BAB I - BAB IV (CILEGON) New Edit
BAB I - BAB IV (CILEGON) New Edit
1 BAB I............................................................................................................... 4
PENDAHULUAN .................................................................................................. 4
1.3.1 Umum................................................................................................ 6
2. BAB II ............................................................................................................. 8
1
2.4 Analisa Hidrolika ................................................................................... 33
3.1.1 Umum.............................................................................................. 42
3.1.3 Kondisi Fisik Sistem Drainase dan Permasalahan Yang Terjadi Pada
Sistem Drainase ............................................................................................. 43
4 BAB IV .......................................................................................................... 42
2
4.1.2 Data Catchment Area ...................................................................... 42
3
1 BAB I
PENDAHULUAN
4
3. Dimensi Penampang
Ukuran dimensi sungai kurang proposional antara bagian hulu dan hilir
atau penyempitan di bagian hilir sehingga daya tamping berkurang
sedangkan air yang dialirkan lebih besar dari daya tamping tersebut.
4. Perusakan lahan
Seperti yang terjadi di beberapa wilayah, banyak kejadian banjir dan tanah
longsor karena ulah perusakan lahan. Tanah yang seharusnya jadi penahan
air menjadi tergerus dan menyebabkan banjir.
5. Pemukiman sembarangan
Pemukiman sembarangan menjadi faktor penyebab banjir yang utama
akibat meluapnya aliran sungai
LOKASI
5
1.2 MAKSUD DAN TUJUAN
Adapun maksud dari kajian ini adalah mengevaluasi dan merencanakan
kembali penampang saluran sumampir terutama daerah yang seringkali terkena
banjir bila sedang diguyur hujan
Tujuan dari evaluasi dan perencanaan saluran sumampir adalah mengkaji
saluran sumampir sebagai bagian dari sistem drainase Kota Cilegon
6
penduduk. Ketiga hal tersebut di atas merupakan factor penting dalam
penentuan strategi pembangunan suatu kota.
7
2. BAB II
TINJAUAN PUSTAKA
8
2.1.1 Definisi Banjir dan Genangan
Dalam Pedoman Penyusunan dan Sistem Peringatan Dini dan Evakuasi
untuk Banjir Bandang yang dikeluarkan oleh Kementrian Pekerjaan umum
di sebutkan, Banjir adalah Peristiwa meluapnya sungai dikarenakan hujan
atau faktor lainnya.
Banjir adalah keadaan aliran air atau elevasi muka air dalam sungai, kali dan
kanal yang lebih besar atau lebih tinggi dari normal.Genangan adalah
peristiwa terhentinya air atau air tidak mengalir dan bisa saja di suatu lokasi
ada genangan air meski tinggi muka air di sungai masih di bawah rata-rata.
Secara substansi Banjir dan genangan dapat dikatakan sama, yaitu air yang
menggenang, Namun secara teknis penanganan Banjir dan genangan bisa
berbeda karena genangan hanya disebabkan oleh tersumbat atau terhentinya
saluran.
2.1.2 Cara Pengendalian Banjir
Cara pengendalian banjir dapat di klasifikasikan menjadi dua bagian yaitu
cara structural dan nonstructural, kedua cara tersebut dapat dilihat dari
gambar dibawah ini :
9
Pengendalian Banjir
6. Sistem Drainase
Gambar 2.2: Pengendalian banjir metode struktur dan nonstruktur
Terdapat tiga macam cara yang berbeda dalam menentukan tinggi curah
hujan rata-rata pada daerah tertentu di beberapa titik pos penakar atau
pencatat hujan.Menurut Suyono Sosrodarsono, pada umumnya untuk
menentukan metode curah hujan daerah yang sesuai adalah dengan
10
menggunakan standar luas daerah, sebagai berikut (Sosrodarsono, 2003 :
51) :
d1 d 2 d 3 ... d n n
d
d i
n i 1 n
dimana :
Cara ini akan memberikan hasil yang dapat dipercaya jika pos-pos
penakarnya ditempatkan secara merata di daerah tersebut, dan hasil
11
penakaran masing-masing pos penakar tidak menyimpang jauh dari nilai
rata-rata seluruh pos di seluruh areal (Soemarto, 1999 : 10).
A1d1 A2 d 2 ... An d n n
Ad n
Ad
d i i i i
A1 A2 ... An i l Ai i l A
dimana :
A = luas areal
12
Sumber : Soemarto, 1999 : 11
d 0 d1 d d2 d dn
A1 1 A2 ... n 1 An
d 2 2 2
A1 A2 ... An
dengan :
d0, d1, …dn = curah hujan pada isohyet 0,1,2, …,nA1, A2,
A3,…An = luas bagian areal yang dibatasi oleh isohyet-
isohyet yang bersangkutan.
13
2.1.2 Pemilihan Metode Perhitungan Hujan Rancangan
Pada daerah studi, pemilihan metode perhitungan hujan rancangan
ditetapkan berdasarkan parameter dasar statistiknya. Berikut perhitungan
parameter dasar statistik, sebagai berikut :
Nilai Rata – Rata
X
i =1
i
X=
n
dimana :
X = nilai rata-rata
Xi = nilai varian ke i
n = banyaknya data
Standar Deviasi
X
n
2
i -X
i=l
Sd =
n -1
dimana :
Sd = standar deviasi
X = nilai rata-rata
Xi = nilai varian ke i
n = banyaknya data
14
Koefisien Skewness
(X - X)
n 3
i
(n - 1) (n - 2) i=l
Cs = 3
Sd
dimana :
Cs = Koefisien Skewness
Sd = Standar Deviasi
X = Nilai Rata-Rata
Xi = Nilai Varian ke i
n = Banyaknya Data
Koefisien Kurtosis
X - X
n
4
n2 i
i=l
Ck =
(n - 1) (n - 2) (n - 3) Sd 4
dimana :
Ck = Koeffisien Kurtosis
Sd = Standar Deviasi
X = Nilai Rata-Rata
Xi = Nilai Varian ke i
n = Banyaknya Data
15
Kofisien Variasi
𝑆𝑑
Cv= 𝑋
Dimana:
Cv = koefisien Variasi
Sd = Standar Deviasi
X = Nilai Rata-rata.
16
Tabel 2.1 :Kriteria Penentuan Jenis Sebaran
Xt X k.Sd
dimana :
k = faktor frekuensi
YT Yn
k
Sn
dimana:
YT = reduced variate
Yn = rerata (reduced)
17
Dimana untuk nilai dari masing masing adalah sebahai berikut:
2 0.3665
5 1.4999
10 2.2502
20 2.9702
25 3.1985
18
Periode Ulang (T) Yt
50 3.9019
100 4.6001
200 5.295
T 1
Yt Ln Ln r
Tr
dimana:
𝟏𝟐𝟏𝟖𝒕+𝟓𝟒
Ri = Xt (𝑿𝒕 (𝟏−𝒕)+ 𝟏𝟐𝟕𝟐𝒕)
dimana :
𝑹
I= 𝒕
19
𝟏𝟏𝟑𝟎𝟎𝒕 𝑿𝒊
R = √ 𝒕+𝟑,𝟏𝟐 [𝟏𝟎𝟎]
dimana :
C. Distribusi Normal
Fungsi densitas peluang normal dari variabel acak kontinyu X,dapat di
tulis sebagai berikut:
1 X 2
1
2
P( X ) e
2
Dimana:
P(x) =fungsi densitas peluang normal (ordinat kurva normal)
X = variabel acak kontinyu
20
Gambar 2.5:Kurva Distribusi Frekwensi Normal
X
1
1 t2
P(t ) e 2
dengan t
2
Tabel 2.5:Berbagai rumus yang dapat digunakan untuk perhitungan probabilitas dan
periode ulang
Rumus T Distribusi T untuk N = 50, M = 1
- California N
- 50
(1929) m
2N
- Hazen (1930) Normal 100
2m 1
- Bernard N 0,4
Pearson II 72
(1962) m 0,3
21
N 0,25
- Blom (1958) Normal 80,4
m 0,375
Exponential
- Gringorten N 0,12
89,5
(1963) m 0,44
Extreme value I
g log x
N 1N 2S log x 3
K = faktor penyimpangan untuk suatu periode ulang tertentu, yang
merupakan fungsi g log x tertentu.
a. Untuk hujan dengan waktu < 2 jam, Prof. Talbot (1881), memberikan
rumus :
𝑎
I= 𝑡+𝑏
dimana :
22
I = intensitas curah hujan (mm/jam),
a,b = konstanta yang tergantung pada lamanya hujan yang terjadi di DAS.
b. Untuk hujan dengan waktu > 2 jam, Prof. Sherman (1905), memberikan
rumus
𝑎
I= 𝑡n
dimana :
n = konstanta.
Adapun untuk mengetahui nilai dari a dab b salah satu caranya adalah
sebagaai berikut:
[𝐼][𝐼.𝑡]−𝑁[𝐼 2 ]
b= 𝑁[𝐼2 ]−[𝐼][𝐼]
dimana :
23
a, b = konstanta yang tergantung pada lamanya hujan yang terjadi di DAS.
𝑅24 24 2/3
I= [ ]
24 𝑡
dimana:
(suyono Sosrodarsono,144) :
𝒃𝒆𝒔𝒂𝒓𝒏𝒚𝒂𝒑𝒖𝒏𝒄𝒂𝒌𝒍𝒊𝒎𝒑𝒂𝒔𝒂𝒏
C1=𝒊𝒏𝒕𝒆𝒏𝒔𝒊𝒕𝒂𝒔𝒄𝒖𝒓𝒂𝒉𝒉𝒖𝒋𝒂𝒏𝒓𝒂𝒕𝒂−𝒓𝒂𝒕𝒂𝒔𝒆𝒍𝒂𝒎𝒂𝒘𝒂𝒌𝒕𝒖
𝒋𝒖𝒎𝒍𝒂𝒉𝒍𝒊𝒎𝒑𝒂𝒔𝒂𝒏
C1=𝒋𝒖𝒎𝒍𝒂𝒉𝑪𝒖𝒓𝒂𝒉𝑯𝒖𝒋𝒂𝒏
𝑋′
C=1- = 1-f’
𝑋𝑡
24
dimana:
C= koefisien pengaliran
C= 1-15.7/Xt
1 Hulu Sungai Biasa ^3/4
C= 1-5.65/Xt
2 Tengah Sungai Biasa ^1/2
C= 1-3.14/Xt
4 Tengah >200 mm ^1/3
C= 1-6.60/Xt
5 Hilir <200 mm ^1/2
Sumber:suyono sosrodarsono,1980.14
a. Curah hujan
Curah hujan kawasan dari stasiun curah hujan terdekat dengan dihitung
rumus menggunakan rumus sesuai tabel 2.6.
25
mengalir di permukaan dan yang kemudian masuk ke dalam badan
sungai.berdasarkan pertimbangan bahwa koefisien ini tergantung dari faktor-
faktor fisik. Seperti keadaan di atas maka besarnya angka koefisien pengaliran
pada suatu daerah dapat di lihat pada tabel berikut:
kondisi DAS C
pegunungan 0.75-0.90
∑𝑛
𝑖=1 𝐴𝑖.𝐶𝑖
Cm= ∑𝑛
𝑖=1 𝐴𝑖
dimana:
26
Ci= koefisien masing-masing tata guna lahan
Bisnis
kawasan pemukiman
perindustrian
27
TIPE DERAH TANGKAPAN KOEFISIEN ALIRAN (C)
jalan-jalan
beraspal 0.70-0.95
beton 0.80-0.95
atap 0.75-0.95
28
Rn C.R
dimana :
Q = 0.002778 x C x I x A
Dimana :
C = Koefisien aliran
A.R0
Qp
3,6.(0,3.T p T0,3 )
Dengan :
29
T0,3 = Waktu yang diperlukan oleh penurunan debit, dari puncak
sampai 30% dari debit puncak
Tp = tg + 0,8 tr
T0,3 = tg
Tr = 0,5 tg sampai tg
Metode ini juga biasa digunakan sebagai data hidrograf pada perencanaan
suatu DAS sebagai acuan dasar. Parameter-parameter data perhitungan
Hidrograf Satuan Metode Snyder-Alexeyev yaitu :
30
Dengan unsur-unsur tersebut di atas maka Snyder membuat model
hidrograf satuan sebgai berikut (Gray,1970;Chow ,et.all,1988;Bediet and
Huber,1992).
L * L c
n
t p Ct *
S
jika te = tr
time rise to peak (Tp) = tp
Qp q p * A
31
koefisien dan
Tp
Qp
A * h
besarnya ordinat y
1 x 2
y 10 x
Besarnya Qt
Qt Q p * y
Pasan Hasil akhir dari perhitungan debit banjir rancangan adalah informasi
kejadian banjir disertai probabilitas dan kala ulangnya (Return Period)
untuk masing-masing titik peninjauan.
32
2.4 Analisa Hidrolika
2.3.1 Definisi Drainase
Drainase berasal dari kata Drainage yang artinya mengeringkan atau
mengalirkan. Drainase merupakan tempat atau wadah untuk mengalirkan
air dari permukaan tanah menuju tempat pembuangan yang bersifat di
dalam tanah atau di permukaan.
a. Saluran Interseptor
Saluran ini adalah saluran yang berfungsi sebagai pencegah terjadinya
pembebanan aliran dari suatu daerah terhadap daerah lain di bawahnya.
+90
Daerah genangan
+80
Saluran interceptor
+70
+60
b. Saluran Kolektor
Berfungsi sebagai pengumpul aliran dari saluran drainase yang lebih kecil
misalnya saluran inseptor.Outlet saluran ini berada pada saluran konveyor
33
atau langsung ke sungai.Saluran ini berfungsi sebagai pengumpul dari
anak cabang saluran yang ada.
+70
+60
c. Saluran Konveyor
Saluran Konveyor berfungsi sebagai saluran pembawa seluruh air buangan
dari suatu daerah ke lokasi pembuang, Misalnya saluran / kanal Banjir atau
saluran bypass yang bekerja khusus hanya mengalirkan air secara cepat
sampai ke lokasi pembuangan
Daerah genangan
+90
Saluran konveyor
+80
+70
+60
Laut
34
Sumber :wesli ‘drainase perkotaan’
dimana :
n = kekasaran Manning,
dimana
R=A/P
35
Nilai koefisien n manning untuk berbagai macam saluran secara lengkap
dapat di lihat diberbagai referensi, disini hanya di tampilkan beberapa yang
di anggap paling sering di pakai dalam perencanaan praktis.
V=C√𝑅𝑆˳
dimana:
36
C= faktor tahanan aliran yang di sebut koefisien Chezy
c). Darcy-Weisbach
𝐿 𝑉2
hf = f 𝐷 2𝑔
8𝑔𝑅𝑆
V= √ 𝑓
8𝑔 1/2 8 1/2
C=[ 𝑓 ] atau V/U*=[𝑓]
dimana:
37
2.3.4 Geometri Penampang Melintang Saluran
a. Bentuk Saluran yang Paling Ekonomis
A=bxh
P = b+2h
R =A/P
38
m h
A= (b+(mh)) x h
P= b + 2h x √𝑚2 + 1
R=A/P
m h
A=h2tan 𝜃
Atau
𝐴
h=√tan 𝜃
P=(2h)sec 𝜃
2√𝐴
P= (sec 𝜃)
√tan 𝜃
39
Pada luas penampang A konstan dengan diferensial persamaan terhadap
𝜃 dan di buat sama dengan nol maka di peroleh persamaan sebgai
berikut:
Atau
2 tan2 𝜃-sec2𝜃=0
Atau
√2 tan 𝜃= sec 𝜃
1
Qsal=At 𝑥 𝑅𝑡 2/3 𝑆𝑡 1/2
𝑁𝑒𝑞
dimana:
At= luas profil basah total dari masing-masing sub-profil basah dalam m2
40
Rt= total jari-jari hidrolis dari masing-masing sub profil basah dalam m.
𝐴𝑡(𝑅𝑡)2/3
Neq= 1
∑𝑛
𝑖=1 𝐴𝑖𝑅𝑖
2/3
𝑛𝑡
41
3 BAB III
GAMBARAN UMUM LOKASI KAJIAN DAN
METODOLOGI
42
3.1.3 Kondisi Fisik Sistem Drainase dan Permasalahan Yang Terjadi Pada
Sistem Drainase
Daerah Aliran Saluran Sumampir terdiri dari pemukiman, jalan raya, taman,
pertokoan, tanah kosong, dan pesawahan, yang memiliki penampang alami
yang berkelok.
43
Gambar 3.3 Utilitas Yang Menghambat Aliran Sungai
44
menampung air limpasan dari saluran tersebut, sehingga sering terjadi
banjir.
3.2 METODOLOGI
Kajian suatu saluran perlu mempertimbangkan beberapa aspek yaitu sosial
budaya, ekonomi dan lingkungan.Untuk mencapai perencanaan yang tepat,
efektif dan efisien maka diperlukan metodologi perencanaan.
45
3.3.2.2 Data Hidrologi
Data debit di mata air yang terjadi selama 13 tahun terakhir dari hasil
pengamatan, yaitu dari tahun 2005 - 2017. Debit yang terkecil yang
digunakan sebagai debit andalan.
3.4 ANALISA DATA
Data primer dan data sekunder diolah untuk mendapatkan data daerah-
daerah yang dapat dikembangkan penyediaan air baku serta sistem yang
dapat digunakan. Hasil data olahan tersebut kemudian dianalisa dan
digunakan sebagai dasar perencanaan.
46
3.4.3 Analisa Dimensi dengan Metode HEC-RAS
Analisa dengan metode ini berfungsi untuk membandingkan antara hitungan
yang dilakukan dengan metode rasional dengan analisa menggunakan
program (HEC-RAS), yang nantinya akan diambil dimensi efektif dan
efisen yang telah disertakan angka keamanan agar dapat menampung debit
banjir yang telah direncanakan.
3.4.4 Detail Desain Awal (pra Desain)
Detail Desain adalah penentuaan debit rencana yang dilakukan dengan
melakukan perhitungan dengan cara rasional, kemudian hasil perhitungan
tersebut disimulasikan dengan menggunakan HEC-RAS. Dari Q5 dan Q10
yang telah dihitung akan direncanakan :
a. Penggunaan sempadan
b. Normalisasi sungai, dan
c. Perencanaan dimensi sungai pada daerah yang terjadi banjir.
3.5 PEMBAHASAN
Pada proses ini dilakukan perencanaaan teknis berupa :
a. Penetapan garis sempadan sungai
b. Perencanaan dimensi Sungai
c. Normalisasi sungai berupa peninggian tangul dan menabah kedalaman
sungai yang tercemar oleh limbah-limbah rumah tangga dan limbah
industri serta sedimentasi serta sering terjadi banjir.
3.6 HASIL PERENCANAAN TEKNIS
Pada kajian saluran sumampir sebagai sungai perkotaan direncanakan
sungai yang dapat menampung dan mengalirkan debit banjir Q5 dan Q10
dengan baik sehingga tidak terjadi lagi banjir. saluran sumampir dikelola
oleh Dinas Pengairan Kota Cilegon disebabkan sebagian besar saluran
sumampir terdapat di kota Cilegon. Bagan alir tahapan perencanaan Kajian
Kota Cilegon Sebagai Bagian Dari Drainase Kota Cilegon adalah sebagai
berikut:
47
Mulai
Persiapan
Tinjauan Literatur
Pengumpulan Data
- Keadaan umum
lokasi kajian - Data Topografi
Data Primer Data Sekunder
- Keadaan sungai - Data Hidrologi
eksisting
40
A
Perencanaan
Ulang Dimensi
Penampang
Sungai
Memenuhi
kriteria
hidrolis
Detail Desain
Selesai
41
4 BAB IV
ANALISA PERHITUNGAN
42
4.1.4 Keadaan Eksisting dari Hasil Tinjauan
4.1.5 Data Topografi
Keadaan topografi atau relief pada daerah Saluran Sumampir Kota Cilegon
memiliki Luas = 23.47 Ha, panjang saluran P = 484.46 meter dengan elevasi
lahan dan kemiringan sebesar Lt = 685.13 meter
Perhitungan ini dilakukan untuk mengetahui kondisi jumlah air yang mengalir
sepanjang Saluran Sumampir. Kondisi tersebut akan mempengaruhi untuk
menentukan debit banjir yang telah menjadi ketentuan adalah Q5. Data yang
digunakan untuk melakukan analisa hidrologi ini adalah data curah hujan 13
tahun terakhir di stasiun pengamatan A di daerah Cilegon.
Tabel 4.2 Angka kekasaran manning
43
4.2.2 Metode Gumbel
Perhitungan curah hujan rencana menurut Metode Gumbel, mempunyai
perumusan sebagai berikut :
XT = X + S x K
dimana :
XT : hujan rencana (mm)
X : nilai rata-rata dari hujan
S : Standar deviasi dari data hujan
K : Faktor frekuensi Gumbel : K= Yt – Yn
_______
Sn
t : reduced variate (lampiran tabel)`
Sn : reduced standar (lampiran tabel)
Yn : reduced mean (lampiran tabel)
No Tahun X X2
1 2005 275 75,625
2 2006 315 99,225
3 2007 120 14,400
4 2008 158 24,964
5 2009 196 38,416
6 2010 89 7,921
7 2011 240 57,600
8 2012 185 34,225
9 2013 270 72,900
10 2014 410 168,100
11 2015 315 99,225
12 2016 160 25,600
44
No Tahun X X2
13 2017 215 46,225
14 2018 0 0
15 2019 0 0
16 2020 0 0
17 2021 0 0
18 2022 0 0
19 2023 0 0
20 2024 0 0
21 2025 0 0
22 2026 0 0
23 2027 0 0
24 2028 0 0
25 2029 0 0
26 2030 0 0
27 2031 0 0
28 2032 0 0
Jumlah 2948 764,426
Sumber : Hasil Perrhitungan
Perhitungan :
2948
X = = 226.77
13
45
4.2.3 Metode Haspers Der Weduwen
Metode ini berasal dari kecenderungan curah hujan harian yang dikelompokkan
atas dasar anggapan bahwa curah hujan memiliki distribusi yang simetris dengan
durasi curah hujan lebih kecil dari satu jam dan durasi curah hujan lebih kecil
dari 1 sampai 24 jam (Melinda, 2007)
Perhitungan intensitas curah hujan Metode Haspers dan der Weduwen adalah
sebagai berikut :
𝟏𝟐𝟏𝟖𝒕+𝟓𝟒
Ri = Xt (𝑿𝒕 (𝟏−𝒕)+ 𝟏𝟐𝟕𝟐𝒕)
46
dimana :
t : Durasi curah hujan dalam satuan jam
Xt : Curah hujan maksimum yang terpilih
𝑹
I= 𝒕
dimana :
I : Intensitas curah hujan (mm/jam)
R, Rt : Curah hujan menurut Haspers dan Der Weduwen
t : Durasi curah hujan (jam)
Xt : Curah hujan harian maksimum yang terpilih (mm/hari)
Tabel 4.4 Data Perhitungan Statiun A
No urutan X
1 1 0
2 2 410
3 3 0
4 4 0
5 5 0
6 6 0
7 7 315
8 8 315
9 9 0
10 10 0
11 11 275
12 12 270
13 13 0
14 14 0
15 15 0
16 16 240
17 17 0
47
No urutan X
18 18 215
19 19 0
20 20 196
21 21 0
22 22 185
23 23 0
24 24 0
25 25 160
26 26 158
27 27 120
28 28 89
Jumlah 2948
Sumber : Hasil Perrhitungan
Maks m T Ut
410 1 14 1.8
410 2 7 1.17
Sumber : Hasil Perrhitungan
R = 226.77
U2 = - 0.22 U10 = 1.26
U5 = 0.64 U15 = 1.63
48
49
4.2.4 Rekapitulasi Curah Hujan Rata – Rata
Tabel 4.5 Curah Hujan Rata – Rata Metode Gumbel
CURAH HUJAN (mm)
PERIODE
NO METODE GUMBEL
ULANG
STASIUN A STASIUN B STASIUN C STASIUN D STASIUN E STASIUN F RATA-RATA
1 2 214.172 - - - - - 214.172
2 5 315.794 - - - - - 315.794
3 10 383.066 - - - - - 383.066
4 15 383.066 - - - - - 383.066
Sumber : Hasil Perrhitungan
Tabel 4.6 Curah Hujan Rata – Rata Metode Haspers
CURAH HUJAN (mm)
NO PERIODE ULANG METODE HASPER
STASIUN A STASIUN B STASIUN C STASIUN D STASIUN E STASIUN F RATA-RATA
1 2 198.345 611.325 634.156 595.563 639.435 617.353 198.345
2 5 309.458 523.452 559.274 523.601 549.930 545.008 309.458
3 10 389.563 1248.396 505.288 471.721 485.402 492.852 389.563
4 15 437.367 1442.073 473.072 440.761 446.894 461.727 437.367
Sumber : Hasil Perrhitungan
45
Tabel 4.6 Curah Hujan Maksimum
CURAH HUJAN (mm)
NO PERIODE ULANG METODE
GUMBEL HASPER MAX
1 2 214.172 198.345 214.172
2 5 315.794 309.458 315.794
3 10 383.066 389.563 389.563
4 15 383.066 437.367 437.367
Sumber : Hasil Perhitungan
46
4.2.5 Intensitas Hujan
Intensitas huan adalah tinggi atau kedalaman air hujan persatuan waktu.
Sifat umum hujan adalah semakin singkat hujan berlangsung intensitasnya
cenderung makin tinggi dan makin besar periode ulangnya makin tinggi
pula intensitasnya. Perhitungan intensitas curah hujan ini menggunakan
Metode Dr. Mononobe dan Metode Talbot dengan mengacu pada
Persamaan yang merupakan sebuah variasi dari persamaan-persamaan curah
hujan jangka pendek.
4.2.5.1 Perhitungan Metode Mononobe
Dalam perhitungan debit banjir rencana perhitungan intensitas hujan sangat
penting dilakukan dengan sebanyak mungkin data yang harus diperoleh.
Maka digunakanlah Metode Mononobe sebagai berikut sebagai pengganti /
peubah dari data hujan untuk intensitas harian ke data hujan menitan.
𝑹 𝟐𝟒 𝟐/𝟑
𝑰= ( )
𝟐𝟒 𝒕
214.172 24
I2 = ( )2/3 = 374.76 mm/jam
24 5/60
315.794 24
I5 = ( )2/3 = 552.57 mm/jam
24 5/60
389.563 24
I10 = ( )2/3 = 681.66 mm/jam
24 5/60
437.367 24
I15 = ( )2/3 = 765.30 mm/jam
24 5/60
Keterangan :
I : Intensitas Curah Hujan (mm/menit)
T : lamanya curah hujan atau durasi (menit)
R : besarnya intensitas hujan (mm/jam/hari)
47
Tabel 4.7 Tabel Intensitas hujan untuk periode ulang T pada durasi t (Metode Mononobe)
214.1719 60
R2 = i= Rx
24 t
= 8.9238 mm
Tabel 4.8 Intensitas hujan untuk periode ulang 2 tahun (Metode Talbot)
49
No t (menit) i. ixt i.2 i2 t
16 80 6.6929 535.4297 44.7945 3583.561653
17 85 6.2992 535.4297 39.6796 3372.763908
18 90 5.9492 535.4297 35.3932 3185.388136
Jumlah 374.2769 9637.734 18243.4 200398.9645
Sumber : Hasil Perhitungan
100820369.6
a =
188298.0626
= 535.4296706 535.42967
I5 =
t+0
0
b =
188298.0626
= 0
315.7936 60
R5 = i= Rx
24 t
= 13.1581 mm
Tabel 4.9 Intensitas hujan untuk periode ulang 5 tahun (Metode Talbot)
50
No t (menit) i. ixt i.2 i2 t
13 65 12.1459 789.484 147.523 9588.998647
14 70 11.2783 789.484 127.201 8904.070172
15 75 10.5265 789.484 110.806 8310.465494
16 80 9.8685 789.484 97.3883 7791.061401
17 85 9.2880 789.484 86.2678 7332.763671
18 90 8.7720 789.484 76.9488 6925.387912
Jumlah 551.8663 14210.71 39663.2 435689.6262
Sumber : Hasil Perrhitungan
Tabel 4.10 Intensitas hujan untuk periode ulang 10 tahun (Metode Talbot)
51
No t (menit) i1 ixt i2 i2t
13 65 14.983182 973.9068 224.496 14592.22253
14 70 13.912954 973.9068 193.57 13549.92092
15 75 12.985424 973.9068 168.621 12646.59286
16 80 12.173835 973.9068 148.202 11856.1808
17 85 11.457727 973.9068 131.28 11158.7584
18 90 10.821187 973.9068 117.098 10538.82738
Jumlah 680.78191 17530.32 60358.1 663018.1329
Sumber : Hasil Perrhitungan
Tabel 4.11 Intensitas hujan untuk periode ulang 15 tahun (Metode Talbot)
52
No t (menit) i1 ixt i2 i2t
11 55 19.880325 1093.418 395.227 21737.50369
12 60 18.223632 1093.418 332.101 19926.04505
13 65 16.821814 1093.418 282.973 18393.27235
14 70 15.620256 1093.418 243.992 17079.46718
15 75 14.578905 1093.418 212.544 15940.83604
16 80 13.667724 1093.418 186.807 14944.53378
17 85 12.86374 1093.418 165.476 14065.44356
18 90 12.149088 1093.418 147.6 13284.03003
Jumlah 764.32275 19681.52 76080.5 835724.1721
Sumber : Hasil Perhitungan
Dari perhitungan yang dilakukan dengan cara yang sama, maka perhitungan
untuk intensitas hujan selanjutnya akan ditampilkan dalam bentuk tabel
seperti berikut :
Tabel 4.12 Intensitas Curah Hujan Metode Talbot
Intensitas Curah Hujan (mm/jam)
No t (menit)
I2 I5 I10 I15
1 5 107.0859341 157.8967906 194.7813609 218.6835799
2 10 53.54296706 78.9483953 97.39068047 109.3417899
3 15 35.69531138 52.63226353 64.92712032 72.89452663
4 20 26.77148353 39.47419765 48.69534024 54.67089497
5 25 21.41718683 31.57935812 38.95627219 43.73671598
6 30 17.84765569 26.31613177 32.46356016 36.44726331
7 35 15.29799059 22.55668437 27.82590871 31.24051141
8 40 13.38574177 19.73709883 24.34767012 27.33544749
9 45 11.89843713 17.54408784 21.64237344 24.29817554
10 50 10.70859341 15.78967906 19.47813609 21.86835799
11 55 9.735084921 14.35425369 17.70739645 19.88032544
12 60 8.923827844 13.15806588 16.23178008 18.22363166
13 65 8.237379548 12.14590697 14.98318161 16.82181384
14 70 7.648995295 11.27834219 13.91295435 15.62025571
53
Intensitas Curah Hujan (mm/jam)
No t (menit)
I2 I5 I10 I15
15 75 7.139062275 10.52645271 12.98542406 14.57890533
16 80 6.692870883 9.868549413 12.17383506 13.66772374
17 85 6.299172596 9.288046506 11.45772711 12.86373999
18 90 5.949218563 8.772043922 10.82118672 12.14908777
Sumber : Hasil Perrhitungan
54
Gambar 4.4 Grafik intensitas Curah Hujan Metode Mononobe
55
Gambar 4.5 Grafik intensitas Curah Hujan Metode Talbot
56
4.2.6 Analisa Debit Rencana
4.2.6.1 Perhitungan Debit Rencana 5 Tahunan
Perkiraan debit banjir dilakukan dengan Metode Rasional dan dilakukan
pula perhitungan menggunakan program Hec-Ras. Perhitungan debit banjir
rencana yang dilakukan sebelumnya akan menjadi patokan atau debit
rencana yang akan dipakai untuk kajian ini, sehingga tidak terjadi banjir
pada tempat kajian ini. Untuk merencanakan debit banjir rencana selain
intensitas curah hujan komponen utama yang harus dicari koefisien
tampungan dan pengaliran juga menjadi sangat penting untuk melihat
konsentrasi air berapa lama untuk mengalirkan air dari awal saluran sampai
akhirnya bermuara.
Keterangan
A : Luas areal (Ha)
Ls : Panjang Saluran (m)
Lt : Panjang aliran terjauh diatas lahan (m)
St : Kemiringan lahan (%)
to : Waktu untuk mengalir dari permukaan lahan ke saluran terdekat
(menit)
td : Waktu pengaliran dalam saluran (menit)
tc : Waktu pengumpulan air (menit)
57
Cs : Faktor koefisien konsentrasi
I : Intensitas curah hujan (mm/jam)
C : Koefisien pengaliran
A = 23.470 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.127725 0.77
to = 0.0197 x ( )
0.06324555
to = 25.1894 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 25.1894
tc = 94.7846 menit
58
Penentuan Intensitas dengan Metode Mononobe Untuk T = 5 tahun
59
4.2.6.1.2 Hasil Simulasi Hec – Ras pada penampang saluran CR 1 – CR13
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 1 CR1
.016
34.0 Legend
33.5 EG PF 1
WS PF 1
Elevation (m)
33.0
Crit PF 1
32.5 Ground
Bank Sta
32.0
31.5
31.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4
Station (m )
34.0 WS PF 1
Elevation (m)
Ground
33.5
Bank Sta
33.0
32.5
32.0
31.5
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (m )
34.0 WS PF 1
Elevation (m)
Ground
33.5
Bank Sta
33.0
32.5
32.0
31.5
0 1 2 3 4 5 6
Station (m )
57
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 4 CR4
.016
35.0 Legend
34.5
EG PF 1
34.0 WS PF 1
Elevation (m)
33.5 Ground
33.0 Bank Sta
32.5
32.0
31.5
31.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
34 Ground
Bank Sta
33
32
31
0 1 2 3 4
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
34 Ground
Bank Sta
33
32
31
0 1 2 3 4 5 6 7
Station (m )
58
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 7 CR7
.016
36 Legend
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5 6
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5
Station (m )
59
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 10 CR10
.016
36 Legend
35 EG PF 1
WS PF 1
Elevation (m) 34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
33
Bank Sta
32
31
30
29
0 1 2 3 4 5 6 7
Station (m )
60
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 13 CR13
.016
36 Legend
35 EG PF 1
34 WS PF 1
Elevation (m) Ground
33
Bank Sta
32
31
30
29
0 1 2 3 4 5 6 7
Station (m )
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.127725 0.77
to = 0.0197 x ( )
0.07071068
to = 23.1157 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
Tc = td + to
tc = 69.5952 + 23.1157
61
tc = 92.7109 menit
2 tc = 185.4218563
Cs =
2 tc + td 185.421856 + 69.5952
Cs = 0.7271
33 Ground
32 Bank Sta
31
30
29
28
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (m )
62
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 15 CR15
.016
36 Legend
35
EG PF 1
34 WS PF 1
Elevation (m) 33 Ground
32 Bank Sta
31
30
29
28
0 1 2 3 4
Station (m )
33 Ground
32 Bank Sta
31
30
29
28
0.0 0.5 1.0 1.5 2.0
Station (m )
33 Ground
32 Bank Sta
31
30
29
28
0.0 0.5 1.0 1.5 2.0
Station (m )
63
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 18 CR18
.016
36 Legend
EG PF 1
34 WS PF 1
Elevation (m) Ground
32 Bank Sta
30
28
0.0 0.5 1.0 1.5 2.0 2.5
Station (m )
EG PF 1
34
WS PF 1
Elevation (m)
32 Ground
Bank Sta
30
28
26
0.0 0.5 1.0 1.5 2.0 2.5
Station (m )
EG PF 1
34
WS PF 1
Elevation (m)
32 Ground
Bank Sta
30
28
26
0 1 2 3 4 5
Station (m )
64
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 21 CR21
.016
36 Legend
EG PF 1
34
WS PF 1
Elevation (m) 32 Ground
Bank Sta
30
28
26
0 1 2 3 4 5
Station (m )
EG PF 1
34
WS PF 1
Elevation (m)
32 Ground
Bank Sta
30
28
26
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (m )
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0 1 2 3 4
Station (m )
65
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 24 CR24
.016
38 Legend
36 EG PF 1
WS PF 1
Elevation (m) 34
Ground
32 Bank Sta
30
28
26
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6 7
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
66
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 27 CR27
.016
38 Legend
36 EG PF 1
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 2 4 6 8 10
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
67
685.127725 0.77
to = 0.0197 x ( )
0.04167105
to = 34.7326 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
Tc = td + to
tc = 69.5952 + 34.7326
tc = 104.3279 menit
2 tc = 208.6557495
Cs =
2 tc + td 208.65575 + 69.5952
Cs = 0.7499
Penentuan Intensitas dengan Metode Mononobe Untuk T = 5 tahun
68
4.2.6.1.5 Hasil Simulasi Hec – Ras pada penampang saluran CR 29 – CR 43
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 29 CR29
.016
38 Legend
36 EG PF 1
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4
Station (m )
69
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 32 CR32
.016
38 Legend
36 EG PF 1
34 WS PF 1
Elevation (m) 32
Ground
Bank Sta
30
28
26
24
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
70
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 35 CR35
.016
38 Legend
36 EG PF 1
34 WS PF 1
Elevation (m) Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Station (m )
71
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 38 CR38
.016
38 Legend
36 EG PF 1
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5 6 7 8
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 2 4 6 8 10
Station (m )
72
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 41 CR41
.016
38 Legend
36
EG PF 1
34 WS PF 1
Elevation (m) 32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5 6
Station (m )
73
4.2.6.1.6 Saluran CR 44 – CR 51
Jika diketahui data-data sebagai berikut :
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.13 0.77
to = 0.0197 x ( )
0.04167105
to = 34.7326 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 34.7326
tc = 104.3279 menit
2 tc 208.6557495
Cs =
2 tc + td = 208.65575 + 69.5952
Cs = 0.7499
74
Penentuan Intensitas dengan Metode Mononobe Untuk T = 5 tahun
32 Ground
30 Bank Sta
28
26
24
22
0 2 4 6 8
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
75
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 46 CR46
.016
38 Legend
36
EG PF 1
34
WS PF 1
Elevation (m) 32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6 7
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
76
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 49 CR49
.016
38 Legend
36
EG PF 1
34
WS PF 1
Elevation (m)
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m ) \
Gambar 4.56 Profile Steady Flow CR 50
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6 7
Station (m )
77
4.2.6.1.8 Saluran CR 52 – CR 64
Jika diketahui data-data sebagai berikut :
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.127725 0.77
to = 0.0197 x ( )
0.03007319
to = 44.6490 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 44.6490
tc = 114.2443 menit
2 tc 228.4885433
Cs =
2 tc + td = 228.488543 + 69.5952
Cs = 0.7665
78
Penentuan Intensitas dengan Metode Mononobe Untuk T = 5 tahun
32
Ground
30
Bank Sta
28
26
24
22
20
0 2 4 6 8
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 2 4 6 8
Station (m )
79
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 54 CR54
.016
38 Legend
36
EG PF 1
34
Elevation (m) 32 WS PF 1
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (m )
80
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 57 CR57
.016
38 Legend
36
EG PF 1
34
Elevation (m) 32 WS PF 1
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8 10
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8 10 12
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (m )
81
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 60 CR60
.016
38 Legend
36
EG PF 1
34
32 WS PF 1
Elevation (m)
30 Ground
28 Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (m )
82
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 63 CR63
.016
38 Legend
36
EG PF 1
34
Elevation (m)
32 WS PF 1
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
Dari titik pengamatan setelah dilakukan simulasi menggunakan Hec – Ras untuk
periode ulang 5 tahunan, terlihat bahwa di semua titik tidak dapat menampung
air dikarenakan di seluruh titik simulasi hampir atau sampai mencapai titik batas
ketentuan air meluap.
Maka dari itu perlu dilakukan perencanaan ulang, dengan
memperkirakan debit serta tinggi rencana penampang agar mampu menampung
air yang tersedia.
83
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
Saluran DAS
38 Legend
36
EG PF 1
34 WS PF 1
32 Crit PF 1
Elevation (m)
30 Ground
28
26
24
22
20
18
0 50000 100000 150000 200000
Main Channel Distance (m)
4 Legend
Vel Chnl PF 1
3
0
0 50000 100000 150000 200000
Main Channel Distance (m)
84
CILEGON Plan: Plan 01 5/19/2018
Geom: CILEGON Flow: Flow 01
Hydr Depth L (m), Hydr Depth C (m), Hydr Depth R (m) Saluran DAS
18 Legend
16
Hydr Depth C PF 1
14
12
10
0
0 50000 100000 150000 200000
Main Channel Distance (m)
85
4.2.6.1.10 Perhitungan Debit Rencana 10 Tahunan
4.2.6.1.11 Saluran CR 1 – CR 13
Jika diketahui data-data sebagai berikut :
A = 23.470 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.127725 0.77
to = 0.0197 x ( )
0.06324555
to = 25.1894 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 25.1894
tc = 94.7846 menit
2 tc 189.5692059
Cs =
2 tc + td = 189.569206 + 69.5952
Cs = 0.7315
86
Penentuan Intensitas dengan Metode Mononobe Untuk T = 10 tahun
33.5 EG PF 1
WS PF 1
Elevation (m)
33.0
Crit PF 1
32.5 Ground
Bank Sta
32.0
31.5
31.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4
Station (m )
34.0 Ground
33.5 Bank Sta
33.0
32.5
32.0
31.5
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (m )
87
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 3 CR3
.016
36 Legend
EG PF 1
35
Elevation (m) WS PF 1
34 Ground
Bank Sta
33
32
31
0 1 2 3 4 5 6
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
34 Ground
Bank Sta
33
32
31
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
34 Ground
Bank Sta
33
32
31
0 1 2 3 4
Station (m )
88
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 6 CR6
.016
36 Legend
EG PF 1
35
WS PF 1
Elevation (m)
34 Ground
Bank Sta
33
32
31
0 1 2 3 4 5 6 7
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5 6
Station (m )
89
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 9 CR9
.016
36 Legend
35 EG PF 1
Elevation (m) WS PF 1
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5
Station (m )
35 EG PF 1
WS PF 1
Elevation (m)
34
Ground
33 Bank Sta
32
31
30
0 1 2 3 4 5
Station (m )
90
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 12 CR12
.016
36 Legend
35 EG PF 1
34 WS PF 1
Elevation (m)
Ground
33
Bank Sta
32
31
30
29
0 1 2 3 4 5 6 7
Station (m )
34 WS PF 1
Elevation (m)
Ground
33
Bank Sta
32
31
30
29
0 1 2 3 4 5 6 7
Station (m )
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
91
685.127725 0.77
to = 0.0197 x ( )
0.07071068
to = 23.1157 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 23.1157
tc = 92.7109 menit
2 tc 185.4218563
Cs =
2 tc + td = 185.421856 + 69.5952
Cs = 0.7271
Penentuan Intensitas dengan Metode Mononobe Untuk T = 10 tahun
92
4.2.6.1.14 Hasil Simulasi Hec – Ras pada penampang saluran CR 14 – CR 28
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 14 CR14
.016
36 Legend
35
EG PF 1
34 WS PF 1
Elevation (m)
33 Ground
32 Bank Sta
31
30
29
28
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (m )
33 Ground
32 Bank Sta
31
30
29
28
0 1 2 3 4
Station (m )
34
Ground
33
Bank Sta
32
31
30
29
28
0.0 0.5 1.0 1.5 2.0
Station (m )
93
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 17 CR17
.016
38 Legend
EG PF 1
36
WS PF 1
Elevation (m)
34 Ground
Bank Sta
32
30
28
0.0 0.5 1.0 1.5 2.0
Station (m )
EG PF 1
36
WS PF 1
Elevation (m)
34 Ground
Bank Sta
32
30
28
0.0 0.5 1.0 1.5 2.0 2.5
Station (m )
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0.0 0.5 1.0 1.5 2.0 2.5
Station (m )
94
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 20 CR20
.016
38 Legend
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0 1 2 3 4 5
Station (m )
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0 1 2 3 4 5
Station (m )
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (m )
95
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 23 CR23
.016
38 Legend
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0 1 2 3 4
Station (m )
36 EG PF 1
WS PF 1
Elevation (m)
34
Ground
32 Bank Sta
30
28
26
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6 7
Station (m )
96
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 26 CR26
.016
38 Legend
36 EG PF 1
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 2 4 6 8 10
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
97
4.2.6.1.15 Saluran CR 29 – CR 43
Jika diketahui data-data sebagai berikut :
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.127725 0.77
to = 0.0197 x ( )
0.04167105
to = 34.7326 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 34.7326
tc = 104.3279 menit
2 tc 208.6557495
Cs =
2 tc + td = 208.65575 + 69.5952
Cs = 0.7499
98
Penentuan Intensitas dengan Metode Mononobe Untuk T = 10 tahun
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5
Station (m )
99
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 31 CR31
.016
38 Legend
36 EG PF 1
Elevation (m) 34 WS PF 1
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
100
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 34 CR34
.016
38 Legend
36 EG PF 1
Elevation (m)
34 WS PF 1
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5 6
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4 5
Station (m )
101
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 37 CR37
.016
38 Legend
36 EG PF 1
Elevation (m) 34 WS PF 1
Ground
32
Bank Sta
30
28
26
24
0.0 0.5 1.0 1.5 2.0 2.5 3.0
Station (m )
34 WS PF 1
Elevation (m)
Ground
32
Bank Sta
30
28
26
24
0 1 2 3 4
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5 6 7 8
Station (m )
102
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 40 CR40
.016
38 Legend
36
EG PF 1
34 WS PF 1
Elevation (m)
32 Ground
30 Bank Sta
28
26
24
22
0 2 4 6 8 10
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5
Station (m )
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5
Station (m )
103
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 43 CR43
.016
38 Legend
36
EG PF 1
Elevation (m)
34 WS PF 1
32 Ground
30 Bank Sta
28
26
24
22
0 1 2 3 4 5 6
Station (m )
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.13 0.77
to = 0.0197 x ( )
0.04167105
to = 34.7326 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 34.7326
104
tc = 104.3279 menit
2 tc 208.6557495
Cs =
2 tc + td = 208.65575 + 69.5952
Cs = 0.7499
Penentuan Intensitas dengan Metode Mononobe Untuk T = 10 tahun
32 Ground
30 Bank Sta
28
26
24
22
0 2 4 6 8
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
105
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 46 CR46
.016
38 Legend
36
EG PF 1
34
WS PF 1
Elevation (m)
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6 7
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
106
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 49 CR49
.016
38 Legend
36
EG PF 1
34
WS PF 1
Elevation (m)
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6 7
Station (m )
107
4.2.6.1.19 Saluran CR 52 – CR 64
Jika diketahui data-data sebagai berikut :
A = 23.47 Ha
Lt 0.77
to = 0.0197 x ( )
St
685.127725 0.77
to = 0.0197 x ( )
0.03007319
to = 44.6490 menit
td = Ls v= 0.7 m/det
v
2923
td = = 69.5952 menit
0.7
tc= td + to
tc = 69.5952 + 44.6490
tc = 114.2443 menit
2 tc 228.4885433
Cs =
2 tc + td = 228.488543 + 69.5952
Cs = 0.7665
108
Penentuan Intensitas dengan Metode Mononobe Untuk T = 10 tahun
32
Ground
30
Bank Sta
28
26
24
22
20
0 2 4 6 8
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 2 4 6 8
Station (m )
109
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 54 CR54
.016
40 Legend
EG PF 1
35
Elevation (m) WS PF 1
30 Ground
Bank Sta
25
20
15
0 2 4 6 8
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
30 Ground
Bank Sta
25
20
15
0 2 4 6 8
Station (m )
110
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 57 CR57
.016
38 Legend
36
EG PF 1
34
32 WS PF 1
Elevation (m)
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8 10
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 2 4 6 8 10 12
Station (m )
30 Ground
28 Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (m )
111
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 60 CR60
.016
40 Legend
EG PF 1
35
WS PF 1
Elevation (m)
30 Ground
Bank Sta
25
20
15
0 1 2 3 4 5 6 7 8
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
30 Ground
Bank Sta
25
20
15
0 1 2 3 4 5 6 7 8
Station (m )
EG PF 1
35
WS PF 1
Elevation (m)
30 Ground
Bank Sta
25
20
15
0 1 2 3 4 5 6 7 8
Station (m )
112
CILEGON Plan: Plan 01 5/20/2018
Geom: CILEGON Flow: Flow 01
River = Saluran Reach = DAS RS = 63 CR63
.0315
40 Legend
EG PF 1
35
WS PF 1
Elevation (m)
30 Ground
Bank Sta
25
20
15
0 2 4 6 8
Station (m )
32
Ground
30
Bank Sta
28
26
24
22
20
0 1 2 3 4 5 6
Station (m )
113
4.2.7 Analisa penampang rencana baru
V KONTROLE WAKING
SALURAN V-1
- CR - 1 1.163 1.163 1.163 0.200 2.812 3.648 0.200 0.116 3.270 4.243 0.116 7.746
- CR - 2 1.365 1.365 1.365 0.710 1.680 1.638 0.650 0.485 2.293 2.236 0.444 5.457
- CR - 3 1.718 1.718 1.718 0.210 2.770 2.100 0.160 0.180 4.759 3.608 0.137 8.684
- CR - 4 1.581 1.581 1.581 0.350 1.548 1.536 0.360 0.277 2.447 2.428 0.285 5.437
- CR - 5 2.150 2.150 2.150 0.510 1.470 1.530 0.450 0.548 3.161 3.290 0.484 7.482
- CR - 6 1.733 1.733 1.733 2.360 1.170 1.110 0.420 2.045 2.028 1.924 0.364 6.360
- CR - 7 1.780 1.780 1.780 0.370 1.380 1.330 0.420 0.329 2.456 2.367 0.374 5.527
- CR - 8 1.734 1.734 1.734 1.420 1.130 1.170 1.330 1.231 1.959 2.029 1.153 6.372
- CR - 9 2.050 2.050 2.050 1.490 0.520 0.500 1.600 1.527 1.066 1.025 1.640 5.258
- CR - 10 1.747 1.747 1.747 1.500 0.700 0.700 1.600 1.310 1.223 1.223 1.398 5.154
- CR - 11 3.052 3.052 3.052 1.450 0.500 0.500 1.600 2.213 1.526 1.526 2.442 7.706
- CR - 12 2.871 2.871 2.871 0.910 0.120 0.780 1.370 1.306 0.345 2.239 1.967 5.857
- CR - 13 1.956 1.956 1.956 0.940 0.090 0.780 1.370 0.919 0.176 1.526 1.340 3.961
- CR - 13a
- CR - 14 2.052 2.052 2.052 0.370 1.490 1.510 0.350 0.380 3.057 3.099 0.359 6.895
- CR - 15 1.997 1.997 1.997 0.570 1.078 1.100 0.300 0.569 2.153 2.197 0.300 5.218
- CR - 16 2.045 2.045 2.045 0.300 1.134 1.134 0.300 0.307 2.319 2.319 0.307 5.252
- CR - 17 1.889 1.889 1.889 0.300 1.323 1.323 0.300 0.283 2.499 2.499 0.283 5.565
114
V KONTROLE WAKING
SALURAN V-1
- CR - 28 1.473 1.473 1.473 1.550 0.495 2.010 0.500 1.142 0.729 2.961 0.368 5.200
- CR - 29 1.465 1.465 1.465 0.400 1.380 1.740 0.600 0.293 2.022 2.549 0.440 5.303
- CR - 30 1.219 1.219 1.219 0.510 2.660 1.596 0.730 0.311 3.243 1.946 0.445 5.944
- CR - 31 1.190 1.190 1.190 0.400 3.116 1.482 0.470 0.238 3.708 1.764 0.280 5.989
- CR - 32 1.362 1.362 1.362 0.500 2.280 1.320 0.610 0.341 3.105 1.798 0.415 5.659
- CR - 32a
- CR - 32b
- CR - 33 1.020 1.020 1.020 0.290 3.528 3.192 0.380 0.148 3.599 3.256 0.194 7.196
- CR - 34 1.290 1.290 1.290 0.320 2.210 2.142 0.370 0.206 2.851 2.763 0.239 6.059
- CR - 35 1.232 1.232 1.232 0.380 2.337 2.337 0.340 0.234 2.879 2.879 0.209 6.202
115
V KONTROLE WAKING
SALURAN V-1
- CR - 43 2.330 2.330 2.330 0.460 1.690 1.630 0.440 0.536 3.938 3.798 0.513 8.784
- CR - 43a 2.308 2.308 2.308
- CR - 44 2.370 2.370 2.370 0.350 2.200 2.200 0.510 0.415 5.214 5.214 0.604 11.447
- CR - 45 2.403 2.403 2.403 0.630 2.140 2.010 0.470 0.757 5.142 4.830 0.565 11.294
- CR - 46 2.378 2.378 2.378 0.700 2.000 1.950 0.350 0.832 4.756 4.637 0.416 10.642
- CR - 47 2.300 2.300 2.300 0.750 1.900 2.000 0.300 0.863 4.370 4.600 0.345 10.178
- CR - 48 2.141 2.141 2.141 0.400 2.100 2.300 0.350 0.428 4.496 4.924 0.375 10.223
116
V KONTROLE WAKING
SALURAN V-1
- CR - 51 2.141 2.141 2.141 0.620 2.310 2.310 0.260 0.664 4.946 4.946 0.278 10.833
- CR - 52 4.141 4.141 4.141 0.350 4.130 1.960 0.900 0.725 17.102 8.116 1.863 27.807
- CR - 53 4.035 4.035 4.035 0.400 2.800 1.740 1.290 0.807 11.298 7.021 2.603 21.728
- CR - 54 4.344 4.344 4.344 0.450 2.450 3.900 0.500 0.977 10.643 16.942 1.086 29.648
- CR - 55 4.271 4.271 4.271 0.460 2.440 3.900 0.500 0.982 10.421 16.657 1.068 29.128
- CR - 56 4.289 4.289 4.289 0.500 3.150 3.150 0.500 1.072 13.510 13.510 1.072 29.165
- CR - 57 3.435 3.435 3.435 0.500 3.720 3.180 0.500 0.859 12.778 10.923 0.859 25.419
- CR - 58 3.447 3.447 3.447 0.500 3.720 4.180 0.500 0.862 12.823 14.408 0.862 28.955
- CR - 58a
- CR - 58b
- CR - 58c
- CP 3
- CR - 59 3.173 3.173 3.173 0.063 3.320 2.790 0.440 0.100 10.534 8.853 0.698 20.185
- CR - 60 1.346 1.346 1.346 1.660 2.280 2.010 1.110 1.117 3.069 2.705 0.747 7.639
- CR - 61 2.566 2.566 2.566 1.470 1.500 2.230 2.099 1.886 3.849 5.722 2.693 14.150
- CR - 62 3.036 3.036 3.036 1.810 2.000 2.720 0.820 2.748 6.072 8.258 1.245 18.322
- CR - 63 3.200 3.200 3.200 0.440 3.400 3.400 0.390 0.704 10.880 10.880 0.624 23.088
- CR - 64 1.999 1.999 1.999 0.500 1.510 0.390 0.650 0.500 3.018 0.780 0.650 4.948
117
V KONTROLE WAKING
SALURAN V-2
POT KELILING PENAMPANG HIRLOLIS (O) JARI-JARI HIRLOLIS (R) KECEP DEBIT DEBIT
MLINTANG TALUD DASAR TALUD O TALUD DASAR TALUD R IWA
kiRI KIRI KANAN KANAN TOT kiRI KIRI KANAN KANAN TOT V Q Q
m m m m m m m m m m m/det m3/det
7.000
- CR - 1 1.180 2.812 3.648 1.180 8.820 0.099 1.163 1.163 0.099 0.878 1.920 14.870 212%
- CR - 2 1.539 1.680 1.638 1.512 6.368 0.315 1.365 1.365 0.293 0.857 1.889 10.307 147%
- CR - 3 1.731 2.770 2.100 1.725 8.326 0.104 1.718 1.718 0.080 1.043 2.153 18.698 267%
- CR - 4 1.619 1.548 1.536 1.621 6.325 0.171 1.581 1.581 0.176 0.860 1.893 10.291 147%
- CR - 5 2.210 1.470 1.530 2.197 7.406 0.248 2.150 2.150 0.220 1.010 2.108 15.770 225%
- CR - 6 2.928 1.170 1.110 1.783 6.991 0.698 1.733 1.733 0.204 0.910 1.966 12.501 179%
- CR - 7 1.818 1.380 1.330 1.829 6.357 0.181 1.780 1.780 0.204 0.869 1.907 10.540 151%
- CR - 8 2.241 1.130 1.170 2.185 6.727 0.549 1.734 1.734 0.528 0.947 2.019 12.868 184%
- CR - 9 2.534 0.520 0.500 2.600 6.155 0.603 2.050 2.050 0.631 0.854 1.885 9.911 142%
- CR - 10 2.303 0.700 0.700 2.369 6.072 0.569 1.747 1.747 0.590 0.849 1.877 9.672 138%
- CR - 11 3.379 0.500 0.500 3.446 7.825 0.655 3.052 3.052 0.709 0.985 2.072 15.969 228%
- CR - 12 3.012 0.120 0.780 3.181 7.093 0.434 2.871 2.871 0.618 0.826 1.843 10.792 154%
- CR - 13 2.170 0.090 0.780 2.388 5.428 0.424 1.956 1.956 0.561 0.730 1.697 6.721 96%
- CR - 13a
- CR - 14 2.085 1.490 1.510 2.082 7.167 0.182 2.052 2.052 0.173 0.962 2.040 14.066 201%
- CR - 15 2.077 1.078 1.100 2.019 6.274 0.274 1.997 1.997 0.148 0.832 1.851 9.661 138%
- CR - 16 2.067 1.134 1.134 2.067 6.402 0.148 2.045 2.045 0.148 0.820 1.835 9.634 138%
- CR - 17 1.913 1.323 1.323 1.913 6.471 0.148 1.889 1.889 0.148 0.860 1.893 10.535 151%
- CR - 18 1.308 2.520 2.124 1.313 7.265 0.151 1.271 1.271 0.160 0.868 1.905 12.022 172%
118
V KONTROLE WAKING
SALURAN V-2
POT KELILING PENAMPANG HIRLOLIS (O) JARI-JARI HIRLOLIS (R) KECEP DEBIT DEBIT
MLINTANG TALUD DASAR TALUD O TALUD DASAR TALUD R IWA
kiRI KIRI KANAN KANAN TOT kiRI KIRI KANAN KANAN TOT V Q Q
m m m m m m m m m m m/det m3/det
- CR - 19 0.998 5.600 2.900 0.970 10.468 0.139 0.955 0.955 0.084 0.796 1.799 14.996 214%
- CR - 20 1.382 2.175 1.830 1.360 6.747 0.156 1.344 1.344 0.104 0.851 1.879 10.785 154%
- CR - 21 1.615 1.640 1.390 1.631 6.276 0.119 1.597 1.597 0.162 0.844 1.869 9.895 141%
- CR - 22 1.968 1.270 1.220 1.965 6.423 0.148 1.945 1.945 0.139 0.842 1.866 10.092 144%
- CR - 23 2.115 0.990 1.160 2.120 6.385 0.243 2.055 2.055 0.252 0.856 1.888 10.318 147%
BM
- CR - 24 2.188 1.590 1.590 2.208 7.575 0.134 2.171 2.171 0.197 1.007 2.104 16.054 229%
- CR - 25 2.381 1.220 1.140 2.145 6.886 0.549 1.982 1.982 0.379 0.987 2.076 14.110 202%
- CR - 26 2.381 0.690 0.690 2.241 6.002 0.545 1.995 1.995 0.454 0.844 1.870 9.476 135%
- CR - 27 2.695 0.960 1.600 1.444 6.699 0.590 1.372 1.372 0.214 0.808 1.816 9.829 140%
- CR - 28 2.138 0.495 2.010 1.556 6.199 0.534 1.473 1.473 0.237 0.839 1.862 9.682 138%
- CR - 29 1.519 1.380 1.740 1.583 6.222 0.193 1.465 1.465 0.278 0.852 1.882 9.981 143%
- CR - 30 1.321 2.660 1.596 1.421 6.998 0.235 1.219 1.219 0.313 0.849 1.878 11.160 159%
- CR - 31 1.255 3.116 1.482 1.279 7.133 0.190 1.190 1.190 0.219 0.840 1.863 11.159 159%
- CR - 32 1.451 2.280 1.320 1.492 6.543 0.235 1.362 1.362 0.278 0.865 1.900 10.754 154%
- CR - 32a
- CR - 32b
- CR - 33 1.060 3.528 3.192 1.088 8.869 0.139 1.020 1.020 0.178 0.811 1.821 13.105 187%
- CR - 34 1.329 2.210 2.142 1.342 7.023 0.155 1.290 1.290 0.178 0.863 1.897 11.495 164%
- CR - 35 1.289 2.337 2.337 1.278 7.241 0.182 1.232 1.232 0.164 0.856 1.888 11.709 167%
- CR - 36 1.271 3.100 2.046 1.185 7.602 0.274 1.104 1.104 0.200 0.824 1.840 11.533 165%
119
V KONTROLE WAKING
SALURAN V-2
POT KELILING PENAMPANG HIRLOLIS (O) JARI-JARI HIRLOLIS (R) KECEP DEBIT DEBIT
MLINTANG TALUD DASAR TALUD O TALUD DASAR TALUD R IWA
kiRI KIRI KANAN KANAN TOT kiRI KIRI KANAN KANAN TOT V Q Q
m m m m m m m m m m m/det m3/det
- CR - 37 1.972 1.278 0.828 1.865 5.942 0.366 1.802 1.802 0.232 0.833 1.853 9.169 131%
a
b
c
- CR - 38 1.987 1.264 1.040 1.933 6.223 0.269 1.906 1.906 0.158 0.840 1.864 9.751 139%
- CR - 38a
- CR - 38b
- CR - 39 1.945 3.110 2.390 2.180 9.625 0.314 1.826 1.826 0.498 1.220 2.390 28.063 401%
- CR - 40 1.632 2.000 2.000 1.657 7.290 0.198 1.580 1.580 0.238 0.966 2.045 14.396 206%
- CR - 40a
- CR - 41 2.569 1.500 1.700 2.558 8.327 0.193 2.539 2.539 0.154 1.082 2.207 19.893 284%
- CR - 42 2.688 1.600 1.600 2.698 8.586 0.100 2.681 2.681 0.149 1.077 2.200 20.348 291%
- CR - 42a
- CR - 43 2.375 1.690 1.630 2.371 8.066 0.226 2.330 2.330 0.216 1.089 2.216 19.465 278%
- CR - 43a
- CR - 44 2.396 2.200 2.200 2.424 9.220 0.173 2.370 2.370 0.249 1.242 2.418 27.682 395%
- CR - 45 2.484 2.140 2.010 2.449 9.083 0.305 2.403 2.403 0.231 1.243 2.421 27.340 391%
- CR - 46 2.479 2.000 1.950 2.404 8.833 0.336 2.378 2.378 0.173 1.205 2.370 25.224 360%
- CR - 47 2.419 1.900 2.000 2.319 8.639 0.357 2.300 2.300 0.149 1.178 2.335 23.766 340%
- CR - 48 2.178 2.100 2.300 2.169 8.747 0.197 2.141 2.141 0.173 1.169 2.323 23.746 339%
- CR - 49 2.399 2.200 2.200 2.404 9.203 0.159 2.378 2.378 0.173 1.223 2.395 26.965 385%
120
V KONTROLE WAKING
SALURAN V-2
POT KELILING PENAMPANG HIRLOLIS (O) JARI-JARI HIRLOLIS (R) KECEP DEBIT DEBIT
MLINTANG TALUD DASAR TALUD O TALUD DASAR TALUD R IWA
kiRI KIRI KANAN KANAN TOT kiRI KIRI KANAN KANAN TOT V Q Q
m m m m m m m m m m m/det m3/det
- CR - 50 2.377 2.180 2.490 2.321 9.368 0.290 2.300 2.300 0.154 1.258 2.440 28.761 411%
- CR - 51 2.229 2.310 2.310 2.157 9.006 0.298 2.141 2.141 0.129 1.203 2.368 25.652 366%
- CR - 52 4.156 4.130 1.960 4.238 14.483 0.174 4.141 4.141 0.440 1.920 3.234 89.922 1285%
- CR - 53 4.055 2.800 1.740 4.236 12.831 0.199 4.035 4.035 0.614 1.693 2.974 64.625 923%
- CR - 54 4.367 2.450 3.900 4.373 15.090 0.224 4.344 4.344 0.248 1.965 3.284 97.362 1391%
- CR - 55 4.296 2.440 3.900 4.300 14.936 0.229 4.271 4.271 0.248 1.950 3.268 95.184 1360%
- CR - 56 4.318 3.150 3.150 4.318 14.936 0.248 4.289 4.289 0.248 1.953 3.270 95.385 1363%
- CR - 57 3.471 3.720 3.180 3.471 13.842 0.247 3.435 3.435 0.247 1.836 3.139 79.797 1140%
- CR - 58 3.483 3.720 4.180 3.483 14.866 0.247 3.447 3.447 0.247 1.948 3.265 94.536 1351%
- CR - 58a
- CR - 58b
- CR - 58c
- CP 3
- CR - 59 3.174 3.320 2.790 3.203 12.487 0.031 3.173 3.173 0.218 1.616 2.883 58.202 831%
- CR - 60 2.137 2.280 2.010 1.745 8.172 0.523 1.346 1.346 0.428 0.935 2.001 15.287 218%
- CR - 61 2.957 1.500 2.230 3.315 10.002 0.638 2.566 2.566 0.812 1.415 2.638 37.331 533%
- CR - 62 3.535 2.000 2.720 3.145 11.399 0.777 3.036 3.036 0.396 1.607 2.872 52.631 752%
- CR - 63 3.230 3.400 3.400 3.224 13.254 0.218 3.200 3.200 0.194 1.742 3.031 69.975 1000%
- CR - 64 2.061 1.510 0.390 2.102 6.063 0.243 1.999 1.999 0.309 0.816 1.828 9.045 129%
121
4.2.7.1 Hasil simulasi penampang rencana baru dengan debit 10 tahun
31.9 EG PF 1
WS PF 1
31.8
Elevation (ft)
Crit PF 1
31.7 Ground
Bank Sta
31.6
31.5
31.4
0 2 4 6 8
Station (ft)
34.0 WS PF 1
Elevation (ft)
Crit PF 1
33.5
Ground
33.0
Bank Sta
32.5
32.0
31.5
0 1 2 3 4 5
Station (ft)
32.6 Ground
32.4 Bank Sta
32.2
32.0
31.8
31.6
31.4
0 1 2 3 4 5 6
Station (ft)
122
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 4 CR 4
.0016
Legend
32.6
EG PF 1
32.4 WS PF 1
Elevation (ft)
32.2 Ground
32.0 Bank Sta
31.8
31.6
31.4
31.2
0 1 2 3 4 5
Station (ft)
EG PF 1
33.0
WS PF 1
Elevation (ft)
32.5 Ground
Bank Sta
32.0
31.5
31.0
0 1 2 3 4
Station (ft)
Ground
32.0
Bank Sta
31.8
31.6
31.4
31.2
0 1 2 3 4 5
Station (ft)
123
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 7 CR 7
.0016
32.5 Legend
EG PF 1
32.0 WS PF 1
Elevation (ft)
Ground
31.5 Bank Sta
31.0
30.5
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
EG PF 1
32.0 WS PF 1
Elevation (ft)
Ground
31.5 Bank Sta
31.0
30.5
0 1 2 3 4 5 6
Station (ft)
EG PF 1
32.5
WS PF 1
Elevation (ft)
32.0 Ground
Bank Sta
31.5
31.0
30.5
0 1 2 3 4 5 6
Station (ft)
124
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 10 CR 10
.0016
33.0 Legend
EG PF 1
32.5
WS PF 1
31.0
30.5
0 1 2 3 4 5
Station (ft)
Ground
31.8
Bank Sta
31.6
31.4
31.2
31.0
30.8
0 1 2 3 4 5
Station (ft)
34 EG PF 1
WS PF 1
33
Elevation (ft)
Ground
32 Bank Sta
31
30
29
0 1 2 3 4 5 6 7
Station (ft)
125
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 13 CR 13
.0016
35 Legend
34 EG PF 1
WS PF 1
33
Elevation (ft)
Ground
32 Bank Sta
31
30
29
0 1 2 3 4 5 6 7
Station (ft)
Ground
33
Bank Sta
32
31
30
29
28
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (ft)
33 WS PF 1
Elevation (ft)
Ground
32
Bank Sta
31
30
29
28
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (ft)
126
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 16 CR 16
.0016
35 Legend
EG PF 1
34
WS PF 1
Elevation (ft) 33 Ground
Bank Sta
32
31
30
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
33 WS PF 1
Elevation (ft)
Ground
32
Bank Sta
31
30
29
28
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
33 WS PF 1
Elevation (ft)
Ground
32
Bank Sta
31
30
29
28
0 1 2 3 4 5 6
Station (ft)
127
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 19 CR 19
.0016
35 Legend
34
EG PF 1
33 WS PF 1
Elevation (ft)
32 Ground
31 Bank Sta
30
29
28
27
0 2 4 6 8 10
Station (ft)
32 Ground
31 Bank Sta
30
29
28
27
0 1 2 3 4 5
Station (ft)
25 WS PF 1
Elevation (ft)
Ground
20
Bank Sta
15
10
0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (ft)
128
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 22 CR 22
.0016
34 Legend
33 EG PF 1
32 WS PF 1
Elevation (ft)
Ground
31
Bank Sta
30
29
28
27
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
32 WS PF 1
Elevation (ft)
Ground
31
Bank Sta
30
29
28
27
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
31 Ground
30 Bank Sta
29
28
27
26
0 1 2 3 4 5
Station (ft)
129
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 25 CR 25
.0016
34 Legend
EG PF 1
32
WS PF 1
Elevation (ft)
30 Ground
Bank Sta
28
26
24
0 1 2 3 4 5
Station (ft)
EG PF 1
32
WS PF 1
Elevation (ft)
30 Ground
Bank Sta
28
26
24
0 1 2 3 4
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5 6
Station (ft)
130
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 28 CR 28
.0016
36 Legend
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5 6
Station (ft)
131
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 31 CR 31
.0016
36 Legend
34 EG PF 1
WS PF 1
Elevation (ft) 32
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5 6
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 2 4 6 8
Station (ft)
132
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 34 CR 34
.0016
36 Legend
34 EG PF 1
WS PF 1
32
Elevation (ft) Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5 6
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5 6
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0 1 2 3 4 5 6 7
Station (ft)
133
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 37 CR 37
.0016
36 Legend
34 EG PF 1
WS PF 1
32
Elevation (ft) Ground
30 Bank Sta
28
26
24
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
34 EG PF 1
WS PF 1
32
Elevation (ft)
Ground
30 Bank Sta
28
26
24
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Station (ft)
32 WS PF 1
Elevation (ft)
Ground
30
Bank Sta
28
26
24
22
0 1 2 3 4 5 6 7 8
Station (ft)
134
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 40 CR 40
.0016
36 Legend
34 EG PF 1
32 WS PF 1
Elevation (ft)
Ground
30
Bank Sta
28
26
24
22
0 1 2 3 4 5 6
Station (ft)
32 WS PF 1
Elevation (ft)
Ground
30
Bank Sta
28
26
24
22
0 1 2 3 4
Station (ft)
32 WS PF 1
Elevation (ft)
Ground
30
Bank Sta
28
26
24
22
0 1 2 3 4
Station (ft)
135
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 43 CR 43
.0016
36 Legend
34 EG PF 1
32 WS PF 1
26
24
22
0 1 2 3 4 5
Station (ft)
32 WS PF 1
Elevation (ft)
Ground
30
Bank Sta
28
26
24
22
0 1 2 3 4 5 6
Station (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5 6
Station (ft)
136
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 46 CR 46
.0016
36 Legend
34
EG PF 1
32 WS PF 1
Elevation (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5
Station (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5
Station (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5 6
Station (ft)
137
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 49 CR 49
.0016
36 Legend
34
EG PF 1
32 WS PF 1
Elevation (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5 6
Station (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5 6
Station (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 2 4 6 8 10
Station (ft)
138
4.2.7.1.5 Hec – Ras pada penampang saluran CR 52 - CR 64
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 52 CR 52
.0016
36 Legend
34
EG PF 1
32 WS PF 1
Elevation (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5 6 7 8
Station (ft)
30 Ground
28 Bank Sta
26
24
22
20
0 1 2 3 4 5 6 7 8
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
139
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 55 CR 55
.0016
36 Legend
34
EG PF 1
32
WS PF 1
30
Elevation (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (ft)
140
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 58 CR 58
.0016
36 Legend
34
EG PF 1
32
WS PF 1
30
Elevation (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 2 4 6 8 10
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
141
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 61 CR 61
.0016
36 Legend
34
EG PF 1
32
WS PF 1
30
Elevation (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 1 2 3 4 5 6 7 8
Station (ft)
Ground
28
Bank Sta
26
24
22
20
18
0 2 4 6 8
Station (ft)
142
CILEGON RENCANA Plan: Plan 01 5/25/2018
Geom: Geom 01 Flow: Flow 01
River = CILEGON RENCANA Reach = Semam pir RS = 64 CR 64
.0016
36 Legend
34
EG PF 1
Elevation (ft) 32 WS PF 1
30 Ground
28 Bank Sta
26
24
22
20
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Station (ft)
143
4.2.8 REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
REKAPITULASI RENCANAN ANGGARAN BIAYA (RAB)
TOTAL
NO URAIAN PEKERJAAN
( Rp )
144
II - 3 BONGKAR POND TANGGUL SAL - KA 106,599,690 106,599,690
II-3.1 - CR 1-13 11,750,890
II-3.2 - CR 13-28 36,812,740
II-3.3 - CR 28-43 58,036,060
II-3.4 - CR 43-51 0
II-3.5 - CR 51-64 0
145
III GALIAN TANAH SALURAN 404,553,570 404,553,570
III-2.4 - CR 43-51 0
III-2.5 - CR 51-64 0
146
III - 3 GALIAN TANGGUL SAL - KA 116,300,950 116,300,950
III-3.4 - CR 43-51 0
III-3.5 - CR 51-64 0
147
IV-1.5 - CR 51-64 2,213,320
148
V-1.4 - CR 43-51 0
V-1.5 - CR 51-64 0
V-2.4 - CR 43-51 0
V-2.5 - CR 51-64 0
V-3.4 - CR 43-51 0
149
V-3.5 - CR 51-64 0
V-4.4 - CR 43-51 0
V-4.5 - CR 51-64 0
V-5.4 - CR 43-51 0
V-5.5 - CR 51-64 0
150
VI PLESTERAN TOPI DINDING TANGGUL 61,906,240 61,906,240
VI-1.4 - CR 43-51 0
VI-1.5 - CR 51-64 0
VI-2.4 - CR 43-51 0
151
VI-2.5 - CR 51-64 0
152