VOLUME PEKERJAAN DOLPHIN DERMAGA

NO URAIAN VOLUME
1 Bollard + Angkur Baut 1.00

2 Fender + Angkur Baut 1.00

3 Beton Dolphin luas penampang (m) Tinggi (m)


autoCad 1.86 2.5 4.65

4 Spunpile Ø35 cm P = 15 m 5
75.00
5 Pembesian Poer
dia (mm) panjang(m) jumlah btg Panjang total (m) berat (kg/m)
tul Beugel
Ø16 4.79 13 62.27 1.580 98.39

Sengkang
Ø16 0.90 20 18.00 1.580 28.44
Ø16 1.26 20 25.20 1.580 39.82
Ø16 1.40 30 42.00 1.580 66.36
134.62
tul pokok
Ø19 7.75 6 46.50 2.230 103.70
Ø19 7.46 4 29.84 2.230 66.54
Ø19 6.74 4 26.96 2.230 60.12
230.36
6 Beton isi tiang pancang luas penampang (m) Tinggi (m) jumlah tiang
autoCad 0.0284 1.5 5 0.213

6 Pembesian isi tiang pancang


dia (mm) panjang(m) jumlah btg Panjang total (m) berat (kg/m) jumlah tiang
spiral
Ø10 12 1 12.00 0.617 5 37.02
Ø19 2 5 10.00 2.230 5 111.50

JU
AGA
SATUAN HARGA SATUAN (Rp) TOTAL HARGA (Rp)
bh

bh

m3

btg
m1

Kg

+
Kg

+
Kg

m3

Kg
Kg

JUMLAH HARGA TOTAL ( Rp )


VOLUME PEKERJAAN DOLPHIN DERMAGA
NO URAIAN VOLUME
1 Bollard + Angkur Baut 1.00

2 Fender + Angkur Baut 1.00

3 Beton Dolphin luas penampang (m) Tinggi (m)


autoCad 1.86 2.5 4.65

4 Spunpile Ø35 cm P = 15 m 5
75.00
5 Pembesian Poer
dia (mm) panjang(m) jumlah btg Panjang total (m) berat (kg/m)
tul Beugel
Ø12 4.79 13 62.27 0.888 55.30
sengkang
Ø16 1.4 30 42.00 1.580 66.36
Ø16 0.9 20 18.00 1.580 28.44
94.80
tul pokok
Ø16 7.75 6 46.50 1.580 73.47
Ø16 6.92 4 27.68 1.580 43.73
117.20
6 Beton isi tiang pancang luas penampang (m) Tinggi (m) jumlah tiang
autoCad 0.0284 1.5 5 0.213

6 Pembesian isi tiang pancang


dia (mm) panjang(m) jumlah btg Panjang total (m) berat (kg/m) jumlah tiang
spiral
Ø10 12 1 12.00 0.617 5 37.02
Ø16 2 5 10.00 1.580 5 79.00

JU
AGA
SATUAN HARGA SATUAN (Rp) TOTAL HARGA (Rp)
bh

bh

m3

btg
m1

Kg

+
Kg

+
Kg

m3

Kg
Kg

JUMLAH HARGA TOTAL ( Rp )