Date 22.07.2018
Name of Company Square Textile Limited (Unit-4)
Name of Project Warehouse Expansion Shed
Project Location Olipur, Habigonj.
Project Area 9540.00 sft o/o
Clear Height 20.00 ft,
Project Code MSSL-2018-07-09-0174-R2
A. Structural Framing Materials:
SL
Item Name SCOPE OF WORK Unit Quantity
No.
STEEL WORKS Sft. 9,540.00
Supply of M.S. Foundation bolt of ASTM A36 Grade 36 will be
1 Anchor Bolts Galvanized as specified by ASTM and as per design & drawing. Kg 273.00
Supply & Fabrication of structural steel Purlin, Girts & Sag rod
either Z sections will be cold formed from Galvanized steel
3 Purlin/Girt which has a minimum yield strength of 345 Mpa (50,000 psi) and Kg 6,357.00
will conform to the physical specifications of ASTM A-653
(Grade 50) or equivalent.
A
m
o
u
n
t
Rate (Tk.) Amount (Tk)
(
T
k
108.00 29,484.00###
)
110.00 1,210,880.00###
###
114.00 724,698.00###
240.00 92,640.00###
A
m
### o
A. Sub-total of Framing Material = 2,057,702.00
u
n
Rate (Tk.) Amount (Tk) t
(
T
200.00 k
1,225,400.00###
)
A
m
B. Sub- Total of Sheeting & Accessories= 1,225,400.00
### o
u
n
Rate (Tk.) Amount (Tk) t
(
T
k
)
230.00 376,050.00
###
450.00 ### A
273,600.00
m
C. Sub-total of Building Accessories: = 649,650.00
### o
u
n
Rate (Tk.) Amount (Tk) t
(
13.00 T
347,113.00###
k
)
C. Sub- total of Transportation & Erection= 347,113.00###
Total (A+B+C+D) = 4,279,865.00###
Total Wt.(kg) = 26,701.00###
Unit Tk/ Kg. = 160.29
###
Sixty Five Only.
BILL OF QUANTITIES
Date 24.06.2018
Name of Company Sawdesh Feeds Ltd.
Name of Project Factory Building.
Project Location Sreepur, Gazipur.
Project Area 39263.00 sft (Out to Out)
Clear Height 24.00 ft,
Project Code MSSL-2018-06-26-0113
A. Structural Framing Materials:
SL
Item Name SCOPE OF WORK Unit
No.
STEEL WORKS Sft.
Supply of M.S. Foundation bolt of ASTM A36 Grade 36 will be
2 Anchor Bolts Galvanized with Nut and Washer as specified by ASTM and as Kg
per design & drawing.
Supply & Fabrication of structural steel member (Column,
1 MS Plate Beam, Rafter) will be Built-up ''I'' section of M.S. steel plate of Kg
ASTM A572, Grade-40 (Fy = 27.5 kN/cm2)
14 Down Pipe Supply of down pipe by 100/150mm diam PVC Pipe Rft
D. Additional Item :
SL
Item Name Description Unit
No.
Providing and fixing in position 1.50m width Steel Ledder with
Steel Ladder and
9 M.S Channel & Chequered Plate as per design.(Double Flight up Nos
Stair
to 6 storied without railing)
27 Exhaust Fan Supply of Exhaust Fan; all complete a)Size = 4' X 4' Nos
28 Ridgr Ventilator
Supply of Ridge Ventiletor all complete as per design. Rft
9,540.00
###
6,230.00 110.00 685,300.00
- 120.00 -
- 600.00 -
- 110.00 -
- 115.00 -
- 320.00 -
- 3.00 -
- 15,000.00 -
- 25,000.00 -
- 3,600.00 -
- 250.00 -
D. Sub-Total of Additional Item = 4,500,000.00
Unit price/sft. (Additional)= 471.70
Total (A+B+C+D+E) = 8,286,259.80
Unit price/Kg = 343.44
BILL OF QUANTITIES
Date 20.05.2018
Name of Company Fiber At Home.
Name of Project Godwon.
Project Location Khulna.
Project Area .00 sft
Clear Height 16.5.00 ft
Project Code MSSL-2018-05-17-0131
A. Super Structure:
SL Unit
Item Name Description Unit
No. Wt.
STEEL WORKS Sft.
1 Anchor Bolts Supply of Anchor Bolt including nut & washer as per design Kg 1
Supply of MS Plate for Super structure Member Built up
2 MS Plate Kg 1
section Column, Rafter.
3 Purlin/Girt Supply Z Purlin / Girt as per design. (MS) Kg 1
4 Strut member Supply of Pipe Bracing as per design Kg 1
5 Shear Bolts Supply of Shear Rod for Secondary Beam Kg 1
6 PSA Supply of PSA & Sheeting Angle Kg 1
7 Cable Bracing Supply of 12 dia Cable Bracing Rft 0.48
7 Angle Bracing Supply of Double Angle Bracing Kg 1
8 Sag Rod Supply of Sag Rod Kg 1
Galvanized Nut & Bolt ASTM-A325 for Super Structure
9 Structural Bolts Kg 1
Member
10 Paint One coat primer paint. Kg 0
A. Sub-t
B. Shetting & Accessories:
SL Unit
Item Name Description Unit
No. Wt.
D. Additional Item:
SL Unit
Item Name Description Unit
No. Wt.
D. Sub - T
Un
9,539.82 9,540.00
273.00 273.00 100.00 27,300.00
9,786.00 9,786.00 108.00 1,056,888.00
6,229.56 6,230.00 98.00 610,540.00
651.42 652.00 105.00 68,460.00
- - 150.00 -
318.18 319.00 85.00 27,115.00
419.71 420.00 65.00 27,300.00
- - 65.00 -
127.09 128.00 95.00 12,160.00
293.58 294.00 220.00 64,680.00
16,985.16 17,115.00 1.00 17,115.00
A. Sub-total of Super Structure = 1,911,558.00
- - 80.00 -
AREA Nos.
GF 1
0
GRID DESCRIPTION NO
Column
Sec-2-14 (W=250x4) (F=150x6)
Sec-1-1 Grid (2~19)
Sec-1-1 (W=400-800x6) (F=250x12)
Rafter
R-201 (W=250x6) (F=150x6)
Base Plate
BP-1
BP-2
Connection Plate
DECKING SCREW
Total = 12
Add 0%
Nut Bolt
Gutter Support
Selant
SCREW
Roof Screw
Clading
Stiching
Down Pipe Strap Screw
Door Qty.
0
Canopy Qty.
0
Louver 0
Exhaust Fan 0
Roof Monitor (248 ft x20 ft) 4960
Item Name Qnt.
Red Steel 0
Roof Sheet 0
Wall Sheet & Gable Sheet 0
Purlin 0
Ridge Cap 0
Gable Trem 0
Screw 0
Glass 0
E
Grand Total A
Un
STAIR 0
Item Name Size
Column 350(6)x175(8)
Beam-1 250(5)x125(7)
Beam-2 200(4)x100(6)
C-Chanel 250x65x8
Purlin 200x65x20x1.8
Roof Sheet 490
Chequr Plate 1360
NB 277.812
0 slope
L W TH WT KG
-
-
-
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
Total 8,155.00
20% 1,631.00
Total = 6,229.56
Wastage 0% -
Total= 6,229.56
Rmm /850 mm
40950 50.59 Nos 25.80
Rmm /850 mm
163800 192.71 Nos
Nos
10895.06 9.079 9
0
Length (ft) Unit Weight (Kg) Total Weight (Kg)
200 11.5 2300
20 7.02 140.4
80 4.67 373.6
340 7.28 2475.2
196 1.55 303.8
Sft 0.38 186.2
Sft 2.92 3971.2
Nos 86.12172
9836.52172
55.96
59.557
1000
1000
1000
1000
1000
1000
1200
1200
1200
1200
1200
1200
1200