Anda di halaman 1dari 1

Access Engineering Consultant

Proposed B+G+3 Labor Accomodation


Fixture Discharge Unit
Location of fixture
Type of Fixture Number of Fixture Fixture DU Total DU
Wash basin 33 0.3 9.9
Water Closeet 17 2 34
Ground Floor
Shower 17 0.5 8.5
kitch sink 10 0.5 5
Wash basin 44 0.3 13.2
Water Closeet 37 2 74
First Floor
Shower 31 0.5 15.5
kitch sink 0 0.5 0
Wash basin 44 0.3 13.2
Water Closeet 37 2 74
Second Floor
Shower 31 0.5 15.5
kitch sink 0 0.5 0
Wash basin 44 0.3 13.2
Water Closeet 37 2 74
Thrid Floor
Shower 31 0.5 15.5
kitch sink 0 0.5 0
Total DU 365.5

so Qww = k√ DU
K= 0.7
√DU = 19.12 L/S
Qww = 13.38 L/S

SIZE OF THE PIPE IS DN 150 @ 1.00 M/S VELOCITY

Anda mungkin juga menyukai