ENGINEER ESTIMATE (EE)

Pekerjaan :
Lokasi :
Tahun Anggaran :

Harga Satuan Jumlah Harga Total Harga


No. Uraian Pekerjaan Satuan Volume
Rp Rp Rp
1 PEKERJAAN PERBAIKAN SALURAN HM.23+45.16 1,885,729,901.80
Pas.Beton K-125 m3 522.57 1,153,755.86 602,920,507.72
Tulangan Wiremesh kg 261.29 3,954,156.25 1,033,165,669.94
2
Begesting m 942.81 254,555.95 239,998,743.74
2
Membongkar Begesting m 1,414.22 6,820.00 9,644,980.40

2 PEKERJAAN PERBAIKAN SALURAN HM.20+8.20 942,864,950.90


Pas.Beton K-125 m3 261.29 1,153,755.86 301,460,253.86
Tulangan Wiremesh kg 130.64 3,954,156.25 516,582,834.97
2
Begesting m 471.41 254,555.95 119,999,371.87
2
Membongkar Begesting m 707.11 6,820.00 4,822,490.20
3 PEKERJAAN PERBAIKAN PINTU AIR TERSIER HM.8+73.74 3,744,982.30
Pintu Air bh 1 3,744,982.30 3,744,982.30