This includes 33 sewerage Projects (630 MLD STP) and 24 Ghats &Crematoria projects.
Component B
New initiatives at an estimated cost of Rs.12,728 crore with 100% central assistance
This includes 102 sewerage Projects (3256 MLD STP) and 37 Ghats &Crematoria
projects.
2
Salient Features
100%
Centrally
funded
programme
Hybrid O&M cost
Annuity for 15 years
based PPP included for
model new
adopted projects
NAMAMI
GANGE
5 year Comprehen
dedicated sive
Budget integrated
allocation programme
Non-
lapsable
fund
3
Namami Gange Projects Overview
Sl Sanction Cost
Projects Undertaken No. of Projects
No (Rs in Cr)
Pollution Abatement Projects
Sewage Infrastructure (94 on Ganga, 8 on
1 102 16984
tributaries)
2 Bioremediation 8 26.94
3 Modular STPs –Decentralised Treatment 20 410
Upcoming Projects on Tributaries (7 states, 31
4 68 Under estimation
tributaries, 68 towns)
Sub total 198 17420.94
5 Rural Sanitation (4465 villages along Ganga) 1 1018
Total 199 18438.94
4
Namami Gange Projects Overview
Sanction Cost
Sl No Projects Undertaken No. of Projects
(Rs in Cr)
River Front, Ghats & Crematoria Projects
1 Ghats & Crematoria (Old) 24 204.39
2 Ghats & Crematoria (New) 37 721.94
3 Ghats Cleaning 1 15.00
4 River Surface Cleaning 1 55.24
5 River Front Development 2 270.55
Sub-total 65 1267.12
Other Projects
6 Institutional Development 6 340.41
Project Implementation Support / Research &
7 2 9.96
Study Projects
8 Biodiversity 4 31.91
9 Afforestation 11 113.28
10 Composite Ecological Task Force 1 167
Sub-total 24 662.56
S. Work- Tender
State STP Comple in- Receive
No. STP Under Tender Projec Tender
Complet Work-in- ts Capacit ted Progre d & Under
Projects Capacity Tenderin to be to be
ed progress y ss Finaliza Tendering floated
(MLD) g floated
(MLD) tion in
process
Ganga Main stem
1 Uttarakhand 10 24 1 9 - - 31 156 13 18 0 0 0
Uttar
2
Pradesh
12 334 - 7 3 2 27 743.5 8 8 1 10 0
3 Bihar 4 55 - 4 19 529 - 10 3 0 6
4 Jharkhand 1 12 - 0 1 0 2 16 - 2 0 - -
5 West Bengal 4 60 - 3 1 15 483.5 2 4 - 4 5
Sub Total 31 485 1 (18) 23 5 2 94 1928 23 42 4 14 11
Tributaries
6 Haryana 2 145 - 2 2 145 1 1 - - -
7 Delhi - - - 2 1044 - 1 - 1 -
8 U.P - - - 3 130.5 - 1 2 - -
9 Bihar - - - 1 9 - - 1 - -
Sub Total 2 145 0 2 0 0 8 1328.5 1 3 3 1 -
Total 33 630 1 (18) 25 5 2 102 3256 24 45 7 15 6 11
Initiatives taken up by NMCG
“One City One Operator” - STPs in 7 towns (Kanpur, Allahabad, Mathura, Patna,
Kolkata, Howrah-Bally, Bhagalpur) are being integrated & tendered with Hybrid Annuity
based projects – 4 already tendered during this period (Kanpur, Allahabad, Mathura &
Kolkata)
Focus on 10 major towns contributing almost 64% of total sewage discharge.
Total STP capacity- 1109 MLD is being created at a cost of ₹ 9883 Cr in these
towns
Performance evaluation of existing STPs completed in Uttarakhand, Uttar Pradesh and
Bihar.
Project Engineers for Haridwar and Varanasi projects appointed by NMCG
Annual inspection of GPIs through technical institutions in a time bound manner.
Close monitoring of milestones. Field visits increased.
Regular Follow-up with State Agencies
Upcoming projects on tributaries- 68 towns in 7 states on 31 tributaries
7
Focus on Large Cities of Ganga Main Stem
10 towns with a total sewage generation of 1897 Mld contribute almost 64% of total
sewage (2953 Mld) discharge from the 97 towns to river Ganga
700
All figures are in Mld
600 26
500
30
15
400
300 72 615
589
150
310
457 456
200
310 320
270
234
100 82 200
150 160
102 45 40
63 45 35 60 65 41
0
Haridwar Kanpur Allahabad Varanasi Farrukhabad Patna Bhagalpur Kolkata Howrah Bally
8
Sewage Generation (2035) Existing Treatment Capacity (Mld) Ongoing Projects Under Tendering Approved Projects
Status of Hybrid Annuity Sewerage Projects
Awarded projects:
Project Signing of Agreement Start of work
82 MLD STP at Haridwar 11/10/2017 01/02/2018
50 MLD STP at Varanasi 11/10/2017 01/02/2018
Contract Signing
Progress of Works
9
Status of other Hybrid Annuity Sewerage Projects
10
Sewerage Projects in Haridwar
12
Uttarakhand– Completed Projects
S. No. Project
STP at Devprayag
Cost - 3.66 Cr
1
STP capacity – 1.4 MLD
I&D at Joshimath
3 Cost – 9.61 Cr
13
Uttarakhand – Completed Projects
S. No. Project
14
Uttarakhand– Completed Projects
S. No. Project
I&D at Devprayag
11
Cost – 7.27 Cr
I&D at Badrinath
12
Cost – 7.26 Cr
Sewerage Scheme in Uttarkashi
13
Cost – 4.84 Cr Gangotri
Total (13 projects) Cost – ₹ 139.35 Cr
STP capacity – 23.9 MLD
15
Uttarakhand – Work in Progress
S.No. Project
STP at Jagjeetpur & Sarai
Cost – 273.37 Cr
1 STP capacity – 82 MLD
Physical progress – 13.05 %
Likely date of completion – Mar’19
Tertiary treatment of existing 27 MLD STP
at Jagjeetpur & u/g of existing 18 MLD STP
at Sarai
2
Cost – 32.65 Cr
Physical progress – 10 %
Likely date of completion – Nov’18 STP Sarai
I&D at Sarai & Jagjeetpur
Cost – 116.28 Cr
3 Physical progress – 48.86 %
Likely date of completion – Dec’18
Kassawan
Upgradation of STP at Tapovan SPS (I&D
Cost – 2.19 Cr
4 Sarai)
Physical progress – 98 %
Likely date of completion – May’18
16
Uttarakhand – Work in Progress
S.No. Project
STP at Kirtinagar
Cost – 4.23 Cr
STP capacity – 0.06 MLD
5
Physical progress – 70 %
Likely date of completion – May’18
17
Uttarakhand – Work in Progress
S. No. Project
Cost – 18.23 Cr
8 STP capacity – 1.01 MLD
Physical progress – 3 %
Likely date of completion – Dec’18
Cost – 61.83 Cr
10 STP capacity – 4.38 MLD
Physical progress – 11 %
Likely date of completion – Dec’18 Nandprayag 18
Uttarakhand – Work in Progress
S. No. Project
Upgradation of STP at Srinagar
Cost – 15.40 Cr
11
Physical progress – 5 %
Likely date of completion – Nov’18
I&D and STP at Srinagar
Cost – 22.51 Cr
12 STP capacity – 1 MLD
Physical progress – 8 % Srinagar STP Excavation
Likely date of completion – Nov’18
I&D with STP at Joshimath
Cost – 48.42 Cr
Upgradation at Uttarkashi STP
STP capacity – 3.78 MLD
13
Physical progress – 10 %
Likely date of completion – Nov’18
19
Uttarakhand – Work in Progress
S. No. Project
23
Uttar Pradesh- Completed projects
S. No. Project
24
Uttar Pradesh- Completed projects
S. No. Project
Sewerage works in
Anupshahar, Bulandshahar
Cost – 75.79 Cr
STP capacity – 2.5 MLD
8
26
Sewage Generation- 310 MLD
Existing Capacity – 102 MLD
Work in Progress – 310 MLD STP
28
•District III Sewer network
Sisamau Nala
•District I network
•Sisamau nala I&D works
31
Uttar Pradesh – Tender received and under finalization
32
Uttar Pradesh – Under Tendering
Sanctioned STP Sewer
Sl Likely Date
Name of Project Cost (₹ in Capacity Network
No. of Award
Cr.) (MLD) (Km)
33
Uttar Pradesh – Under Tendering
Uttar Pradesh State Project Overview
34
Namami Gange Projects (20 Towns) in Bihar
Projects – 20 Cost: Rs. 4629.12 Cr
Work in Progress – 10
Tender under evaluation-4
Under tendering- 6
35
Sewerage Projects in Patna
37
Bihar– Ongoing projects
S. No. Project
Beur STP,
Sewer Networks, SPS and STP at Buxar Patna
Cost – 74.95 Cr
1
STP capacity – 16 MLD
Physical progress – 39 %
Likely date of completion – Feb’19
S.No. Project
Sewerage scheme at Pahari (Zone IVA (S)), Patna, Bihar
Cost – 184.86 Cr
8
(Recently Awarded) Karmalichak STP,
Likely date of completion – Apr’21 Patna
Sewerage Treatment Plant at Pahari - Patna, Bihar
Cost – 191.62 Cr
STP capacity – 60 MLD
9 (Agreement signed on 9-5-2018)
Likely date of completion – April’21
Total
Cost (10 projects) – ₹1909.75 Cr
STP capacity – 216 MLD
40
Abstract - Under Tendering Process projects
Tender Under
Projects Cost Tender to be floated
Evaluation
10 2719.12 4 6
Total 232.82 38
41
Bihar– Tender to be floated
Sr. Project Name Approved STP capacity Sewer NIT Publication
No Project Cost (MLD) Network Date
(₹ in Cr.) (Km)
Sewerage System and STP for Digha
1 824.00 100 288 May-18
zone, Patna (HAM)
Sewerage System and STP for
2 578.89 50 150 May-18
Kankarbagh zone, Patna (HAM)
I&D and STP works for Bhagalpur
3 254.13 65 - Jun-18
(HAM)
Sewer Networks, SPS and STP,
4 294.02 30 174.75 May-18
Munger
Sewer Network, SPS and STP,
5 230.07 17 114 May-18
Begusarai
Sewer Networks, SPS and STP,
6 305.19 22 189.3 May-18
Hajipur
Total 2486.3 284 916
42
Namami Gange Projects (2 Towns) in Jharkhand
Projects – 2
Work in Progress – 2
Cost: Rs. 149.59 Cr
Sahibganj- 12 MLD STP, 55 km Sewer, ₹ 99.36 Cr,32% progress; likely
completion- December 2018
Rajmahal- 3.5 MLD STP, 34 km Sewer, ₹ 50.23 Cr, recently awarded;
likely completion by June 2019 43
Sahibganj STP
44
Namami Gange Projects in West Bengal
Projects – 15
Completed –2
Work in Progress – 4
Under Tendering -4
Tender to be floated-5
Cost: Rs. 2606.58 Cr
45
West Bengal – Completed projects
West Bengal State Project Overview
Sl No. Project
Total
Cost – 226.54 Cr
STP capacity – 29.23 MLD 46
West Bengal –Ongoing Projects
West Bengal State Project Overview
S.No. Project
47
West Bengal – Ongoing Projects
West Bengal State Project Overview
S.No. Project
Sewerage System & STP
works at Budge-Budge
Cost – 145.98 Cr
3 STP capacity – 9.3 MLD
Physical progress –35 %
Likely date of
completion – Oct’19
Sewerage System with
sewer network at
Barrackpore
Cost – 272.32 Cr
4
STP capacity – 24 MLD
Physical progress – 24 %
Likely date of
completion – Dec’19
TOTAL (4 projects) - Cost ₹ 921.58 Cr
STP capacity – 80.3 MLD
48
West Bengal – Under Tendering projects
49
West Bengal – Tender to be floated
West Bengal State Project Overview
Tender to be floated:
Date of Sanctione STP Sewer NIT
Sl
Name of Project AA&ES d Cost (₹ Capacity Networ Publicatio
No.
in Cr.) (MLD) k (Km) n
Interception, Diversion & treatment works at
1 02.08.2017 185.22 65 May-18
Howrah (HAM)
Interception & Diversion with STP at Bally
2 10.10.2017 164.93 40 May-18
(HAM)
Interception, Diversion & treatment works at
3 17.01.2018 172.10 60 9 May-18
Baranagar & Kamarahati (HAM)
Interception & Diversion with STP at Hugli-
4 - 160 29.3 20 Jun-18
Chinsurah
5 Interception & Diversion with STP at Maheshtala - 198.43 28.1 Jun-18
TOTAL 880.68 222.4 29
50
Status of Existing Sewerage Infrastructure & Interventions
97 towns on Ganga Main Stem
Sewage Generation : 2953 MLD (Yr. 2016), 3603 MLD (Yr 2035)
Available Treatment Capacity (01/11/2017) : 84 STPs – 1584 MLD in 46 Towns
39 STPs- Working satisfactorily
12 STPs (91 MLD)- Up-gradation & O&M Sanctioned
8 STPs (530 MLD)- Integrated under One City One Operator
23 STPs – Tender for upgradation
2 STPs discarded; Status of Existing 84 STPs
Defunct (270 Recently
mld) - 31 STPs commissioned,
working fine
alongwith long
37% 46% term O&M (733
MLD) - 39 STPs
Operational
and non
compliant &
17%
under utilized
(581 mld) - 14
STPs 51
Present Status of Existing STPs
State Working fine – Up-gradation & Integrated under Up- Discarded Total
Necessary O&M One City One gradation Nos. (MLD) Nos. (MLD)
Interventions Sanctioned Operator through
taken Nos. (MLD) Nos. (MLD) Atkins
Nos. (MLD) Nos.
(MLD)
Uttarakhand 9 (91.9) 2 (9.5) 11(101.4)
Lakkar Ghat
Srinagar
Uttar 17 (437.31) 4 (343) 1 (27) 2 (7.5) 24(814.81)
Pradesh Jajmau 130 Jajmau Kalindipuram
Bingawan 210 CETP Jajmau 5
Shantipuram
Trivenipuram
Bihar 3 (84) 3 (38) 1 (2) 7(124)
Pahari, Buxar Chhapra
Bhagalpur (BP)
West Bengal 10 (119.42) 7 (43.25) 4 (187) 21 (194.27) 42(543.94)
Bhatpara– 4nos. Anupara (BP)
Budge-Budge Gardenreach
Barrackpore Keorapukur
Maheshtala (BP) Kamarhati (BP)
Total 39 (732.63) 12 (90.75) 8 (530) 23 (223.27) 2 (7.5) 84 (1584.15)
2 Jharkhand 24977 66
GHATS
Rudraprayag Alaknanda
Original site Present Proposed River Bathing Ghat - 1
CREMATORIA
RHS RUDRAPRAYAG
57
Chandi Ghat RFD
Development of Chandi Ghat
(Adjacent to Chandi Ghat Bridge, Haridwar)
Ravani katiri
Ghat, Balawali
Bhairav, Kaushalya, Bharat &
to Anupshahr
Pandav Ghats Bithoor
59
Ghats and Crematoria - Bihar
No. Of Status
Cost (₹ in
No. of Projects Crematoria Completed Under Progress
Ghats (G) Total (T) Cr)
(C) G C G C
5 14 1 15 40.86 0 0 14 1
Patna RFD 61
Ghats and Crematoria - Jharkhand
No. Of Status
No. of Cost
Completed Under Progress Under Tendering
Projects Ghats Crematoria Total
(₹ in Cr)
(G) (C) (T) G C G C G C
4 12 2 14 62.07 1 0 7 1 4 1
Maskaliaya Crematorium
Babughat, Garulia
63
Bhatpara Crematorium
River and Ghat Cleaning
Trash Skimmers
• Trash skimmers are deployed in 11 cities.
• Delhi, Haridwar, Garhmukteshwar, Kanpur, Allahabad,
Varanasi, Patna, Sahibganj, Howrah, Mathura-
Vrindavan, and Nabadwip.
Ghat Cleaning
IL&FS Environmental Infrastructure and Service Ltd. (IEISL) to clean 84 Ghats in
Varanasi for 3 years at the cost of Rs.5.0 Crores per year under tripartite agreement
between NMCG, Varanasi Nagar Nigam & IEISL.
• Similar Ghat Cleaning activities are
being taken up for other major towns
such as Haridwar, Kanpur- Bithoor,
Allahabad ,Mathura-Vrindavan
65
Biodiversity
• Biodiversity conservation to study restoration & rehabilitation of the aquatic environment of
River Ganga
• Assessment of Fish & fisheries in Ganga river system for developing sustainable
conservation & restoration plan
66
Thank You