Anda di halaman 1dari 6

PT.

PLN (Persero) WILAYAH KALTIM


AP2B
TRAGI AREA SAMARINDA

DATA HASIL PENGUKURAN BATTERY 91 CELL TEGANGAN 110 V DC

Gardu Induk BUKIT BIRU Area Samarinda


Cell Level Tegangan Temp. Cell Level Tegangan Temp.
No. Air ( Volt ) C No. Air ( Volt ) C
1 Cukup 1.412 25.4 47 Cukup 1.404 25.4
2 Cukup 1.395 25.4 48 Cukup 1.402 25.4
3 Cukup 1.413 25.4 49 Cukup 1.412 25.4
4 Cukup 1.399 25.4 50 Cukup 1.406 25.4
5 Cukup 1.415 25.4 51 Cukup 1.411 25.4
6 Cukup 1.424 25.4 52 Cukup 1.404 25.4
7 Cukup 1.395 25.4 53 Cukup 1.407 25.4
8 Cukup 1.414 25.4 54 Cukup 1.368 25.4
9 Cukup 1.274 25.4 55 Cukup 1.404 25.4
10 Cukup 1.406 25.4 56 Cukup 1.399 25.4
11 Cukup 1.374 25.4 57 Cukup 1.413 25.4
12 Cukup 1.400 25.4 58 Cukup 1.428 25.4
13 Cukup 1.400 25.4 59 Cukup 1.420 25.4
14 Cukup 1.412 25.4 60 Cukup 1.432 25.4
15 Cukup 1.396 25.4 61 Cukup 1.428 25.4
16 Cukup 1.412 25.4 62 Cukup 1.422 25.4
17 Cukup 1.412 25.4 63 Cukup 1.423 25.4
18 Cukup 1.404 25.4 64 Cukup 1.428 25.4
19 Cukup 1.402 25.4 65 Cukup 1.425 25.4
20 Cukup 1.409 25.4 66 Cukup 1.416 25.4
21 Cukup 1.413 25.4 67 Cukup 1.410 25.4
22 Cukup 1.413 25.4 68 Cukup 1.421 25.4
23 Cukup 1.405 25.4 69 Cukup 1.401 25.4
24 Cukup 1.391 25.4 70 Cukup 1.399 25.4
25 Cukup 1.385 25.4 71 Cukup 1.406 25.4
26 Cukup 1.410 25.4 72 Cukup 1.400 25.4
27 Cukup 1.408 25.4 73 Cukup 1.389 25.4
28 Cukup 1.405 25.4 74 Cukup 1.402 25.4
29 Cukup 1.406 25.4 75 Cukup 1.401 25.4
30 Cukup 1.410 25.4 76 Cukup 1.406 25.4
31 Cukup 1.408 25.4 77 Cukup 1.392 25.4
32 Cukup 1.399 25.4 78 Cukup 1.402 25.4
33 Cukup 1.413 25.4 79 Cukup 1.399 25.4
34 Cukup 1.408 25.4 80 Cukup 1.424 25.4
35 Cukup 1.402 25.4 81 Cukup 1.379 25.4
36 Cukup 1.388 25.4 82 Cukup 1.409 25.4
37 Cukup 1.390 25.4 83 Cukup 1.390 25.4
38 Cukup 1.401 25.4 84 Cukup 1.400 25.4
39 Cukup 1.410 25.4 85 Cukup 1.395 25.4
40 Cukup 1.387 25.4 86 Cukup 1.400 25.4
41 Cukup 1.415 25.4 87 Cukup 1.394 25.4
42 Cukup 1.398 25.4 88 Cukup 1.400 25.4
43 Cukup 1.397 25.4 89 Cukup 1.403 25.4
44 Cukup 1.387 25.4 90 Cukup 1.407 25.4
45 Cukup 1.415 25.4 91 Cukup 1.406 25.4
46 Cukup 1.405 25.4
JUMLAH 64.44 JUMLAH 63.29

Keterangan :
Pengukuran Tanggal : 26 Februari 2018
Tegangan + ke Ground : 55.4
Tegangan - ke Ground : -59.3
Total Tegangan 91 Cell Battery : 127.5
Penunjukan Volt Meter DC : 125
PT.PLN (Persero) WILAYAH KALTIM
AP2B
TRAGI AREA SAMARINDA

DATA HASIL PENGUKURAN BATTERY 39 CELL TEGANGAN 48 V DC

Gardu Induk BUKIT BIRU Area Samarinda


Cell Level Tegangan Temp. Cell Level Tegangan Temp.
No. Air ( Volt ) C No. Air ( Volt ) C
1 Cukup 1.384 25.4 21 Cukup 1.400 25.4
2 Cukup 1.382 25.4 22 Cukup 1.363 25.4
3 Cukup 1.401 25.4 23 Cukup 1.381 25.4
4 Cukup 1.381 25.4 24 Cukup 1.378 25.4
5 Cukup 1.365 25.4 25 Cukup 1.381 25.4
6 Cukup 1.384 25.4 26 Cukup 1.386 25.4
7 Cukup 1.397 25.4 27 Cukup 1.393 25.4
8 Cukup 1.434 25.4 28 Cukup 1.377 25.4
9 Cukup 1.395 25.4 29 Cukup 1.391 25.4
10 Cukup 1.389 25.4 30 Cukup 1.376 25.4
11 Cukup 1.330 25.4 31 Cukup 1.355 25.4
12 Cukup 1.388 25.4 32 Cukup 1.396 25.4
13 Cukup 1.350 25.4 33 Cukup 1.328 25.4
14 Cukup 1.377 25.4 34 Cukup 1.387 25.4
15 Cukup 1.396 25.4 35 Cukup 1.379 25.4
16 Cukup 1.399 25.4 36 Cukup 1.393 25.4
17 Cukup 1.389 25.4 37 Cukup 1.389 25.4
18 Cukup 1.388 25.4 38 Cukup 1.378 25.4
19 Cukup 1.339 25.4 39 Cukup 1.388 25.4
20 Cukup 1.325 25.4 25.4

JUMLAH 27.59 JUMLAH 26.22

Keterangan :
Pengukuran Tanggal : 27 Februari 2018
Tegangan + ke Ground : 0.605
Tegangan - ke Ground : -53.3
Total Tegangan 36 Cell Battery : 53.5
Penunjukan Volt Meter DC : 53
PT.PLN (Persero) WILAYAH KALTIM
AP2B
TRAGI AREA SAMARINDA

DATA HASIL PENGUKURAN BATTERY 86 CELL TEGANGAN 110 V DC

Gardu Induk BUKIT BIRU Area Samarinda


Cell Level Tegangan Temp. Cell Level Tegangan Temp.
No. Air ( Volt ) C No. Air ( Volt ) C
1 Cukup 1.383 24.5 44 Cukup 1.378 24.5
2 Cukup 1.366 24.5 45 Cukup 1.336 24.5
3 Cukup 1.334 24.5 46 Cukup 1.382 24.5
4 Cukup 1.337 24.5 47 Cukup 1.379 24.5
5 Cukup 1.337 24.5 48 Cukup 1.365 24.5
6 Cukup 1.337 24.5 49 Cukup 1.332 24.5
7 Cukup 1.320 24.5 50 Cukup 1.377 24.5
8 Cukup 1.343 24.5 51 Cukup 1.340 24.5
9 Cukup 1.368 24.5 52 Cukup 1.374 24.5
10 Cukup 1.359 24.5 53 Cukup 1.360 24.5
11 Cukup 1.339 24.5 54 Cukup 1.331 24.5
12 Cukup 1.340 24.5 55 Cukup 1.373 24.5
13 Cukup 1.337 24.5 56 Cukup 1.353 24.5
14 Cukup 1.347 24.5 57 Cukup 1.333 24.5
15 Cukup 1.360 24.5 58 Cukup 1.342 24.5
16 Cukup 1.341 24.5 59 Cukup 1.335 24.5
17 Cukup 1.336 24.5 60 Cukup 1.385 24.5
18 Cukup 1.342 24.5 61 Cukup 1.378 24.5
19 Cukup 1.375 24.5 62 Cukup 1.338 24.5
20 Cukup 1.366 24.5 63 Cukup 1.380 24.5
21 Cukup 1.334 24.5 64 Cukup 1.343 24.5
22 Cukup 1.348 24.5 65 Cukup 1.338 24.5
23 Cukup 1.342 24.5 66 Cukup 1.343 24.5
24 Cukup 1.330 24.5 67 Cukup 1.368 24.5
25 Cukup 1.337 24.5 68 Cukup 1.333 24.5
26 Cukup 1.338 24.5 69 Cukup 1.341 24.5
27 Cukup 1.338 24.5 70 Cukup 1.374 24.5
28 Cukup 1.360 24.5 71 Cukup 1.342 24.5
29 Cukup 1.343 24.5 72 Cukup 1.328 24.5
30 Cukup 1.336 24.5 73 Cukup 1.339 24.5
31 Cukup 1.341 24.5 74 Cukup 1.371 24.5
32 Cukup 1.336 24.5 75 Cukup 1.320 24.5
33 Cukup 1.339 24.5 76 Cukup 1.337 24.5
34 Cukup 1.340 24.5 77 Cukup 1.370 24.5
35 Cukup 1.338 24.5 78 Cukup 1.373 24.5
36 Cukup 1.339 24.5 79 Cukup 1.375 24.5
37 Cukup 1.363 24.5 80 Cukup 1.337 24.5
38 Cukup 1.370 24.5 81 Cukup 1.345 24.5
39 Cukup 1.363 24.5 82 Cukup 1.373 24.5
40 Cukup 1.380 24.5 83 Cukup 1.336 24.5
41 Cukup 1.377 24.5 84 Cukup 1.338 24.5
42 Cukup 1.330 24.5 85 Cukup 1.373 24.5
43 Cukup 1.352 24.5 86 Cukup 1.336 24.5
JUMLAH 57.94 JUMLAH 58.20

Keterangan :
Pengukuran Tanggal : 27 Februari 2018
Tegangan + ke Ground : 56.3
Tegangan - ke Ground : -58.9
Total Tegangan 86 Cell Battery : 115.9
Penunjukan Volt Meter DC : 128.9
PT.PLN (Persero) WILAYAH KALTIMRA
AP2B SISTEM KALTIM
TRAGI AREA SAMARINDA

PEMERIKSAAN BATTERY TEGANGAN 110 V DC

Gardu Induk BUKIT BIRU Samarinda


URAIAN KONDISI
No Peralatan / Komponen yang diperiksa 91 cell 86 Cell 39Cell 18 Cell

1 Cell Battery Baik Baik Baik

2 Rangkaian sirkuit Arus Searah / DC

3 Ruang Battery / Ventiasi Baik Baik Baik

4 Isolator dudukan rak dan rak Battery Baik Baik Baik

5 Battery Charger Baik Baik Baik

6 Kebersihan Cell & Charge Baik Baik Baik

7 Temperatu Ruangan ( co ) 24.5 24.5 24.5

8 Kelembaban ( % ) 65% 65% 65%

9 Peralatan kerja Khusus battery Ada Ada Ada

Keterangan :

Diperiksa Pelaksana
Supv. Ophar Koordinator GI

ALFARIS HIDAYAT KEVIN SATYA PRATAMA