Anda di halaman 1dari 1

CLEAN ROOM

CLASS 100

OUTGOING
QA

CONTROL ROOM

OP80B

VTM VTM VTM VTM VTM VTM VTM VTM VTM


OP80A ATAC 1 ATAC 2 ATAC 3 ATAC 4 ATAC 5 ATAC 6 ATAC 7 ATAC 8 ATAC 9

VTM VTM Assembly VTM Assembly Area


SPURS Build Area

VTM OP10 VTM OP20 VTM PRE, FQC & VTM PRE, FQC & VTM PRE, FQC &
VTM OP50 VTM OP60 VTM OP70 PACK 2 PACK 3
VTM OP30 PACK 1
FRAME IPK rack & Tool Box
FloorIPK
stock
Rack
rack Floor stock rack Floor stock rack Tool Box Material Rack

Material Rack Material Rack Workbench IPK Area IPK Area

Workbench
SPUR
VTM VTM VTM VTM VTM VTM
FDR 1 FDR 2 Sub-Assembly FDR 7
FDR 5 FDR 6
Buid Area
Floor stock rack

Workbench

VTM
Table & Bottom
panel rack
Workbench Workbench FDR 3

Platform

ATM Assembly
Buid Area

FRAME ATM - OP20 ATM - OP30 ATM - OP40 ATM - OP50 ATM - OP60 ATM
Material Rack Material Rack FQC & PACK
SLIDING DOOR

WIP
FFU
TESTING

FFU
FFU

RAW TROLLEY
FAN
FFU

ATM SPURE MATERIAL

ATM
FDR 1
ATM ATM
ATM ATM ATM
ATAC 3 ATAC 4 ATAC 5 ATM
ATAC 1 ATAC 2 ATAC 6

NPI LINE NPI LINE NPI LINE


NPI LINE ATAC 2
OP10, 20, 30 OP40, 50, 60 ATAC 1

ATM
LOAD PORT

ATM
Material Rack

Sub-Assembly
CEFEM FDR 3 CEFEM FDR 1 CEFEM FDR 2 Buid Area EFEM FDR 2 EFEM FDR 5 EFEM FDR 4

Workbench

KIT TO OPT
LOCATION

ENTRANCE

AIR SHOWER

RAPID SHUFFLE

Anda mungkin juga menyukai