NAMA PAKET : MASJID

PROP/KAB/KODYA : DI Yogyakarta/Kulonprogo-Yogyakarata
PPK : ANGKASA PURA I
KONTRAKTOR PELAKSANA : PP KSO
KONSULTAN PENGAWAS : KSO CITIAJASA BLUEVISION TGP

DED

Uraian Sat
Volume DED

b c d'

MASJID
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR PONDASI
Pondasi Spunpile D600 mm M 320
- Pre Boring Kedalaman 20 m M 320
- Pemancangan M 320
- Joint + Welding Titik 16
- Bobok Kepala Tiang Pancang Bh 16
- Isian Spunpile K-350 M3 7.0336
- Stek pembesian kg
- Pengujian Tiang Pancang dengan cara PDA Test Titik
Pekerjaan Tanah
- Dynamic compaction M2
- Galian tanah M3 46.568
Urugan pasir M3 7.024
Lantai Kerja M3 3.512
Pilecap
- Pembesian U.40 Kg 2669.31440064
- Bekisting M2 86.08
- Beton Pondasi Tapak K-350 M3 26.832
PEKERJAAN STRUKTUR LANTAI DASAR (+0.00)
Anti Rayap M2
Tie Beam
- Galian tanah M3
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian U.40 Kg
- Bekisting M2
- Beton Tie Beam K-350 Integral M3
Slab Beton
- Urugan Pasir M3 71.899
- Lantai Kerja M3 35.9495
- Pembesian Wiremesh M10-150 M2 718.99
- Slab Beton t=15 cm K.350 Integral M3 718.99
- Waterproofing M2
Pekerjaan Kolom
- Beton Kolom K-350 M3 12.2
- Pembesian U.40 Kg 3939.010848
- Bekisting M2 98.56
PEKERJAAN STRUKTUR LANTAI ATAP
Balok
- Pembesian U.40 Kg 301.33651968
- Bekisting M2 14.96
- Beton Balok K-350 M3 1.632
Slab Lantai Atap
- Bekisting M2
- Pembesian Kg
- Slab Beton t=15 cm K.350 M3
- Waterproofing M2
Kubah rangka pipa
Rangka Atap kg 50790.85
PEKERJAAN HARDSCAPE
Lantai Kerja M3 35.9495
Pembesian M2
Beton K-300 M3
PEKERJAAN ARSITEKTUR DAN INTERIOR
PEKERJAAN FINISHING LANTAI
Lantai Homogenous Tile (HT) MASJID m2 795.4525509
Lantai Homogenous Tile (HT) TOILET PRIA m2 163.49124015
Lantai Homogenous Tile (HT) TOILET WANITA m2 165.9287742
Lantai Homogenous Tile (HT) SELASAR dalam m2 107.07732
Lantai Homogenous Tile (HT) SELASAR luar m2 131.03118
Pekerjaan Koral sikat m2 1620.41491265
Pekerjaan Paving block (grassblock) m2 957.22614435
Pekerjaan WPC Decking 20 mm m2 171.8208828
Pekerjaan Cat + Koral tabur m2 721.6228845
Pekerjaan Grass m2 1870.109409
PEKERJAAN INTERIOR DINDING LANTAI
Kolom Praktis 10x10cm (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1 221.8976085333
Balok Praktis (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1 68.84
Pekerjaan Plesteran Kolom beton exposed m2 44.352
PEKERJAAN PINTU
Pintu WD1 uk 900 x 2150 mm unit 3
Pintu WD2 uk 800 x 2150 mm unit 1
Jendela AW1 uk 1310 x 1250 mm unit 2
Jendela AW2 uk 910 x 500mm unit 8
PEKERJAAN TOILET
toilet pria
Pekerjaan Hebel dan plesteran m3 314.414
Washtafel Unit 3
Closet Duduk m' 6
Urinoir m' 12
Urinoir Devider m' 12
Floor drai m' 38
Paper holder m' 1
Shower spray m' 1
Kran dinding m' 27
Cubicle Toilet Pria set 5
Bak air set 1
Meja wastefel m2 1.92
toilet wanita
Pekerjaan Hebel dan plesteran m3 314.414
Washtafel Unit 4
Closet Duduk m' 5
Floor drai m' 64
Kran dinding m' 63
Cubicle Toilet Pria set 5
Meja wastefel m2 2.64
PEKERJAAN PLAFOND
LANTAI 1 ( SATU )
GRC Board 6mm, Rangka Hollow m2 571.463024
Gypsum - C5 Stetch Membrane m2 1287.77392
PEKERJAAN ATAP
Penutup atap Kubah Masjid m2 1287.77392
Lisplank m1 4419.1
Plashing m1 4419.1
Talang datar m1 35.8
Talana vertikal m1 25.6
Roof Drain bh 4
Penutup atap Metal toilet m2 313.25
Rangka atap Baja, Gording m2 313.25
Lisplank m1 89.1
Plashing m1 89.1
Talang datar toilet m1 35.8
Talang vertikal toilet m1 25.6
Ruuf drair toilet bh 4
Penutup atap canopi selasar dan penitipan sandal m2 567.203289
Rangka atap canopi selasar m2 567.203289
PEKERJAAN PAGAR DAN RAILLING
Railling Stainlessteel m1 9.2
Pagar Keliling m1 350.921
Gerbang unit 1
ulonprogo-Yogyakarata

BLUEVISION TGP

DURASI
Harga Jumlah
Sat
Satuan Harga-Harga BOBOT BOBOT START RENCANA
(Rupiah) PP (Rupiah) (HARI)
e f=(dxe) c

764224 244551680 M 320 0.003877929 8 9/22/2018


336200 107584000 M 320 0.001705992 8 9/22/2018
110045.76238 35214643.960396 M 320 0.000558409 8 9/22/2018
198492.93 3175886.88 Titik 16 0.000050361 8 9/22/2018
158900 2542400 Bh 16 4.03156E-05 8 9/22/2018
1024690.8038 7207265.23752964 M3 7.0336 0.000114288 8 9/22/2018
12714.524365 kg 8 9/22/2018
6114900 Titik 8 9/22/2018

0 M2 10 9/30/2018
54976.190476 2560131.23809524 M3 46.568 4.05968E-05 10 9/30/2018
385165.39683 2705401.74730159 M3 7.024 4.29004E-05 10 9/30/2018
951918.44395 3343137.57515176 M3 3.512 5.30131E-05 10 9/30/2018
1
12496.524365 33357152.4467304 Kg 2669.31440064 0.000528954 16 12/2/2018
147291.00855 12678810.0161643 M2 86.08 0.000201052 16 12/2/2018
1228444.2503 32961616.1250771 M3 26.832 0.000522682 16 12/2/2018

14600 M2 21 12/2/2018

54976.190476 M3 21 12/2/2018
385165.39683 M3 21 12/2/2018
951918.44395 M3 21 12/2/2018
12496.524365 Kg 21 12/2/2018
147291.00855 M2 21 12/2/2018
1336544.2503 M3 21 12/2/2018

385165.39683 27693006.8663492 M3 71.899 0.000439136 21 12/2/2018


951918.44395 34220992.100774 M3 35.9495 0.000542653 21 12/2/2018
231058.03692 166128417.967323 M2 718.99 0.002634348 21 12/2/2018
1336544.2503 960961950.550731 M3 718.99 0.015238261 21 12/2/2018
183400 M2 21 12/2/2018

1228444.2503 14987019.8541272 M3 12.2 0.000237654 16 12/7/2018


12496.524365 49223945.0379308 Kg 3939.010848 0.000780559 16 12/7/2018
147265.50963 14514488.6291794 M2 98.56 0.000230161 16 12/7/2018

12496.524365 3765659.16039074 Kg 301.33651968 5.97132E-05 16 12/9/2018


147279.74348 2203304.962432 M2 14.96 3.49385E-05 16 12/9/2018
1228444.2503 2004821.0165521 M3 1.632 0.000031791 16 12/9/2018

147265.77534 0 M2 16 12/9/2018
12496.524365 0 Kg 16 12/9/2018
1228444.2503 0 M3 16 12/9/2018
183400 0 M2 16 12/9/2018

61100 3103320935 kg 0.049210289 16 12/9/2018

951918.44395 34220992.100774 M3 0.000542653 21 12/21/2018


12496.524365 0 M2 21 12/21/2018
907885.25034 0 M3 21 12/21/2018
-

379670.5 302009867.726478 m2 795.4525509 0.004789061 19 12/23/2018


379670.5 62072800.8933706 m2 163.49124015 0.000984307 19 12/23/2018
379670.5 62998260.6649011 m2 165.9287742 0.000998982 19 12/23/2018
379670.5 40654099.62306 m2 107.07732 0.000644664 19 12/23/2018
379670.5 49748673.62619 m2 131.03118 0.00078888 19 12/23/2018
525000 850717829.14125 m2 1620.41491265 0.013490087 19 12/23/2018
195000 186659098.14825 m2 957.22614435 0.002959909 19 12/23/2018
650000 111683573.82 m2 171.8208828 0.001771 19 12/23/2018
71630 51689847.216735 m2 721.6228845 0.000819661 19 12/23/2018
26000 48622844.634 m2 1870.109409 0.000771027 19 12/23/2018

130695.70087 29001063.4676914 m1 221.897608533 0.000459879 19 12/23/2018


130695.70087 8997092.04759624 m1 68.84 0.00014267 19 12/23/2018
128977.51335 5720410.67228587 m2 44.352 9.07103E-05 19 12/23/2018

6723824.7573 20171474.2718664 unit 3 0.000319865 15 1/7/2019


5976733.1176 5976733.11759004 unit 1 9.47748E-05 15 1/7/2019
4503125 9006250 unit 2 0.000142815 15 1/7/2019
1237500 9900000 unit 8 0.000156987 15 1/7/2019
750000 235810500 m3 314.414 1.003715882 16 12/30/2018
2532915 7598745 Unit 3 0.000120496 16 12/30/2018
3008000 18048000 m' 6 0.000286193 16 12/30/2018
6700000 80400000 m' 12 0.001274927 16 12/30/2018
2215000 26580000 m' 12 0.000421487 16 12/30/2018
1097100 41689800 m' 38 0.000661088 16 12/30/2018
323600 323600 m' 1 5.13142E-06 16 12/30/2018
952800 952800 m' 1 1.51088E-05 16 12/30/2018
594000 16038000 m' 27 0.000254319 16 12/30/2018
13330500 66652500 set 5 0.001056929 16 12/30/2018
13330500 13330500 set 1 0.000211386 16
304200 584064 m2 1.92 9.26168E-06 16 12/30/2018

750000 235810500 m3 314.414 0.0098929 16 12/30/2018


2532915 10131660 Unit 4 0.000160661 16 12/30/2018
3008000 15040000 m' 5 0.000238494 16 12/30/2018
1097100 70214400 m' 64 0.001113411 16 12/30/2018
594000 37422000 m' 63 0.000593412 16 12/30/2018
13330500 66652500 set 5 0.001056929 16 12/30/2018
304200 803088 m2 2.64 1.27348E-05 16 12/30/2018

910000 520031351.84 m2 571.463024 0.008246293 21 1/11/2019


198000 254979236.16 m2 1287.77392 0.004043282 21 1/11/2019

260000 334821219.2 m2 1287.77392 0.00530936 31 12/25/2018


405000 1789735500 m1 4419.1 0.028380372 31 12/25/2018
195000 861724500 m1 4419.1 0.013664623 31 12/25/2018
169000 6050200 m1 35.8 9.59398E-05 31 12/25/2018
78000 1996800 m1 25.6 3.16639E-05 31 12/25/2018
404700 1618800 bh 4 2.56698E-05 31 12/25/2018
260000 81445000 m2 313.25 0.001291498 31 12/25/2018
405000 126866250 m2 313.25 0.002011756 31 12/25/2018
405000 36085500 m1 89.1 0.000572219 31 12/25/2018
195000 17374500 m1 89.1 0.000275513 31 12/25/2018
169000 6050200 m1 35.8 9.59398E-05 31 12/25/2018
78000 1996800 m1 25.6 3.16639E-05 31 12/25/2018
343600 1374400 bh 4 2.17943E-05 31 12/25/2018
169000 95857355.841 m2 567.203289 0.001520039 31 12/25/2018
405000 229717332.045 m2 567.203289 0.003642696 31 12/25/2018

1625000 14950000 m1 9.2 0.000237067 21 12/21/2018


1625000 570246625 m1 350.921 0.009042571 21 12/21/2018
52000000 52000000 unit 1 0.00082458 21 12/21/2018
31781.7832174
FINISH RENCANA 1 2 3
1/21/2019 1/28/2019 2/4/2019 bobot progress Bobot
1/27/2019 2/3/2019 2/10/2019

9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
- - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
- - - - -
12/17/2018 - - - - -
12/17/2018 - - - - -
12/17/2018 - - - - -
- - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
- - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
- - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
- - - - -
12/24/2018 - - - - -
- - - - -
1/10/2019 - - - - -
1/10/2019 - - - - -
1/10/2019 - - - - -
- - - - -
- - - - -
1/10/2019 159.09 318.18 130.28 607.55 795.45
1/10/2019 - - 32.69 32.69 163.49
1/10/2019 - - 27.65 27.65 165.93
1/10/2019 - - 35.69 35.69 107.08
1/10/2019 - - 43.67 43.67 131.03
1/10/2019 202.55 405.13 358.95 966.63 1620.41
1/10/2019 106.35 114.87 212.71 433.93 957.23
1/10/2019 - 28.63 76.36 104.99 171.82
1/10/2019 - - - - -
1/10/2019 - - 831.16 831.16 1870.11
- - - - -
1/10/2019 147.93 73.96 - 221.89 221.89
1/10/2019 - 22.95 45.89 68.84 68.84
1/10/2019 8.87 35.48 - 44.35 44.35
- - - - -
1/21/2019 - - - -
1/21/2019 - - - -
1/21/2019 - - - -
1/21/2019 - - - -
- - - - -
- - - - -
1/14/2019 62.88 188.64 62.88 314.4 314.40
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
- - - - -
1/14/2019 52.41 104.82 157.18 314.41 314.41
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -

1/31/2019 - - 244.92 244.92 571.46


1/31/2019 - 515.32 772.45 1287.77 1287.77

1/24/2019 107.31 367.93 740.23 1108.16 1287.77


1/24/2019 - 1104.77 2209.08 3313.85 4419.10
1/24/2019 - 982.42 1964.86 2947.28 4419.10
1/24/2019 - - - - -
1/24/2019 - - - - -
1/24/2019 - - - - -
1/24/2019 - 223.74 89.51 313.25 313.25
1/24/2019 208.33 104.92 - 313.25 313.25
1/24/2019 - 35.64 53.46 89.1 89.10
1/24/2019 - 22.62 66.48 89.1 89.10
1/24/2019 - - 35.8 35.8 35.80
1/24/2019 - - 25.6 25.6 25.60
1/24/2019 - - 4 4 4.00
1/24/2019 - - 576.21 576.21 576.21
1/24/2019 - 189.06 387.14 576.2 576.20

1/10/2019 - - 2.3 2.3 9.20


1/10/2019 70.16 116.37 120.67 307.2 350.92
1/10/2019 0.2 0.2 0.2 0.6 1.00
persen progress ket

proyek masjid telah masuk dalam proyek


percepatan, ketika terjadi keterlambatan
pihak kontraktor pelaksana melaksanakan
rapat harian dan membuat schedule detail
- tiap pekerjaan, setiap pengambilan keputusan
- berhubungan dengan manpower, material
- method, dan location
-
- progress didapat dari proses mapping lapangan
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
76%
20%
17%
33%
33%
60%
45%
61%
-
44%
-
100%
100%
100%
-
-
-
-
-
-
-
100%
-
-
-
-
-
-
-
-
-
-
-
-
100%
-
-
-
-
-
-

43%
100%

86%
75%
67%
-
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%

25%
88%
60%
NAMA PAKET : MASJID
PROP/KAB/KODYA : DI Yogyakarta/Kulonprogo-Yogyakarata
PPK : PT. ANGKASA PURA I
KONTRAKTOR PELAKSANA : PT. PP KSO
KONSULTAN PENGAWAS : KSO CITIAJASA BLUEVISION TGP

Uraian Sat

b c

MASJID
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR PONDASI
Pondasi Spunpile D600 mm M
- Pre Boring Kedalaman 20 m M
- Pemancangan M
- Joint + Welding Titik
- Bobok Kepala Tiang Pancang Bh
- Isian Spunpile K-350 M3
- Stek pembesian kg
- Pengujian Tiang Pancang dengan cara PDA Test Titik
Pekerjaan Tanah
- Dynamic compaction M2
- Galian tanah M3
Urugan pasir M3
Lantai Kerja M3
Pilecap
- Pembesian U.40 Kg
- Bekisting M2
- Beton Pondasi Tapak K-350 M3
PEKERJAAN STRUKTUR LANTAI DASAR (+0.00)
Anti Rayap M2
Tie Beam
- Galian tanah M3
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian U.40 Kg
- Bekisting M2
- Beton Tie Beam K-350 Integral M3
Slab Beton
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian Wiremesh M10-150 M2
- Slab Beton t=15 cm K.350 Integral M3
- Waterproofing M2
Pekerjaan Kolom
- Beton Kolom K-350 M3
- Pembesian U.40 Kg
- Bekisting M2
PEKERJAAN STRUKTUR LANTAI ATAP
Balok
- Pembesian U.40 Kg
- Bekisting M2
- Beton Balok K-350 M3
Slab Lantai Atap
- Bekisting M2
- Pembesian Kg
- Slab Beton t=15 cm K.350 M3
- Waterproofing M2
Kubah rangka pipa
Rangka Atap kg
PEKERJAAN HARDSCAPE
Lantai Kerja M3
Pembesian M2
Beton K-300 M3
PEKERJAAN ARSITEKTUR DAN INTERIOR
PEKERJAAN FINISHING LANTAI
Lantai Homogenous Tile (HT) MASJID m2
Lantai Homogenous Tile (HT) TOILET PRIA m2
Lantai Homogenous Tile (HT) TOILET WANITA m2
Lantai Homogenous Tile (HT) SELASAR dalam m2
Lantai Homogenous Tile (HT) SELASAR luar m2
Pekerjaan Koral sikat m2
Pekerjaan Paving block (grassblock) m2
Pekerjaan WPC Decking 20 mm m2
Pekerjaan Cat + Koral tabur m2
Pekerjaan Grass m2
PEKERJAAN INTERIOR DINDING LANTAI
Kolom Praktis 10x10cm (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1
Balok Praktis (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1
Pekerjaan Plesteran Kolom beton exposed m2
PEKERJAAN PINTU
Pintu WD1 uk 900 x 2150 mm unit
Pintu WD2 uk 800 x 2150 mm unit
Jendela AW1 uk 1310 x 1250 mm unit
Jendela AW2 uk 910 x 500mm unit
PEKERJAAN TOILET
toilet pria
Pekerjaan Hebel dan plesteran m3
Washtafel Unit
Closet Duduk m'
Urinoir m'
Urinoir Devider m'
Floor draiN m'
Paper holder m'
Shower spray m'
Kran dinding m'
Cubicle Toilet Pria set
Bak air set
Meja wastefel m2
toilet wanita
Pekerjaan Hebel dan plesteran m3
Washtafel Unit
Closet Duduk m'
Floor drai m'
Kran dinding m'
Cubicle Toilet Pria set
Meja wastefel m2
PEKERJAAN PLAFOND
LANTAI 1 ( SATU )
GRC Board 6mm, Rangka Hollow m2
Stetch Membrane m2
PEKERJAAN ATAP
Penutup atap Kubah Masjid m2
Lisplank m1
Plashing m1
Talang datar m1
Talana vertikal m1
Roof Drain bh
Penutup atap Metal toilet m2
Rangka atap Baja, Gording m2
Lisplank m1
Plashing m1
Ruuf drair toilet bh
Penutup atap canopi selasar dan penitipan sandal m2
Rangka atap canopi selasar m2
PEKERJAAN PAGAR DAN RAILLING
Railling Stainlessteel m1
Pagar Keliling m1
Gerbang unit
BOBOT
BOBOT KUMULATIF
: DI Yogyakarta/Kulonprogo-Yogyakarata
: PT. ANGKASA PURA I
: PT. PP KSO
: KSO CITIAJASA BLUEVISION TGP

DED
Harga Jumlah
Sat
Volume DED Satuan Harga-Harga BOBOT
(Rupiah) PP (Rupiah)
d' e f=(dxe) c

320 764224 244551680 M 320


320 336200 107584000 M 320
320 110045.8 35214643.960396 M 320
16 198492.9 3175886.88 Titik 16
16 158900 2542400 Bh 16
7.0336 1024691 7207265.23752964 M3 7.0336
12714.52 kg
6114900 Titik

0 M2
46.568 54976.19 2560131.23809524 M3 46.568
7.024 385165.4 2705401.74730159 M3 7.024
3.512 951918.4 3343137.57515176 M3 3.512

2669.31440064 12496.52 33357152.4467304 Kg 2669.31440064


86.08 147291 12678810.0161643 M2 86.08
26.832 1228444 32961616.1250771 M3 26.832

14600 M2

54976.19 M3
385165.4 M3
951918.4 M3
12496.52 Kg
147291 M2
1336544 M3

71.899 385165.4 27693006.8663492 M3 71.899


35.9495 951918.4 34220992.100774 M3 35.9495
718.99 231058 166128417.967323 M2 718.99
718.99 1336544 960961950.550731 M3 718.99
183400 M2

12.2 1228444 14987019.8541272 M3 12.2


3939.010848 12496.52 49223945.0379308 Kg 3939.010848
98.56 147265.5 14514488.6291794 M2 98.56

301.33651968 12496.52 3765659.16039074 Kg 301.33651968


14.96 147279.7 2203304.962432 M2 14.96
1.632 1228444 2004821.0165521 M3 1.632

147265.8 0 M2
12496.52 0 Kg
1228444 0 M3
183400 0 M2

50790.85 61100 3103320935 kg

35.9495 951918.4 34220992.100774 M3


12496.52 0 M2
907885.3 0 M3

795.4525509 379670.5 302009867.726478 m2 0.0387361626


163.49124015 379670.5 62072800.8933706 m2 0.0079615349
165.9287742 379670.5 62998260.6649011 m2 0.0080802356
107.07732 379670.5 40654099.62306 m2 0.0052143456
131.03118 379670.5 49748673.62619 m2 0.006380827
1620.41491265 525000 850717829.14125 m2 0.1091141307
957.22614435 195000 186659098.14825 m2 0.0239411289
171.8208828 650000 111683573.82 m2 0.0143246746
721.6228845 71630 51689847.216735 m2 0.0066298043
1870.109409 26000 48622844.634 m2 0.0062364267
0 0
221.8976085333 130695.7 29001063.4676914 m1 0.0037197126
68.84 130695.7 8997092.04759624 m1 0.0011539783
44.352 128977.5 5720410.67228587 m2 0.000733707
0 0
3 6723825 20171474.2718664 unit 0.0025872185
1 5976733 5976733.11759004 unit 0.0007665833
2 4503125 9006250 unit 0.0011551529
8 1237500 9900000 unit 0.0012697864
0 0
0 0
314.414 750000 235810500 m3 0.0302453491
3 2532915 7598745 Unit 0.0009746245
6 3008000 18048000 m' 0.002314859
12 6700000 80400000 m' 0.0103122044
12 2215000 26580000 m' 0.003409184
38 1097100 41689800 m' 0.0053471858
1 323600 323600 m' 4.150534E-05
1 952800 952800 m' 0.0001222073
27 594000 16038000 m' 0.0020570539
5 13330500 66652500 set 0.0085489329
1 13330500 13330500 set 0.0017097866
1.92 304200 584064 m2 7.4912778E-05
0 0
314.414 750000 235810500 m3 0.0302453491
4 2532915 10131660 Unit 0.0012994994
5 3008000 15040000 m' 0.0019290492
64 1097100 70214400 m' 0.0090057866
63 594000 37422000 m' 0.0047997924
5 13330500 66652500 set 0.0085489329
2.64 304200 803088 m2 0.0001030051
0 0
0 0
571.463024 910000 520031351.84 m2 0.0666998704
1287.77392 198000 254979236.16 m2 0.0327039551
0 0
1287.77392 260000 334821219.2 m2 0.0429445875
4419.1 405000 1789735500 m1 0.2295537094
4419.1 195000 861724500 m1 0.1105258601
35.8 169000 6050200 m1 0.0007760062
25.6 78000 1996800 m1 0.0002561121
4 404700 1618800 bh 0.0002076293
313.25 260000 81445000 m2 0.0104462374
313.25 405000 126866250 m2 0.0162720236
89.1 405000 36085500 m1 0.0046283713
89.1 195000 17374500 m1 0.0022284751
4 343600 1374400 bh 0.0001762823
567.203289 169000 95857355.841 m2 0.0122947841
567.203289 405000 229717332.045 m2 0.0294638318
0 0
9.2 1625000 14950000 m1 0.0019175057
350.921 1625000 570246625 m1 0.073140544
1 52000000 52000000 unit 0.0066695849
7,796,587,146.16 1
DURASI

START RENCANA
FINISH RENCANA 23 24 25 26
(HARI) 17-Dec 24-Dec 31-Dec 7-Jan
23-Dec 30-Dec 6-Jan 13-Jan

8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
8 9/22/2018 9/29/2018 - - - -
- - - -
10 9/30/2018 10/9/2018 - - - -
10 9/30/2018 10/9/2018 - - - -
10 9/30/2018 10/9/2018 - - - -
10 9/30/2018 10/9/2018 - - - -
1 - - - -
16 12/2/2018 12/17/2018 - - - -
16 12/2/2018 12/17/2018 - - - -
16 12/2/2018 12/17/2018 - - - -
- - - -
21 12/2/2018 12/22/2018 - - - -
- - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
- - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
21 12/2/2018 12/22/2018 - - - -
- - - -
16 12/7/2018 12/22/2018 - - - -
16 12/7/2018 12/22/2018 - - - -
16 12/7/2018 12/22/2018 - - - -
- - - -
- - - -
16 12/9/2018 12/24/2018 - - - -
16 12/9/2018 12/24/2018 - - - -
16 12/9/2018 12/24/2018 - - - -
- - - -
16 12/9/2018 12/24/2018 - - - -
16 12/9/2018 12/24/2018 - - - -
16 12/9/2018 12/24/2018 - - - -
16 12/9/2018 12/24/2018 - - - -
- - - -
16 12/9/2018 12/24/2018 - - - -
- - - -
21 12/21/2018 1/10/2019 - - - -
21 12/21/2018 1/10/2019 - - - -
21 12/21/2018 1/10/2019 - - - -
- - - -
- - - -
19 12/23/2018 1/10/2019 41.866 293.061 293.061 167.464
19 12/23/2018 1/10/2019 8.605 60.234 60.234 34.419
19 12/23/2018 1/10/2019 8.733 61.132 61.132 34.932
19 12/23/2018 1/10/2019 5.636 39.450 39.450 22.543
19 12/23/2018 1/10/2019 6.896 48.275 48.275 27.586
19 12/23/2018 1/10/2019 85.285 596.995 596.995 341.140
19 12/23/2018 1/10/2019 50.380 352.662 352.662 201.521
19 12/23/2018 1/10/2019 9.043 63.302 63.302 36.173
19 12/23/2018 1/10/2019 37.980 265.861 265.861 151.921
19 12/23/2018 1/10/2019 98.427 688.988 688.988 393.707
- - - -
19 12/23/2018 1/10/2019 11.679 81.752 81.752 46.715
19 12/23/2018 1/10/2019 3.623 25.362 25.362 14.493
19 12/23/2018 1/10/2019 2.334 16.340 16.340 9.337
- - - -
15 1/7/2019 1/21/2019 - - - 1.400
15 1/7/2019 1/21/2019 - - - 0.467
15 1/7/2019 1/21/2019 - - - 0.933
15 1/7/2019 1/21/2019 - - - 3.733
- - - -
- - - -
16 12/30/2018 1/14/2019 - - - -
16 12/30/2018 1/14/2019 - 0.1875 1.3125 1.3125
16 12/30/2018 1/14/2019 - 0.375 2.625 2.625
16 12/30/2018 1/14/2019 - 0.75 5.25 5.25
16 12/30/2018 1/14/2019 - 0.75 5.25 5.25
16 12/30/2018 1/14/2019 - 2.375 16.625 16.625
16 12/30/2018 1/14/2019 - 0.0625 0.4375 0.4375
16 12/30/2018 1/14/2019 - 0.0625 0.4375 0.4375
16 12/30/2018 1/14/2019 - 1.6875 11.8125 11.8125
16 12/30/2018 1/14/2019 - 0.3125 2.1875 2.1875
16 1/14/2019 - 0.0625 0.4375 0.4375
16 12/30/2018 1/14/2019 - 0.12 0.84 0.84
- - - -
16 12/30/2018 1/14/2019 - - - -
16 12/30/2018 1/14/2019 - 0.25 1.75 1.75
16 12/30/2018 1/14/2019 - 0.3125 2.1875 2.1875
16 12/30/2018 1/14/2019 - 4 28 28
16 12/30/2018 1/14/2019 - 3.9375 27.5625 27.5625
16 12/30/2018 1/14/2019 - - - -
16 12/30/2018 1/14/2019 - 0.165 1.115 1.155
- - - -
- - - -
21 1/11/2019 1/31/2019 - - - 81.638
21 1/11/2019 1/31/2019 - - - 183.968
- - - -
31 12/25/2018 1/24/2019 - 249.247 290.788 290.788
31 12/25/2018 1/24/2019 - 855.310 997.861 997.861
31 12/25/2018 1/24/2019 - 855.310 997.861 997.861
31 12/25/2018 1/24/2019 - 6.929 8.084 8.084
31 12/25/2018 1/24/2019 - 4.955 5.781 5.781
31 12/25/2018 1/24/2019 - 0.774 0.903 0.903
31 12/25/2018 1/24/2019 - 60.629 70.734 70.734
31 12/25/2018 1/24/2019 - 60.629 70.734 70.734
31 12/25/2018 1/24/2019 - 17.245 20.119 20.119
31 12/25/2018 1/24/2019 - 17.245 20.119 20.119
31 12/25/2018 1/24/2019 - 0.774 0.903 0.903
31 12/25/2018 1/24/2019 - 109.781 128.078 128.078
31 12/25/2018 1/24/2019 - 109.781 128.078 128.078
- - - -
21 12/21/2018 1/10/2019 - 3.067 3.067 1.752
21 12/21/2018 1/10/2019 - 116.974 116.974 66.842
21 12/21/2018 1/10/2019 - 0.333 0.333 0.190
27 28 29 30 1 2 3
14-Jan 21-Jan 28-Jan 4-Feb 1/21/2019 1/28/2019 2/4/2019
20-Jan 27-Jan 3-Feb 10-Feb 1/27/2019 2/3/2019 2/10/2019

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - 159.09 318.18 130.28
- - - - - - 32.69
- - - - - - 27.65
- - - - - - 35.69
- - - - - - 43.67
- - - - 202.55 405.13 358.95
- - - - 40.23 312.71 412.65
- - - - - 28.63 76.36
- - - - - - -
- - - - - - 831.16
- - - - - - -
- - - - 147.93 73.96 -
- - - - - 22.95 45.89
- - - - 8.87 35.48 -
- - - - - - -
1.400 0.200 - - - - -
0.467 0.067 - - - - -
0.933 0.133 - - - - -
3.733 0.533 - - - - -
- - - - - - -
- - - - - - -
- - - - 62.88 188.64 62.88
0.1875 - - - - - -
0.375 - - - - - -
0.75 - - - - - -
0.75 - - - - - -
2.375 - - - - - -
0.0625 - - - - - -
0.0625 - - - - - -
1.6875 - - - - - -
0.3125 - - - - - -
0.0625 - - - - - -
0.12 - - - - - -
- - - - - - -
- - - - 52.41 104.82 157.18
0.25 - - - - - -
0.3125 - - - - - -
4 - - - - - -
3.9375 - - - - - -
- - - - - - -
0.165 - - - - - -
- - - - - - -
- - - - - - -
190.488 190.488 108.850 - - - 244.92
429.258 429.258 245.290 - - 315.23 972.54
- - - - - - -
290.788 166.164 - - 107.31 367.93 540.36
997.861 570.206 - - - 1104.77 2209.08
997.861 570.206 - - - 982.42 1964.86
8.084 4.619 - - - - -
5.781 3.303 - - - - -
0.903 0.516 - - - - -
70.734 40.419 - - - 223.74 89.51
70.734 40.419 - - 208.33 104.92 -
20.119 11.497 - - - 35.64 53.46
20.119 11.497 - - - 22.62 66.48
0.903 0.516 - - - - 4
128.078 73.188 - - - - 576.21
128.078 73.188 - - - 189.06 387.14
- - - - - - -
- - - - - - 2.3
- - - - 70.16 116.37 120.67
- - - - 0.2 - -
4 5
2/11/2019 2/18/2019 bobot progress Bobot persen progress
2/17/2019 2/24/2019

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
62.23 125.67 795.45 795.45 100%
61.81 68.99 163.49 163.49 100%
42.57 95.71 165.93 165.93 100%
23.79 47.60 107.08 107.08 100%
40.35 29.12 113.14 131.03 86%
217.92 435.86 1620.41 1620.41 100%
100.24 91.40 957.23 957.23 100%
26.73 40.10 171.82 171.82 100%
90.2 237.34 327.54 721.62 45%
139.86 415.28 1386.3 1870.11 74%
- - - - -
- - 221.89 221.89 100%
- - 68.84 68.84 100%
- - 44.35 44.35 100%
- - - - -
- 3 3 3.00 100%
- 1 1 1.00 100%
- 2 2 2.00 100%
- 8 8 8.00 100%
- - - - -
- - - - -
- - 314.4 314.40 100%
- 3.00 3.00 3.00 100%
- 6.00 6.00 6.00 100%
- 12.00 12.00 12.00 100%
- 12.00 12.00 12.00 100%
- 38.00 38.00 38.00 100%
- 1.00 1.00 1.00 100%
- - 0.00 1.00
- 27.00 27.00 27.00 100%
- 5.00 5.00 5.00 100%
- - - 1.00
- 1.92 1.92 1.92 100%
- - - - -
- - 314.41 314.41 100%
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
108.84 217.70 571.46 571.46 100%
- - 1287.77 1287.77 100%
- -
252.98 19.19 1287.77 1287.77 100%
1105.25 - 4419.1 4419.10 100%
1471.82 - 4419.1 4419.10 100%
- 35.80 35.80 35.80 100%
- 25.60 25.60 25.60 100%
- 4.00 4.00 4.00 100%
- - 313.25 313.25 100%
- - 313.25 313.25 100%
- - 89.1 89.10 100%
- - 89.1 89.10 100%
- - 4 4.00 100%
- - 576.21 576.21 100%
- - 576.2 576.20 100%
- -
4.6 2.30 9.2 9.20 100%
14.57 29.15 350.92 350.92 100%
0.2 0.4 0.8 1.00 80%
23 24
ket 17-Dec 24-Dec
23-Dec 30-Dec
proyek masjid telah masuk dalam proyek
percepatan, ketika terjadi keterlambatan
pihak kontraktor pelaksana melaksanakan
rapat harian dan membuat schedule detail
tiap pekerjaan, setiap pengambilan keputusan - -
berhubungan dengan manpower, material - -
method, dan location - -
- -
progress didapat dari proses mapping lapangan - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.00204 0.01427
0.00042 0.00293
0.00043 0.00298
0.00027 0.00192
0.00034 0.00235
0.00574 0.04020
0.00126 0.00882
0.00075 0.00528
0.00035 0.00244
0.00033 0.00230
- -
0.00020 0.00137
0.00006 0.00043
0.00004 0.00027
- -
- -
- -
- -
- -
- -
- -
- -
- 0.00006
- 0.00014
- 0.00064
- 0.00021
- 0.00033
- 0.00000
- 0.00001
- 0.00013
- 0.00053
- 0.00011
- 0.00000
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 0.00831
- 0.04443
- 0.02139
- 0.00015
- 0.00005
- 0.00004
- 0.00202
- 0.00315
- 0.00090
- 0.00043
- 0.00003
- 0.00234
- 0.00561
- -
- 0.00064
- 0.02438
- 0.00222
0.01222 0.20384
0.01222 0.22
25 26 27 28
31-Dec 7-Jan 14-Jan 21-Jan
6-Jan 13-Jan 20-Jan 27-Jan

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.01427 0.00815 - -
0.00293 0.00168 - -
0.00298 0.00170 - -
0.00192 0.00110 - -
0.00235 0.00134 - -
0.04020 0.02297 - -
0.00882 0.00504 - -
0.00528 0.00302 - -
0.00244 0.00140 - -
0.00230 0.00131 - -
- - - -
0.00137 0.00078 - -
0.00043 0.00024 - -
0.00027 0.00015 - -
- - - -
- 0.00121 0.00121 0.00017
- 0.00036 0.00036 0.00005
- 0.00054 0.00054 0.00008
- 0.00059 0.00059 0.00008
- - - -
- - - -
- - - -
0.00043 0.00043 0.00006 -
0.00101 0.00101 0.00014 -
0.00451 0.00451 0.00064 -
0.00149 0.00149 0.00021 -
0.00234 0.00234 0.00033 -
0.00002 0.00002 0.00000 -
0.00005 0.00005 0.00001 -
0.00090 0.00090 0.00013 -
0.00374 0.00374 0.00053 -
0.00075 0.00075 0.00011 -
0.00003 0.00003 0.00000 -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 0.00953 0.02223 0.02223
- 0.00467 0.01090 0.01090
- - - -
0.00970 0.00970 0.00970 0.00554
0.05183 0.05183 0.05183 0.02962
0.02496 0.02496 0.02496 0.01426
0.00018 0.00018 0.00018 0.00010
0.00006 0.00006 0.00006 0.00003
0.00005 0.00005 0.00005 0.00003
0.00236 0.00236 0.00236 0.00135
0.00367 0.00367 0.00367 0.00210
0.00105 0.00105 0.00105 0.00060
0.00050 0.00050 0.00050 0.00029
0.00004 0.00004 0.00004 0.00002
0.00273 0.00273 0.00273 0.00156
0.00655 0.00655 0.00655 0.00374
- - - -
0.00064 0.00037 - -
0.02438 0.01393 - -
0.00222 0.00127 - -
0.23175 0.20030 0.14169 0.09276
0.45 0.65 0.79 0.88
29 30 1 2
28-Jan 4-Feb 1/21/2019 1/28/2019
3-Feb 10-Feb 1/27/2019 2/3/2019

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.00775 0.01549
- - - -
- - - -
- - - -
- - - -
- - 0.01364 0.02728
- - 0.00101 0.00782
- - - 0.00239
- - - -
- - - -
- - - -
- - 0.00248 0.00124
- - - 0.00038
- - 0.00015 0.00059
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.00605 0.01815
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.00504 0.01008
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.01270 - - -
0.00623 - - 0.00801
- - - -
- - 0.00358 0.01227
- - - 0.05739
- - - 0.02457
- - - -
- - - -
- - - -
- - - 0.00746
- - 0.01082 0.00545
- - - 0.00185
- - - 0.00057
- - - -
- - - -
- - - 0.00967
- - - -
- - - -
- - 0.01462 0.02425
- - 0.00133 -
0.01893 0.06647 0.23491
1.00 0.06647 0.30138
3 4 5
2/4/2019 2/11/2019 2/18/2019
2/10/2019 2/17/2019 2/24/2019

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
0.00634 0.00303 0.00612 25/01 6 pekerja
0.00159 0.00301 0.00336
0.00135 0.00207 0.00466
0.00174 0.00116 0.00232
0.00213 0.00196 0.00142
0.02417 0.01467 0.02935
0.01032 0.00251 0.00229
0.00637 0.00223 0.00334
- 0.00083 0.00218
0.00277 0.00047 0.00138
- - -
- - -
0.00077 - -
- - -
- - -
- - 0.00259
- - 0.00077
- - 0.00116
- - 0.00127
- - -
- - -
0.00605 - - 26/01 5 pekerja
- - 0.00097
- - 0.00231
- - 0.01031
- - 0.00341
- - 0.00535
- - 0.00004
- - -
- - 0.00206
- - 0.00855
- - -
- - 0.00007
- - -
0.01512 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
0.02859 0.01270 0.02541
0.02470 - -
- - -
0.01802 0.00844 0.00064 25/01 4 org
0.11475 0.05741 - 25/01 4 org
0.04914 0.03681 -
- - 0.00078
- - 0.00026
- - 0.00021
0.00298 - -
- - - 25/01 8 org
0.00278 - -
0.00166 - -
0.00018 - -
0.01229 - -
0.01980 - -
- - -
0.00048 0.00096 0.00048
0.02515 0.00304 0.00608
- 0.00133 0.00267
0.37924 0.15264 0.13179
0.68061 0.83325 0.96504
25/01 26/01 29/01
keramik masjid 6 org 6 org
atap metal toilet 7 org
atap kubah masjid
listplank 4 org 5 org
relung diagonal 5 org 3 org
metal sheet 2 org 2 org
bakar membran 2 org 2 org
hollow panel 3 org 6 org
hebel toilet pria 5 org
pengecatan baja atap 3 org
grassblock 3 org