and NOC from SPCB) for Expansion Cum Modernization of Bokaro Steel Plant
(SCOPE OF WORK)
ii) Rendering technical assistance to SAIL-BSL for on-line submission of the Form-I
along with other supporting documents to MoEFCC website.
iii) Provide technical assistance to SAIL-BSL and presenting the project before members
of Expert Appraisal Committee (EAC), MoEFCC, New Delhi.
v) Preparation of Draft EIA/EMP report based on one season baseline data as per the
project specific ToR approved by MOEFCC. The EIA/EMP report shall be in
accordance with the latest stipulations of Ministry of Environment, Forest and
Climate Change (MoEFCC), Govt. of India.
The scope of work is based on the recently issued TORs for similar type of Projects
presently followed by MoEFCC. However, if during finalization of ToR, MoEFCC
specifies any additional monitoring or parameters (other than mentioned in clause 1.1) or
any additional studies, the same may be carried out by MECON at an additional cost to
be mutually discussed and agreed upon.
Page 1 of 8
On receipt of work order & copy of FR/TEFR/Pre FR and other details of the project,
MECON shall carry out the following-
Once ToR is granted by MoEFCC, the data generation work shall begin in a period other
than monsoon for one full season. However, the baseline data generation work shall be as
mentioned hereunder.
The study area considered for baseline data generation will be taken 10 km radius around
the project site. Baseline data generation will be within the study area and will be carried
out with respect to meteorology, air, water, noise, soil, ecology, socio-economic factors
and land use. This will be carried out for one full season (three months continuously)
other than monsoon as follows:
1.1.3 Air
i) Monitoring of Ambient Air Quality (AAQ) in the study area will be conducted at
maximum 8 (Eight) locations. The monitoring of pollutants will be Particulate Matter
(PM10 & PM2.5), Oxides of Nitrogen (NOx) and Sulphur Dioxide (SO2) twice a week
throughout the monitoring season. One sample of 24 hour duration will be taken on
each monitoring day for PM10, PM2.5, SO2, and NOx. Characterization of RSPM in
selected samples (if specified in the approved TOR by MoEFCC). CO will be
monitored on selected days on one hourly basis. However, sampling and analysis for
Lead, Ammonia, Benzene, BaP, Arsenic and Nickel shall be done on selected days
only.
ii) A Meteorological Station will be set up wherein wind speed and direction, air
temperature, relative humidity, rainfall and solar radiation will be recorded at hourly
intervals continuously throughout the monitoring season. Mixing heights will be
determined from published literature.
1.1.4 Water
1.1.5 Noise
Noise Monitoring shall be done at 8 (eight) locations in the study area. Leq noise will be
monitored at hourly intervals for 24 hours at each location once during the monitoring
season.
Page 2 of 8
1.1.6 Soil
5 (Five) top soil sampling points will be selected around the site in the study area.
Samples will be collected once during the monitoring season for physico-chemical
parameters.
1.1.7 Ecology (Flora & Fauna), Demography, Socio-Economic Study and Land Use
Pattern.
Following studies shall be carried out in respect of the project site and in the study area.
i) Ecological Studies: Assessment of existing environmental status of flora and fauna
within 10 km radius of study area in and around the project site shall be conducted
once during the monitoring season.
Location of Wild life Sanctuary/Reserve Forest/Other Forest with respect to plant
location.
ii) Socio-Economic Study: Socio-Economic Study will be conducted within the study
area covering demographical pattern, land use pattern and socio economic factors.
Ecological studies and socio economic study will be based on the data/information
available and collected from different Central & State Government Agencies,
Published Literature and augmented by limited field survey.
iii) Land-Use Study: Land Use Study of the study area shall be conducted involving
preparation of thematic maps produced through satellite image (LISS III/IV)
processing, for incorporation in the report.
i. Carry out Environmental Impact Assessment (EIA) based on above, separately for
construction and operation phase of the project.
iii. Find out the impact of air emissions (PM, NOx, SO2) on ambient air quality of the 10
km area of the proposed plant including the existing plant. For this, details of air
emissions, Stack height will be obtained from the FR/DPR and from SAIL-BSL.
Impact on air quality - Ground Level Concentration of air pollutants will be predicted
by using computerized dispersion models.
iv. Environmental Management Plan (EMP) shall be prepared on the basis of the
FR/TEFR/DPR and inputs from SAIL-BSL. EMP will also include scientifically
based green belt. Further recommendations for post-project monitoring, setting up of
Page 3 of 8
environmental laboratory and organization for pollution control department will also
be indicated.
1.1.10 Impact of the proposed project will be evaluated with respect to gaseous emissions,
liquid & solid waste and other environmental effects of plant operation.
1.1.11 EIA report with computerized dispersion model, noise etc will be prepared in line with
scope of work.
i) MECON shall render technical assistance to SAIL-BSL for getting the ToR (Form-I)
approval and getting the EIA/EMP reports cleared by MOEFCC, Government of
India. These services shall extend for a period of maximum one year from the date of
submission of Final EIA/EMP report.
ii) All reports prepared by MECON shall be in English only. However executive
summary prepared by MECON shall be submitted both in English & Hindi.
Page 5 of 8
4.0 FEES AND TERMS & CONDITIONS
4.1 MECON’s fee for Preparation and submission of FORM-1 & Providing consultancy for
getting EC, as per the Scope of Services as detailed under clause 1.1
i) 10% of fee on initial site visit & kick off meeting.
ii) 20% of fee on Submission of Draft Form-1.
iii) 10% of fee after presentation before EAC, MoEFCC on ToR.
iv) 30% of fee on mobilization of equipment and start of Baseline Data Monitoring work.
v) 15% of fee on submission of Draft EIA/EMP Report to SAIL-BSL.
vi) 5% of fee on submission of Final EIA/EMP Report to SAIL-BSL.
vii) 5% of fee after presentation for EC at MoEFCC.
viii) 5% of fee on receipt/grant of final EC by MoEFCC.
4.2 The above fees are exclusive of tours. Any tour other than monitoring tours to site BSL
within India, if required, shall be as per requisition of SAIL/BSL. The tours undertaken by
MECON personnel will be reimbursed on submitting relevant details on actual as certified
by MECON accounts personnel. Such cost shall include up and down air/rail/taxi fares,
daily allowance and local travel cost as per MECON TA rules. The expenditure on tours
shall be limited to 10% of the Consultancy fees (Basic price).
Page 6 of 8
4.5 CHANGE IN SCOPE OF PROJECT, REPORT AND/OR CONSULTANT’s
SERVICES
Should the scope of project and/or scope of services increase and/or time scheduled
get extended due to changes suggested by SAIL/BSL or for reasons beyond
MECON’s control, MECON shall be paid additional fee which shall be mutually
discussed and agreed.
The Change order will be finalized as per BSL change order procedure.
Page 7 of 8
5.18 To provide corner-coordinates of plant, and the extent of type of land - Government /
Private / Agricultural / Barren / Marshy / Forest, etc and the extent and type of land acquired
by or to be acquired by the project.
5.19 Work zone monitoring data with respect to stack, effluent, solid waste, work zone air
quality & Noise (as monitored by BSL during regular post-project monitoring schedule for
submission to statutory bodies) for the existing SAIL-BSL facilities shall be provided for
inclusion in EIA/EMP report.
5.20 Authentication of list of flora/fauna by forest department and preparation / approval of
Forest Diversion Proposal and Site Specific Wildlife Conservation Plan, if applicable.
5.21 Provide any other relevant information / data / reports I facilities as available with SAIL-
BSL from time to time for completion of the work.
5.22 Cost estimates of the management measures and other commitments made by SAIL-BSL in
response to public comments during Public Hearing along with the proceedings of
public hearing.
5.23 Liaison with all Government and Statutory bodies.
5.24 CSR budget allocation and plan along with photographs.
5.25 Existing green belt development status within and around plant premises marked on layout
drawings and along with photographs.
5.26 Corporate Environmental Policy
5.27 Provide security and Laboratory space free of cost for MECON personnel visiting
/monitoring.
5.28 Payment of fees towards various statutory clearances from the authorities
Page 8 of 8