Harga Satuan Dasar Upah Dan Bahan Bangunan Semester II
Harga Satuan Dasar Upah Dan Bahan Bangunan Semester II
A Pekerjaan Persiapan
1 Pek. Bongkaran Atap,Dinding Dan Daun Pintu/ jendela
B Pekerjaan Pondasi
1 Pek urugan pasir padat
2 Pasangan batu belah, Camp 1 : 5
C Pekerjaan dinding
2 Pasangan bata Dinding camp = 1 : 4
3 Pasangan plesteran, camp 1 : 4
4 Pek. Rangka Dinding Besi Hollow
5 Pek. Dinding Partisi Kalciboard
E Pekerjaan Kayu
1 Kusen Pintu Jendela , kayu klas I
2 Pek. Daun Pintu kayu Panel
3 Pek. Daun Pintu Kaca
4 Pek. Membuat daun jendela kaca,
5 Lisplank, 3/20, papan kayu klas II, kamper
6 Arsicraft
F Pekerjaan Atap
1 Penutup Atap Multi Sirap
2 Bubungan Atap
3 Rangka Atap Baja Ringan
G Pekerjaan Langit-langit
1 Pek. Rangka langit-langit besi hollow
2 Pek. Plafond + Ornamen
3 Pek. List langit-langit profil gypsum 10 cm
K Pekerjaan Sanitasi
1 Pasang Bahtub
3 Pasang Duduk Toto Setara
4 Pipa Air Bersih PVC tipe AW, Diameter 1/2"
5 Wastafel Toto atau setara
6 Shower
7 Pasang floor drain
8 Pasang Kran air Toto Atau Setara
M Pekerjaan Lain-lain
1 Pembersihan lapangan
REKAPITULASI
PROGRAM : PENGEMBANGAN WILAYAH STRATEGIS DAN CEPAT TUMBUH
KEGIATAN : PEMBANGUNAN/PENINGKATAN INFRASTRUKTUR
PEKERJAAN : REHAB RUMAH JABATAN BUPATI (LANJUTAN)
LOKASI : KUALA KAPUAS
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN DINDING
D PEKERJAAN BETON BERTULANG
E PEKERJAAN KAYU
F PEKERJAAN PENUTUP ATAP
G PEKERJAAN LANGIT-LANGIT
H PEKERJAAN KACA/KUNCI/ALAT GANTUNG
I PEKERJAAN PENGECATAN
J PEKERJAAN LANTAI
K PEKERJAAN SANITASI
L PEKERJAAN INSTALASI LISTRIK
M PEKERJAAN LAIN-LAIN
SUB TOTAL ( A )
PAJAK PPn 10% X (A )
TOTAL
DIBULATKAN
TERBILANG :
CANA ANGGARAN BIAYA
DAN CEPAT TUMBUH
TRUKTUR
Jumlah #REF!
1 Ls 2,500,000.00 2,500,000.00
Jumlah #REF!
0.7 M3 #REF! #REF!
2.625 M3 #REF! #REF!
Jumlah #REF!
11.5 M2 #REF! #REF!
23 M2 #REF! #REF!
30.845 M2 #REF! #REF!
30.845 M2 85,000.00 2,621,825.00
Jumlah #REF!
0.3 M3 #REF! #REF!
1.575 M3 #REF! #REF!
0.28 M' #REF! #REF!
0.69 M #REF! #REF!
-
Jumlah #REF!
0.06 M3 #REF! #REF!
3.36 M2 #REF! #REF!
15.12 M2 #REF! #REF!
27.6 M2 #REF! #REF!
14 M' #REF! #REF!
187.2 M' 75,000.00 14,040,000.00
Jumlah #REF!
31.5 M2 #REF! #REF!
6 M' #REF! #REF!
31.5 M2 271,250.00 8,544,375.00
Jumlah #REF!
200 M2 #REF! #REF!
200 M2 195,000.00 39,000,000.00
200 M 78,000.00 15,600,000.00
Jumlah #REF!
8 Bh #REF! #REF!
2 Bh #REF! #REF!
27 Bh #REF! #REF!
60 Bh #REF! #REF!
10 Bh #REF! #REF!
30 Bh #REF! #REF!
60 Bh #REF! #REF!
-
Jumlah #REF!
45.5 M2 #REF! #REF!
200 M2 #REF! #REF!
18.48 M2 #REF! #REF!
18.51 M2 #REF! #REF!
-
Jumlah #REF!
15.75 M2 #REF! #REF!
9 M2 #REF! #REF!
52.5 M2 #REF! #REF!
350 M2 #REF! #REF!
200 M2 650,000.00 130,000,000.00
200 M' 78,000.00 15,600,000.00
-
Jumlah #REF!
2 Bh #REF! #REF!
2 Bh #REF! #REF!
20 M' #REF! #REF!
2 Bh 1,500,000.00 3,000,000.00
2 Bh 750,000.00 1,500,000.00
2 Bh #REF! #REF!
2 Bh 150,000.00 300,000.00
Jumlah 32,896,842.76
41 Ttk 296,436.36 12,153,890.76
10 Ttk 142,795.20 1,427,952.00
11 Ttk 25,000.00 275,000.00
24 ttk 125,000.00 3,000,000.00
1 ttk 15,000,000.00 15,000,000.00
16 ttk 65,000.00 1,040,000.00
-
Jumlah 2,500,000.00
1 1.00 2,500,000.00 2,500,000.00
REKAPITULASI
DAN CEPAT TUMBUH
TRUKTUR
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rp 32,896,842.76
Rp 2,500,000.00
#REF!
#REF!
#REF!
#REF!
RENCANA ANGGARAN BIAYA
PROGRAM : PENGEMBANGAN WILAYAH STRATEGIS DAN CEPAT TUMBUH
KEGIATAN : PEMBANGUNAN/PENINGKATAN INFRASTRUKTUR
PEKERJAAN : REHAB RUMAH JABATAN BUPATI (LANJUTAN)
LOKASI : KUALA KAPUAS
B R. KELUARGA
1 Sofa 3 seater 2300 x 900 x 450/950 1 pcs
2 Sofa 2 seater 1700 x 900 x 450/950 1 pcs
3 Corner Table 500 x 500 x 500 1 pcs
4 Console 1000 x 400 x 1000 1 pcs
5 Almari TV 2600 x 400 x 2400 1 pcs
6 Almari Hias + Background 3000 x 400 x 2400 1 pcs
C R. TIDUR UTAMA
1 Bed 200 x 200 + Kasur King Koil + Nakas 1 set
2 Meja Rias + Kursi 1300 x 500 x 730 1 pcs
3 Puff 1200 x 500 x 450 1 pcs
4 Meja Kerja 1800 x 800 x 750 1 pcs
5 Dressoire TV 1800 x 520 x 550 1 pcs
6 Almari Kristal 850 x 520 x 1670 1 pcs
7 Meja Konsul 1100 x 400 x 850 1 pcs
8 Sofa 1 seater 1100 x 900 x 450/900 2 pcs
9 Meja Center Ø = 600 t = 700 1 pcs
10 Wardrobe 350 x 520 x 2400 3 pcs
11 Komode 1300 x 630 x 750 1 pcs
12 Komode 1500 x 630 x 750 1 pcs
13 Mirror 1000 x 40 x 1000 2 pcs
REKAPITULASI
SUB TOTAL
PAJAK PPn 10% X (A )
JUMLAH
Terbilang : Enam Ratus Enam Belas Juta Tujuh Ratus Lima BelasTOTAL
Ribu Ru
Harga Jumlah
Satuan Harga
14,300,000 14,300,000
7,150,000 21,450,000
2,275,000 2,275,000
1,300,000 1,300,000
4,875,000 4,875,000
44,200,000
14,300,000 14,300,000
10,400,000 10,400,000
2,275,000 2,275,000
2,275,000 2,275,000
19,500,000 19,500,000
16,250,000 16,250,000
65,000,000
52,000,000 52,000,000
7,150,000 7,150,000
3,250,000 3,250,000
19,500,000 19,500,000
9,750,000 9,750,000
5,850,000 5,850,000
4,875,000 4,875,000
2,925,000 5,850,000
2,275,000 2,275,000
9,750,000 29,250,000
5,850,000 5,850,000
7,150,000 7,150,000
1,950,000 3,900,000
156,650,000
32,500,000 32,500,000
7,150,000 7,150,000
3,900,000 7,800,000
15,600,000 15,600,000
8,450,000 8,450,000
71,500,000
52,000,000 52,000,000
19,500,000 40,000,000
26,000,000
& AKOMODASI 66,000,000
Page 12
73 Kaca Rayband 3mm M2 Rp 80,000.00
74 Kaca Rayband 5mm M2 Rp 100,000.00
75 Kaca Cermin 3 mm M2 Rp 93,720.00
76 Kaca Warna/Motif M2 Rp 562,320.00
78 Plywood 3 mm lbr Rp 60,000.00
80 Kalciboard 6 mm Lbr Rp 78,500.00
81 Gipsum Lbr Rp 82,500.00
82 teakwood lbr Rp 91,283.28
83 Plywood 9 mm Lbr Rp 149,526.00
84 List Gypsum M Rp 72,000.00
87 Kuda - kuda baja ringan M2 Rp 73,000.00
89 Seng gelombang Lbr Rp 44,000.00
90 Atap Metal Zincalume Lbr Rp 41,000.00
91 bubungan Atap zincalume lbr Rp 12,500.00
92 Mega roof 0.8x0.9m, 0.3 mm lbr Rp 53,931.60
93 Multi Sirap m2 Rp 68,790.48
94 multi roof 0.8x0.m, 0.3 mm m2 Rp 80,500.00
95 sakura roof 0.8x0.9,0.3mm lbr Rp 38,000.00
96 sakura roof 0.8x0.9,0.2mm lbr Rp 28,000.00
97 seng alumuniun 0.2 mm lbr Rp 47,797.20
98 seng plat untuk bubungan/talang m Rp 14,058.00
99 Atap Spandek lbr Rp 50,000.00
100 Rangka Plafond Holow 40.40.2 Btg Rp 30,000.00
101 Bubungan Genteng Beton lbr Rp 10,500.00
102 plastik talang lbr Rp 58,575.00
103 seng gelombang lbr Rp 44,235.84
105 Menie Besi Kg Rp 18,603.42
106 Ampelas lbr Rp 7,242.00
107 aqua proof klg Rp 45,700.00
108 cat Kilap Glotrex klg Rp 48,800.00
109 cat Kilap Platon klg Rp 50,500.00
110 Cat meni Kg Rp 42,174.00
111 cat dasar klg Rp 38,500.00
112 cat tembok matex 5 kg Klg Rp 52,800.00
113 dempul kayu klg Rp 35,700.00
114 fernis klg Rp 46,860.00
115 cat jotun 2.5 liter klg Rp 238,986.00
116 plamur tembok kg Rp 57,400.00
117 minyak cat btl Rp 15,762.00
118 tinner biasa ltr Rp 24,000.00
120 shower Bh Rp 447,300.00
121 bak mandi fiber Bh Rp 240,000.00
122 kloset duduk Bh Rp 890,340.00
123 kloset duduk toto atau setara bh Rp 2,506,300.00
124 kloset jongkok bh Rp 330,000.00
125 Bak Cuci Piring bh Rp 161,282.75
126 urinoir set Rp 950,000.00
127 floor drain Bh Rp 37,400.00
128 Tanki Air 1200 ltr Bh Rp 1,487,500.00
130 Bolam lampu 65 watt (Philips) Bh Rp 210,870.00
131 Bolam Hemat 18 watt philips Bh Rp 46,860.00
132 box kwh meter Bh Rp 1,640,100.00
133 Lampu Downlight bh Rp 117,150.00
134 Lampu Tl Philips 14 watt bh Rp 28,116.00
135 instalasi stop kontak untuk kayu bh Rp 70,383.72
136 instalasi stop kontak untuk Beton set Rp 142,795.20
137 instalasi titik lampu untuk Kayu Bh Rp 296,436.36
138 instalasi titik lampu untuk Beton Bh Rp 161,709.60
139 1 set sekring/MCB sekring 2 group Bh Rp 64,666.80
140 List Plank beton ringan lebar 60 cm M' Rp 234,300.00
141 Batu alam adhesif M2 Rp 208,740.00
142 Minyak residu/teeer Liter Rp 24,452.40
143 Hollow 40.40.2 mm Batang Rp 7,455.00
144 Kuas Bh Rp 17,040.00
145 Pek. Pasang septictank kapasitas 3000 liter Bh Rp 20,350,000.00
146 Pek. Pasang septictank kapasitas 1000 liter Bh Rp 8,250,000.00
147 Pintu Tempered kaca tebal 12 mm lengkap terpasang Unit Rp 8,800,000.00
Page 13
DAFTAR HARGA SATUAN UPAH
Page 14
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.175 85,000.00
Tukang Besi L.02 OH 0.175 100,000.00
Kepala Tukang L.03 OH 0.035 170,000.00
Mandor L.04 OH 0.018 215,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow M' 5.000 7,500.00
40.40.2 mm
Assesoris Ls 10%xrangka
(perkuatan, las dll)
Harga Satuan
N0 Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.400 90,000
Tukang batu L.02 OH 0.150 120,000
Kepala Tukang L.03 OH 0.015 170,000
Mandor L.04 OH 0.018 215,000
JUMLAH TENAGA KERJA
B BAHAN
Batako M2 8.50000 11,000.00
Semen porlan Kg 10.00000 1,325.00
Pasir Pasang m3 0.01330 113,000.00
14,875.00
17,500.00
5,950.00
3,870.00
37,500.00
9,375.00
89,070.00
13,360.50
102,430.50
Jumlah Harga
(Rp)
36,000.000
18,000.000
2,550.000
3,870.000
60,420.000
93,500.000
13,250.000
1,502.900
8.333333
108,252.900
0
168,672.90
25,300.94
193,973.84