rural Sanitation (4465 villages along Ganga) 1 1018
Total 199 18438.94

4
Namami Gange Projects Overview
Sanction Cost
Sl No Projects Undertaken No. of Projects
(Rs in Cr)
River Front, Ghats & Crematoria Projects
1 Ghats & Crematoria (Old) 24 204.39
2 Ghats & Crematoria (New) 37 721.94
3 Ghats Cleaning 1 15.00
4 River Surface Cleaning 1 55.24
5 River Front Development 2 270.55
Sub-total 65 1267.12
Other Projects
6 Institutional Development 6 340.41
Project Implementation Support / Research &
7 2 9.96
Study Projects
8 Biodiversity 4 31.91
9 Afforestation 11 113.28
10 Composite Ecological Task Force 1 167
Sub-total 24 662.56

Grand Total 288 20368.62 5


Status of Sewerage Projects
Status as on May 2014 Status as on May 2018
Under Tendering Process

S. Work- Tender
State STP Comple in- Receive
No. STP Under Tender Projec Tender
Complet Work-in- ts Capacit ted Progre d & Under
Projects Capacity Tenderin to be to be
ed progress y ss Finaliza Tendering floated
(MLD) g floated
(MLD) tion in
process
Ganga Main stem
1 Uttarakhand 10 24 1 9 - - 31 156 13 18 0 0 0
Uttar
2
Pradesh
12 334 - 7 3 2 27 743.5 8 8 1 10 0
3 Bihar 4 55 - 4 19 529 - 10 3 0 6
4 Jharkhand 1 12 - 0 1 0 2 16 - 2 0 - -
5 West Bengal 4 60 - 3 1 15 483.5 2 4 - 4 5
Sub Total 31 485 1 (18) 23 5 2 94 1928 23 42 4 14 11
Tributaries
6 Haryana 2 145 - 2 2 145 1 1 - - -
7 Delhi - - - 2 1044 - 1 - 1 -
8 U.P - - - 3 130.5 - 1 2 - -
9 Bihar - - - 1 9 - - 1 - -
Sub Total 2 145 0 2 0 0 8 1328.5 1 3 3 1 -
Total 33 630 1 (18) 25 5 2 102 3256 24 45 7 15 6 11
Initiatives taken up by NMCG
 “One City One Operator” - STPs in 7 towns (Kanpur, Allahabad, Mathura, Patna,
Kolkata, Howrah-Bally, Bhagalpur) are being integrated & tendered with Hybrid Annuity
based projects – 4 already tendered during this period (Kanpur, Allahabad, Mathura &
Kolkata)
 Focus on 10 major towns contributing almost 64% of total sewage discharge.
 Total STP capacity- 1109 MLD is being created at a cost of ₹ 9883 Cr in these
towns
 Performance evaluation of existing STPs completed in Uttarakhand, Uttar Pradesh and
Bihar.
 Project Engineers for Haridwar and Varanasi projects appointed by NMCG
 Annual inspection of GPIs through technical institutions in a time bound manner.
 Close monitoring of milestones. Field visits increased.
 Regular Follow-up with State Agencies
 Upcoming projects on tributaries- 68 towns in 7 states on 31 tributaries

7
Focus on Large Cities of Ganga Main Stem
10 towns with a total sewage generation of 1897 Mld contribute almost 64% of total
sewage (2953 Mld) discharge from the 97 towns to river Ganga

700
All figures are in Mld

600 26

500
30
15

400

300 72 615
589
150
310
457 456
200
310 320
270
234
100 82 200
150 160
102 45 40
63 45 35 60 65 41
0
Haridwar Kanpur Allahabad Varanasi Farrukhabad Patna Bhagalpur Kolkata Howrah Bally

8
Sewage Generation (2035) Existing Treatment Capacity (Mld) Ongoing Projects Under Tendering Approved Projects
Status of Hybrid Annuity Sewerage Projects
 Awarded projects:
Project Signing of Agreement Start of work
82 MLD STP at Haridwar 11/10/2017 01/02/2018
50 MLD STP at Varanasi 11/10/2017 01/02/2018
Contract Signing

Progress of Works
9
Status of other Hybrid Annuity Sewerage Projects

S. Name of the Package Capacity Present Status Award Date


No. in MLD (Tentative)
(i) Mathura 30 Bids Received (14-03- 14/05/2018
2018); Evaluated
(ii) Allahabad - Jhusi, Naini, 72 NIT published (16/03/2018) 19/06/2018
Phaphamau
(iii) Unnao, Shuklaganj and Kanpur 49 NIT published (08/03/2018) 02/06/2018
(iv) Farrukhabad 35 NIT published (12/04/2018) 02/07/2018
(v) Mirzapur and Gazipur 38 NIT published (14/04/2018) 02/07/2018
(vi) Digha & Kankarbagh in Patna* 150 Likely NIT date-14/05/2018 11/07/2018
(vii) Bhagalpur* 65 Likely NIT date-30/05/2018 16/07/2018

(viii) Kolkata (Tolly’s Nalla) 26 NIT published (27/04/2018) 12/07/2018


(ix) Howrah &Bally; Kamarhati & 165 Likely NIT date-14/05/2018 12/07/2018
Baranagar *

*- Projects under World Bank funding

10
Sewerage Projects in Haridwar

Sewage Generation- 74 MLD


Existing Capacity – 63 MLD
Work in Progress – 82 MLD STP, I&D works,
Arihant Vihar network
All 20 drains being tapped

12
Uttarakhand– Completed Projects

S. No. Project
STP at Devprayag
Cost - 3.66 Cr
1
STP capacity – 1.4 MLD

Sewerage Scheme in Devprayag


2 Cost – 4.50 Cr

I&D at Joshimath
3 Cost – 9.61 Cr

I&D at Gopeshwar Triveni Ghat


4 Cost – 10.18 Cr

Sewerage Scheme at Triveni


5 Ghat, Rishikesh
Cost – 7.23 Cr

13
Uttarakhand – Completed Projects

S. No. Project

Sewerage system & STP for


Tapovan area, Rishikesh
6
Cost – 24.12 Cr
STP capacity – 3.5 MLD

Sewerage Scheme at Ahbab Nagar


7 Jwalapur Zone E-2 at Haridwar
Cost – 24.84 Cr
Tapovan STP

STP at Sarai, Haridwar


Cost – 24.91 Cr
8
STP capacity – 18 MLD

14
Uttarakhand– Completed Projects
S. No. Project

Sewerage Scheme in Gangotri


9
Cost – 0.45 Cr

Sewerage System and STP for


Gangotri Dham
10 Cost – 10.48 Cr
Gangotri
STP capacity – 1 MLD

I&D at Devprayag
11
Cost – 7.27 Cr
I&D at Badrinath
12
Cost – 7.26 Cr
Sewerage Scheme in Uttarkashi
13
Cost – 4.84 Cr Gangotri
Total (13 projects) Cost – ₹ 139.35 Cr
STP capacity – 23.9 MLD
15
Uttarakhand – Work in Progress
S.No. Project
STP at Jagjeetpur & Sarai
Cost – 273.37 Cr
1 STP capacity – 82 MLD
Physical progress – 13.05 %
Likely date of completion – Mar’19
Tertiary treatment of existing 27 MLD STP
at Jagjeetpur & u/g of existing 18 MLD STP
at Sarai
2
Cost – 32.65 Cr
Physical progress – 10 %
Likely date of completion – Nov’18 STP Sarai
I&D at Sarai & Jagjeetpur
Cost – 116.28 Cr
3 Physical progress – 48.86 %
Likely date of completion – Dec’18

Kassawan
Upgradation of STP at Tapovan SPS (I&D
Cost – 2.19 Cr
4 Sarai)
Physical progress – 98 %
Likely date of completion – May’18

16
Uttarakhand – Work in Progress
S.No. Project
STP at Kirtinagar
Cost – 4.23 Cr
STP capacity – 0.06 MLD
5
Physical progress – 70 %
Likely date of completion – May’18

I&D and STP at Rudraprayag


Cost – 13.14 Cr
STP capacity – 0.525 MLD
6
Physical progress – 5 %
Likely date of completion – Dec’18

I&D and STP at Karnaprayag Kirtinagar STP


Cost – 12.09 Cr
STP capacity – 0.35 MLD
7 Physical progress – 12 %
Likely date of completion – Dec’18

17
Uttarakhand – Work in Progress

S. No. Project

I&D with STP at Badrinath

Cost – 18.23 Cr
8 STP capacity – 1.01 MLD
Physical progress – 3 %
Likely date of completion – Dec’18

I&D and STP at Nandaprayag


Badrinath
Cost – 6.46 Cr
9 STP capacity – 0.15 MLD
Physical progress – 14 %
Likely date of completion – Dec’18

I&D and STP, at Chamoli

Cost – 61.83 Cr
10 STP capacity – 4.38 MLD
Physical progress – 11 %
Likely date of completion – Dec’18 Nandprayag 18
Uttarakhand – Work in Progress
S. No. Project
Upgradation of STP at Srinagar
Cost – 15.40 Cr
11
Physical progress – 5 %
Likely date of completion – Nov’18
I&D and STP at Srinagar
Cost – 22.51 Cr
12 STP capacity – 1 MLD
Physical progress – 8 % Srinagar STP Excavation
Likely date of completion – Nov’18
I&D with STP at Joshimath
Cost – 48.42 Cr
Upgradation at Uttarkashi STP
STP capacity – 3.78 MLD
13
Physical progress – 10 %
Likely date of completion – Nov’18

Upgradation of STP (Gyansu)


Cost – 10.03 Cr
14 Physical progress – 20 %
Likely date of completion – Jun’18

19
Uttarakhand – Work in Progress
S. No. Project

Upgradation of STP at Swargashram,(Rishikesh)


Cost – 5.20 Cr
15
Physical progress – 15 %
Likely date of completion – Jun’18
Rising main and STP at Muni Ki Reti
Cost – 80.45 Cr
16 STP capacity – 12.5 MLD
Physical progress – 12 %
Likely date of completion – Mar’19
I&D at Arihant Vihar and New Vishnu Garden,
Haridwar
17 Cost – 4.68 Cr
Physical progress – 11 %
Likely date of completion – Oct’18
I&D with STP at Rishikesh Muni ki Reti SPS
Cost – 158 Cr
18 STP capacity – 26 MLD
Physical progress – 8 %
Likely date of completion – Dec’19
Total (18 projects) Cost – ₹ 885.16 Cr
STP capacity – 131.76 MLD 20
Cost: Rs. 6538.62 Cr
Sewage Generation- 234 MLD
Existing Capacity – 272MLD
Under Tendering- 72 MLD
All 20 drains being tapped
Uttar Pradesh- Completed projects
S. No. Project

Sewerage & Non sewerage


Schemes at District 'B' & 'E' of
Allahabad
1
Cost – 199.26 Cr
STP capacity – 85 MLD Kodra STP-
25 MLD

Sewerage work in District ‘E’


2
Cost – 142 Cr

Sewerage & Non sewerage


Schemes at District 'A' of
3 Alahabad
Cost – 106.08 Cr
STP capacity – 20 MLD
Salori STP-
14 MLD
STP at Salori
Cost – 42.4 Cr
4 STP capacity – 14 MLD

23
Uttar Pradesh- Completed projects
S. No. Project

Sewerage System & STP works


(Phase II) at Kannauj (Kali) Kannauj
Cost – 43.66 Cr STP- 13MLD
5
STP capacity – 1 MLD

Sewerage Scheme at Narora, Narora STP-


Bulandshahar
6 4MLD
Cost – 34.87 Cr
STP capacity – 4 MLD

24
Uttar Pradesh- Completed projects
S. No. Project

Sewerage System & STP works at


Garhmuhteshwar
Cost – 46.51 Cr
STP capacity – 9 MLD
7

Sewerage works in
Anupshahar, Bulandshahar
Cost – 75.79 Cr
STP capacity – 2.5 MLD
8

Total (8 projects) Cost – ₹ 690.57 Cr


STP capacity – 135.5 MLD 25
Uttar Pradesh- Work in progress projects
S.No. Project
Sewerage System in District 'C' &
Allahapur, Allahabad
Cost – 146.87 Cr
Physical progress –84%
1 Chilla SPS
Likely date of completion – May’18

Sewerage works in Sewerage


District 'A' of Allahabad
Cost – 288.94 Cr
Physical progress – 65 % Vivekanand
2
Likely date of completion – Oct’18
Park SPS

Sewerage System with Sewer


network in District 'B' of Allahabad
Cost – 265.86 Cr
Sewer Works in
3 Physical progress – 63 %
Likely date of completion – Dec’18 Dist-B

26
Sewage Generation- 310 MLD
Existing Capacity – 102 MLD
Work in Progress – 310 MLD STP

All 37 drains being tapped


Uttar Pradesh- Work in progress projects
S.No. Project

Sewer network in District E of


Allahabad - Part 2 Trenchless
Cost – 52.78 Cr Sewerline
4
Physical progress –88%
Likely date of completion –
May’18

JICA assisted Ganga Action


Plan Phase II project at
Varanasi Dinapur STP
5 Cost – 641.19 Cr
STP capacity – 140 MLD
Physical progress –82%
Likely date of completion – Jul’18

28
•District III Sewer network
Sisamau Nala
•District I network
•Sisamau nala I&D works

Sewage Generation- 457 MLD


Existing Capacity – 457MLD
Work in Progress – 15 MLD
Under Tendering- 30 MLD
All 21 drains being tapped
•District IV Sewer network
Uttar Pradesh- Work in progress projects
S.No. Project
Sewerage System & STP works
(Phase I) at Moradabad
Cost – 279.91 Cr
STP capacity – 58 MLD
Physical progress – 87% Moradabad STP-
6 Likely date of completion – 58MLD
Jun’18

I&D of Sisamau Nala of Kanpur


city
Cost – 63.8 Cr
7
Physical progress – 20 %
Likely date of completion –
Oct’18 Guptar Ghat SPS

Sewerage works in District I of


Kanpur
8 Cost – 370.4 Cr
Physical progress – 10 %
Likely date of completion – Jul’20
30
Uttar Pradesh- Work in progress projects
S.No. Project

STP for Assi-BHU District at


Ramana
Cost – 161.31 Cr
9
STP capacity – 50 MLD
Likely date of completion –
Dec’19

TOTAL (9 projects) Cost – ₹ 2271.06 Cr


STP capacity – 248 MLD

31
Uttar Pradesh – Tender received and under finalization

Sanctioned STP Sewer


Sl Date of Likely Date
Name of the project Cost (₹ in Capacity Network
No. Sanction of Award
Cr.) (MLD) (Km)
Interception, Diversion & Treatment
1 02.08.2017 27.98 2 1.16 May-18
works in Chunar, Dist. Mirzapur
Rehabilitation of Sewage Infrastructure &
2 Augmentation/ up gradation of Existing 24.03.2017 33.82 5 - May-18
STP at Vrindavan

3 Mathura Sewerage Scheme (HAM) 17.10.2017 204.97 67.5 - May-18

Total 266.8 74.5 1.16

32
Uttar Pradesh – Under Tendering
Sanctioned STP Sewer
Sl Likely Date
Name of Project Cost (₹ in Capacity Network
No. of Award
Cr.) (MLD) (Km)

1 Sewerage Scheme & STP at Bithoor, Kanpur Nagar 13.4 2 - June-18

Interception, Diversion of drains & Sewage


2 71.26 10 0.44 July-18
Treatment works at Ramnagar
Interception, Diversion of drains & Sewage
3 102.2 13 3.3 July-18
Treatment works at Unnao (HAM)
Interception, Diversion of drains & Sewage
4 Treatment works at Shuklaganj, Dist. Unnao 65.18 6 0.15 July-18
(HAM)
STP at Pankha, Kanpur and integration with July-18
5 967.23 30 16.5
existing STPs
Interception, Diversion & Treatment works for
6 Naini (District G), Phaphamau (District F) & Jhusi 767.59 72 13.21 July-18
area District in Allahabad (HAM)
Integrated project for development of STPs in
7 904.00 - - July-18
Allahabad alongwith existing Assets

33
Uttar Pradesh – Under Tendering
Uttar Pradesh State Project Overview

Sanctioned STP Sewer


Sl Likely Date
Name of Project Cost (₹ in Capacity Network
No. of Award
Cr.) (MLD) (Km)
Farrukhabad I&D and STP works (HAM)
8 213.62 35 - Jul-18

9 I&D works and STP, Mirzapur (HAM) 114.93 17 - Jul-18

10 I&D works and STP, Gazipur (HAM) 90.81 21 - Jul-18

Total 3310.22 206 33.6

34
Namami Gange Projects (20 Towns) in Bihar
Projects – 20 Cost: Rs. 4629.12 Cr
Work in Progress – 10
Tender under evaluation-4
Under tendering- 6

35
Sewerage Projects in Patna

Sewage Generation- 286 MLD


Existing Capacity – 109 MLD
Work in Progress – 200 MLD
Tender to be Floated- 150 MLD
All 33 drains being tapped
PM Laying Foundation Stone for Patna Sewerage Schemes (at Mokama)

37
Bihar– Ongoing projects
S. No. Project
Beur STP,
Sewer Networks, SPS and STP at Buxar Patna
Cost – 74.95 Cr
1
STP capacity – 16 MLD
Physical progress – 39 %
Likely date of completion – Feb’19

Sewage Treatment Plant - Beur for Patna,


Bihar
2 Cost – 68.16 Cr
STP capacity – 43 MLD
Physical progress – 23 %
Likely date of completion – Dec’19

Sewerage system with Sewer network,


Patna Beur
3 Cost – 225.77Cr
Physical progress – 22%
Likely date of completion – Mar’20 Beur Network,
Patna
38
Bihar StateOngoing
Bihar– Projectprojects
Overview
S. No. Project
Sewage Treatment Plant - Karmalichak for
Patna, Bihar Saidpur STP,
Cost – 77.04 Cr Patna
4
STP capacity – 37 MLD
Physical progress – 24 %
Likely date of completion – Dec ‘ 19
Saidpur STP and adjoining Network for Patna,
Bihar
Cost – 184.93 Cr
5
STP capacity – 60 MLD
Physical progress – 22%
Likely date of completion – Dec’19
Saidpur Sewer Network, Patna, Bihar
Cost –Cr
6 STP capacity –6 MLD
Physical progress –%
Likely date of completion –
Sewerage scheme at Pahari Zone V, Patna, Bihar
Cost – 356.37Cr
7
(Agreement signed on 25-4-2018)
Likely date of completion – Apr’21
39
Bihar StateOngoing
Bihar– Projectprojects
Overview

S.No. Project
Sewerage scheme at Pahari (Zone IVA (S)), Patna, Bihar
Cost – 184.86 Cr
8
(Recently Awarded) Karmalichak STP,
Likely date of completion – Apr’21 Patna
Sewerage Treatment Plant at Pahari - Patna, Bihar
Cost – 191.62 Cr
STP capacity – 60 MLD
9 (Agreement signed on 9-5-2018)
Likely date of completion – April’21

Sewerage system with Sewer network ,Patna


Karmalichak
Cost – 277.42 Cr
10
(Recently Awarded)
Likely date of completion – Aug’20

Total
Cost (10 projects) – ₹1909.75 Cr
STP capacity – 216 MLD
40
Abstract - Under Tendering Process projects
Tender Under
Projects Cost Tender to be floated
Evaluation
10 2719.12 4 6

Bihar– Tender Received and Finalisation in Process:


Sanctioned Sewer
Sl STP Capacity Likely Date of
Name of Project Cost (₹ in Network
No. (MLD) Award
Cr.) (Km)

1 Sultanganj I&D and STP works 60.22 10 - May-18

2 Mokama I&D and STP works 53.81 8 - May-18

3 I&D and STP for Barh town 58 11 - May-18

4 I&D and STP works for Naugachia 60.79 9 - May-18

Total 232.82 38

41
Bihar– Tender to be floated
Sr. Project Name Approved STP capacity Sewer NIT Publication
No Project Cost (MLD) Network Date
(₹ in Cr.) (Km)
Sewerage System and STP for Digha
1 824.00 100 288 May-18
zone, Patna (HAM)
Sewerage System and STP for
2 578.89 50 150 May-18
Kankarbagh zone, Patna (HAM)
I&D and STP works for Bhagalpur
3 254.13 65 - Jun-18
(HAM)
Sewer Networks, SPS and STP,
4 294.02 30 174.75 May-18
Munger
Sewer Network, SPS and STP,
5 230.07 17 114 May-18
Begusarai
Sewer Networks, SPS and STP,
6 305.19 22 189.3 May-18
Hajipur
Total 2486.3 284 916

42
Namami Gange Projects (2 Towns) in Jharkhand

Projects – 2
Work in Progress – 2
Cost: Rs. 149.59 Cr
Sahibganj- 12 MLD STP, 55 km Sewer, ₹ 99.36 Cr,32% progress; likely
completion- December 2018
Rajmahal- 3.5 MLD STP, 34 km Sewer, ₹ 50.23 Cr, recently awarded;
likely completion by June 2019 43
Sahibganj STP

44
Namami Gange Projects in West Bengal

Projects – 15
Completed –2
Work in Progress – 4
Under Tendering -4
Tender to be floated-5
Cost: Rs. 2606.58 Cr

45
West Bengal – Completed projects
West Bengal State Project Overview
Sl No. Project

Sewerage Scheme & STP


works at Gayeshpur
Cost – 168.67 Cr
STP capacity – 8.23 MLD
1

Sewerage Scheme & STP


works at Kalyani
Cost – 57.87 Cr
2 STP capacity – 4+17 MLD

Total
Cost – 226.54 Cr
STP capacity – 29.23 MLD 46
West Bengal –Ongoing Projects
West Bengal State Project Overview
S.No. Project

Sewerage Scheme & STP


works at Bhatpara
Cost – 228.52 Cr
1 STP capacity – 31 MLD
Physical progress – 91%
Likely date of completion
– Jun’18

Sewerage System & STP


works at Halishahr
Cost – 274.76 Cr
2 STP capacity – 16 MLD
Physical progress – 28 %
Likely date of completion
– Dec’18

47
West Bengal – Ongoing Projects
West Bengal State Project Overview
S.No. Project
Sewerage System & STP
works at Budge-Budge
Cost – 145.98 Cr
3 STP capacity – 9.3 MLD
Physical progress –35 %
Likely date of
completion – Oct’19
Sewerage System with
sewer network at
Barrackpore
Cost – 272.32 Cr
4
STP capacity – 24 MLD
Physical progress – 24 %
Likely date of
completion – Dec’19
TOTAL (4 projects) - Cost ₹ 921.58 Cr
STP capacity – 80.3 MLD

48
West Bengal – Under Tendering projects

Sanctioned STP Sewer


Sl Likely Date
Name of Project Cost (₹ in Capacity Network
No. of Award
Cr.) (MLD) (Km)
Interception, Diversion & treatment works at
1 51.20 3.5 5.25 Jun-18
Behrampore
Interception, Diversion & treatment works at
2 54.30 20 4 Jun-18
Nabadwip
Interception, Diversion & treatment Works at
3 307.12 26.10 114 Jul-18
Tolly's Nullah (Adi Ganga) (HAM)
Integration of STPs with rehabilitation and O&M of
4 165.16 - - Jul-18
existing Assets
Total 577.78 49.6 123.25

49
West Bengal – Tender to be floated
West Bengal State Project Overview
Tender to be floated:
Date of Sanctione STP Sewer NIT
Sl
Name of Project AA&ES d Cost (₹ Capacity Networ Publicatio
No.
in Cr.) (MLD) k (Km) n
Interception, Diversion & treatment works at
1 02.08.2017 185.22 65 May-18
Howrah (HAM)
Interception & Diversion with STP at Bally
2 10.10.2017 164.93 40 May-18
(HAM)
Interception, Diversion & treatment works at
3 17.01.2018 172.10 60 9 May-18
Baranagar & Kamarahati (HAM)
Interception & Diversion with STP at Hugli-
4 - 160 29.3 20 Jun-18
Chinsurah
5 Interception & Diversion with STP at Maheshtala - 198.43 28.1 Jun-18
TOTAL 880.68 222.4 29

50
Status of Existing Sewerage Infrastructure & Interventions
 97 towns on Ganga Main Stem
 Sewage Generation : 2953 MLD (Yr. 2016), 3603 MLD (Yr 2035)
 Available Treatment Capacity (01/11/2017) : 84 STPs – 1584 MLD in 46 Towns
39 STPs- Working satisfactorily
12 STPs (91 MLD)- Up-gradation & O&M Sanctioned
8 STPs (530 MLD)- Integrated under One City One Operator
23 STPs – Tender for upgradation
2 STPs discarded; Status of Existing 84 STPs
Defunct (270 Recently
mld) - 31 STPs commissioned,
working fine
alongwith long
37% 46% term O&M (733
MLD) - 39 STPs

Operational
and non
compliant &
17%
under utilized
(581 mld) - 14
STPs 51
Present Status of Existing STPs
State Working fine – Up-gradation & Integrated under Up- Discarded Total
Necessary O&M One City One gradation Nos. (MLD) Nos. (MLD)
Interventions Sanctioned Operator through
taken Nos. (MLD) Nos. (MLD) Atkins
Nos. (MLD) Nos.
(MLD)
Uttarakhand 9 (91.9) 2 (9.5) 11(101.4)
Lakkar Ghat
Srinagar
Uttar 17 (437.31) 4 (343) 1 (27) 2 (7.5) 24(814.81)
Pradesh Jajmau 130 Jajmau Kalindipuram
Bingawan 210 CETP Jajmau 5
Shantipuram
Trivenipuram
Bihar 3 (84) 3 (38) 1 (2) 7(124)
Pahari, Buxar Chhapra
Bhagalpur (BP)
West Bengal 10 (119.42) 7 (43.25) 4 (187) 21 (194.27) 42(543.94)
Bhatpara– 4nos. Anupara (BP)
Budge-Budge Gardenreach
Barrackpore Keorapukur
Maheshtala (BP) Kamarhati (BP)
Total 39 (732.63) 12 (90.75) 8 (530) 23 (223.27) 2 (7.5) 84 (1584.15)

Implementati Operating Execution- 10 Bidding- 6 (445) Bid prep- Execution- 10 (75.27)


on Status (75.27) Bid prep- 2 (85) 23(223.27) Bidding – 6 (445)
52
Bid prep – 2 (15) Bid prep – 27 (323.27)
Upcoming Projects on Tributaries
Sr. No. of No. of
State
No. Tributaries Towns
1 Uttarakhand 1 1
2 Uttar Pradesh 10 33
3 Bihar 7 15
4 Jharkhand 2 2
5 West Bengal 1 3
6 Rajasthan 3 4
7 Madhya Pradesh 7 10
TOTAL 31 68
Decentralised Treatment of 20 drains in 15 cities through
Modular Treatment System
• 20 drains which are not covered in sewerage projects have
been identified
• Pollution flowing in 20 drains in 15 cities (about 60 MLD) to be
contained & treated using modular STPs,
• First of its kind offered on services contract model and include
removal of trash, solid waste and pollution load.
• Bhudana, Muzaffar nagar, Gajraula, Moradabad, Hapur,
Gulaothi, Kasganj, Unnao, Bhadohi, Kunda in UP and Titagarh,
Jangipur, Champdani, Chandannagar and Belur in West Bengal.
• Tenders on services model are under process
• Award of work by May’2018 end.
• Modular STPs are ready to install tailored systems and will be
operational in six months time.
• After successful response to the tenders, the model will be
replicated in other untapped drains.
Rural Sanitation
Ministry of Drinking Water and Sanitation has taken up construction of IHHLs, liquid
waste management for all 1662 Gram Panchayats.

Villages (Near Ganga)


S. No. State Completed IHHL
Declared as ODF
1 Bihar 321324 468

2 Jharkhand 24977 66

3 U.P 388340 1604

4 Uttarakhand 9540 222

5 W.B 339507 2105

Total 1083688 4465

Total Cost – Rs. 841.3 Crores 55


Ghats and Crematoria
No. Of Status
No. of Cost
Ghats Crematoria Total Completed Under Progress Under Tendering
Projects (₹ in Cr)
(G) (C) (T) G C G C G C
37 151 54 205 721.94 32 6 104 22 15 26

GHATS

Rudraprayag Alaknanda
Original site Present Proposed River Bathing Ghat - 1

CREMATORIA

Original site Present Proposed


56
Srinagar Nathaini Cremation ghat
Ghats and Crematoria - Uttarakhand
No. Of Status
No. of Cost
Completed Under Progress Under Tendering
Projects Ghats Crematoria Total (₹ in Cr)
(G) (C) (T) G C G C G C
9 22 22 44 175.08 8 6 13 16 1 0

RAMKUND GHAT DEVPRAYAG

RHS RUDRAPRAYAG

57
Chandi Ghat RFD
Development of Chandi Ghat
(Adjacent to Chandi Ghat Bridge, Haridwar)

PRE - PROJECT SCENARIO PRESENT SCENARIO

Main Component of Chandi Ghat Project-


Project cost- 50.36 Cr
•Bathing Ghat- 630 m long
Physical progress- 55%
•Cremation Ghat- 140 m long
Expenditure- 26.17 Cr
•STP- 25 KLD
Likely Date of Completion- Dec-18
•Water & Sewer Network- 1.5 km
•Overhead Water Tank- 70 KLD
58
Ghats and Crematoria – Uttar Pradesh
No. Of Status
No. of Cost
Completed Under Progress Under Tendering
Projects Ghats Crematoria Total (₹ in Cr)
(G) (C) (T) G C G C G C
11 87 25 112 397.70 23 0 61 1 3 24

Sarsaiya ghat, Kanpur

Ravani katiri
Ghat, Balawali
Bhairav, Kaushalya, Bharat &
to Anupshahr
Pandav Ghats Bithoor

59
Ghats and Crematoria - Bihar
No. Of Status
Cost (₹ in
No. of Projects Crematoria Completed Under Progress
Ghats (G) Total (T) Cr)
(C) G C G C
5 14 1 15 40.86 0 0 14 1

Gola ghat, Buxar

Pul Ghat, Sonepur Konhara Crematoria, Hajipur


60
Patna RFD
Cost: ₹ 243.27 Crore Expenditure: ₹ 167 Crore
No. of Ghats: 20 Complete: 16
Promenade: 6.6 km Complete: 4.7 km
Crematoria : 1 Civil Work complete
overall 85% complete

Patna RFD 61
Ghats and Crematoria - Jharkhand
No. Of Status
No. of Cost
Completed Under Progress Under Tendering
Projects Ghats Crematoria Total
(₹ in Cr)
(G) (C) (T) G C G C G C
4 12 2 14 62.07 1 0 7 1 4 1

Maskaliaya Crematorium

Sarkanda Ghat Sahibganj to Rajmahal 62


Ghats and Crematoria – West Bengal
No. Of Status
No. of Cost
Ghats Crematoria Total Completed Under Progress Under Tendering
Projects (₹ in Cr)
(G) (C) (T) G C G C G C
7 15 4 19 44.24 0 0 9 3 6 1

Girish ghat, Garulia

Babughat, Garulia

63
Bhatpara Crematorium
River and Ghat Cleaning
Trash Skimmers
• Trash skimmers are deployed in 11 cities.
• Delhi, Haridwar, Garhmukteshwar, Kanpur, Allahabad,
Varanasi, Patna, Sahibganj, Howrah, Mathura-
Vrindavan, and Nabadwip.

Ghat Cleaning
IL&FS Environmental Infrastructure and Service Ltd. (IEISL) to clean 84 Ghats in
Varanasi for 3 years at the cost of Rs.5.0 Crores per year under tripartite agreement
between NMCG, Varanasi Nagar Nigam & IEISL.
• Similar Ghat Cleaning activities are
being taken up for other major towns
such as Haridwar, Kanpur- Bithoor,
Allahabad ,Mathura-Vrindavan

Man Mandir Ghat


64
Afforestation
FRI, Dehradun has prepared afforestation plan of 1,34,106 hectare areas at an estimated cost of
INR 2294 crores.
2016-2018
STATE Area in ha. Rs crore
Uttarakhand 5369 35.497
Uttar Pradesh 831 18.652
Bihar 600.5 24.924
Jharkhand 396 13.428
West Bengal 3588 19.64
Total 10785 112.141

65
Biodiversity
• Biodiversity conservation to study restoration & rehabilitation of the aquatic environment of
River Ganga
• Assessment of Fish & fisheries in Ganga river system for developing sustainable
conservation & restoration plan

66
Thank You
67

Anda mungkin juga menyukai