Anda di halaman 1dari 350

SPESIFIKASI MATERIAL

DOKUMEN / RKS No. ………………………………..


TANGGAL ………………………………..

PERINCIAN VOLUME
No. JENIS MATERIAL SAT

JTM MVTIC .........

Column1 Material Volume Harga Material Harga Jasa Column6


#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! 4000 #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

PIVOT

CONDUCTOR ACCESSORIES :
AAACS 150 sqmm mtr
AAAC 70 sqmm mtr
BC 50 sqmm mtr
LVTC 3x70 + 1x50 sqmm / NFA2X mtr
Compresiont Joint Sleeve 150 mm bh
Insulated Non Tension Joint 50 sqmm bh
Insulated Tension Joint 70 sqmm bh
Verlenk Stuck Pipa 3" - 3 meter bh
Verlenk Stuck Pipa 3" - 5 meter bh
Ornament Cable Band / Begel Kacamata bh
Bolt & Nut M 16 x 75 mm bh
Pipa Air Galvanized 3/4" Ljr
Pipa Air Galvanized 2" Ljr
Pipa Air Galvanized 3" Ljr
Pipa Air Galvanized 4" Ljr
Pipa Air Galvanized 6" Ljr

POLE SUPPORTER :

MV Guy Insulator ( coklat ) bh


Preformed Termination 70 sqmm - Guy Wi bh
Preformed Termination 35 sqmm - Guy Wi bh
Preformed Termination 22 sqmm - Guy Wi bh

Galv. Steel Stranded Wire 70 sqmm mtr


Galv. Steel Stranded Wire 35 sqmm mtr
Galv. Steel Stranded Wire 22 sqmm mtr
Beton Block 40 x 40 x 10 bh
U Bolt bh
PERINCIAN VOLUME
No. JENIS MATERIAL SAT

JTM MVTIC .........

Steel Plate bh
Guy Rod 2,5 mtr D = 15 mm bh
Guy Rod 1,8 mtr D = 15 mm bh

Square Washer bh
Single Guy Wire Band ……" bh
Single Guy Wire Band ……" - TM bh
Single Guy Wire Band ……" - TR bh
Double Guy Wire Band ……" bh
Double Guy Wire Band ……" - T bh
Double Guy Wire Band ……" - T bh
Pipa Pelindung 3/4" - 2 meter bh
Single Arm Band …… " + Nut - TM bh
Single Arm Band …… " + Nut - TR bh
Strut Tie 2500 - TM bh
Strut Tie 1500 - TR bh
Strut Arm - TM bh
Strut Arm - TR bh
Guy Wire Thimble for 70 mm bh
Guy Wire Thimble for 35 mm bh
Turn Buckle 3/4" - TM ( 7000kg) bh
PERINCIAN VOLUME
No. JENIS MATERIAL SAT

JTM MVTIC .........

Turn Buckle 5/8" - TR (4000kg) bh


Wire Clip 70 mm bh
Wire Clip 35 mm bh
Wire Clip 22 mm bh
bh
POLE TOP ARRANGEMENT : bh
Cross Arm UNP 10 - 2000 type tumpu bh
Cross Arm UNP 10 - 2000 type tarik bh
Cross Arm UNP 10 - 3000 type tarik bh
Cross Arm UNP 10 - 6000 type tarik bh
20 kV Insulator Tumpu bh
20 kV Insulator Tarik bh
NYA 6 mm ( untuk pengganti All. Binding ) mtr
Strain Clamp 150 - 240 mm bh
Alluminium Tape bh
Alluminium Binding Wire bh
Compresion Connector 70 mm bh
Compresion Connector 150 mm bh
Anti Climbing Set
LA 20 kV - 5 kA + Bracket bh
Polymer Cut Out Switch 20 kV - 100 kA bh
Fuse Link …….. Amper bh
Terminal Lug 70 sqmm bh

Terminal Lug 150 sqmm bh


Pole Block bh
Arm Tie type 750 - pipe 3/4" bh
Arm Tie type 900 - pipe 3/4" bh
Arm Tie Band ……. " bh
Arm Tie Band ……. " bh
Bolt & Nut M 16 x 50 mm bh
Bolt & Nut M 16 x 75 mm bh
Bolt & Nut M 16 x 120 mm bh
Double Arm Bolt & Nut M 16 x 350 mm bh
Double Arm Bolt & Nut M 16 x 400 mm bh
Square Washer bh
Double Arm Band ……" bh
Double Arm Band ……" bh
Double Arm Band ……" bh
U - Strap bh
Cross Arm Clevis bh

Pole Block Band ……" bh


Pole Block bh
Compresion Connector For Alluminium 7 bh
Ground Wire Clamp Type - A bh
Ground Wire Clamp Type - B bh
Ground Wire Clamp Type - C bh
Bolt M 12 x 30 mm bh
Ornament Cable Band / Begel Kacamata Set
Ornament Cable Band / Begel Kacamata Set
Load Segel / Identifikasi Kabel Tanah bh
Patok Tanda Kabel / Cable Router bh
Small Angle Assembly ( SAA ) Set
PERINCIAN VOLUME
No. JENIS MATERIAL SAT

JTM MVTIC .........

Large Angle Assembly ( LAA ) Set


Dead End Assembly ( DEA ) Set
Bundled End Protection ( BEP ) Set
PERINCIAN VOLUME
No. JENIS MATERIAL SAT

JTM MVTIC .........

GTT 20 kV : bh
bh
Terminal Lug 50 mm - Cu bh
Terminal Lug 70 mm - Cu bh
Compresiont Connector For Grounding 5 bh
Ground Rod 16 mm - 2,5 mtr + Clamp bh
Ground Rod 16 mm - 1,5 mtr + Clamp bh
Stainless Steel Strip bh
Stoping Buckle ( Sainless ) bh
Link bh
Pipa Air 3/4" - 4 mtr u/ Pelindung bh
Pipa Air 3/4" - 3 mtr u/ Pelindung bh
Line Tap Connector 50/50 Al bh

Rangka Tempat Duduk Trafo 1 Tiang Kompl set


Rangka Tempat Duduk Trafo 2 Tiang Kompl set
Rangka Tempat Duduk Trafo 2 Tiang (Pema set
bh
LV Panel 2 Group ( cat powder coating / Ho bh
LV Panel 4 Group ( cat powder coating / Ho bh

NYY 4 x 70 mm bh
NYY 1 x 150 mm bh
Terminal Lug Cu - 70 mm bh
Terminal Lug Cu - 150 mm bh
NYA 50 sqmm ( u/ LV Panel ke Ground ) bh
NYAF 50 sqmm ( u/ Arrester ) bh
Pipa Air 2" - 3 meter ( medium ) bh
Pipa Air 3" - 5 meter ( medium ) bh
Pipa Air 3/4" - 1 meter ( u/ Grounding LV P bh
U - Bow PVC 2" / 2 L Bow PVC 2" bh
U - Bow PVC 3" / 2 L Bow PVC 3" bh
Compresion Joint Bimetal Al/Cu - 35 - 50 bh

Tranformator 3 Ph - ......... kVA unit


Tranformator 3 Ph - ......... kVA unit
Tanda Bahaya Besar / Danger Plate bh
Tanda Bahaya Kecil / Danger Plate Small bh
Tiang Beton bh
Pondasi Type A set
Pondasi Type D set
PERINCIAN VOLUME
SPESIFIKASI YANG DIM
Volume Hot Dip D
Refferensi / No. Gambar Galvanized
......... ......... JTR Min Panjang

Column7 Column8 Column9 Column10 Column11 Column12 Column13

70 µ
SPLN:41-10 Stranded = 19/37
SPLN:41-6,41-8 Stranded = 19
SPLN:41-4 dan 41- 5 Stranded = 19
SPLN:42-10
KK/006 380
KK/005 130
KK/005 130
- 70 µ Atas ditutup
- 70 µ Atas ditutup
KK/008 70 µ SK
KK/017 30 µ Ulir = 35
KK/030 70 µ 6000
KK/030 70 µ 6000
KK/030 70 µ 6000
KK/030 70 µ 6000
KK/030 70 µ 6000

ANSI 54-4, KK/006 171


KK/029 70 µ Stranded = 6, Panjang = 710. (St
KK/029 70 µ Stranded = 5, Panjang = 460 (Str
KK/029 70 µ Stranded = 4, Panjang = 460 (Str

JIS G 3537, KK/029 70 µ Jumlah sranded = 7, Right Hand


JIS G 3537, KK/029 70 µ Jumlah sranded = 7, Right Hand
JIS G 3537, KK/029 70 µ Jumlah sranded = 7, Right Hand
KK/015;Camp : 1pc;2kr;3psr 70 µ 400
KK/015 70 µ Ulir=40
PERINCIAN VOLUME
SPESIFIKASI YANG DIM
Volume Hot Dip D
Refferensi / No. Gambar Galvanized
......... ......... JTR Min Panjang

KK/015 70 µ 110
KK/014 70 µ 2500
KK/014 70 µ 1800

70 µ 45
KK/013 70 µ Withstand Load 2
KK/013 70 µ SK
KK/013 70 µ -
KK/013 70 µ Withstand Load 2
KK/013 70 µ -
KK/013 70 µ -
KK/012 70 µ 2000
KK/004 70 µ Las=50
KK/004 70 µ Las=50
KK/012 70 µ 2500
KK/012 70 µ 1500
KK/012 70 µ 300
KK/012 70 µ 250
KK/010 70 µ -
KK/010 70 µ -
KK/011 70 µ Plat=155
PERINCIAN VOLUME
SPESIFIKASI YANG DIM
Volume Hot Dip D
Refferensi / No. Gambar Galvanized
......... ......... JTR Min Panjang

KK/011 70 µ Plat=140
KK/010 - Untuk GSW 70, J
KK/010 - Untuk GSW 35,
KK/010 - Untuk GSW 70,

KK/001 70 µ 2000
KK/001 70 µ 2000
KK/021 70 µ 3000
KK/021 70 µ 6000
SPLN 10.. - -
SPLN 10.. - -
SPLN:42 - 1 -
KK/038 70 µ Cond. AAACS 150
KK/023 - -
KK/023 - -
KK/005 - 60
KK/005 - 65
KK/025 70 µ -
- -
-
- -
KK/007 - -

KK/007 - -
Camp : 1pc;3psr - 1200
KK/016 70 µ 750/810
KK/016 70 µ 900/960
KK/003 70 µ -
KK/003 70 µ -
KK/017 30 µ Ulir=25
KK/017 30 µ Ulir = 35
KK/017 30 µ Ulir=40
KK/017 30 µ Ulir=100
KK/017 30 µ Ulir=100
KK/017 70 µ 45
KK/004 70 µ Las=50
KK/004 70 µ Las=50
KK/004 70 µ Las=50
KK/026 70 µ 165
KK/028 70 µ 150

KK/004 70 µ Las=50
KK/032;Camp : 1pc;2kr;3psr 70 µ 1200
KK/005 - 60
KK/031 70 µ 200
KK/031 70 µ 200
KK/031 70 µ 200
- 30 µ 12
KK/008 70 µ SK
KK/008 70 µ SK
KK/033 - 300
KK/034 - 300
SPLN:87;1991 - Beban pat
PERINCIAN VOLUME
SPESIFIKASI YANG DIM
Volume Hot Dip D
Refferensi / No. Gambar Galvanized
......... ......... JTR Min Panjang

SPLN:87;1991 - Beban pat


SPLN:87;1991 - Beban pat
- - 500
PERINCIAN VOLUME
SPESIFIKASI YANG DIM
Volume Hot Dip D
Refferensi / No. Gambar Galvanized
......... ......... JTR Min Panjang

KK/007 - 65
KK/007 - 65
KK/007 - 45
KK/019 EP = 25 µ 2500
KK/019 EP = 25 µ 1500
KK/018 - -
KK/018 - 26
KK/018 70 µ 25
KK/030 70 µ 4000
KK/030 70 µ 3000
KK/006 - 45
70 µ
GTT/GD/C/001 - 002 70 µ Tebal Cross
GTT/GD/P/001 - 002 70 µ Tebal Cross
GTT/GD/C/002 - 004 70 µ Tebal Cross
70 µ -
KK/0101 S/D 0104 70 µ -
KK/0105 S/D 0108 70 µ -

SPLN:43-1 - Stranded=19
SPLN:43-1 - Stranded=32
KK/007 - 65
KK/007 - 80
SPLN:42-1 dan 42-3 - -
SPLN:42-1 dan 42-3 - -
SPLN:42-1 dan 42-3 70 µ 3000
70 µ 5000
KK/030 70 µ -
- -
- -
KK/005 - 130

D3 th.2007 - -
D3 th. 2007 - -
KK/022 - 450
KK/025 - 200
KK/024 - Ujung Pole Top m
KK/040 - 850
KK/039 - 2500
IFIKASI YANG DIMINTA
Dimensi ( mm )

Lebar Tebal Tinggi Diameter

Column14 Column15 Column16 Column17

Stranded = 19/37 9.05


Stranded = 19
Stranded = 19 9.05

- 4.5 - OD=25
- 4.25 - -
- 4.25 - -
Atas ditutup 2.5 3000 OD=76,2
Atas ditutup 2.5 5000 OD=76,2
45 6 - SK
- - - -
1.4
2.2
2.35
3.5
4

89 Mechanical Strenght 89 kN
anded = 6, Panjang = 710. (Strenght=3000kg)
anded = 5, Panjang = 460 (Strenght=2046kg)
anded = 4, Panjang = 460 (Strenght=1,820kg)

mlah sranded = 7, Right Hand Lay (Z) 3.2


mlah sranded = 7, Right Hand Lay (Z) 2.6
mlah sranded = 7, Right Hand Lay (Z) 1.8
400 besi=6x6 100 Min=6,25
60 Mur=4 - Min=15,2
IFIKASI YANG DIMINTA
Dimensi ( mm )

Lebar Tebal Tinggi Diameter

50 5 - -
Las=45 - - 15
Las=45 - - 15

45 3.2 - -
Withstand Load 2000 kg, Breakdown Load 5000 kg
45 6 - -
35 6 - -
Withstand Load 2000 kg, Breakdown Load 5000 kg
45 6 - -
35 6 - -
Cat=20 1.4 - OD=19,05
35 6 Ulir=200 -
35 6 Ulir=200 -
- 1.8 100 2"
- 1.8 100 2"
50 5,0 100 -
50 5,0 100 -
- 2.5 55 -
- 2.5 50 -
44 6 Bolt=230 M=20
IFIKASI YANG DIMINTA
Dimensi ( mm )

Lebar Tebal Tinggi Diameter

40 6 Bolt=200 M=16
Untuk GSW 70, Jarak Bolt, min 9,5 - mak 11 mm
Untuk GSW 35, Jarak Bolt, min 7,6 - mak 8 mm
Untuk GSW 70, Jarak Bolt, min 5,0 - mak 6 mm

50 5,0 100 -
50 5,0 100 -
50 5,0 100 -
50 5,0 100 -
- - - -
- - - -

Cond. AAACS 150 mm, memakai 3 U-Bolt M12+Nut


10 0.8 - -
- - - 3.0
42.6 25 - -
49.5 30 - -
35 3.2 - SK
- - - -

- - - 8 amper
- - - -

- - - -
220 100/160 Ulir=100 Besi=10
28 2.35 - -
28 2.35 - -
45 6 - -
45 6 - -
- - - -
- - - -
- - - -
- - - -
- - - -
45 2.8 - -
35 5 Ulir=150 -
35 5 Ulir=150 -
35 5 Ulir=150 -
44 6 - -
44 6

35 6 Ulir=200 M=16
160 100 250 besi 10
42.6 25 - -
50 6 - -
38 6 - -
38 6 - -
- - - -
45 6 - SK
45 6 - SK
120 2.2 Timah Hitam
120 100 800 -
Beban patah F1= 700kg, F2=500kg
IFIKASI YANG DIMINTA
Dimensi ( mm )

Lebar Tebal Tinggi Diameter

Beban patah F1=1500kg, F2=600kg


Beban patah F1=1500kg, F2=600kg
1.5
IFIKASI YANG DIMINTA
Dimensi ( mm )

Lebar Tebal Tinggi Diameter

- 2.25 - -
- 2.5 - -
- 25 - -
- - - 16
- - - 16
20 0.7 Non Magnetic
24 0.8 Non Magnetic
25 5 - -
- 1.4 - OD=19,05
1.4 - OD=19,05
31.8 - - -

Tebal Cross Arm NP-10 minimal 5 mm


Tebal Cross Arm NP-10 minimal 5 mm
Tebal Cross Arm NP-10 minimal 5 mm
- - - -
700 400 1250 Plat 2,8
1000 400 1250 Plat 2,8

Stranded=19 - - 2.19
Stranded=32 - - 2.27
- 2.5 - 16
- 3.0 - 22
- - - -
- - - -
- 2.2 - OD=50,8
- 2.35 - OD=76,2
- 1.4 - OD=19,05
- - - -
- - - -
- - - -

- - - -
- - - -
400 2 Cat Sistim Oven
150 2.0 Cat Sistim Oven
Ujung Pole Top menggunakan tempat GW Clamp
850 1100
850 1100
SPESIFIKASI YANG DITAWARKAN
Sesuai / tdk Referensi Pabrikan KETERANGAN
sesuai

Column18 Column19 Column20

Sesuai Voksel / Jembo

Sesuai Voksel / Jembo

Sesuai HEC / KAK


Sesuai - Stock Gudang

Sesuai PT. Maju

tebal =1,35 Nasir / Maju

Sesuai Twink / KAK


Sesuai PT. Wonosari
Sesuai PT. Wonosari
Sesuai - Stock Gudang

Sesuai PT. Wonosari


Sesuai PT. Wonosari
Sesuai PT. Wonosari
SPESIFIKASI YANG DITAWARKAN
Sesuai / tdk Referensi Pabrikan KETERANGAN
sesuai

Sesuai PT. Nasir / PT. Maju

Sesuai PT. Nasir

Sesuai PT. Nasir

d d
s s
t t
SPESIFIKASI YANG DITAWARKAN
Sesuai / tdk Referensi Pabrikan KETERANGAN
sesuai

d d
s s
t t
SPESIFIKASI YANG DITAWARKAN
Sesuai / tdk Referensi Pabrikan KETERANGAN
sesuai
SPESIFIKASI YANG DITAWARKAN
Sesuai / tdk Referensi Pabrikan KETERANGAN
sesuai

d d
s s
t t

Direktur
PT / CV ........................

......................................
DAFTAR HARGA SATUAN ANGKUTAN ORG
DAFTAR HARGA SATUAN ANGKUTAN ORGANDA JATIM

ORGANDA JAWA TIMUR BONGKAR MUAT PENYEBERANGAN

Termasuk Kenaikan BBM dan Inflasi

REKONFIGURASI JARINGAN
BERAT MATERIAL JARAK DARI JARAK KOTA
TONASE YANG

MATERIAL
JUMLAH YG ( TERMASUK DIANGKUT TUJUAN KE
NO. KOTA TUJUAN MATERIAL YG DIANGKUT SAT SURABAYA

KODE
DIANGKUT ACCESORIESS / SITE
( TON ) ( KM ) ( +/- KM )
HASPEL )

5
1 2 3

Retour 0.00 800 1


1 jarak 1 km 1.00 1

1 SBB 1.00 35 5
2 SBS 1.00 35 5
3 SBU 1.00 35 5
4 SIDOARJO 1.00 35 5
5 GRESIK 1.00 40 5
6 MOJOKERTO 1.00 55 5
7 JOMBANG 1.00 81 5
8 NGANJUK 1.00 123 5
9 MADIUN 1.00 171 5
10 NGAWI 1.00 197 5
11 MAGETAN 1.00 195 5
12 PONOROGO 1.00 201 5
13 PACITAN 1.00 282 5
14 KEDIRI 1.00 128 5
15 BLITAR 1.00 170 5
16 TULUNGAGUNG 1.00 161 5
17 TRENGGALEK 1.00 188 5
18 BOJONEGORO 1.00 113 5
19 TUBAN 1.00 105 5
20 MALANG 1.00 90 5
21 PASURUAN 1.00 81 5
22 PROBOLINGGO 1.00 105 5
23 JEMBER 1.00 205 5
24 LUMAJANG 1.00 154 5
24 SITUBONDO 1.00 204 5
25 BONDOWOSO 1.00 196 5
26 BANYUWANGI 1.00 297 5
27 PAMEKASAN 1.00 113 5
28 SAMPANG 1.00 80 5
29 SUMENEP 1.00 167 5
30 BANGKALAN 1.00 18 5

Mobil 3,5 Ton

TONASE YANG DIANGKUT 1.00

Harga / TonM3 #REF!


Angkutan Tiang Beton jarak 0 s/d 100 km
1 Tiang Beton 7 meter Bt 1 350 0.350 100 10
2 Tiang Beton 9 meter Bt 1 530 0.530 100 10
3 Tiang Beton 11 meter Bt 1 900 0.900 100 10
4 Tiang Beton 12 meter Bt 1 1,000 1.000 100 10
5 Tiang Beton 13 meter Bt 1 1,150 1.150 100 10
6 Tiang Beton 14 meter Bt 1 1,350 1.350 100 10

Angkutan Tiang Beton jarak 100 s/d 200 km


1 Tiang Beton 7 meter Bt 1 350 0.350 200 10
2 Tiang Beton 9 meter Bt 1 530 0.530 200 10
3 Tiang Beton 11 meter Bt 1 900 0.900 200 10
4 Tiang Beton 12 meter Bt 1 1,000 1.000 200 10
5 Tiang Beton 13 meter Bt 1 1,150 1.150 200 10
6 Tiang Beton 14 meter Bt 1 1,350 1.350 200 10

Angkutan Tiang Beton jarak 200 s/d 300 km


1 Tiang Beton 7 meter Bt 1 350 0.350 300 10
2 Tiang Beton 9 meter Bt 1 530 0.530 300 10
3 Tiang Beton 11 meter Bt 1 900 0.900 300 10
4 Tiang Beton 12 meter Bt 1 1,000 1.000 300 10
5 Tiang Beton 13 meter Bt 1 1,150 1.150 300 10
6 Tiang Beton 14 meter Bt 1 1,350 1.350 300 10
KUTAN ORGANDA JATIM TAHUN
ANDA JATIM TAHUN 2018

JARAK DARI HARGA SATUAN PENYEBERA


JUMLAH RUPIAH BONGKAR MUAT
SITE KE OVER HEAD HARGA SATUAN
ORGANDA NGAN PULAU TOTAL BIAYA HARGA PEMBULATAN
LOKASI ( / TON ) KEUNTUNGAN ANGKUTAN
( +/- KM ) (TON ) ( / TON )

25 1,831.64 Rp 93,675 Rp 75,000


4 5=((2+3)+(4x1,2)) 6 = 1 x ( 2+3+4) 7 = Rp/Bkr 7 = 5 x.. % 8=Penyeb.rgn/4 9= 5+6+7+8 10 11

2 1,471,536 -
2 6,228 6,228 26,764 - 32,992 32,900

25 128,214 128,214 26,764 - 154,979 154,900


25 128,214 128,214 26,764 - 154,979 154,900
25 128,214 128,214 26,764 - 154,979 154,900
25 128,214 128,214 26,764 - 154,979 154,900
25 137,373 137,373 26,764 - 164,137 164,100
25 164,847 164,847 26,764 - 191,612 191,600
25 212,470 212,470 26,764 - 239,234 239,200
25 289,398 289,398 26,764 - 316,163 316,100
25 377,317 377,317 26,764 - 404,081 404,000
25 424,939 424,939 26,764 - 451,704 451,700
25 421,276 421,276 26,764 - 448,041 448,000
25 432,266 432,266 26,764 - 459,030 459,000
25 580,628 580,628 26,764 - 607,393 607,300
25 298,557 298,557 26,764 - 325,321 325,300
25 375,485 375,485 26,764 - 402,250 402,200
25 359,001 359,001 26,764 - 385,765 385,700
25 408,455 408,455 26,764 - 435,219 435,200
25 271,082 271,082 26,764 - 297,846 297,800
25 256,429 256,429 26,764 - 283,193 283,100
25 228,954 228,954 26,764 - 255,719 255,700
25 212,470 212,470 26,764 - 239,234 239,200
25 256,429 256,429 26,764 - 283,193 283,100
25 439,593 439,593 26,764 - 466,357 466,300
25 346,179 346,179 26,764 - 372,943 372,900
25 437,761 437,761 26,764 - 464,525 464,500
25 423,108 423,108 26,764 - 449,872 449,800
25 608,103 608,103 26,764 - 634,867 634,800
25 271,082 271,082 26,764 75,000 372,846 372,800
25 210,638 210,638 26,764 75,000 312,402 312,400
25 369,990 369,990 26,764 75,000 471,755 471,700
25 97,077 97,077 26,764 75,000 198,841 198,800

Dari Jakarta 0
Dari Surabaya #REF!
ke Lokasi #REF!
Mat. Bongkaran 0
REKONFIGURASI JARINGAN harga/ton/m3 #REF!
5 212,470 74,364 9,368 - 83,732 83,700
5 212,470 112,609 14,185 - 126,794 126,700
5 212,470 191,223 24,088 - 215,311 215,300
5 212,470 212,470 26,764 - 239,234 239,200
5 212,470 244,340 30,779 - 275,119 275,100
5 212,470 286,834 36,132 - 322,966 322,900

5 395,633 138,472 9,368 - 147,839 147,800


5 395,633 209,686 14,185 - 223,871 223,800
5 395,633 356,070 24,088 - 380,158 380,100
5 395,633 395,633 26,764 - 422,398 422,300
5 395,633 454,978 30,779 - 485,757 485,700
5 395,633 534,105 36,132 - 570,237 570,200

5 578,797 202,579 9,368 - 211,946 211,900


5 578,797 306,762 14,185 - 320,947 320,900
5 578,797 520,917 24,088 - 545,005 545,000
5 578,797 578,797 26,764 - 605,561 605,500
5 578,797 665,616 30,779 - 696,395 696,300
5 578,797 781,376 36,132 - 817,508 817,500
Nomor : 5 /DAN.02.03/DIST-JATIM/2017 Kepada :
Lampiran : Ada
Sifat : Segera
Perihal : Surat Pesanan Barang/Jasa (SPB-J) Err:502
PT PLN (Persero) AREA MALANG Jl. ................
XXXX

u.p. Yth. Direktur

Berdasarkan Perjanjian Kesepakatan Harga Satuan PIHAK PERTAMA Nomor :


007.PJ/HKM.00/AREA-SBS/2018 16 November 2018
tentang : Pembangunan dan Pemasangan Pekerjaan JTM, JTR Gardu dan SR APP tahun 2
maka untuk memenuhi Program Pemasaran

mohon dapat dikerjakan Pembangunan dan Pemasangan Jardis dengan scope sebagai beriku

I. PROGRAM PERKUATAN JARINGAN (PRK.2019.DJT.1.1)


1.1 Rekonfigurasi JTM (perincian terlampir)
PEKERJAAN JARINGAN JTM AAACS = 5,175 ms Rp 458,064,0
PEKERJAAN JARINGAN MVTIC SINGLE = 5,014 ms Rp 1,146,690,0
PEKERJAAN JARINGAN MVTIC DOUBLE = 0 ms Rp
PEKERJAAN UGC / KABEL TANAH = 32 ms Rp 897,0
RECLOSER / LBS MOTORIZED = 9 unit Rp 152,118,0

1.2 Rekonfigurasi JTR


SUTR TWISTED CABLE 3x70 + 1x50 mm = 0 ms Rp

1.3 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Pecah beban


PEKERJAAN JARINGAN JTM AAACS = 22,897 ms Rp 1,989,187,0
PEKERJAAN JARINGAN MVTIC SINGLE = 2,768 ms Rp 384,134,0
PEKERJAAN JARINGAN MVTIC DOUBLE = 0 ms Rp
PEKERJAAN UGC / KABEL TANAH = 0 ms Rp 104,292,0
LBS MOTORIZED = 3 unit Rp 68,640,0
1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Operasi GI Baru
PEKERJAAN JARINGAN JTM AAACS = 0 ms Rp
PEKERJAAN JARINGAN MVTIC SINGLE = 0 ms Rp
PEKERJAAN JARINGAN MVTIC DOUBLE = 0 ms Rp
PEKERJAAN UGC / KABEL TANAH = 0 ms Rp
LBS MOTORIZED = 0 unit Rp

1.5 Rehabilitasi JTM - (JTM, MVTIC)


PEKERJAAN UPRATING JARINGAN JTM AA = 276,312 ms Rp 5,890,323,0

1.6 Rehabilitasi JTR - (LVTC)


1.6 Rehabilitasi JTR - (LVTC) = 21,071 ms Rp 568,952,0

1.7 Pemasangan GSW (Ground Shield Wire) = 144,308 ms Rp 6,662,316,0

1.8 Penyempurnaan Konstruksi Per Penyulang / Penggantian Material Tua


PENGGANTIAN MATERIAL JTM = 1 lot Rp 1,322,308,0

II. PROGRAM PENURUNAN SUSUT DISTRIBUSI


2.1 Uprating Jaringan TM (JTM,MVTIC) = 78,707 ms Rp 2,306,267,0

2.2 Uprating Jaringan TR (LVTC) = 64,993 ms Rp 1,523,649,0

2.3 Trafo Sisipan dan Jaringan penunjang =


TRANSFORMATOR CANTOL = 20 Unit Rp 516,943,0
TRANSFORMATOR PORTAL = 22 Unit Rp 752,619,0
PEKERJAAN JARINGAN JTM AAACS = 7,437 ms Rp 583,400,0
SUTR TWISTED CABLE 3x70 + 1x50 mm = 2,318 ms Rp 216,865,0

2.6 Penambahan SUTR untuk Tegangan drop ( seri SR Renteng diatas 5)


SUTR TWISTED CABLE 3x70 + 1x50 mm = 8,622 ms Rp 787,455,0

III. PROGRAM PENINGKATAN PEMASARAN


3.1 Jaringan penunjang
TRANSFORMATOR PORTAL = 0 Unit Rp
PEKERJAAN JARINGAN JTM AAACS = 0 ms Rp
SUTR TWISTED CABLE 3x70 + 1x50 mm = 0 ms Rp
PEKERJAAN JARINGAN MVTIC SINGLE = 0 ms Rp
PEKERJAAN JARINGAN MVTIC DOUBLE = 0 ms Rp
PEKERJAAN UGC / KABEL TANAH = 0 ms Rp

3.1 Pelanggan SR 3 Phasa


6,6 - 33 kVA = 0 plgg Rp
41,5 - 197 kVA = 0 plgg Rp
197 kVA (TM) = 0 plgg Rp

Jumlah = Rp 25,435,119,0

Harga tersebut diatas sudah termasuk PPN 10%


Lokasi Pekerjaan di Rayon .....
Sumber Dana SKKI No. 01/DJT/AREA-....../2018 PRK.2018 DJT.3.1
PRK.2018 DJT.3.2
PRK.2018 DJT.3.3
PRK.2018 DJT.3.4
Dalam melaksanakan pekerjaan wajib mematuhi ketentuan sesuai kesepakatan Harga Satuan
PIHAK PERTAMA : 007.PJ/HKM.00/AREA-SBS/2018 16 November 2018
PIHAK KEDUA xxxxxxx xxxxxxxx

Waktu Penyerahan pekerjaan paling lambat 30 (tiga puluh) hari Kalender setelah effective
Surat Pesanan Barang/Jasa (SPB-J) ini
Demikian disampaikan atas perhatian dan kerja samanya diucapkan terima kasih

PT. Xxxxxx Manajer Area


Direktur Direktur

xxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxx

Lampiran Surat No. 5 /DAN.02.03/DIST-JATIM/2017 16 November 2018

Harga Harga
No. Konstruksi Sat Vol
Material Pasang Material Pasang

I Tiang Beton
Tiang Beton 14 - 350 daN + E B
Tiang Beton 13 - 350 daN + E B 60

II Pole Supporter :
GUY WIRE MURNI S 20 1,171,920 177,500 23,438,400 3,550,000
GUY WIRE NUMPANG S 39 891,600 98,315 34,772,400 3,834,285
HORIZONTAL GUY WIRE MURN S
HORIZONTAL GUY WIRE NUM S
STRUT POLE S 1 637,200 83,380 637,200 83,380
GUARDNET S

III Pole Top Arrangement :

IV Anti Climbing + Danger Plate

V Conductor Accesories :
dan SR APP tahun 2018

scope sebagai berikut :

Rp 458,064,000
Rp 1,146,690,000
Rp -
Rp 897,000
Rp 152,118,000

Rp -

Rp 1,989,187,000
Rp 384,134,000
Rp -
Rp 104,292,000
Rp 68,640,000

Rp -
Rp -
Rp -
Rp -
Rp -

Rp 5,890,323,000
Rp 568,952,000

Rp 6,662,316,000

Rp 1,322,308,000

Rp 2,306,267,000

Rp 1,523,649,000

Rp 516,943,000
Rp 752,619,000
Rp 583,400,000
Rp 216,865,000

Rp 787,455,000

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp 25,435,119,000

akatan Harga Satuan nomor


mber 2018

nder setelah effective date


anajer Area
Direktur

xxxxxxxxxxxxxxxx

Jumlah

26,988,400
38,606,685

720,580
DAFTAR HARGA DASAR SATUAN MATERIAL

J-Proc Berat (kg)


NO. NAMA MATERIAL 5.0% 250,000
SAT 17,000

1 AAAC - 70 sqmm ( SPLN ) M 0.23


2 AAAC - 150 sqmm ( SPLN ) M 0.47
3 AAAC - 240 sqmm ( SPLN ) M 0.94
4 AAAC - S 70 sqmm ( SPLN ) M 0.33
5 AAAC - S 150 sqmm ( SPLN ) M 0.61
6 AAAC - S 240 sqmm ( SPLN ) M 1.22
7 Alluminium Binding Wire Ø 4 M 0.04
8 Alluminium Tape ((l=10mm, t=0,8mm) M 0.04
9 Arding Pipe 1,5 - 5,5 mtr S 4.19
10 Arding Pipe 1,5" - 2,5 mtr S 1.50
11 Arding Pipe 1,5" - 6 mtr S 3.50
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 2.11
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) B 1.30
14 Arm Tie Type 900 - 3/4" - (t=2,3 mm) B 1.56
15 MV Guy Insulator ( TM ) - belimbing B 1.50
16 Baut mata B 0.85
17 BC 50 MM M 0.19
18 Begel Ornament 4" - 10" - (l=44mm, t=6mm) B 2.11
19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) B 2.11
20 Beton Block 400 x 400 x 100 - kotak B 21.15
21 Beugels 3"+Bolt & nut - (l=44mm, t=6mm) B 1.20
22 Beugels u/ dask 1.5 "/ fixing colar + dekschroeven B 0.25
23 Klem C 50 mm B 0.40
24 Bimetal Connector Al/Cu -150 mm B 0.40
25 Bolt & Nut 3/16 x 0,5" B 0.20
26 Bolt & Nut M.16 x 140 (517/U/2009) S 0.26
27 Bolt & Nut M.16 x 120 (517/U/2009) S 0.26
28 Double Arm Bolt & Nut M.16 x 350 (besi as) S 0.68
29 Double Arm Bolt & Nut M.16 x 400 (besi as) S 0.76
30 Bolt & Nut M.16 x 50 (517/U/2009) B 0.14
31 Bolt & Nut M.16 x 75 (517/U/2009) B 0.18
32 Bolt M.12 x 30 - CU B 0.14
33 Bongkar BC 16 mm / AAAC 35 MM M 0.23
34 Borring untuk Kabel tanah M 0.00
35 Bundled End Assembly ( BEA ) - komplit S 0.75
36 Comp. Joint Bimetal Al/Cu - 70/70 mm (507/U/2009) B 0.40
37 Connector for Alluminium 70 mm - Type H (507/U/2009) B 0.10
38 Compresion Joint Sleeve 95 mm (507/U/2009) B 0.18
39 Concrete Slove / pengaman kabel uk.450x300x40 mm B 0.01
40 Conn. press AL/AL type 6-25 mm2 / 35-70 mm2 + vinil masive B 0.40
41 Conn. press AL/AL type 6-25 mm2 / 6-25 mm2 + vinil masive B 0.40
42 Connector press AL/AL type 35-16mm2 & Cover+tanda phasa B 0.10
43 Connector press AL/AL type 70-35mm2 & Cover+tanda phasa B 0.10
44 Terminal Lug 50 mm2 AL-CU. (507/U/2009) B 0.04
45 Terminal Lug 70 mm2 AL-CU. (507/U/2009) B 0.04
46 Cross arm - UNP 100 x 50 x 5 mm - 3000 mm - (l=50mm, t=5mm, tgg=100mm) B 21.00
47 Cross arm - UNP 100 x 50 x 5 mm - 6000 mm- (l=50mm, t=5mm, tgg=100 B 42.00
48 Cross Arm Clevis - TM - (l=50mm, t=6mm) B 0.82
49 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu/tarik B 14.00
50 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu/tarik B 14.00
51 Cross Arm UNP-80 - 2500 (l=45mm,t=3,5mm,tgg=80mm) S 8.00
52 Cross Arm UNP 100 x 50 x 5 mm - 2500 mm - (l=50mm, t=5mm, tgg=100 B 14.28
53 Cross Arm UNP-80 - 3000 (l=45mm,t=3,5mm,tgg=80mm) B 8.93
54 Cross Arm Type 1.500 NP. 10 B 5.71
55 Cross Arm NP. 10 - Type 750 B 2.98
56 Cross Arm type 1.200 NP. 6,5 B 5.64
57 Cross Arm type 1.000 NP. 6,5 B 4.70
58 Cross Arm type 900 NP. 8 B 3.57
59 Cross Arm type 500 - NP. 8 B 1.79
60 Cubicle Pelanggan lengkap B 3.57
61 Kotak APP type C - IA Lengkap S 50.00
62 CT LS 80 / ……. Amp ( sesuai daya ) S 0.00
63 Footstuken+bolt & nut S 0.35
64 Plate Cooper B 0.35
65 NH Fuse B 0.00
66 CT TR 100/5 - 250/5 A B 1.20

Cubicle Single Incoming , 630 A , 20kV, 16kA Lengkap dengan Incoming


67 Cubicle, LBS , manualMetering Cubicle , VT, manualOutgoing Cubicle , S 2,250.00
CB Drawout , CT, PT, OCR , motorized (Type DM1W)

68 manualOutgoing Cubicle , CB Drawout , CT, PT, OCR , motorized (Type S 0.00


69 Dead End Assembly ( DEA ) - komplit S 1.78
70 Double Arm Band 8" - 7" - TM (504/U/2009) B 2.24
71 Double Guy Wire Band 7" - TM S 1.83
72 Dudukan Jointing S 15.00
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatting tembaga 35 micron
S 0.75
74 Fixing Collar 1.5 " B 0.50
75 Polymer Cut Out Switch 24 kV + Fuse S 33.33
76 Galvanized Steel Wire 22 mm (542/U/2009) M 0.44
77 Galvanized Steel Wire 35 mm (542/U/2009) M 0.44
78 Galvanized Steel Wire 70 mm (542/U/2009) M 0.95
79 Gaspijp 1,5" - 2,3 m, u/ dask Galv B 3.50
80 Gaspijp 3 " - 6 m. Galv B 6.98
81 Gaspijp 4 " - 6 m. Galv B 7.54
82 Gembok "setara SOLEX" B 0.40
83 Earthing Rod 16 mm - 1,5 m+clamp - TR- besi As, Electroplatting tembaga S 1.25
84 Guy Wire Rod 5/8" ( 15 mm ) - 1.800 mm (514/U/2009) B 3.48
85 Guy Wire Rod 5/8" ( 15 mm ) - 2.500 mm (514/U/2009) B 6.96
86 Guy Wire Timble (t=2,5mm) B 0.13
87 Insulated Tension Joint 70 mm B 0.10
88 Insulated Non Tension Joint 50 mm B 0.10
89 Jasa Perakitan / Montage Ls 0.00
90 Jasa Perakitan / Montage Ls 0.00
91 Jasa Perakitan / Montage Ls 0.00
92 Joint Sleeve 70 mm (507/U/2009) B 0.07
93 Joint Sleeve 150 mm (507/U/2009) B 0.14
94 Joint Sleeve 240 mm B 0.28
95 Jointing Termination 24 Kv - uk. 150 mm - 3 Core/XLPE S 7.50
96 Jointing Termination 24 Kv - uk. 150 mm - 1 Core/MVTIC S 7.50
97 Jointing Termination 24 Kv - uk. 240 mm - 3 Core/XLPE S 7.50
98 Kanal NP6-60 cm + Bolt&nut B 3.25
99 Kawat Segel @ 15 cm B 0.03
100 Klem Begel 3/4" u/ kabel B 0.76
101 Klem Begel U 2" - (t=3mm, l=35mm) B 0.45
102 Klem Begel U 3" - (t=3mm, l=35mm) B 0.45
103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 2.24
104 Klem Begel U 11" - TM - (l=44mm, t=6mm) B 2.46
105 Klem kabel/ Cable suport (508/U/2009) B 1.20
106 Knee + sook 3" besi B 1.00
107 Knee 2" - PVC B 0.78
108 Kotak APP u/kWh Meter Elektronik + Modem S 3.50
109 kWh Meter 3 ph Elektronik lengkap Modem S 3.25
110 KWh meter 3 phs. 220/380 V - 20/60 A ST Clas 1 Elektronik S 3.25
111 KWh meter 3 phs. 220/380 V - 5/20 A ST Clas 1 Elektronik S 2.50
112 KWh meter 3 phs. Elektronik lengkap dengan Modem S 4.20
KWh meter Electronic Anti Temper 1 Phasa 2 kawat 50 Hz, 5(20) klass 1
113 S 2.20
lengkap MCB
114 L bouw 3 " PVC S 0.65
115 Large Angle Assembly ( LAA ) S 2.75

116 Lengkap dengan Incoming Cubicle, LBS , manualMetering Cubicle , VT, S 0.00

117 Lightning Arrester 24 kV - 10 kA S 8.38


118 Line Tap Connector 50-70 mm type G B 0.40
119 Line Tap Connector Al 150 - 50 mm type G B 0.40
120 C Clamp Cu - 50 mm B 0.40
121 Line Tap Connector Type 70 - 150 mm B 0.40
122 Line Tap Connector Type Al - 150 mm B 0.80
123 Link (506/U/2009) B 0.23
124 Load Break Switch 24 kV - 630 A Manual S 250.00
125 Load Break Switch 24 kV-630 A Motorized 12,5 kA c/w PTCC S 185.00
126 Load Segel @ tiap 5 meter B 1.75
127 Lodden manchet 1.5 " berat 0.95 - 1 kg B 1.00
128 Termination Outdoor 24 kV - uk. 150 mm - 1 Core/MVTIC S 7.50
129 Termination Idoor 24 kV - uk. 150 mm - 1 Core/MVTIC S 7.50
130 MCB 230 V - 35 A s/d 50 A - 1 Phasa B 0.25
131 MCB 230 V - 2 A s/d 35 A - 1 Phasa B 0.25
132 MCB 230 V - 10 s/d 35 A - 3 Phasa B 0.25
133 MCB 3 phs. 230 V - 25 A s/d 50 A B 0.30
134 MCCB 63 s/d 100 A B 2.50
135 Mountage Ls 0.00
136 Mountage SLM 250 kva keatas Ls 0.00
137 Mountage kWH 5/20 A S 0.00
138 NA2XSEYBY 3 x 150 mm2;20KV;UG M 10.50
139 NA2XSEYBY 3 x 240 mm2;20KV;UG M 12.43
140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS M 5.29
141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS M 9.52
142 NYA 35 sqmm ( SPLN ) M 0.10
143 NYA 50 sqmm ( SPLN ) M 0.19
144 NYAF / NYA 2,5 mm² ( SPLN ) M 0.12
145 NYAF 10 mm² ( SPLN ) M 0.12
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 0.10
147 NYY 1 x 70 mm2 ( SPLN ) M 0.10
148 NYY 1 x 150 sqmm - Input ( SPLN ) M 0.38
149 NYY 4 x 70 sqmm - Output ( SPLN ) M 0.76
150 NYY 4x2.5 mm untuk APP ( SPLN ) M 0.20
151 OA Kast type I Sistim Press cat powder coating B 18.00
152 OA Kast type III lengkap cat powder coating S 55.00
153 OA Kast type VI cat powder coating S 45.00
154 OA Kast type VI ,Kecil cat powder coating S 35.00
155 Ornament Kabel Band 6" S 2.11
156 Ornament Kabel Band 9/10." - 3/4" S 1.40
157 Pasir urug M3 0.00
158 Patok Tanda Kabel (169/K/2009) B 5.00
159 Pipa Air 3/4" - 3 mtr. u/ pelindung Ground (555/U/2009) B 0.00
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 8.00
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) B 0.00
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 0.93
163 Pipa Air 3/4" -1 mtr. u/ pelindung Ground (555/U/2009) B 0.23
164 Pipa Air 3/4" - 6 mtr tebal 1,6 mm B 1.85
165 Pipa Air 2" - 1,5 meter ( medium ) (555/U/2009) B 8.38
166 Pipa Air 2" - 3 meter ( medium ) (555/U/2009) B 2.06
167 Pipa Air 2" - 6 mtr tbl 2,5 mm ( medium ) B 2.06
168 Pipa Air 3" - 1 meter ( medium ) (555/U/2009) B 1.40
169 Pipa Air 3" - 5 meter ( medium ) tbl = 3 mm B 8.38
170 Pipa Air 3" - 6 mtr tbl 2,5 mm ( medium ) B 8.38
171 Pipa Air 2" - 5 mtr tbl 2,5 mm ( medium ) B 1.71
172 Pipa Air PVC 2" - 3 meter ( AW ) B 0.00
173 Pipa Air PVC 3" - 5 meter ( AW ) B 0.00
174 Pipa Air 2" - 2 meter / Strut Tie (555/U/2009) S 2.06
175 Pipa Air 3/4" - 1 meter medium (555/U/2009) B 0.00
176 Pipa Air 4" - 6 mter u/ pelindung jalan (555/U/2009) B 9.88
177 Pipa Air 4" - 6 mtr (555/U/2009) B 9.88
178 Pipa Pelindung 3/4" - 2000 (512/U/2009) B 1.85
179 Pipa Pelindung 3/4" - 3000 (555/U/2009) B 2.25
180 Plastic Strap Medium B 0.08
181 Plat Cooper 4 x 40 mm M 1.60
182 Pole Block (504/U/2009) S 1.68
183 Pole Block Band 12" - TM (557/U/2009) S 21.00
184 Pole Bracket 3-6" B 0.50
185 Pole Bracket 6" - 8" B 0.50
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 0.00
187 Pondasi type D ( 2 Tiang ) (91/U/2009) B 0.00
188 Pondasi u/Gaspijp 3" Ls 0.00
189 Preformed Termination 35 mm (542/U/2009) B 0.50
190 Preformed Termination 70 mm (542/U/2009) B 0.40
191 Protective cap 1.5 " B 0.50
192 PVC 3/4" 6 meter B 0.85
193 Service wedge clamp 2/4 x 6/10 mm Bh. 0.75
194 Service wedge clamp 4/4 x 10/16 mm B 0.75
195 Single Arm Band 8" (504/U/2009) B 2.24
196 Single Guy Wire Band 8" - TM (513/U/2009) S 1.40
197 Small Angle Assembly ( SAA ) S 1.76
198 Sock Pipa PVC 3" B 0.04
199 Preformed Termination 22 mm (542/U/2009) B 0.50
200 Square pipe 75 x 75 x 3 - 2000 - tumpu (502/U/2009) B 14.00
201 Square Washer - (l=50mm, p=50mm, t=2,5mm) B 0.05
202 Stainless Steel Strip non magnetic M 0.02
203 Stoping Buckle non magnetic B 0.23
204 Strain Clamp 70 - 150 mm - 2 nut S 0.95
205 Strain Clamp 150 - 240 mm - 3 nut S 1.20
206 Strain Rod Insulator (88/U/2009) S 9.00
207 Strainhook & clamp u/. Gaspijp - 1.5' B 0.95
208 Stroppen u/ loden manchet 1.5" B 0.85
209 Strut Arm TM - (l=50mm, t=5mm, tgg=100mm) NP 10 - 30 cm B 2.80
210 Strut Arm TR - (l=50mm, t=5mm, tgg=100mm) NP 10 - 25 cm B 2.00
211 Strut Tie 2000 - pipe 2" (512/U/2009) B 1.37
212 Suspension Clamp For MV B 0.82
213 Tanda Bahaya Besar - (l=400mm, tgg=450mm) B 0.08
214 NFA2X-T;3x70 + 1x50 mm2 M 1.05
215 TC 3 x 50 + 1 x 35 sqmm ( SPLN ) M 0.77
216 Terminal Lug 150 mm - Al 2 Nut B 0.40
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) B 0.20
218 Terminal Lug 150 mm - Al 2 Nute B 0.20
219 Terminal Lug 35 mm - Cu (507/U/2009) B 0.40
220 Terminal Lug 35-50 mm - Cu (507/U/2009) B 0.40
221 Terminal Lug 50 mm - Al (507/U/2009) B 0.23
222 Terminal Lug 50 mm - Cu (507/U/2009) B 0.40
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 0.40
224 Terminal lug 70 mm AL/CU u/ CO (507/U/2009) B 0.23
225 Terminal Lug 70 mm - Cu (507/U/2009) B 0.40
226 Terminal Lug 70 mm Al (507/U/2009) B 0.10
227 Terminal Lug 70 mm Al - Cu (507/U/2009) B 0.10
228 Terminal Lug 150 mm - Cu (507/U/2009) B 0.80
229 Terminal Lug 50 mm - Cu (507/U/2009) B 0.40
230 Terminal Lug 70 mm - Cu (507/U/2009) B 0.40
231 Termination ID 3 X 150 MM2 u/XLPE S 7.50
232 Termination ID 3 X 240 MM2 u/XLPE S 7.50
233 Termination OD 3 X 150 MM2 u/XLPE S 7.50
234 Termination OD 3 X 240 MM2 u/ XLPE S 7.50
235 Termination Out Door 3 X 150 + 1 x 95 mm u/MVTIC S 7.50
236 Tiang Beton 11 - 200 daN (524/U/2009) B 900.00
237 Tiang Beton 11 - 200 daN + E (524/U/2009) B 900.00
238 Tiang Beton 11 - 350 daN (524/U/2009) B 925.00
239 Tiang Beton 11 - 350 daN + E (524/U/2009) B 925.00
240 Tiang Beton 12 - 200 daN (524/U/2009) B 1,000.00
241 Tiang Beton 12 - 350 daN (524/U/2009) B 1,000.00
242 Tiang Beton 12 - 350 daN + E BC B 1,000.00
243 Tiang Beton 13 - 350 daN + E B 1,150.00
244 Tiang Beton 13 - 350 daN + E BC B 1,150.00
245 Tiang Beton 14 - 350 daN + E B 1,350.00
246 Tiang Beton 14 - 350 daN + E BC B 1,350.00
247 Tiang Beton 9 - 200 daN B 350.00
248 Tiang Beton 9 - 200 daN + E B 530.00
249 Tiang Beton 9 - 200 daN + E BC B 530.00
250 Timah Segel B 0.20
251 Timah solder + pasta Ls 0.30
252 Terminal Lug 50 mm - Cu/Al (507/U/2009) B 0.40
253 Trafo Distribusi 20 kV 3 PH 50 KVA Yzn5 ( D3 ) B 465.50
254 Trafo Distribusi 20 kV 3 PH 100 KVA Yzn5 ( D3 ) B 680.50
255 Trafo Distribusi 20 kV 3 PH 160 KVA Yzn5 ( D3 ) B 885.50
256 Trafo Distribusi 20 kV 3 PH 200 KVA Dyn5 ( D3 ) B 1,095.50
257 Trafo Distribusi 20 kV 3 PH 250 KVA Dyn5 ( D3 ) B 1,250.00
258 Trafo Single Phase 25 kVA s/d 50 kVA B 57.46
259 Cross Arm UNP-80 - 6000 (l=45mm,t=3,5mm,tgg=80mm) B 37.75
260 Besi siku L.50.50.4,5 - 6000 B 20.24
261 Besi siku L.35.35.2,5 - 6000 B 7.95
262 Besi plat - 6000 (l=44mm, t=6mm) B 12.43
263 Besi plat - 6000 (l=35mm, t=6mm) B 9.89
264 Transformer Platform for 1 Pole (Konst. SPLN D3) S 74.05
265 Transformer Platform for 2 Pole (Konst. SPLN D3) S 94.04
266 Turn Buckle TM 3/4" (7000 kg) - TM - (l=44mm, t=6mm) B 2.60
267 Turn Buckle TR 5/8" (4000 kg) - TR - (l=35mm, t=6mm) S 1.80
268 Twisted Cable 2 x 10 mm² - Al M 0.55
269 Twisted Cable 3 x 50 + 1 x 35mm² M 0.77
270 Twisted Cable 4 x 16 mm² M 1.10
271 U - Bolt + Steel Plate TM/TR Bolt M.18 + 2 nut S 1.55
272 U - Strap - TM - (l=44mm, t=6mm) B 1.02
273 L Bow PVC 2" B 0.50
274 L Bow PVC 3" B 0.65
275 Union Zadel 5/8 mm B 0.00
276 Verlenk stuck Pipa 3" - 3 mt - Medium S 4.94
277 Verlenk stuck Pipa 4" - 3 mt - Medium S 4.94
278 Verlenk stuck Pipa 4" - 4 mt - Medium S 6.59
279 Verlenk stuck Square Pipe 75x75x3,0 - 2 mt S 14.00
280 Voetstuken lengkap dng bolt & nut B 0.35
281 Wire Clip (510/U/2009) S 0.09
282 1 Unit External PT 20 kV (phasa-phasa) S 70.00
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel data S 25.00
284 Setting LBS Motorized S 0.00
285 Line Tap Connector Cu - 25 mm / Klem C (507/U/2009) B 0.40
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 0.40
287 Line Tap Connector Cu - 150 mm / Klem C (507/U/2009) B 0.40
288 Bongkar Konstruksi TM-1 Murni & Retour S 31.50
289 Bongkar Konstruksi TM-1 Numpang & Retour S 33.50
290 Plat nama Penyulang Besar Double
291 Plat nama Penyulang Kecil
292 Plat Tembaga Uk.400 x 80 x 5 (untuk jumper Termination) B 1.43
293 Plat Tembaga Uk.600 x 50 x 5 (untuk jumper Termination) B 1.34
294 Pipa PVC 4" & Tutup jumperan B 0.20
295 Cross Arm type 1.200 NP. 10 B 5.64
296 Segel Plastik B 0.02
297 Plat Tembaga 600 X 50 X5
298 Galian Aspal & pengurugan kembali Aspal (tebal Aspal 30 cm + dipadatkan M3
299 LV Insulator A1 B 0.80
300 Multi Chamber Arreter 24 kV - 1,5 kA MCA S 1.70
301 Glass Indicator MCA B
302 Bracket Protection Device / Fitting Clamp MCA B
303 Conductor Clamp + Bolt & Nut MCA S
304 Twisted Cable 4 x 35 mm² M 0.59
305 Terminal Lug 240 mm - Al / Cu - 2 Hole (507/U/2009) B 0.20
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332 Pipa Galvanized 3" - 4 meter (tebal= 2,5 mm) B 32.37
333 Pipa Galvanized 3/4" - 6 meter (tebal= 1,6 mm) B 6.01
334 Pipa Galvanized 1" - 6 meter (tebal= 2,0 mm) B 9.17
335 Pipa Galvanized 1,5" - 6 meter (tebal= 2,0 mm) B 13.61
336 Pipa Galvanized 2" - 6 meter (tebal= 2,5 mm) B 21.27
337 Pipa Galvanized 3" - 6 meter (tebal= 2,5 mm) B 32.37
338 Pipa Galvanized 4" - 6 meter (tebal= 3,2 mm) B 52.94
339 Pipa Galvanized 5" - 6 meter (tebal= 4,0 mm) B 80.50
340 Pipa Galvanized 6" - 6 meter (tebal= 5,0 mm) B 118.38
341 Cross Arm UNP 100 x 50 x 5 - 2.500 - tumpu (501/U/2009) B 118.38
342 Besi siku 50 x 50 x 4 -900 mm B 2.25
343 Klem Begel U 7" - TM - (l=44mm, t=6mm) B 2.10
344 Klem Begel U 8" - TM - (l=44mm, t=6mm) B 1.90
345 Pipa Air 3" - 1 meter ( medium ) + Sock Draad 3" B 3.06
346 Pipa Air 2" - 1 meter ( medium ) + Sock Draad 2" B 2.06
347 Pipa Air 3" - 2 meter ( medium ) + Sock Draad 3" B 4.63
348 Pipa Air 2" - 2 meter ( medium ) + Sock Draad 2" B 3.26
349 Pipa Air 3" - 1,5 meter ( medium ) u/ bawah LV Panel B 3.84
350 Pipa Air 2" - 1,5 meter ( medium ) u/ bawah LV Panel B 3.26
351 Cross Arm type 2.000 NP. 8 B 8.93
352 Cross Arm type 2.000 NP.10 B 14.28
353 Heat Shrink u/ tanda phasa B 0.02
354 Cross Arm type 2.500 NP. 65 B 7.23
355 Besi Siku L 50 x 50 x 1000 Tiang Pagar luar kiri & kanan S 3.50
356 Besi Siku L 50 x 50 x 2500 u/ Pelat Bordes S 8.75
357 Besi Siku L 50 x 50 x 2500 u/ pengaman pagar belakang S 8.75
358 Besi Siku L 50 x 50 x 260 u/ tempat kayu penghalang S 0.91
359 Besi Siku L 50 x 50 x 465 u/ penghubung S 1.82
360 Cross Arm type 1.500 NP - 8 S 5.96
361 Cross Arm type 750 NP - 8 u/ dudukan trafo S 2.98
362 Pelat Bordes 2500 x 30 x 3 S 4.50
363 Penghalang kayu jati 60 x 40 x 2500 / Besi siku L.50.50.4,5 S 2.50
364 Tiang Beton 12 - 200 daN + E (524/U/2009) B 1,000.00
365 LV Panel 250A s/d 400A, lubang atas S 60.00
366
367
368 AAAC - S 150 sqmm ( ex. J - Proc ) M 0.61
369
370
371
372
373
374 NFA2XSEY-T
NA2XSEYBY
AAAC 150 33sqmm
sqmm xx 240
150 + 1E x- 95
mm2
( ex. mm2
( -ex. - CWS) ( ex. J - Proc )
) J -)Proc M 5.29
12.43
375
376
377 - S 150 ( ex. EProc Proc M 0.47
0.61
378
379
380
381 LV Panel 630A, 4 Jurusan (SPLN D3.016-1 : 2010)-LBS S 75.00
382 LV Panel 250A, 2 Jurusan (SPLN D3.016-1 : 2010)-MCCB S 75.00
383 Conn.press Al 35-50 mm + cover vinil untuk kumisan B 0.40
384 Line Tap Connector ( type press ) 6-25 / 35-70 mm + heatshrink B 0.40
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth B 0.40
386 TC 35 mm - 50 cm untuk kumisan M 0.26
387 TC 3 x 70 + 1 x 50 sqmm ( ex. E - Proc ) M 1.05
388 Ground Wire Clamp Type A - TM - (l=50mm, t=6mm, p=300mm) B 1.02
389 Ground Wire Clamp Type B - TM - (l=50mm, t=6mm, p=300mm) B 1.02
390 Ground Wire Clamp Type C - TM - (l=50mm, t=6mm, p=300mm) B 1.50
391 Cousen/Thimble - (t=2,5mm) B 0.01
392 Preformed Termination 22 mm B 0.25
393 Wire Clip 22 mm B 0.04
394 Galvanized Steel Wire 22 mm M 0.22
395 Bolt & Nut M.8 x 30 B 0.14
396 Suspension Clamp 50 mm B 0.20
397 Strain Clamp 50 mm B 0.30
398 Single Guy Wire Band 6" - TR - (l=35mm, t=6mm) S 1.40
399 Single Arm Band 6" - TR (l=35mm, t=6mm) B 2.24
400 Square pipe 75 x 75 x 3 - 3000 B 21.00
401 L Bow Besi 2" B 0.50
402 L Bow Besi 3" B 0.65
403 Bundl.Cond.3x50 + 1x35 mm - 50 cm ( kumis ) B 0.40
404 Cross Arm UNP 100 x 50 x 5 - 2.000 - tarik - (l=50mm, t=5mm, tgg=100mm B 16.80
405 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu - (l=50mm, t=5mm, tgg=100 B 16.80
406 C Clamp 25 mm B 0.40
407 Square pipe 75 x 75 x 3,2 - 3000 - tumpu (522/U/2009) B 24.00
408 Square pipe 75 x 75 x 3,2 - 6000 - tumpu (522/U/2009) B 42.00
409 Pipa Air 3" - 2 meter ( medium 2,5mm ) B 8.38
410 Disconnecting Switch 20 kV - … A Out Door U 42.00
411 Disconnecting Switch 20 kV - … A In Door - 25,8 kV U 42.00
412 Besi Siku L 50x50x4,5 mm - 2500 mm B 1.40
413 Single Guy Wire Band 8" - TM (l=44mm, t=3,5 mm) untuk Ground Shield Wire S 1.10
414 Arm Tie Band 8" ~ 9" - - TM (l=44mm, t=3,5 mm) untuk Ground Shield Wire S 1.10
415 APIK 1 ( Posisi di Insulator @ 1 mtr = 3 bh) Titik 1.20
416 APIK 2 ( Posisi di Konduktor @ 4 meter ) Mtr 1.20
417 Live Line Connector / LTC 50-150 B 0.50
418 Live Line Connector / LTC 70-150 B 0.60
419 Polymer Cut Out Switch 24 Kv - 100 kA S 1.50
420 Polymer Arrester 24 kV - 10 kA S 1.70
421 Battery Charger ( input 220 VAC, Output 24VDC, 65 Ah ) S 33.33
422 Automatic Transfer Switch lengkap dg Box S 33.33
423 DS out door 25,8 kV - 800 A S 105.00
424 LBS Motorized + RTU + Kabel Data S 165.00
425 Recloser Motorized + RTU + Kabel Data S 185.00
426 Cubicle Pelanggan (LBS Non Motorized ) Unit 85.00
427 Cubicle Pelanggan ( CBOM ) Unit 85.00
428 Besi Siku L 50x50x3,2 mm - 6000 mm B 1.40
429 Suspension Clamp Bracket ( Load 700 kg ) B 0.65
430 Suspension Clamp B 0.15
431 Tension Bracket ( Load 600 kg ) B 0.69
432 Strain Clamp (TR) B 0.47
433 PVC 2" - 50 cm B 0.29
434 Dead End Tubes / Bundled End Protection + komplit B 0.19
435 Plastic Strap B 0.08
436 Isolated All. Binding - 4 mm Ø 6 M 0.10
437 Cross Arm UNP 100 x 50 x5 - 2.500 - tumpu B 0.10
438 Pipa Air 2" - 2 meter ( medium ) B 2.79
439 Galian tanah & pengurugan kembali M3
440 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type A B 4.19
441 Ground Wire Clamp Type A ( Khusus Verlenk ) B 1.02
442 Kotak Box Terminal ( persiapan SLO ) B 0.19
443 LBS Motorized Non RTU S 165.00
444 LVCO + ACCESOSORIESS B 0.29
445 Joint Sleeve Non Tenion 150 mm B 0.57
446 Klem C - 25/25 mm - Cu B 0.20
447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, besi 10mm S 1.40
448 Tanda Bahaya Kecil B 0.08
449 Under Frequency Relay ( UFR ) S 1.50
450 Digital Timer range time 0 - 30 hari B 0.05
451 NYAF 1,5 mm² ( SPLN ) M 0.02
452 MCCB 63 s/d 300 A B 2.50
453 Sock Draad Besi 3" - 4" B 0.65
454 OA Kast type I C1 Sistim Press cat powder coating B 18.00
455 ZCT 50/5 - 100/5 A B 1.20
456 Gembok Electronic B 0.20
457 NYY 4 x 4 mm u/ Wirring Panel M 3.50
458 NYY 4 x 6 mm u/ Wirring Panel M 4.50
459 Asuransi Material Lot
460 Angkutan Material km/ton
461 Preformed Termination 110 mm B 0.40
462 Polymer Pin Insulator 20 kV S 0.55
463 Polymer Strain Insulator 20 kV lengkap (SIR) S 4.00
464 Plat Tembaga untuk sambungan Termination + baut B 0.20
465 Begel Klem kaca mata + Bolt 3 u/Steel 70 mm B 0.20
466 Guy Insulator LV (TR) - belimbing B 0.80
467 Guy Insulator MV (TM) - belimbing B 1.20
468 Pipa Wespex 25 mm untuk AAAC 150mm M 1.10
469 Preformed Side Tie Double 150mm (Semi Cond/non metalic/Composite) B 0.20
470 LV Panel 250A, 2 Jurusan (SPLN D3.016-1 : 2010)-LBS S 75.00
471 LV Panel 400A, 4 Jurusan (SPLN D3.016-1 : 2010)-LBS S 115.00
472 Preformed Top Tie 150mm (Semi Cond/non metalic/Composite) B 0.20
473 Preformed Side Tie 150mm (Semi Cond/non metalic/Composite) B 0.20
474 Pipa Air 2" - 5 meter ( medium ) (555/U/2009) B 2.06
475 Pipa Air 2" - 1 meter ( medium ) + draad u/L Bow besi B 2.06
476 Pipa Air 3" - 1 meter ( medium ) + draad u/ L Bow besi B 2.06
477 L Bow 3" besi + sock draad dalam B 3.00
478 L Bow 2" besi + sock draad dalam B 1.50
479 Pipa Air 2" - 1,5 meter ( medium ) + draad u/L Bow besi B 2.06
480 Pipa Air 3" - 1,5 meter ( medium ) + draad u/ L Bow besi B 2.06
481 Bolt M.12 x 30 + Washer Cu B 0.14
482 Galvanized Steel Wire 110 mm M 0.95
483 Tekep (MV Cover) B 0.75
484 Semi Cond. Preformed Top Tie B 0.75
485 Semi Cond. Preformed Side Tie B 0.75
486 Potensial Trafo (PT) 20 kV - Outdoor B 15.00
487 Current Trafo (CT) 20 kV - Outdoor B 18.00

488 Meter Elektronik (ME) 3 ph - 4 W , teg: 57,7/100V; Arus :5A. Class: 0,5 S 2.50

489 Kotak APP type VI 1 (satu) pintu/kaca S 112.00


490 NYY 4 x 10 mm u/ Wirring CT M 4.50
491 Mountage PT-CT Exim Ls 0.00
492 Gaspijp 1,5" - 4,0 m, Galvanized B 3.50
493 Cross Arm type 1.200 NP. 8,0 B 7.64
494 Live Line Connector 150 - 240 mm B 7.64
495 Dudukan : Trafo Cantol, Pipa Kabel, PHB-TR & Dudukan Arrester S 75.00
496 Dudukan : Trafo Portal, Pipa Kabel, PHB-TR & Dudukan Arrester S 115.00
497 Semi Cond. Preformed Side Tie Double B 0.75
498 PHB - TR 2 Jurusan 400 A - SPLN D5.016.1 : 2010 B 45.00
499 Tiang Beton 14 - 500 daN + E B 1,375.00
500 Plat Extension GW
501 Double Arm Band 6" - TM (l=44mm, t=6mm) B 2.24
502 Arm Tie Band 7" - TM B 2.11
503 Bolt & Nut M.16 x 110 S 0.26
504 Jointing Termination 3 X 240 + 1 x 95 mm S 7.50
505 Cross Arm type 3.000 NP. 6,5 B 4.70
506 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type A B 4.19
507 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type B B 4.19
508 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type C B 4.19
509 Single Guy Wire Band 6"-7" - Lebar 35, tebal 3,5 mm - GSW S 1.40
510 Single Guy Wire Band 3"-4" - Lebar 35, tebal 3,5 mm - GSW S 1.40
511 Cross Arm type 500 - NP. 10 B 2.39
512 Cross Arm type 1.000 NP.10 B 7.14
513 Dudukan Recloser lengkap B 16.50
514 Dudukan LBS Motorized lengkap B 16.50
515 1 Unit External CT 20 kV Oout Door S 70.00
516 Klem C - 150/35 mm - Cu B 0.20
517 PMCB Out Door 24 kV lengkap U 175.00
518 Load Break Switch 24 kV-630 A Motorized 12,5 kA non RTU S 210.00
519 Wire Clip M8 (Ø 22mm) S 0.10
520 Wire Clip M10 (Ø 35mm) S 0.12
521 Wire Clip M12 (Ø 70mm) S 0.16
522 Wire Clip M16 (Ø 95mm) S 0.26
523 Connection Clamp For Netral + Bolt M12 x 25 - (Acc.MVTIC) S 0.26
524 Extension for GW type B - (Acc.MVTIC) B 0.70
525 Extension for GW type A - (Acc.MVTIC) B 0.60
526 Separator Clamp for Netral - (Acc.MVTIC) B 0.60
527 Cross Arm Type 750 NP. 10 (l=50mm, t=5mm, tgg=100mm) B 2.98
528 Iron Wire 6 mm M 0.20
529 Cross Arm UNP 80 x 40 x 3,2 - 1.500 S 8.00
530 Joint Sleeve Non Tenion 150 mm - Al B 16.00
531 Joint Sleeve Non Tenion 95 mm - Al B 32.00
532 Begel Ornament 3" - 0,5" + baut u/ Clamp MVTIC (l=30 mm, t=3 mm) B 2.11
533 Cross Arm UNP 80 x 45 x 3,2 - 2.000 S 8.00
H
A
R
G
A
Jumah
HARGA SATUAN PPN 10%
D
PASANG A
HARGA DASAR hps / rab BONGKAR
S
RAB
A
20% 10% 60% R
Volume
9,455 9,925 1,560 ###935 2
18,450 19,370 2,055 1,230 0
###
29,175 35,010 2,605 1,560 1
14,200 14,910 2,130 1,275 7
###
25,000 26,250 2,770 1,660
###
38,795 40,730 3,915 2,345
###
4,000 4,800 2,075 1,245
###
6,000 7,200 1,880 1,125
###
215,000 258,000 81,585 48,950
###
0 0 37,705 22,620
0 0 90,230 54,135
53,000 63,600 11,715 7,025
###
37,000 44,400 2,970 1,780
###
43,000 51,600 3,365 2,015
###
53,000 63,600 4,685 2,810
###
0 0 1,295 775
48,500 58,200 1,650 ###990
97,400 116,880 11,715 7,025
###
66,000 79,200 11,715 7,025
###
131,600 157,920 63,160 37,895
###
28,000 33,600 6,015 3,605
6,980 8,375 5,585 3,350
44,000 52,800 4,895 2,935
###
36,000 43,200 11,715 7,025
###
6,300 7,560 1,220 730
13,000 15,600 1,495 895
###
10,000 10,500 1,265 755
###
30,000 36,000 2,065 1,235
###
37,000 44,400 2,295 1,375
###
7,000 8,400 1,140 680
###
8,000 9,600 1,140 680
###
4,000 4,800 295 ###175
0 0 2,110 1,265
850,000 1,020,000 489,530 293,715
###
80,300 96,360 37,715 22,625
###
77,000 92,400 10,865 6,515
###
22,000 26,400 13,890 8,330
###
95,000 114,000 10,865 6,515
###
54,000 64,800 1,495 ###895
16,500 19,800 9,790 5,870
###
18,000 21,600 9,790 5,870
###
9,500 11,400 9,790 5,870
###
18,000 21,600 9,790 5,870
###
74,800 89,760 7,830 4,695
###
77,000 92,400 7,795 4,675
###
443,000 531,600 33,185 19,910
###
858,000 1,029,600 41,655 24,990
###
50,000 52,500 3,275 1,965
###
0 0 22,945 13,765
97,000 116,400 22,945 13,765
243,800 292,560 41,655 24,990
###
478,500 574,200 49,565 29,735
###
292,500 351,000 23,870 14,320
###
262,900 315,480 13,595 8,155
130,000 156,000 6,090 3,650
94,700 113,640 11,715 7,025
76,300 91,560 8,895 5,335
###
80,100 96,120 5,200 3,120
###
53,500 64,200 3,275 1,965
###
0 0 1,305,445 783,265
0 0 16,180 9,705
0 0 15,290 9,170
0 0 10,085 6,050
0 0 7,730 4,635
65,400 78,480 2,340 1,400
0 0 257,980 154,785

0 0 1,305,445 783,265
###

0 0 1,305,445 783,265
80,300 96,360 41,655 24,990
###
97,000 116,400 11,715 7,025
###
50,000 60,000 11,715 7,025
###
662,000 794,400 117,245 70,345
###
235,400 282,480 27,650 16,590
###
11,000 13,200 9,885 5,930
870,000 1,044,000 25,760 15,455
###
7,000 8,400 1,560 ###935
13,000 15,600 1,690 1,010
###
20,000 24,000 1,780 1,065
###
0 0 14,055 8,430
658,000 789,600 23,430 14,055
###
0 0 28,115 16,865
0 0 2,340 1,400
151,800 182,160 21,050 12,630
###
69,000 82,800 15,055 9,030
###
97,000 116,400 16,310 9,785
###
4,000 4,800 1,175 ###705
44,000 52,800 3,980 2,385
###
41,800 50,160 3,550 2,130
###
0 0 4,345 2,605
0 0 6,740 4,040
0 0 4,345 2,605
83,600 100,320 9,830 5,895
###
145,200 174,240 13,980 8,385
###
187,000 224,400 14,495 8,695
###
6,250,000 7,500,000 1,305,445 783,265
###
5,800,000 6,960,000 1,305,445 783,265
###
6,250,000 7,500,000 1,305,445 783,265
###
40,200 48,240 3,275 1,965
400 480 780 465
34,000 40,800 2,605 1,560
24,000 28,800 3,255 1,950
###
36,000 43,200 3,255 1,950
###
120,000 144,000 3,915 2,345
###
132,000 158,400 3,915 2,345
###
1,100 1,320 2,790 1,670
###
184,000 220,800 3,915 2,345
###
31,000 37,200 2,680 1,605
###
0 0 4,110 2,465
0 0 178,010 106,805
1,480,000 1,776,000 178,010 106,805
0 0 3,550 2,130
0 0 2,605 1,560
275,000 330,000 32,625 19,575
###
74,000 88,800 2,605 1,560
###
121,000 145,200 48,950 29,370
###

0 0 1,305,445 783,265
0 0 55,945 33,565
22,000 26,400 5,200 3,120
###
28,500 34,200 7,025 4,215
###
41,800 50,160 4,895 2,935
###
35,200 42,240 7,025 4,215
###
35,500 42,600 7,025 4,215
###
3,300 3,960 1,220 ###730
19,000 19,950 799,245 479,545
###
65,000 68,250 1,305,445 783,265
###
35,000 42,000 2,605 1,560
###
35,600 42,720 7,025 4,215
3,750,000 4,500,000 1,305,445 783,265
###
3,400,000 4,080,000 1,305,445 783,265
###
29,000 34,800 26,100 15,660
29,000 34,800 4,895 2,935
131,500 157,800 26,100 15,660
0 0 210,550 126,330
0 0 32,800 19,680
0 0 54,380 32,625
0 0 54,380 32,625
0 0 54,380 32,625
340,500 357,525 21,745 13,045
###
463,483 486,655 24,475 14,685
###
248,945 261,390 32,625 19,575
###
291,600 306,180 39,160 23,495
###
25,000 30,000 3,915 2,345
###
64,607 77,525 7,025 4,215
###
0 0 3,275 1,965
0 0 4,210 2,525
58,450 70,140 7,025 4,215
###
79,000 94,800 7,025 4,215
###
166,100 174,405 7,960 4,775
###
290,975 305,520 22,020 13,210
###
0 0 4,210 2,525
0 0 217,565 130,535
128,500 154,200 230,370 138,220
0 0 195,810 117,485
0 0 163,170 97,900
0 0 7,025 4,215
0 0 7,960 4,775
305,887 367,060 10,030 6,015
###
78,000 93,600 13,045 7,825
###
0 0 7,025 4,215
193,000 202,650 10,295 6,175
###
39,000 46,800 3,275 1,965
###
110,900 133,080 4,685 2,810
###
30,850 37,020 2,340 1,400
###
175,000 210,000 11,715 7,025
###
177,200 212,640 4,495 2,695
###
348,200 417,840 7,025 4,215
###
455,000 546,000 26,100 15,660
###
104,500 125,400 6,520 3,910
###
522,500 627,000 32,625 19,575
###
714,000 856,800 39,160 23,495
###
379,160 454,990 2,815 1,685
###
62,000 74,400 5,390 3,230
0 0 13,045 7,825
173,500 208,200 6,090 3,650
###
30,850 37,020 2,340 1,400
735,000 882,000 55,945 33,565
###
735,000 882,000 55,945 33,565
###
39,000 46,800 3,275 1,965
###
51,000 61,200 4,100 2,460
###
2,500 3,000 2,970 1,780
###
0 0 21,745 13,045
125,000 150,000 55,945 33,565
###
63,000 75,600 13,880 8,325
###
43,100 51,720 2,605 1,560
###
45,300 54,360 2,605 1,560
###
325,000 390,000 163,170 97,900
###
625,000 750,000 244,760 146,855
###
0 0 30,115 18,065
53,000 63,600 10,030 6,015
###
58,000 69,600 10,295 6,175
###
8,400 10,080 3,275 1,965
0 0 13,680 8,205
5,500 6,600 3,000 1,800
###
6,600 7,920 3,000 1,800
###
59,000 70,800 5,895 3,535
###
50,000 60,000 11,790 7,070
###
77,000 92,400 11,935 7,160
###
27,500 33,000 4,345 2,605
###
38,000 45,600 8,895 5,335
###
0 0 21,560 12,935
3,000 3,600 700 ###420
15,400 18,480 2,605 1,560
###
4,400 5,280 1,625 ###975
63,000 75,600 3,915 2,345
###
115,200 120,960 4,345 2,605
###
315,000 330,750 15,055 9,030
###
15,400 18,480 3,915 2,345
###
1,510 1,810 4,345 2,605
45,000 54,000 10,295 6,175
###
39,600 47,520 10,865 6,515
###
133,000 159,600 6,090 3,650
###
0 0 1,625 975
61,000 73,200 2,605 1,560
###
39,000 40,950 8,150 4,890
###
0 0 7,300 4,380
103,400 124,080 9,790 5,870
###
127,600 153,120 9,790 5,870
###
103,400 124,080 9,790 5,870
###
41,800 50,160 7,830 4,695
###
57,200 68,640 7,830 4,695
###
24,200 29,040 7,830 4,695
###
50,600 60,720 7,830 4,695
###
129,800 155,760 7,830 4,695
###
129,800 155,760 7,830 4,695
###
66,000 79,200 7,830 4,695
###
26,400 31,680 7,830 4,695
###
77,000 92,400 7,830 4,695
###
121,000 145,200 9,790 5,870
###
57,200 68,640 7,830 4,695
###
66,000 79,200 7,830 4,695
###
4,650,000 5,580,000 1,305,445 783,265
###
4,750,000 5,700,000 1,305,445 783,265
###
5,600,000 6,720,000 1,305,445 783,265
###
5,700,000 6,840,000 1,305,445 783,265
###
3,750,000 4,500,000 1,305,445 783,265
###
4,667,000 4,900,350 890,075 534,045
###
0 0 890,075 534,045
0 0 890,075 534,045
0 0 890,075 534,045
0 0 890,075 534,045
###
0 0 890,075 534,045
0 0 890,075 534,045
###
7,116,000 7,471,800 979,075 587,445
###
0 0 979,075 587,445
7,466,000 7,839,300 1,305,445 783,265
###
0 0 979,075 587,445
###
3,106,000 3,261,300 611,915 367,145
###
3,456,000 3,628,800 611,915 367,145
###
0 0 611,915 367,145
###
0 0 645 385
0 0 645 385
74,800 89,760 7,830 4,695
###
26,190,000 31,428,000 611,915 367,145
40,470,000 42,493,500 652,715 391,625
###
40,590,000 42,619,500 783,265 469,955
###
42,840,000 44,982,000 851,375 510,825
###
48,250,000 50,662,500 932,455 559,470
###
0 301,255 180,750
526,500 631,800 41,655 24,990
0 25,760 15,455
0 23,440 14,060
0 25,760 15,455
0 23,440 14,060
3,795,000 4,554,000 351,545 210,925
###
6,451,500 7,741,800 474,130 284,475
###
104,000 124,800 9,790 5,870
###
90,000 108,000 8,700 5,220
###
4,500 5,400 780 ###465
0 0 8,150 4,890
14,500 17,400 13,980 8,385
45,000 54,000 3,275 1,965
###
25,000 30,000 3,275 1,965
###
35,000 42,000 2,605 1,560
###
74,000 88,800 2,605 1,560
###
0 0 550 330
0 0 42,195 25,315
0 0 61,180 36,705
0 0 64,195 38,515
0 0 23,870 14,320
0 0
5,000 6,000 3,255 1,950
0 0 244,760 146,855
0 0 261,085 156,650
0 0 652,715 391,625
0 0 4,895 2,935
41,800 50,160 5,170 3,100
###
138,600 166,320 7,025 4,215
###
0 0 78,320 46,990
###
0 0 97,900 58,740
###
0 5,210 3,125
0 3,365 2,015
357,500 429,000 9,790 5,870
335,000 402,000 10,865 6,515
62,000 74,400 9,790 5,870
182,400 218,880 10,865 6,515
2,500 3,000 810 485
0 10,865 6,515
0 230,370 138,220
46,000 55,200 4,895 2,935
###
1,568,379 1,882,050 26,100 15,660
###
259,283 311,135 3,430 2,055
7,500 9,000 2,240 1,340
3,500 4,200 3,835 2,300
23,730 28,475 7,520 4,510
321,200 385,440 10,865 6,515
###
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
480,660 576,790 30,115 18,065
###
147,500 177,000 11,790 7,070
###
0 0 6,015 3,605
0 0 6,520 3,910
455,000 546,000 26,100 15,660
###
721,000 865,200 39,160 23,495
###
1,161,000 1,393,200 55,945 33,565
###
1,661,850 1,994,220 78,320 46,990
###
2,612,500 3,135,000 107,820 64,690
###
0 0 23,870 14,320
40,700 48,840 7,830 4,695
###
67,273 80,725 3,915 2,345
###
75,000 90,000 5,155 3,090
###
111,200 133,440 13,045 7,825
###
80,170 96,200 10,030 6,015
###
210,400 252,480 13,045 7,825
###
145,340 174,405 4,760 2,855
###
156,200 187,440 13,045 7,825
###
104,000 124,800 10,030 6,015
###
243,200 291,840 20,185 12,110
###
304,000 364,800 22,945 13,765
###
2,200 2,640 2,340 1,400
###
0 0 8,810 5,285
28,000 33,600 7,830 4,695
###
70,000 84,000 9,790 5,870
###
70,000 84,000 9,790 5,870
###
7,280 8,735 2,340 1,400
###
14,560 17,470 3,275 1,965
###
129,600 155,520 8,895 5,335
###
64,800 77,760 4,650 2,790
###
225,000 270,000 13,045 7,825
###
25,000 30,000 2,340 1,400
###
0 0 890,075 534,045
###
9,500,000 9,975,000 611,915 367,145
###
0 0 326,355
#DIV/0! 195,810
#DIV/0!
0 #DIV/0! #DIV/0!
0
0 0
0 #DIV/0!
2,055 #DIV/0!
1,230
0 2,770
#DIV/0! 1,660
#DIV/0!
0
0 #DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
16,925,000 17,771,250 391,630 234,975
###
11,115,000 11,670,750 326,355 195,810
###
22,000 26,400 4,895 2,935
###
18,200 21,840 7,960 4,775
###
18,200 21,840 7,960 4,775
###
7,310 8,770 2,110 1,265
###
0 0 8,150 4,890
56,000 67,200 5,035 3,020
###
46,000 55,200 5,035 3,020
###
61,000 73,200 5,145 3,085
###
5,950 7,140 1,175 ###705
0 0 8,700 5,220
0 0 3,255 1,950
0 0 1,560 935
2,500 3,000 1,110 ###665
0 0 2,110 1,265
0 0 3,550 2,130
44,000 52,800 9,845 5,905
###
0 0 5,895 3,535
0 0 21,560 12,935
133,000 159,600 3,255 1,950
###
202,000 242,400 3,550 2,130
###
0 0 4,895 2,935
304,000 364,800 22,945 13,765
###
304,000 364,800 22,945 13,765
###
26,400 31,680 4,895 2,935
###
616,000 739,200 33,185 19,910
###
1,236,000 1,483,200 41,655 24,990
###
0 0 10,865 6,515
14,000,000 16,800,000 95,610 57,365
14,000,000 16,800,000 95,610 57,365
82,000 98,400 19,580 11,745
###
33,150 39,780 11,790 7,070
###
0 0 11,790 7,070
0 0 3,915 2,345
0 0 3,915 2,345
240,000 288,000 19,580 11,745
###
220,000 264,000 19,580 11,745
###
835,000 876,750 26,100 15,660
###
634,500 666,225 21,745 13,045
###
0 0 699,345 419,605
0 0 559,470 335,680
4,500,000 5,400,000 79,915 47,945
###
85,500,000 89,775,000 1,305,445 783,265
###
173,000,000 181,650,000 1,305,445 783,265
###
0 0 1,305,445 783,265
0 0 1,305,445 783,265
0 0 24,780 14,865
0 0 3,275 1,965
0 0 3,915 2,345
15,000 18,000 3,275 1,965
0 0 2,110 1,265
0 0 3,255 1,950
70,000 84,000 2,790 1,670
###
250 300 1,295 ###775
10,800 11,340 2,165 1,295
###
0 0 23,900 14,340
0 0 13,495 8,095
0 0 163,170 97,900
0 0 27,970 16,780
0 0 3,275 1,965
55,000 66,000 645 ###385
0 0 1,305,445 783,265
0 0 65,260 39,155
79,200 95,040 13,980 8,385
###
26,400 31,680 4,895 2,935
###
69,000 82,800 8,700 5,220
###
14,000 16,800 1,250 ###750
0 0 271,960 163,175
0 0 78,320 46,990
0 0 2,340 1,400
0 0 46,615 27,965
65,000 78,000 8,895 5,335
0 0 3,210 1,925
0 0 211,000 126,600
0 0 8,700 5,220
0 0 7,960 4,775
0 0 9,845 5,905
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 11,855 7,110
225,000 236,250 5,145 3,085
###
299,650 314,630 8,895 5,335
###
0 0 15,055 9,030
0 0 13,980 8,385
46,000 55,200 3,275 1,965
###
53,000 63,600 4,210 2,525
###
0 0 16,310 9,785
150,000 180,000 4,210 2,525
10,180,000 10,689,000 326,355 195,810
###
14,150,000 14,857,500 391,630 234,975
###
75,000 90,000 6,520 3,910
75,000 90,000 4,210 2,525
0 0 11,185 6,710
0 0 10,030 6,015
296,000 355,200 13,045 7,825
202,000 242,400 7,830 4,695
133,000 159,600 6,520 3,910
0 0 10,030 6,015
0 0 13,045 7,825
4,000 4,800 1,295 ###775
0 0 2,065 1,235
81,400 97,680 7,830 4,695
###
98,000 117,600 6,520 3,910
###
85,000 102,000 4,210 2,525
###
9,500,000 9,975,000 55,945 33,565
###
0 0 55,945 33,565

0 0 328,545 197,125

0 0 195,810 117,485
0 0 14,495 8,695
0 0 21,745 13,045
0 0 10,030 6,015
0 0 6,565 3,935
259,000 271,950 19,580 11,745
###
3,795,000 4,554,000 351,545 210,925
###
6,451,500 7,741,800 474,130 284,475
###
115,000 138,000 5,145 3,085
###
0 0 391,630 234,975
7,466,000 7,839,300 1,631,805 979,080
###
15,000 18,000 1,395 ###835
93,000 111,600 11,790 7,070
###
48,000 57,600 11,715 7,025
###
12,100 14,520 1,265 ###755
0 0 1,305,445 783,265
0 0 14,495 8,695
321,750 386,100 27,970 16,780
###
321,000 385,200 27,970 16,780
###
347,600 417,120 27,970 16,780
###
0 0 11,790 7,070
0 0 7,040 4,220
30,000 36,000 7,015 4,205
152,000 182,400 11,715 7,025
0 0 279,730 167,835
0 0 279,730 167,835
0 0 244,760 146,855
138,600 166,320 4,895 2,935
###
0 0 652,715 391,625
55,010,000 57,760,500 1,305,445 783,265
###
3,000 3,600 3,255 1,950
###
5,000 6,000 3,310 1,985
###
5,000 6,000 3,365 2,015
###
7,000 8,400 3,430 2,055
###
29,000 34,800 1,295 ###775
15,900 19,080 1,220 ###730
28,000 33,600 1,220 ###730
17,000 20,400 1,220 ###730
130,000 156,000 6,090 3,650
###
6,500 7,800 2,405 1,440
###
144,000 172,800 8,895 5,335
###
79,200 95,040 13,980 8,385
###
44,000 52,800 10,865 6,515
###
21,500 25,800 7,830 4,695
###
184,000 220,800 11,715 7,025
###
3,510,773.04
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

1 AAAC - 70 sqmm ( SPLN ) M 1,630.00 1,420.00


2 AAAC - 150 sqmm ( SPLN ) M 2,150.00 1,870.00
3 AAAC - 240 sqmm ( SPLN ) M 2,720.00 2,370.00
4 AAAC - S 70 sqmm ( SPLN ) M 2,230.00 1,940.00
5 AAAC - S 150 sqmm ( SPLN ) M 2,900.00 2,520.00
6 AAAC - S 240 sqmm ( SPLN ) M 4,090.00 3,560.00
7 Alluminium Binding Wire Ø 4 M 2,170.00 1,890.00
8 Alluminium Tape ((l=10mm, t=0,8mm) M 1,960.00 1,710.00
9 Arding Pipe 1,5 - 5,5 mtr S 85,290.00 74,170.00
10 Arding Pipe 1,5" - 2,5 mtr S 39,420.00 34,280.00
11 Arding Pipe 1,5" - 6 mtr S 94,340.00 82,030.00
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 12,250.00 10,650.00
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) B 3,110.00 2,700.00
14 Arm Tie Type 900 - 3/4" - (t=2,3 mm) B 3,520.00 3,060.00
15 MV Guy Insulator ( TM ) - belimbing B 4,900.00 4,260.00
16 Baut mata B 1,360.00 1,180.00
17 BC 50 MM M 1,730.00 1,500.00
18 Begel Ornament 4" - 10" - (l=44mm, t=6mm) B 12,250.00 10,650.00
19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) B 12,250.00 10,650.00
20 Beton Block 400 x 400 x 100 - kotak B 66,030.00 57,420.00
21 Beugels 3"+Bolt & nut - (l=44mm, t=6mm) B 6,290.00 5,470.00
22 Beugels u/ dask 1.5 "/ fixing colar + dekschroeven B 5,840.00 5,080.00
23 Klem C 50 mm B 5,110.00 4,450.00
24 Bimetal Connector Al/Cu -150 mm B 12,250.00 10,650.00
25 Bolt & Nut 3/16 x 0,5" B 1,270.00 1,110.00
26 Bolt & Nut M.16 x 140 (517/U/2009) S 1,570.00 1,360.00
27 Bolt & Nut M.16 x 120 (517/U/2009) S 1,320.00 1,150.00
28 Double Arm Bolt & Nut M.16 x 350 (besi as) S 2,160.00 1,880.00
29 Double Arm Bolt & Nut M.16 x 400 (besi as) S 2,400.00 2,090.00
30 Bolt & Nut M.16 x 50 (517/U/2009) B 1,200.00 1,040.00
31 Bolt & Nut M.16 x 75 (517/U/2009) B 1,200.00 1,040.00
32 Bolt M.12 x 30 - CU B 310.00 270.00
33 Bongkar BC 16 mm / AAAC 35 MM M 2,210.00 1,920.00
34 Borring untuk Kabel tanah M 511,790.00 445,030.00
35 Bundled End Assembly ( BEA ) - komplit S 39,440.00 34,290.00
36 Comp. Joint Bimetal Al/Cu - 70/70 mm (507/U/2009) B 11,370.00 9,880.00
37 Connector for Alluminium 70 mm - Type H (507/U/2009) B 14,520.00 12,630.00
38 Compresion Joint Sleeve 95 mm (507/U/2009) B 11,370.00 9,880.00
39 Concrete Slove / pengaman kabel uk.450x300x40 mm B 1,570.00 1,360.00
40 Conn. press AL/AL type 6-25 mm2 / 35-70 mm2 + vinil masive B 10,230.00 8,900.00
41 Conn. press AL/AL type 6-25 mm2 / 6-25 mm2 + vinil masive B 10,230.00 8,900.00
42 Connector press AL/AL type 35-16mm2 & Cover+tanda phasa B 10,230.00 8,900.00
43 Connector press AL/AL type 70-35mm2 & Cover+tanda phasa B 10,230.00 8,900.00
44 Terminal Lug 50 mm2 AL-CU. (507/U/2009) B 8,180.00 7,120.00
45 Terminal Lug 70 mm2 AL-CU. (507/U/2009) B 8,150.00 7,090.00
46 Cross arm - UNP 100 x 50 x 5 mm - 3000 mm - (l=50mm, t=5 B 34,690.00 30,170.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

47 Cross arm - UNP 100 x 50 x 5 mm - 6000 mm- (l=50mm, t=5m B 43,550.00 37,870.00
48 Cross Arm Clevis - TM - (l=50mm, t=6mm) B 3,430.00 2,980.00
49 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu/tarik B 23,990.00 20,860.00
50 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu/tarik B 23,990.00 20,860.00
51 Cross Arm UNP-80 - 2500 (l=45mm,t=3,5mm,tgg=80mm) S 43,550.00 37,870.00
52 Cross Arm UNP 100 x 50 x 5 mm - 2500 mm - (l=50mm, t=5m B 51,820.00 45,060.00
53 Cross Arm UNP-80 - 3000 (l=45mm,t=3,5mm,tgg=80mm) B 24,960.00 21,700.00
54 Cross Arm Type 1.500 NP. 10 B 14,210.00 12,360.00
55 Cross Arm NP. 10 - Type 750 B 6,370.00 5,540.00
56 Cross Arm type 1.200 NP. 6,5 B 12,250.00 10,650.00
57 Cross Arm type 1.000 NP. 6,5 B 9,310.00 8,090.00
58 Cross Arm type 900 NP. 8 B 5,440.00 4,730.00
59 Cross Arm type 500 - NP. 8 B 3,430.00 2,980.00
60 Cubicle Pelanggan lengkap B 1,364,780.00 1,186,770.00
61 Kotak APP type C - IA Lengkap S 16,910.00 14,710.00
62 CT LS 80 / ……. Amp ( sesuai daya ) S 15,990.00 13,900.00
63 Footstuken+bolt & nut S 10,550.00 9,170.00
64 Plate Cooper B 8,090.00 7,030.00
65 NH Fuse B 2,450.00 2,130.00
66 CT TR 100/5 - 250/5 A B 269,720.00 234,530.00
67 Cubicle Single Incoming , 630 A , 20kV, 16kA Lengkap dengan I S 1,364,780.00 1,186,770.00
68 manualOutgoing Cubicle , CB Drawout , CT, PT, OCR , motor S 1,364,780.00 1,186,770.00
69 Dead End Assembly ( DEA ) - komplit S 43,550.00 37,870.00
70 Double Arm Band 8" - 7" - TM (504/U/2009) B 12,250.00 10,650.00
71 Double Guy Wire Band 7" - TM S 12,250.00 10,650.00
72 Dudukan Jointing S 122,580.00 106,590.00
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatt S 28,910.00 25,140.00
74 Fixing Collar 1.5 " B 10,330.00 8,990.00
75 Polymer Cut Out Switch 24 kV + Fuse S 26,940.00 23,420.00
76 Galvanized Steel Wire 22 mm (542/U/2009) M 1,630.00 1,420.00
77 Galvanized Steel Wire 35 mm (542/U/2009) M 1,780.00 1,540.00
78 Galvanized Steel Wire 70 mm (542/U/2009) M 1,860.00 1,620.00
79 Gaspijp 1,5" - 2,3 m, u/ dask Galv B 14,700.00 12,780.00
80 Gaspijp 3 " - 6 m. Galv B 24,500.00 21,300.00
81 Gaspijp 4 " - 6 m. Galv B 29,390.00 25,560.00
82 Gembok "setara SOLEX" B 2,450.00 2,130.00
83 Earthing Rod 16 mm - 1,5 m+clamp - TR- besi As, Electroplatt S 22,010.00 19,140.00
84 Guy Wire Rod 5/8" ( 15 mm ) - 1.800 mm (514/U/2009) B 15,740.00 13,690.00
85 Guy Wire Rod 5/8" ( 15 mm ) - 2.500 mm (514/U/2009) B 17,050.00 14,830.00
86 Guy Wire Timble (t=2,5mm) B 1,230.00 1,070.00
87 Insulated Tension Joint 70 mm B 4,160.00 3,620.00
88 Insulated Non Tension Joint 50 mm B 3,720.00 3,230.00
89 Jasa Perakitan / Montage Ls 4,540.00 3,950.00
90 Jasa Perakitan / Montage Ls 7,050.00 6,130.00
91 Jasa Perakitan / Montage Ls 4,540.00 3,950.00
92 Joint Sleeve 70 mm (507/U/2009) B 10,280.00 8,940.00
93 Joint Sleeve 150 mm (507/U/2009) B 14,620.00 12,710.00
94 Joint Sleeve 240 mm B 15,160.00 13,180.00
95 Jointing Termination 24 Kv - uk. 150 mm - 3 Core/XLPE S 1,364,780.00 1,186,770.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

96 Jointing Termination 24 Kv - uk. 150 mm - 1 Core/MVTIC S 1,364,780.00 1,186,770.00


97 Jointing Termination 24 Kv - uk. 240 mm - 3 Core/XLPE S 1,364,780.00 1,186,770.00
98 Kanal NP6-60 cm + Bolt&nut B 3,430.00 2,980.00
99 Kawat Segel @ 15 cm B 810.00 710.00
100 Klem Begel 3/4" u/ kabel B 2,720.00 2,370.00
101 Klem Begel U 2" - (t=3mm, l=35mm) B 3,410.00 2,960.00
102 Klem Begel U 3" - (t=3mm, l=35mm) B 3,410.00 2,960.00
103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 4,090.00 3,560.00
104 Klem Begel U 11" - TM - (l=44mm, t=6mm) B 4,090.00 3,560.00
105 Klem kabel/ Cable suport (508/U/2009) B 2,920.00 2,540.00
106 Knee + sook 3" besi B 4,090.00 3,560.00
107 Knee 2" - PVC B 2,810.00 2,440.00
108 Kotak APP u/kWh Meter Elektronik + Modem S 4,300.00 3,740.00
109 kWh Meter 3 ph Elektronik lengkap Modem S 186,100.00 161,830.00
110 KWh meter 3 phs. 220/380 V - 20/60 A ST Clas 1 Elektronik S 186,100.00 161,830.00
111 KWh meter 3 phs. 220/380 V - 5/20 A ST Clas 1 Elektronik S 3,720.00 3,230.00
112 KWh meter 3 phs. Elektronik lengkap dengan Modem S 2,720.00 2,370.00
113 KWh meter Electronic Anti Temper 1 Phasa 2 kawat 50 Hz, 5(20 S 34,110.00 29,660.00
114 L bouw 3 " PVC S 2,720.00 2,370.00
115 Large Angle Assembly ( LAA ) S 51,170.00 44,500.00
116 Lengkap dengan Incoming Cubicle, LBS , manualMetering Cubicl S 1,364,780.00 1,186,770.00
117 Lightning Arrester 24 kV - 10 kA S 58,490.00 50,860.00
118 Line Tap Connector 50-70 mm type G B 5,440.00 4,730.00
119 Line Tap Connector Al 150 - 50 mm type G B 7,350.00 6,390.00
120 C Clamp Cu - 50 mm B 5,110.00 4,450.00
121 Line Tap Connector Type 70 - 150 mm B 7,350.00 6,390.00
122 Line Tap Connector Type Al - 150 mm B 7,350.00 6,390.00
123 Link (506/U/2009) B 1,270.00 1,110.00
124 Load Break Switch 24 kV - 630 A Manual S 835,580.00 726,590.00
125 Load Break Switch 24 kV-630 A Motorized 12,5 kA c/w PTCC S 1,364,780.00 1,186,770.00
126 Load Segel @ tiap 5 meter B 2,720.00 2,370.00
127 Lodden manchet 1.5 " berat 0.95 - 1 kg B 7,350.00 6,390.00
128 Termination Outdoor 24 kV - uk. 150 mm - 1 Core/MVTIC S 1,364,780.00 1,186,770.00
129 Termination Idoor 24 kV - uk. 150 mm - 1 Core/MVTIC S 1,364,780.00 1,186,770.00
130 MCB 230 V - 35 A s/d 50 A - 1 Phasa B 27,290.00 23,730.00
131 MCB 230 V - 2 A s/d 35 A - 1 Phasa B 5,110.00 4,450.00
132 MCB 230 V - 10 s/d 35 A - 3 Phasa B 27,290.00 23,730.00
133 MCB 3 phs. 230 V - 25 A s/d 50 A B 220,120.00 191,410.00
134 MCCB 63 s/d 100 A B 34,300.00 29,820.00
135 Mountage Ls 56,860.00 49,440.00
136 Mountage SLM 250 kva keatas Ls 56,860.00 49,440.00
137 Mountage kWH 5/20 A S 56,860.00 49,440.00
138 NA2XSEYBY 3 x 150 mm2;20KV;UG M 22,740.00 19,770.00
139 NA2XSEYBY 3 x 240 mm2;20KV;UG M 25,580.00 22,250.00
140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS M 34,110.00 29,660.00
141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS M 40,940.00 35,600.00
142 NYA 35 sqmm ( SPLN ) M 4,090.00 3,560.00
143 NYA 50 sqmm ( SPLN ) M 7,350.00 6,390.00
144 NYAF / NYA 2,5 mm² ( SPLN ) M 3,430.00 2,980.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

145 NYAF 10 mm² ( SPLN ) M 4,410.00 3,830.00


146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 7,350.00 6,390.00
147 NYY 1 x 70 mm2 ( SPLN ) M 7,350.00 6,390.00
148 NYY 1 x 150 sqmm - Input ( SPLN ) M 8,330.00 7,240.00
149 NYY 4 x 70 sqmm - Output ( SPLN ) M 23,020.00 20,020.00
150 NYY 4x2.5 mm untuk APP ( SPLN ) M 4,410.00 3,830.00
151 OA Kast type I Sistim Press cat powder coating B 227,460.00 197,790.00
152 OA Kast type III lengkap cat powder coating S 240,840.00 209,430.00
153 OA Kast type VI cat powder coating S 204,710.00 178,010.00
154 OA Kast type VI ,Kecil cat powder coating S 170,590.00 148,340.00
155 Ornament Kabel Band 6" S 7,350.00 6,390.00
156 Ornament Kabel Band 9/10." - 3/4" S 8,330.00 7,240.00
157 Pasir urug M3 10,490.00 9,120.00
158 Patok Tanda Kabel (169/K/2009) B 13,640.00 11,860.00
159 Pipa Air 3/4" - 3 mtr. u/ pelindung Ground (555/U/2009) B 7,350.00 6,390.00
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 10,770.00 9,360.00
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) B 3,430.00 2,980.00
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 4,900.00 4,260.00
163 Pipa Air 3/4" -1 mtr. u/ pelindung Ground (555/U/2009) B 2,450.00 2,130.00
164 Pipa Air 3/4" - 6 mtr tebal 1,6 mm B 12,250.00 10,650.00
165 Pipa Air 2" - 1,5 meter ( medium ) (555/U/2009) B 4,700.00 4,090.00
166 Pipa Air 2" - 3 meter ( medium ) (555/U/2009) B 7,350.00 6,390.00
167 Pipa Air 2" - 6 mtr tbl 2,5 mm ( medium ) B 27,290.00 23,730.00
168 Pipa Air 3" - 1 meter ( medium ) (555/U/2009) B 6,820.00 5,930.00
169 Pipa Air 3" - 5 meter ( medium ) tbl = 3 mm B 34,110.00 29,660.00
170 Pipa Air 3" - 6 mtr tbl 2,5 mm ( medium ) B 40,940.00 35,600.00
171 Pipa Air 2" - 5 mtr tbl 2,5 mm ( medium ) B 2,940.00 2,560.00
172 Pipa Air PVC 2" - 3 meter ( AW ) B 5,630.00 4,900.00
173 Pipa Air PVC 3" - 5 meter ( AW ) B 13,640.00 11,860.00
174 Pipa Air 2" - 2 meter / Strut Tie (555/U/2009) S 6,370.00 5,540.00
175 Pipa Air 3/4" - 1 meter medium (555/U/2009) B 2,450.00 2,130.00
176 Pipa Air 4" - 6 mter u/ pelindung jalan (555/U/2009) B 58,490.00 50,860.00
177 Pipa Air 4" - 6 mtr (555/U/2009) B 58,490.00 50,860.00
178 Pipa Pelindung 3/4" - 2000 (512/U/2009) B 3,430.00 2,980.00
179 Pipa Pelindung 3/4" - 3000 (555/U/2009) B 4,290.00 3,730.00
180 Plastic Strap Medium B 3,110.00 2,700.00
181 Plat Cooper 4 x 40 mm M 22,740.00 19,770.00
182 Pole Block (504/U/2009) S 58,490.00 50,860.00
183 Pole Block Band 12" - TM (557/U/2009) S 14,510.00 12,620.00
184 Pole Bracket 3-6" B 2,720.00 2,370.00
185 Pole Bracket 6" - 8" B 2,720.00 2,370.00
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 170,590.00 148,340.00
187 Pondasi type D ( 2 Tiang ) (91/U/2009) B 255,890.00 222,510.00
188 Pondasi u/Gaspijp 3" Ls 31,490.00 27,380.00
189 Preformed Termination 35 mm (542/U/2009) B 10,490.00 9,120.00
190 Preformed Termination 70 mm (542/U/2009) B 10,770.00 9,360.00
191 Protective cap 1.5 " B 3,430.00 2,980.00
192 PVC 3/4" 6 meter B 14,310.00 12,440.00
193 Service wedge clamp 2/4 x 6/10 mm Bh. 3,140.00 2,730.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

194 Service wedge clamp 4/4 x 10/16 mm B 3,140.00 2,730.00


195 Single Arm Band 8" (504/U/2009) B 6,160.00 5,360.00
196 Single Guy Wire Band 8" - TM (513/U/2009) S 12,330.00 10,720.00
197 Small Angle Assembly ( SAA ) S 12,480.00 10,850.00
198 Sock Pipa PVC 3" B 4,540.00 3,950.00
199 Preformed Termination 22 mm (542/U/2009) B 9,300.00 8,090.00
200 Square pipe 75 x 75 x 3 - 2000 - tumpu (502/U/2009) B 22,540.00 19,600.00
201 Square Washer - (l=50mm, p=50mm, t=2,5mm) B 740.00 640.00
202 Stainless Steel Strip non magnetic M 2,720.00 2,370.00
203 Stoping Buckle non magnetic B 1,700.00 1,480.00
204 Strain Clamp 70 - 150 mm - 2 nut S 4,090.00 3,560.00
205 Strain Clamp 150 - 240 mm - 3 nut S 4,540.00 3,950.00
206 Strain Rod Insulator (88/U/2009) S 15,740.00 13,690.00
207 Strainhook & clamp u/. Gaspijp - 1.5' B 4,090.00 3,560.00
208 Stroppen u/ loden manchet 1.5" B 4,540.00 3,950.00
209 Strut Arm TM - (l=50mm, t=5mm, tgg=100mm) NP 10 - 30 cm B 10,770.00 9,360.00
210 Strut Arm TR - (l=50mm, t=5mm, tgg=100mm) NP 10 - 25 cm B 11,370.00 9,880.00
211 Strut Tie 2000 - pipe 2" (512/U/2009) B 6,370.00 5,540.00
212 Suspension Clamp For MV B 1,700.00 1,480.00
213 Tanda Bahaya Besar - (l=400mm, tgg=450mm) B 2,720.00 2,370.00
214 NFA2X-T;3x70 + 1x50 mm2 M 8,520.00 7,410.00
215 TC 3 x 50 + 1 x 35 sqmm ( SPLN ) M 7,630.00 6,640.00
216 Terminal Lug 150 mm - Al 2 Nut B 10,230.00 8,900.00
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) B 10,230.00 8,900.00
218 Terminal Lug 150 mm - Al 2 Nute B 10,230.00 8,900.00
219 Terminal Lug 35 mm - Cu (507/U/2009) B 8,180.00 7,120.00
220 Terminal Lug 35-50 mm - Cu (507/U/2009) B 8,180.00 7,120.00
221 Terminal Lug 50 mm - Al (507/U/2009) B 8,180.00 7,120.00
222 Terminal Lug 50 mm - Cu (507/U/2009) B 8,180.00 7,120.00
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 8,180.00 7,120.00
224 Terminal lug 70 mm AL/CU u/ CO (507/U/2009) B 8,180.00 7,120.00
225 Terminal Lug 70 mm - Cu (507/U/2009) B 8,180.00 7,120.00
226 Terminal Lug 70 mm Al (507/U/2009) B 8,180.00 7,120.00
227 Terminal Lug 70 mm Al - Cu (507/U/2009) B 8,180.00 7,120.00
228 Terminal Lug 150 mm - Cu (507/U/2009) B 10,230.00 8,900.00
229 Terminal Lug 50 mm - Cu (507/U/2009) B 8,180.00 7,120.00
230 Terminal Lug 70 mm - Cu (507/U/2009) B 8,180.00 7,120.00
231 Termination ID 3 X 150 MM2 u/XLPE S 1,364,780.00 1,186,770.00
232 Termination ID 3 X 240 MM2 u/XLPE S 1,364,780.00 1,186,770.00
233 Termination OD 3 X 150 MM2 u/XLPE S 1,364,780.00 1,186,770.00
234 Termination OD 3 X 240 MM2 u/ XLPE S 1,364,780.00 1,186,770.00
235 Termination Out Door 3 X 150 + 1 x 95 mm u/MVTIC S 1,364,780.00 1,186,770.00
236 Tiang Beton 11 - 200 daN (524/U/2009) B 930,530.00 809,160.00
237 Tiang Beton 11 - 200 daN + E (524/U/2009) B 930,530.00 809,160.00
238 Tiang Beton 11 - 350 daN (524/U/2009) B 930,530.00 809,160.00
239 Tiang Beton 11 - 350 daN + E (524/U/2009) B 930,530.00 809,160.00
240 Tiang Beton 12 - 200 daN (524/U/2009) B 930,530.00 809,160.00
241 Tiang Beton 12 - 350 daN (524/U/2009) B 930,530.00 809,160.00
242 Tiang Beton 12 - 350 daN + E BC B 930,530.00 809,160.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

243 Tiang Beton 13 - 350 daN + E B 1,023,580.00 890,070.00


244 Tiang Beton 13 - 350 daN + E BC B 1,023,580.00 890,070.00
245 Tiang Beton 14 - 350 daN + E B 1,364,780.00 1,186,770.00
246 Tiang Beton 14 - 350 daN + E BC B 1,023,580.00 890,070.00
247 Tiang Beton 9 - 200 daN B 639,740.00 556,290.00
248 Tiang Beton 9 - 200 daN + E B 639,740.00 556,290.00
249 Tiang Beton 9 - 200 daN + E BC B 639,740.00 556,290.00
250 Timah Segel B 680.00 590.00
251 Timah solder + pasta Ls 680.00 590.00
252 Terminal Lug 50 mm - Cu/Al (507/U/2009) B 8,180.00 7,120.00
253 Trafo Distribusi 20 kV 3 PH 50 KVA Yzn5 ( D3 ) B 639,740.00 556,290.00
254 Trafo Distribusi 20 kV 3 PH 100 KVA Yzn5 ( D3 ) B 682,390.00 593,380.00
255 Trafo Distribusi 20 kV 3 PH 160 KVA Yzn5 ( D3 ) B 818,870.00 712,060.00
256 Trafo Distribusi 20 kV 3 PH 200 KVA Dyn5 ( D3 ) B 890,070.00 773,980.00
257 Trafo Distribusi 20 kV 3 PH 250 KVA Dyn5 ( D3 ) B 974,840.00 847,690.00
258 Trafo Single Phase 25 kVA s/d 50 kVA B 314,950.00 273,870.00
259 Cross Arm UNP-80 - 6000 (l=45mm,t=3,5mm,tgg=80mm) B 43,550.00 37,870.00
260 Besi siku L.50.50.4,5 - 6000 B 26,930.00 23,420.00
261 Besi siku L.35.35.2,5 - 6000 B 24,510.00 21,310.00
262 Besi plat - 6000 (l=44mm, t=6mm) B 26,930.00 23,420.00
263 Besi plat - 6000 (l=35mm, t=6mm) B 24,510.00 21,310.00
264 Transformer Platform for 1 Pole (Konst. SPLN D3) S 367,530.00 319,590.00
265 Transformer Platform for 2 Pole (Konst. SPLN D3) S 495,680.00 431,030.00
266 Turn Buckle TM 3/4" (7000 kg) - TM - (l=44mm, t=6mm) B 10,230.00 8,900.00
267 Turn Buckle TR 5/8" (4000 kg) - TR - (l=35mm, t=6mm) S 9,090.00 7,910.00
268 Twisted Cable 2 x 10 mm² - Al M 810.00 710.00
269 Twisted Cable 3 x 50 + 1 x 35mm² M 8,520.00 7,410.00
270 Twisted Cable 4 x 16 mm² M 14,620.00 12,710.00
271 U - Bolt + Steel Plate TM/TR Bolt M.18 + 2 nut S 3,430.00 2,980.00
272 U - Strap - TM - (l=44mm, t=6mm) B 3,430.00 2,980.00
273 L Bow PVC 2" B 2,720.00 2,370.00
274 L Bow PVC 3" B 2,720.00 2,370.00
275 Union Zadel 5/8 mm B 580.00 500.00
276 Verlenk stuck Pipa 3" - 3 mt - Medium S 44,120.00 38,360.00
277 Verlenk stuck Pipa 4" - 3 mt - Medium S 63,970.00 55,620.00
278 Verlenk stuck Pipa 4" - 4 mt - Medium S 67,120.00 58,360.00
279 Verlenk stuck Square Pipe 75x75x3,0 - 2 mt S 24,960.00 21,700.00
280 Voetstuken lengkap dng bolt & nut B 0.00 0.00
281 Wire Clip (510/U/2009) S 3,410.00 2,960.00
282 1 Unit External PT 20 kV (phasa-phasa) S 255,890.00 222,510.00
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel da S 272,950.00 237,350.00
284 Setting LBS Motorized S 682,390.00 593,380.00
285 Line Tap Connector Cu - 25 mm / Klem C (507/U/2009) B 5,110.00 4,450.00
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 5,410.00 4,700.00
287 Line Tap Connector Cu - 150 mm / Klem C (507/U/2009) B 7,350.00 6,390.00
288 Bongkar Konstruksi TM-1 Murni & Retour S 81,880.00 71,200.00
289 Bongkar Konstruksi TM-1 Numpang & Retour S 102,350.00 89,000.00
290 Plat nama Penyulang Besar Double 0 5,450.00 4,740.00
291 Plat nama Penyulang Kecil 0 3,520.00 3,060.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

292 Plat Tembaga Uk.400 x 80 x 5 (untuk jumper Termination) B 10,230.00 8,900.00


293 Plat Tembaga Uk.600 x 50 x 5 (untuk jumper Termination) B 11,370.00 9,880.00
294 Pipa PVC 4" & Tutup jumperan B 10,230.00 8,900.00
295 Cross Arm type 1.200 NP. 10 B 11,370.00 9,880.00
296 Segel Plastik B 850.00 740.00
297 Plat Tembaga 600 X 50 X5 0 11,370.00 9,880.00
298 Galian Aspal & pengurugan kembali Aspal (tebal Aspal 30 cm + M3 240,840.00 209,430.00
299 LV Insulator A1 B 5,110.00 4,450.00
300 Multi Chamber Arreter 24 kV - 1,5 kA MCA S 27,290.00 23,730.00
301 Glass Indicator MCA B 3,590.00 3,120.00
302 Bracket Protection Device / Fitting Clamp MCA B 2,350.00 2,040.00
303 Conductor Clamp + Bolt & Nut MCA S 4,010.00 3,490.00
304 Twisted Cable 4 x 35 mm² M 7,870.00 6,840.00
305 Terminal Lug 240 mm - Al / Cu - 2 Hole (507/U/2009) B 11,370.00 9,880.00
306 0 0 0.00 #DIV/0!
307 0 0 0.00 #DIV/0!
308 0 0 0.00 #DIV/0!
309 0 0 0.00 #DIV/0!
310 0 0 0.00 #DIV/0!
311 0 0 0.00 #DIV/0!
312 0 0 0.00 #DIV/0!
313 0 0 0.00 #DIV/0!
314 0 0 0.00 #DIV/0!
315 0 0 0.00 #DIV/0!
316 0 0 0.00 #DIV/0!
317 0 0 0.00 #DIV/0!
318 0 0 0.00 #DIV/0!
319 0 0 0.00 #DIV/0!
320 0 0 0.00 #DIV/0!
321 0 0 0.00 #DIV/0!
322 0 0 0.00 #DIV/0!
323 0 0 0.00 #DIV/0!
324 0 0 0.00 #DIV/0!
325 0 0 0.00 #DIV/0!
326 0 0 0.00 #DIV/0!
327 0 0 0.00 #DIV/0!
328 0 0 0.00 #DIV/0!
329 0 0 0.00 #DIV/0!
330 0 0 0.00 #DIV/0!
331 0 0 0.00 #DIV/0!
332 Pipa Galvanized 3" - 4 meter (tebal= 2,5 mm) B 0.00 27,380.00
333 Pipa Galvanized 3/4" - 6 meter (tebal= 1,6 mm) B 0.00 10,720.00
334 Pipa Galvanized 1" - 6 meter (tebal= 2,0 mm) B 0.00 5,470.00
335 Pipa Galvanized 1,5" - 6 meter (tebal= 2,0 mm) B 0.00 5,930.00
336 Pipa Galvanized 2" - 6 meter (tebal= 2,5 mm) B 0.00 23,730.00
337 Pipa Galvanized 3" - 6 meter (tebal= 2,5 mm) B 0.00 35,600.00
338 Pipa Galvanized 4" - 6 meter (tebal= 3,2 mm) B 0.00 50,860.00
339 Pipa Galvanized 5" - 6 meter (tebal= 4,0 mm) B 0.00 71,200.00
340 Pipa Galvanized 6" - 6 meter (tebal= 5,0 mm) B 0.00 98,020.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

341 Cross Arm UNP 100 x 50 x 5 - 2.500 - tumpu (501/U/2009) B 0.00 21,700.00
342 Besi siku 50 x 50 x 4 -900 mm B 0.00 7,120.00
343 Klem Begel U 7" - TM - (l=44mm, t=6mm) B 0.00 3,560.00
344 Klem Begel U 8" - TM - (l=44mm, t=6mm) B 0.00 4,690.00
345 Pipa Air 3" - 1 meter ( medium ) + Sock Draad 3" B 0.00 11,860.00
346 Pipa Air 2" - 1 meter ( medium ) + Sock Draad 2" B 0.00 9,120.00
347 Pipa Air 3" - 2 meter ( medium ) + Sock Draad 3" B 0.00 11,860.00
348 Pipa Air 2" - 2 meter ( medium ) + Sock Draad 2" B 0.00 4,330.00
349 Pipa Air 3" - 1,5 meter ( medium ) u/ bawah LV Panel B 0.00 11,860.00
350 Pipa Air 2" - 1,5 meter ( medium ) u/ bawah LV Panel B 0.00 9,120.00
351 Cross Arm type 2.000 NP. 8 B 0.00 18,350.00
352 Cross Arm type 2.000 NP.10 B 0.00 20,860.00
353 Heat Shrink u/ tanda phasa B 0.00 2,130.00
354 Cross Arm type 2.500 NP. 65 B 0.00 8,010.00
355 Besi Siku L 50 x 50 x 1000 Tiang Pagar luar kiri & kanan S 0.00 7,120.00
356 Besi Siku L 50 x 50 x 2500 u/ Pelat Bordes S 0.00 8,900.00
357 Besi Siku L 50 x 50 x 2500 u/ pengaman pagar belakang S 0.00 8,900.00
358 Besi Siku L 50 x 50 x 260 u/ tempat kayu penghalang S 0.00 2,130.00
359 Besi Siku L 50 x 50 x 465 u/ penghubung S 0.00 2,980.00
360 Cross Arm type 1.500 NP - 8 S 0.00 8,090.00
361 Cross Arm type 750 NP - 8 u/ dudukan trafo S 0.00 4,230.00
362 Pelat Bordes 2500 x 30 x 3 S 0.00 11,860.00
363 Penghalang kayu jati 60 x 40 x 2500 / Besi siku L.50.50.4,5 S 0.00 2,130.00
364 Tiang Beton 12 - 200 daN + E (524/U/2009) B 0.00 809,160.00
365 LV Panel 250A s/d 400A, lubang atas S 0.00 556,290.00
366 AAAC - S 150 sqmm ( ex. J - Proc ) M 0.00 296,690.00
367 0 0 0.00 #DIV/0!
368 0 0 0.00 #DIV/0!
369 0 0 0.00 #DIV/0!
370 0 0 0.00 #DIV/0!
371 0 0 0.00 #DIV/0!
372 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS ( ex. J - Proc ) M 0.00 #DIV/0!
373 NA2XSEYBY 3 x 240 mm2 ( ex. J - Proc ) M 0.00 #DIV/0!
374 AAAC 150 sqmm ( ex. E - Proc ) M 0.00 1,870.00
375 AAAC - S 150 sqmm ( ex. E - Proc ) M 0.00 2,520.00
376 0 0 0.00 #DIV/0!
377 0 0 0.00 #DIV/0!
378 0 0 0.00 #DIV/0!
379 0 0 0.00 #DIV/0!
380 0 0 0.00 #DIV/0!
381 LV Panel 630A, 4 Jurusan (SPLN D3.016-1 : 2010)-LBS S 0.00 356,030.00
382 LV Panel 250A, 2 Jurusan (SPLN D3.016-1 : 2010)-MCCB S 0.00 296,690.00
383 Conn.press Al 35-50 mm + cover vinil untuk kumisan B 0.00 4,450.00
384 Line Tap Connector ( type press ) 6-25 / 35-70 mm + heatshrin B 0.00 7,240.00
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth B 0.00 7,240.00
386 TC 35 mm - 50 cm untuk kumisan M 0.00 1,920.00
387 TC 3 x 70 + 1 x 50 sqmm ( ex. E - Proc ) M 0.00 7,410.00
388 Ground Wire Clamp Type A - TM - (l=50mm, t=6mm, p=300mm B 0.00 4,580.00
389 Ground Wire Clamp Type B - TM - (l=50mm, t=6mm, p=300mm B 0.00 4,580.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

390 Ground Wire Clamp Type C - TM - (l=50mm, t=6mm, p=300mm B 0.00 4,680.00
391 Cousen/Thimble - (t=2,5mm) B 0.00 1,070.00
392 Preformed Termination 22 mm B 0.00 7,910.00
393 Wire Clip 22 mm B 0.00 2,960.00
394 Galvanized Steel Wire 22 mm M 0.00 1,420.00
395 Bolt & Nut M.8 x 30 B 0.00 1,010.00
396 Suspension Clamp 50 mm B 0.00 1,920.00
397 Strain Clamp 50 mm B 0.00 3,230.00
398 Single Guy Wire Band 6" - TR - (l=35mm, t=6mm) S 0.00 8,950.00
399 Single Arm Band 6" - TR (l=35mm, t=6mm) B 0.00 5,360.00
400 Square pipe 75 x 75 x 3 - 3000 B 0.00 19,600.00
401 L Bow Besi 2" B 0.00 2,960.00
402 L Bow Besi 3" B 0.00 3,230.00
403 Bundl.Cond.3x50 + 1x35 mm - 50 cm ( kumis ) B 0.00 4,450.00
404 Cross Arm UNP 100 x 50 x 5 - 2.000 - tarik - (l=50mm, t=5mm B 0.00 20,860.00
405 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu - (l=50mm, t=5 B 0.00 20,860.00
406 C Clamp 25 mm B 0.00 4,450.00
407 Square pipe 75 x 75 x 3,2 - 3000 - tumpu (522/U/2009) B 0.00 30,170.00
408 Square pipe 75 x 75 x 3,2 - 6000 - tumpu (522/U/2009) B 0.00 37,870.00
409 Pipa Air 3" - 2 meter ( medium 2,5mm ) B 0.00 9,880.00
410 Disconnecting Switch 20 kV - … A Out Door U 0.00 86,920.00
411 Disconnecting Switch 20 kV - … A In Door - 25,8 kV U 0.00 86,920.00
412 Besi Siku L 50x50x4,5 mm - 2500 mm B 0.00 17,800.00
413 Single Guy Wire Band 8" - TM (l=44mm, t=3,5 mm) untuk Grou S 0.00 10,720.00
414 Arm Tie Band 8" ~ 9" - - TM (l=44mm, t=3,5 mm) untuk Grou S 0.00 10,720.00
415 APIK 1 ( Posisi di Insulator @ 1 mtr = 3 bh) Titik 0.00 3,560.00
416 APIK 2 ( Posisi di Konduktor @ 4 meter ) Mtr 0.00 3,560.00
417 Live Line Connector / LTC 50-150 B 0.00 17,800.00
418 Live Line Connector / LTC 70-150 B 0.00 17,800.00
419 Polymer Cut Out Switch 24 Kv - 100 kA S 0.00 23,730.00
420 Polymer Arrester 24 kV - 10 kA S 0.00 19,770.00
421 Battery Charger ( input 220 VAC, Output 24VDC, 65 Ah ) S 0.00 635,770.00
422 Automatic Transfer Switch lengkap dg Box S 0.00 508,610.00
423 DS out door 25,8 kV - 800 A S 0.00 72,650.00
424 LBS Motorized + RTU + Kabel Data S 0.00 1,186,770.00
425 Recloser Motorized + RTU + Kabel Data S 0.00 1,186,770.00
426 Cubicle Pelanggan (LBS Non Motorized ) Unit 0.00 1,186,770.00
427 Cubicle Pelanggan ( CBOM ) Unit 0.00 1,186,770.00
428 Besi Siku L 50x50x3,2 mm - 6000 mm B 0.00 22,530.00
429 Suspension Clamp Bracket ( Load 700 kg ) B 0.00 2,980.00
430 Suspension Clamp B 0.00 3,560.00
431 Tension Bracket ( Load 600 kg ) B 0.00 2,980.00
432 Strain Clamp (TR) B 0.00 1,920.00
433 PVC 2" - 50 cm B 0.00 2,960.00
434 Dead End Tubes / Bundled End Protection + komplit B 0.00 2,540.00
435 Plastic Strap B 0.00 1,180.00
436 Isolated All. Binding - 4 mm Ø 6 M 0.00 1,970.00
437 Cross Arm UNP 100 x 50 x5 - 2.500 - tumpu B 0.00 21,730.00
438 Pipa Air 2" - 2 meter ( medium ) B 0.00 12,270.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

439 Galian tanah & pengurugan kembali M3 0.00 148,340.00


440 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type B 0.00 25,430.00
441 Ground Wire Clamp Type A ( Khusus Verlenk ) B 0.00 2,980.00
442 Kotak Box Terminal ( persiapan SLO ) B 0.00 590.00
443 LBS Motorized Non RTU S 0.00 1,186,770.00
444 LVCO + ACCESOSORIESS B 0.00 59,330.00
445 Joint Sleeve Non Tenion 150 mm B 0.00 12,710.00
446 Klem C - 25/25 mm - Cu B 0.00 4,450.00
447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm S 0.00 7,910.00
448 Tanda Bahaya Kecil B 0.00 1,140.00
449 Under Frequency Relay ( UFR ) S 0.00 247,240.00
450 Digital Timer range time 0 - 30 hari B 0.00 71,200.00
451 NYAF 1,5 mm² ( SPLN ) M 0.00 2,130.00
452 MCCB 63 s/d 300 A B 0.00 42,380.00
453 Sock Draad Besi 3" - 4" B 0.00 8,090.00
454 OA Kast type I C1 Sistim Press cat powder coating B 0.00 2,920.00
455 ZCT 50/5 - 100/5 A B 0.00 191,820.00
456 Gembok Electronic B 0.00 7,910.00
457 NYY 4 x 4 mm u/ Wirring Panel M 0.00 7,240.00
458 NYY 4 x 6 mm u/ Wirring Panel M 0.00 8,950.00
459 Asuransi Material Lot 0.00 #DIV/0!
460 Angkutan Material km/ton 0.00 #DIV/0!
461 Preformed Termination 110 mm B 0.00 10,780.00
462 Polymer Pin Insulator 20 kV S 0.00 4,680.00
463 Polymer Strain Insulator 20 kV lengkap (SIR) S 0.00 8,090.00
464 Plat Tembaga untuk sambungan Termination + baut B 0.00 13,690.00
465 Begel Klem kaca mata + Bolt 3 u/Steel 70 mm B 0.00 12,710.00
466 Guy Insulator LV (TR) - belimbing B 0.00 2,980.00
467 Guy Insulator MV (TM) - belimbing B 0.00 3,830.00
468 Pipa Wespex 25 mm untuk AAAC 150mm M 0.00 14,830.00
469 Preformed Side Tie Double 150mm (Semi Cond/non metalic/C B 0.00 3,830.00
470 LV Panel 250A, 2 Jurusan (SPLN D3.016-1 : 2010)-LBS S 0.00 296,690.00
471 LV Panel 400A, 4 Jurusan (SPLN D3.016-1 : 2010)-LBS S 0.00 356,030.00
472 Preformed Top Tie 150mm (Semi Cond/non metalic/Composite B 0.00 5,930.00
473 Preformed Side Tie 150mm (Semi Cond/non metalic/Composit B 0.00 3,830.00
474 Pipa Air 2" - 5 meter ( medium ) (555/U/2009) B 0.00 10,170.00
475 Pipa Air 2" - 1 meter ( medium ) + draad u/L Bow besi B 0.00 9,120.00
476 Pipa Air 3" - 1 meter ( medium ) + draad u/ L Bow besi B 0.00 11,860.00
477 L Bow 3" besi + sock draad dalam B 0.00 7,120.00
478 L Bow 2" besi + sock draad dalam B 0.00 5,930.00
479 Pipa Air 2" - 1,5 meter ( medium ) + draad u/L Bow besi B 0.00 9,120.00
480 Pipa Air 3" - 1,5 meter ( medium ) + draad u/ L Bow besi B 0.00 11,860.00
481 Bolt M.12 x 30 + Washer Cu B 0.00 1,180.00
482 Galvanized Steel Wire 110 mm M 0.00 1,880.00
483 Tekep (MV Cover) B 0.00 7,120.00
484 Semi Cond. Preformed Top Tie B 0.00 5,930.00
485 Semi Cond. Preformed Side Tie B 0.00 3,830.00
486 Potensial Trafo (PT) 20 kV - Outdoor B 0.00 50,860.00
487 Current Trafo (CT) 20 kV - Outdoor B 0.00 50,860.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

488 Meter Elektronik (ME) 3 ph - 4 W , teg: 57,7/100V; Arus :5A. Cl S 0.00 298,680.00
489 Kotak APP type VI 1 (satu) pintu/kaca S 0.00 178,010.00
490 NYY 4 x 10 mm u/ Wirring CT M 0.00 13,180.00
491 Mountage PT-CT Exim Ls 0.00 19,770.00
492 Gaspijp 1,5" - 4,0 m, Galvanized B 0.00 9,120.00
493 Cross Arm type 1.200 NP. 8,0 B 0.00 5,970.00
494 Live Line Connector 150 - 240 mm B 0.00 17,800.00
495 Dudukan : Trafo Cantol, Pipa Kabel, PHB-TR & Dudukan Arreste S 0.00 319,590.00
496 Dudukan : Trafo Portal, Pipa Kabel, PHB-TR & Dudukan Arreste S 0.00 431,030.00
497 Semi Cond. Preformed Side Tie Double B 0.00 4,680.00
498 PHB - TR 2 Jurusan 400 A - SPLN D5.016.1 : 2010 B 0.00 356,030.00
499 Tiang Beton 14 - 500 daN + E B 0.00 1,483,460.00
500 Plat Extension GW 0 0.00 1,270.00
501 Double Arm Band 6" - TM (l=44mm, t=6mm) B 0.00 10,720.00
502 Arm Tie Band 7" - TM B 0.00 10,650.00
503 Bolt & Nut M.16 x 110 S 0.00 1,150.00
504 Jointing Termination 3 X 240 + 1 x 95 mm S 0.00 1,186,770.00
505 Cross Arm type 3.000 NP. 6,5 B 0.00 13,180.00
506 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type B 0.00 25,430.00
507 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type B 0.00 25,430.00
508 Pipa Air 3" - 2 meter ( medium 2,5mm ) + Plat GW Clamp Type B 0.00 25,430.00
509 Single Guy Wire Band 6"-7" - Lebar 35, tebal 3,5 mm - GSW S 0.00 10,720.00
510 Single Guy Wire Band 3"-4" - Lebar 35, tebal 3,5 mm - GSW S 0.00 6,400.00
511 Cross Arm type 500 - NP. 10 B 0.00 6,380.00
512 Cross Arm type 1.000 NP.10 B 0.00 10,650.00
513 Dudukan Recloser lengkap B 0.00 254,300.00
514 Dudukan LBS Motorized lengkap B 0.00 254,300.00
515 1 Unit External CT 20 kV Oout Door S 0.00 222,510.00
516 Klem C - 150/35 mm - Cu B 0.00 4,450.00
517 PMCB Out Door 24 kV lengkap U 0.00 593,380.00
518 Load Break Switch 24 kV-630 A Motorized 12,5 kA non RTU S 0.00 1,186,770.00
533 Cross Arm UNP 80 x 45 x 3,2 - 2.000 S 0.00 10,650.00
534 Angkutan Material Ton/M3 0.00 #DIV/0!
535 Asuransi Material PLN Ls 0.00 #DIV/0!
536 Commisioning test Jaringan JTM Loks. 0.00 356,030.00
537 Commisioning test Jaringan Kabel JTM Loks. 0.00 2,225,190.00
538 Commisioning test GD Loks. 0.00 296,690.00
539 Commisioning test JTR Loks. 0.00 222,510.00
540 Commisioning test LBS / Recloser Loks. 0.00 712,060.00
541 Safety Cost K3L Pek. 0.00 161,830.00
542 Commisioning SR 1 Phasa Loks. 0.00 7,120.00
543 Commisioning SR 3 Phasa Loks. 0.00 35,600.00
544 0 0 0.00 #DIV/0!
545 0 0 0.00 #DIV/0!
546 0 0 0.00 #DIV/0!
547 0 0 0.00 #DIV/0!
548 0 0 0.00 #DIV/0!
549 0 0 0.00 #DIV/0!
550 0 0 0.00 #DIV/0!
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

551 0 0 0.00 #DIV/0!


552 0 0 0.00 #DIV/0!
553 0 0 0.00 #DIV/0!
554 0 0 0.00 #DIV/0!
555 0 0 0.00 #DIV/0!
556 0 0 0.00 #DIV/0!
557 0 0 0.00 #DIV/0!
558 0 0 0.00 #DIV/0!
559 0 0 0.00 0.00
560 Persiapan 0 0.00 0.00
561 Perencanaan, pendataan utilitas Jaringan, ijin penggalian & SP lokasi 0.00 712,060.00
562 Direksi
- LampuKITT
LS -(2x4 mtr)"Ada
Rambu = 8 m2
pengerjakaan Pengeboran" lokasi 0.00 809,160.00
563 - Trafic Cone Lot 0.00 1,618,320.00
564 Pekerjaan Galian dan Perbaikan Lubang HDD (3,0x1,3x1,5) m3 0 0.00 0.00
565 Pada tanah Keras/Koral Berm Titik 0.00 273,870.00
566 Pada Tanah Biasa/Rumput/Taman Titik 0.00 243,850.00
567 Pada Trotoar Inter Blok Titik 0.00 574,240.00
568 Pada Trotoar Floor Beton Titik 0.00 593,380.00
569 Pada Jala Lapis Penutup Hotmix Lebar Jalan > 7 m Titik 0.00 2,966,920.00
570 Pada Jalan Lapis Paving Block Titik 0.00 1,271,540.00
571 Pada Jalan dengan Konstruksi Beton Segmen Uk. 3,5 x 5 m2 Titik 0.00 2,543,080.00
572 Pekerjaan Pengeboran HDD 0 0.00 0.00
573 Pendataan & Penyuntikan Utilitas Terpasang Titik 0.00 44,500.00
574 Pagar Pengaman (Spandek) Go Green Standar PEMDA Bh 0.00 356,030.00
575 Mobilisasi Mesin Boring HDD & Perlengkapannya Rit 0.00 3,560,310.00
576 Demobilisasi Mesin Boring HDD & perlengkapannya Rit 0.00 3,236,640.00
577 Pengeboran Pipa Diameter 8" tanpa casing Mtr 0.00 712,060.00
578 Pengadaan dan Pemasangan 0 0.00 0.00
579 Pipa HDPE PN 12,5/PE 100 SDR 13,6 diameter 6" 180 mm, Ke Mtr 0.00 42,380.00
580 Karet pelindung Kabel untuk menahan air & tanah (reducer) Bh 0.00 8,900.00
581 Pengikat Reducer bagian depan (klem) untuk menahan air & tan Bh 0.00 35,600.00
582 Pengikut Reducer bagian depan (klem) untuk menahan air & tan Bh 0.00 35,600.00
583 Pengelasan Pipa HDPE Batang 0.00 129,800.00
584 Tali Pancing Mtr 0.00 8,090.00
585 Papan penahan Tanah M3 0.00 89,000.00
586 Penandaan lokasi untuk Patok Boring/Kabel Bh 0.00 5,080.00
587 Foto Dokumentasi 1set (12 lembar) Set 0.00 0.00
588 AS BULIT DRAWING 1:5000 (1 kalkir + 5 Blue Print) Set 0.00 0.00
589 AS BULIT DRAWING 1:200 (1 kalkir + 5 Blue Print+ 1 film) Mtr 0.00 0.00
590 Pengadaan/Pengangkutan Air untuk Boring Ltr 0.00 0.00
591 Pembersihan Pekerjaan (umum) lokasi 0.00 445,030.00
592 Dop HDPE Bh 0.00 7,120.00
593 Pengadaan Timah Lebel Bh 0.00 5,080.00
594 Pengadaan Batu Pengaman Bh 0.00 5,470.00
595 Pekerjaan Penarikan Kabel 0 0.00 0.00
596 Angkutan SKTM 20 kV 3x240 mm/300 mm, 1 Haspel Rit 0.00 1,424,120.00
597 Angkutan SKTM 20 kV 3x240 mm/300 mm, 3 Haspel Rit 0.00 1,873,840.00
598 Angkutan SKTM 20 kV 3x240 mm/300 mm, (50 - 200 meter) Rit 0.00 508,610.00
599 Penarikan SKTM 20 kV 3x240 mm/300 mm dengan mesin Win Mtr 0.00 39,550.00
ZONA-2

MJK, MLG

No Material Sat Maksimal Minimal


1,630.00 1,420.00

600 Pelindung (Dop Kabel) 3x240 mm/300 mm Bh 0.00 8,900.00


601 Pekerjaan Penarikan Kabel 0 0.00 0.00
602 Pasir Urug 20 cm M3 0.00 9,120.00
603 Pekerjaan Penunjang 0 0.00 0.00
604 Transportasi Pembuangan tanah bekas galian M3 0.00 123,190.00
605 Penjagaan pekerjaan HKL 0.00 148,340.00
606 0 0 0.00 #DIV/0!
PT.PLN (PERSERO) DISTRIBUSI JAWA TIMUR
AREA : DISJATIM
ROADMAP PRK ANGGARAN INVESTASI
TAHUN 2018

Volume per tahun


NO KEGIATAN SAT Keteranga HARGA SATUAN
n
2018 2019 2020
1 2 3 7 8 9 10 11
I PROGRAM PERKUATAN JARINGAN
1 Rekonfigurasi JTM Pyl 121.00 5 -
- JTM - AAAC-S 150 mm2 kms 170.25 6.51 - 477,365
- JTM - AAAC-S 240 mm2 kms 5.52 - - 533,896
- MVTIC 3X150 mm2 + 1X95 mm2 kms 30.94 0.06 - 861,899
- MVTIC 3X240 mm2 + 1X95 mm2 kms - - - 911,899
- UGC MV, 3x150 mm2 kms 2.64 - - 1,193,106
- UGC MV, 3x240 mm2 kms 0.16 - - 1,417,880
2 Rekonfigurasi JTR
- JTR - TIC 3x70 + 1x50 mm2 kms 38.23 - - 204,884
3 Pembangunan Penyulang Baru untuk Pecah beban Pyl
- Jumlah Penyulang buah 32.00 - -
- JTM - AAAC-S 150 mm2 kms 222.33 - - 477,365
- JTM - AAAC-S 240 mm2 kms 58.09 - - 533,896
- MVTIC 3X150 mm2 + 1X95 mm2 kms 29.42 - - 861,899
- MVTIC 3X240 mm2 + 1X95 mm2 kms 2.68 - - 911,899
- UGC MV, 3x150 mm2 kms 0.85 - - 1,193,106
- UGC MV, 3x240 mm2 kms 6.06 - - 1,417,880
4 Pembangunan Penyulang Baru untuk Operasi GI baru
- Jumlah Penyulang buah 20.00 - - -
- JTM - AAAC-S 150 mm2 kms 75.03 - - - 477,365
- JTM - AAAC-S 240 mm2 kms - - - - 533,896
- MVTIC 3X150 mm2 + 1X95 mm2 kms 26.02 - - - 861,899
- MVTIC 3X240 mm2 + 1X95 mm2 kms - - - - 911,899
- UGC MV, 3x150 mm2 kms 0.90 - - - 1,193,106
- UGC MV, 3x240 mm2 kms 2.84 - - - 1,417,880
5 Rehabilitasi JTM
PT.PLN (PERSERO) DISTRIBUSI JAWA TIMUR
AREA : DISJATIM
ROADMAP PRK ANGGARAN INVESTASI
TAHUN 2018

Volume per tahun


NO KEGIATAN SAT Keteranga HARGA SATUAN
n
2018 2019 2020
- JTM - AAAC-S 150 mm2 kms 55.93 1,685.54 - - 328,365

- JTM - AAAC-S 240 mm2 kms - 69.44 - - 298,365

- MVTIC 3X150 mm2 + 1X95 mm2 kms 4.45 51.62 - - 616,464

- MVTIC 3X240 mm2 + 1X95 mm2 kms - - - - 764,493


6 Rehabilitasi JTR kms -
- JTR - TIC 3x70 + 1x50 mm2 kms 81.21 859.11 - 113,884
7 Pemasangan GSW (Ground Shield Wire) kms 1,696.76 31.25 - 53,917
Penyempurnaan Konstruksi per Penyulang / Penggantian Material Tua
8 Jaringan
- Lightning Arrester (Polymer) bh 4,568.00 201.00 - 998
- Fuse Cut Out (Polymer) bh 3,868.00 62.00 - 1,145
- Pin Post Isolator bh 7,192.00 41.00 - 263
- Strain Rod Isolator bh 2,024.00 - - 431
- LVCO menjadi LV Panel 2 Jurusan bh 136.00 - - 59,597
- LV Panel Keropos + kabel (lv panel 2 jurusan) bh 460.00 1.00 - 59,597
- LV Panel Keropos + kabel (lv panel 4 jurusan) bh 90.00 9.00 - 49,060
-Cross Arm bh 87.00 450
- Tiang besi TM 13 mtr keropos bh 29.00 7,508
- Disconnecting Switch set 95.00 15,000
- Pemutus Beban lebih Trafo bh 5,120.00 936
- Pengaman Bushing Trafo (Polymer Rubber) bh 12,000.00 127
- Insulation Pull Polymer Rubber bh 3,200.00 328
10 Penggantian Trafo tua / cadang
- 50 KVA TAP KHUSUS buah 160.00 32,574
- 50 KVA buah 94.00 - - - 47,907
- 100 KVA buah 566.00 - - - 52,907
- 160 KVA buah 517.00 - - - 61,450
- 200 KVA buah 185.00 - - - 62,055
PT.PLN (PERSERO) DISTRIBUSI JAWA TIMUR
AREA : DISJATIM
ROADMAP PRK ANGGARAN INVESTASI
TAHUN 2018

Volume per tahun


NO KEGIATAN SAT Keteranga HARGA SATUAN
n
2018 2019 2020
- 250 KVA buah 133.00 - - - 68,055
11 Pengadaan dan Pemasangan Key Point
- PMCB 20 Kv set 32.00 230,096
- Recloser 20 kV 400 A + RTU set 111.00 9.00 - 213,060
- LBS Motorized set 311.00 2.00 - 152,425
- LBS Motorized 20kV 400A tanpa RTU set - 2.00 - 87,846
- LBS Motorized 3 way set 80.00 382,883
- Elektronik Motorized set 20.00 35,200
- Disconecting Switch Polymer set 160.00 17,040
12 Penggantian cubicle tua pelanggan set
- Cubicle Single Incoming set 33.00 211,930
- Cubicle Single Incoming Full Gas Insulated set 29.00 506,101
- Cubicle Double Incoming set 2.00 324,450
- Cubicle Double Incoming Full Gas Insulated set 9.00 792,368
23 Pengadaan Peralatan PDKB & Peralatan Emergensi set -
Peralatan PDKB TM 20 KV Berjarak (Penggantian) set 13.00 553,726
Peralatan PDKB TM 20 KV Sentuh Langsung set 1.00 2,254,726
Mobil PDKB set 1.00 4,235,000
Unit Gardu Bergerak 200 kVA set 32.00 410,000
Mobile Crane 3 ton set 2.00 1,017,500
Peralatan PDKB TM 20KV Berjarak (Baru) set 1.00 7,150,000
Mobile Genset 250 kVA set 1.00 299,200
Line Live Connetor (LLC) 35 - 70 mm bh 350.00 242
Line Live Connetor (LLC) 70 - 150 mm bh 7,590.00 264
Line Live Connetor (LLC) 150 - 240 mm bh 1,245.00 286
24 Pengadaan peralatan PDKB sentuh langsung set -
25 Penggantian Peralatan Kerja PDKB dan Alat Bantu set -
26 Pengadaan Genset 150 KVA set 1.00
27 Pengadaan Trafo Mobil 250 kVA set
28 Pengadaan Peralatan Investigasi dan Alat Uji
U
s
u
l
KEBUTUHAN ANGGARAN KEBUTUHAN ANGGARAN KEBUTUHAN ANGGARAN a
n
2018 2019 2020
A
12 13 14 r
e
a

81,271,570.34 3,107,643.87 -
2,948,171.50 - -
26,667,585.67 51,713.94 -
- - -
3,149,799.18 - -
226,860.82 - -
- - -
7,832,499.99 - -
- - -
- - -
106,132,482.63 - -
31,014,529.30 - -
25,354,482.56 - -
2,444,801.19 - -
1,014,139.89 - -
8,586,682.01 - -
- - -
- - -
35,818,579.15 - -
- - -
22,427,473.59 - -
- - -
1,073,795.17 - -
4,026,779.54 - -
- - -
U
s
u
l
KEBUTUHAN ANGGARAN KEBUTUHAN ANGGARAN KEBUTUHAN ANGGARAN a
n
2018 2019 2020
A
r
18,364,778.15 553,472,617.20 - e
a
- 20,716,949.47 -

2,743,266.80 31,819,922.22 -

- - -
- - -
9,248,106.83 97,838,903.81 -
91,483,720.98 1,684,739.19 -
- - -
4,556,580.00 200,497.50 -
4,426,926.00 70,959.00 -
1,887,900.00 10,762.50 -
871,332.00 - -
8,105,185.20 - -
27,414,597.00 59,596.95 -
4,415,418.00 441,541.80 -
39,150.00
217,717.50
1,425,000.00
4,790,896.00
1,518,000.00
1,048,960.00
- - -
5,211,840.00 - -
4,503,295.60 - -
29,945,588.40 - -
31,769,753.40 - -
11,480,175.00 - -
U
s
u
l
KEBUTUHAN ANGGARAN KEBUTUHAN ANGGARAN KEBUTUHAN ANGGARAN a
n
2018 2019 2020
A
9,051,315.00 - - r
e
- - - a
7,363,072.00
23,649,660.00 1,917,540.00 -
47,404,175.00 304,850.00 -
- 175,692.00 -
30,630,640.00 - -
704,000.00 - -
2,726,400.00 - -
- - - APD
6,993,698.76 - -
14,676,926.19 - -
648,900.00 - -
7,131,309.81 - -
- - -
7,198,438.50
2,254,726.10
4,235,000.00
13,120,000.00 -
2,035,000.00
7,150,000.00
299,200.00
84,700.00
2,003,760.00
356,070.00
- - -
- - -
- - -
- - -
- - -
KESEPAKATAN ANGGARAN MATERIAL DAN JAS
UP3 MALANG

PRK SUB PRK

I PROGRAM PERKUATAN JARINGAN

1.1 Rekonfigurasi JTM

1.2 Rekonfigurasi JTR

1.3 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Pecah beban

1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Operasi GI Baru

1.5 Rehabilitasi JTM - (JTM, MVTIC)

1.6 Rehabilitasi JTR - (LVTC)

1.7 Pemasangan GSW (Ground Shield Wire)

1.8 Penyempurnaan Konstruksi Per Penyulang / Penggantian Material Tua

1.9 Penggantian Trafo Tua

1.16 Evakuasi Daya

II PROGRAM PENURUNAN SUSUT DISTRIBUSI

2.1 Uprating Jaringan TM (JTM,MVTIC)

2.2 Uprating Jaringan TR (LVTC)

2.3 Trafo Sisipan dan Jaringan penunjang

2.6 Penambahan SUTR untuk Tegangan drop ( seri SR Renteng diatas 5)


AN MATERIAL DAN JASA
LANG

MDU NON MDU JASA TOTAL

47,495,253,126 14,478,841,603 6,935,398,292 68,909,493,021

4,511,774,883 1,233,536,601 524,234,042 6,269,545,526

0 0 0 0

4,523,753,581 2,026,427,150 519,827,738 7,070,008,469

0 0 0 0

24,367,035,525 1,956,043,419 3,934,279,927 30,257,358,871

977,611,635 188,151,062 380,801,923 1,546,564,620

0 6,076,219,776 586,096,754 6,662,316,530

3,700,629,158 983,002,906 339,305,632 5,022,937,695

2,698,861,770 369,142,202 200,367,352 3,268,371,324

6,715,586,576 1,646,318,487 450,484,924 8,812,389,986

17,445,805,872 3,551,281,148 3,135,920,629 24,133,007,648

6,920,240,250 1,036,695,865 1,269,571,322 9,226,507,436

3,015,402,390 432,176,047 1,091,473,624 4,539,052,061

6,446,891,022 1,590,155,956 479,673,568 8,516,720,546

1,063,272,210 492,253,281 295,202,114 1,850,727,605


PRK.2019 UMK 3,510,773 Kab Malang

I. PROGRAM PERKUATAN JARINGAN (PRK.2019.DJT.1.1)


1.1 Rekonfigurasi JTM

Uraian & Lokasi MALANG

SURVEY Koordinat Exsisiting

KONSTRUKSI
No. LOKASI EXSIST./ PENYULANG No. GAMBAR
Petugas

S - 07.19.516'
Rayon

E - 112.47.576'

M
UB
M
2019 NGT TM8 SROMO SD TM8 PAKAN NGANTANG NGT.2019.XXXXXX
UB
M
2019 TMP DUSUN REKESAN JABUNG GUNUNG JATI 1.1.001
UB
M
1 TMP
UB
M
2 TMP
UB
P.BEDALI DGN LWG.2019.1.1.001 M
LWG DESA SETRAN / LWG P.SUMBERWUNI UB

P.NONGKOJAJAR LWG.2019.1.1.002 M
LWG JL.Sumber Waras / LWG DGN P.SUMBERWUNI UB

P. MATOS DG P. M
DNY JL. TRS RY DIENG / DINOYO TELKOM UB

P. Grahadewata M
DNY JL. Ters Sigura-gura dan Galunggung UB

P. MAWAR DG P. M
DNY Jl. Telaga Wangi GLINTUNG UB
SEKARPURO M
BLB JL. KAPIWORO SAWOJAJAR/ BLB BLB.2019.1.1.001
UB
PANDANWANGI M
BLB JL. TELUK GRAJAKAN / BLB BLB.2019.1.1.002
UB
WISNUWARDANA M
BLB PR DIRGANTARA SAWOJAJAR BLB.2019.1.1.004
UB
WENDIT M
BLB J RY PANJISUROSO BLB.2019.1.1.005
UB
WENDIT M
BLB JL SUNANDAR PRIYO SUDARMO BLB.2019.1.1.006
UB
M
UB

458,064,000 1,146,690,000 M
JUMLAH 1,757,769,000
897,000 152,118,000 13,648,652 UB
PEKERJA
POLE TOP ARRANGEMENT

TM-1 TM-1A TM-2 TM-4 TM-5 TM-8 TM-8A TM-10 TM-11 TM-12 TM-13 TM-TP2 TM-TP2A

Set Set Set Set Set Set Set Set Set Set Set Set Set

1 2
14 23 2
33 2 2 3
2 2

4 2 1

1
12 2 1
1
37 2 7 3 3 4

26 23 2 2 1
539

EKERJAAN JARINGAN JTM AAACS


Conductor ..... mm Tiang Beton (.... Meter)

TM-4X TM-4XC TM-8X TM-10X TM-10XC 150 240 14/350 13/350 11/200 9/200

Set Set Set Set Set ms ms Bt Bt Bt Bt

2217 5
1

1900 40 1
2
94 6
2

237 7
1 1

679 1
1 1

48 1
1

0
5,175 60 1
4 4 2
458,064,000

Estimasi jarak
Grounding POLE SUPPORTER ACCESORIES
Ferleng
Stuck 4"-3 Ferleng Stuck Guard Arrester di Pole Pondasi
Dalam Luar GW HGW SP .....
3"-3 mtr net tiang Exs. Block type A
mtr
Set Set Set Set Set Set Set Set Set Set Set Set Gawang

#DIV/0!

2
9 52.0
28
9 1
13 47.0

#DIV/0!

#DIV/0!
#DIV/0!

#DIV/0!

2
23.0
2
4
2 33.0
1
2
3 42.0
6
1
1 48.0
2

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
#DIV/0!

20 1
15 12 1
39
PEKERJAAN JARINGAN MVTIC SINGLE
POLE TOP ARRANGEMENT
PASANGAN

MVTIC MVTIC 2 MVTIC 3 MVTIC MVTIC MVTIC


1 4 5 5A

Set Set Set Set Set Set

M
UB
M
UB
M 16 1 4 1
UB
M 16 1 4 1
UB
M 16 1 4 1
UB
M 7 1 2
UB

M 1 2
UB

M
UB 5 1 4
M
UB
M
UB
M
UB 2
M
UB 2 1 2
M 5
UB 2
M
UB 1 1 2
M 16 4 2 1 1
UB
M
UB

M 76 9 2 17 3 1

UB 8 3 12
AN JARINGAN MVTIC SINGLE 1,146,690,000
ENT MVTIC ...mm TIANG BETON POLE SUPPORTER ACCESORIES
Ferleng Ferleng
MVTIC MVTIC 10 MVTIC .. 150 240 13/350 11/200 9/200 14/350 GW HGW SP Stuck 4"-3 Stuck 3"-3 Pondasi
5B .. Type A
mtr mtr
Set Set Set ms ms Bh Bh Bh Bh Set Set Set Set Set Set

5
855 22

5
855 22

5
855 22
1 481 4 1
11

30 3
3

351
1

27

194
1
4 8
372 9

129
1
1 7
865 23
6 37 1
5,014 112
3
PEKERJAAN JARINGAN MVTIC DOUBLE
Estimasi jarak

POLE TOP ARRANGEMENT MVTIC MVTIC TIANG BE


PASANGAN

MVTIC MVTIC 2 MVTIC MVTIC MVTIC MVTIC MVTIC MVTIC MVTIC... 150 mm 240 mm 13/350 11/200
1 3 4 5 5A 5B 10 .

Gawang Set Set Set Set Set Set Set Set Set ms ms Bh Bh

M
#DIV/0!
UB
M
#DIV/0!
UB
M
47.5
UB
M
47.5
UB
M
47.5
UB
53.4

30.0

M
35.1
UB
M
#DIV/0!
UB
M
#DIV/0!
UB
M
13.5
UB
M
38.8
UB
M
33.8
UB
M
32.3
UB
M
36.0
UB
M
#DIV/0!
UB

UB
0 PEKERJAAN UGC / KABEL TANAH 897,000

Estimasi jarak
BETON POLE SUPPORTER SKTM / UGC KONDISI SKTM TERMINATION

Naik Melewati Ground


9/200 14/350 GW HGW SP 150 mm 240 mm Ditanam Outdoor Indoor
ketiang Jalan Luar

Bh Bh Set Set Set Gawang ms ms Mtr Mtr Mtr Mtr Set Set

###

###
###

###

###

###

###

###

###

### 32
###

32
00 RECLOSER / LBS MOTORIZED 152,118,000 Total
Tiang
ON KONSTRUKSI TIANG .. daN
LBS MOTO RECLOSER

PASANGAN
Podasi
RIZED Bongkar Type A
Joint TM-5 TM-.... 13/350 14/350 UTAMA
Konst TM-1

Set Set Set Set Set Set Bh Bh Bh Bh

M
UB
M
UB
M
1 1 1
UB
M
1 1 1
UB
M
1 1 1
UB
M
UB
M
UB
M
UB
M
1
UB
M
1
UB
M
1
UB
M
2
UB
M
UB
M
9 3 3
UB
JANUARI PEBRUARI MARET

1 2 3 4 5 6 7 8 9 10 11 12 13 14
APRIL MEI JUNI JULI

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESE

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
SEMBER

51 52 53
PT PLN (PERSERO) DISTRIBUSI JAWA TIMUR

I PROGRAM PERKUATAN JARINGAN :


sesuai normalisasi
REKONFIGURASI JARINGAN
PRK.2018
PEKERJAAN JARINGAN JTM
I. PROGRAM PERKUATAN JAR

NO.
MAT PEKERJAAN Ton/Kg

I. PROGRAM PERKUATAN JARINGAN (PRK.2019.DJT.1.1)


1.1 REKONFI1.1 REKONFIGURASI JTM - KONSTRUKSI JTM

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

POLLE SUPORTER :
GUY WIRE MURNI 769.1
GUY WIRE NUMPANG 343.0
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 8.0
GUARDNET 0.0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 821.9
KONTRUKSI TM - 1A ( Underbuilt ) 0.0
KONTRUKSI TM - 2 ( Underbuilt ) 728.9
KONTRUKSI TM - 4 ( Underbuilt ) 59.3
KONTRUKSI TM - 4X ( Underbuilt ) 60.6
KONTRUKSI TM - 4XC ( Underbuilt ) 0.0
KONTRUKSI TM - 5 ( Underbuilt ) 77.1
KONTRUKSI TM - 8 ( Underbuilt ) 0.0
KONTRUKSI TM - 8A ( Underbuilt ) 0.0
KONTRUKSI TM - 8X ( Underbuilt ) 155.1
KONTRUKSI TM - 10 ( Underbuilt ) 38.5
KONTRUKSI TM - 10 X ( Underbuilt ) 77.5
KONTRUKSI TM - 10 XC ( Underbuilt ) 0.0
KONTRUKSI TM - 11 ( Underbuilt ) 0.0
KONTRUKSI TM - 12 ( Underbuilt ) 0.0
KONTRUKSI TM - 13 ( Underbuilt ) 0.0
KONTRUKSI TM - TP2 ( Underbuilt ) 0.0
KONTRUKSI TM - TP2A ( Underbuilt ) 0.0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 1,055.7
KONTRUKSI TM - 1A 0.0
KONTRUKSI TM - 2 62.0
KONTRUKSI TM - 4 195.1
KONTRUKSI TM - 5 110.2
KONTRUKSI TM - 8 0.0
KONTRUKSI TM - 8A 0.0
KONTRUKSI TM - 10 118.7
KONTRUKSI TM - 11 (akhir dan kabel) 0.0
KONTRUKSI TM - 12 (Trafo Portal Akhir) 0.0
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 0.0
KONTRUKSI TM - TP2 263.4
KONTRUKSI TM - TP2A 0.0

ANTI CLIMBING + DANGER PLATE 96.96


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, besi 10mm 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

CONDUCTOR ACCESSORIES
### 5 AAAC - S 150 sqmm ( SPLN ) 1 3,205.8
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0
### 93 Joint Sleeve 150 mm (507/U/2009) 2.1 31.5
### 94 Joint Sleeve 240 mm 0.0 0.0
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 2,277.0

GROUNDING GW STEEL WIRE 35 MM


GROUNDING DALAM 23.6
GROUNDING LUAR 35.9
Arrester Jaringan Tiang Lama 0.00

POLE BLOCK
### 182 Pole Block (504/U/2009) 0.0 0.0
### 183 Pole Block Band 12" - TM (557/U/2009) 0.0 0.0

PONDASI TYPE A - Tiang JTM)


### 186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.0 0.0

VERLENK STUCK JARINGAN


### 277 Verlenk stuck Pipa 4" - 3 mt - Medium 0.0 0.0
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 0.0 0.0
### 31 Bolt & Nut M.16 x 75 (517/U/2009) 0.0 0.0

VERLENK STUCK STEEL WIRE


### 276 Verlenk stuck Pipa 3" - 3 mt - Medium 0.0 0.0
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 0.0 0.0
### 31 Bolt & Nut M.16 x 75 (517/U/2009) 0.0 0.0

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan
PEKERJAAN JARINGAN MVTIC

NO.
MAT PEKERJAAN Ton/Kg

1.1 REKONFI1.1 REKONFIGURASI JTM - KONSTRUKSI MVTIC SINGLE

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
240 Tiang Beton 12 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

POLLE SUPORTER :
GUY WIRE MURNI 1,422.8
GUY WIRE NUMPANG 26.4
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 8.0

ANTI CLIMBING + DANGER PLATE 218.2


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

CONDUCTOR ACCESSORIES
### 140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS 5.3 26,976.5
### 141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS 9.5 342.8
CLAMP CONNECTION
Perlengkapan penggantung 135
### 78 Galvanized Steel Wire 70 mm (542/U/2009) 1.0 4,763.3
### 523 Connection Clamp For Netral + Bolt M12 x 25 - (Acc.MVTIC) 0.3 1,209.7

POLE TOP ARRANGEMENT UNDER BUILD - (UB) : 228


KONTRUKSI MVTIC - 1 (lurus) - (UB) 203.1
Pekerjaan utama : 22.8
### 12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) 2.1
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.1
### 525 Extension for GW type A - (Acc.MVTIC) 0.6
Accesories : 180.3
### 526 Separator Clamp for Netral - (Acc.MVTIC) 0.6
### 180 Plastic Strap Medium 0.1
### 521 Wire Clip M12 (Ø 70mm) 0.2

KONTRUKSI MVTIC - 2 (sudut >150) - (UB) 21.7


KONTRUKSI MVTIC - 3 (Trafo Portal) - (UB) 0.0
KONTRUKSI MVTIC - 4 (akhir) - (UB) 113.8
KONTRUKSI MVTIC - 5 (jumper atas) - (UB) 0.0
KONTRUKSI MVTIC - 5A (Jointing) - (UB) 0.0
KONTRUKSI MVTIC - 5B (Jointing ditengah) - (UB) 0.0
KONTRUKSI MVTIC - 10 - (UB) 0.0

POLE TOP ARRANGEMENT MURNI - (M) : 0


KONTRUKSI MVTIC - 1 (lurus) 5,229.2
KONTRUKSI MVTIC - 2 (sudut >150) 65.1
KONTRUKSI MVTIC - 3 (Trafo Portal) - (UB) 0.0
KONTRUKSI MVTIC - 4 (akhir) 370.6
KONTRUKSI MVTIC - 5 (jumper atas) 116.9
KONTRUKSI MVTIC - 5A (Jointing) 73.7
KONTRUKSI MVTIC - 5B (Jointing ditengah) 0.0
KONTRUKSI MVTIC - 10 43.4

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0
Jumlah Harga Material
Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

PEKERJAAN JARINGAN MVTIC

NO.
MAT PEKERJAAN Ton/Kg

1.1 REKONFI1.1 REKONFIGURASI JTM - KONSTRUKSI MVTIC DOUBLE

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
236 Tiang Beton 11 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

ANTI CLIMBING + DANGER PLATE 0.0


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

CONDUCTOR ACCESSORIES
### 140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS 5.3 0.0
### 141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS 9.5 0.0

CLAMP CONNECTION
Perlengkapan penggantung 0
### 78 Galvanized Steel Wire 70 mm (542/U/2009) 1.0 0.0
### 523 Connection Clamp For Netral + Bolt M12 x 25 - (Acc.MVTIC) 0.3 0.0

POLLE SUPORTER :
GUY WIRE MURNI 0.0
GUY WIRE NUMPANG 0.0
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 0.0

POLE TOP ARRANGEMENT NUMPANG (UB) :


KONTRUKSI 2MVTIC - 1 (lurus) - Numpang 0.0
KONTRUKSI 2MVTIC - 2 (sudut 150) - Numpang 0.0
KONTRUKSI 2MVTIC - 3 (Trafo Portal) - Numpang 0.0
KONTRUKSI 2MVTIC - 4 (Akhir) - Numpang 0.0
KONTRUKSI 2MVTIC - 5 (Jumper atas) - Numpang 0.0
KONTRUKSI 2MVTIC - 5A (Jointing) - Numpang 0.0
KONTRUKSI 2MVTIC - 5B (Jointing ditengah) - Numpang 0.0
KONTRUKSI 2MVTIC - 10 (sudut 600) - Numpang 0.0

POLE TOP ARRANGEMENT MURNI :


KONTRUKSI 2MVTIC - 1 (lurus) 0.0
KONTRUKSI 2MVTIC - 2 (sudut 150) 0.0
KONTRUKSI 2MVTIC - 4 (Akhir) 0.0
KONTRUKSI 2MVTIC - 5 (Jumper atas) 0.0
KONTRUKSI 2MVTIC - 5A (Jointing) 0.0
KONTRUKSI 2MVTIC - 5B (Jointing ditengah) 0.0
KONTRUKSI 2MVTIC - 10 (sudut 600) 0.0

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan
PEKERJAAN UGC / KABEL

NO.
MAT PEKERJAAN Ton/Kg

1.1 REKONFI1.1 REKONFIGURASI JTM - KONSTRUKSI KABEL TANAH

KONSTRUKSI UGC XLPE 150 mm


KONSTRUKSI UGC XLPE 240 mm
Kabel ditanam
Spelling Kabel yang ditanam
Spelling Kabel Termination
### 138 NA2XSEYBY 3 x 150 mm2;20KV;UG 10.5 336
### 139 NA2XSEYBY 3 x 240 mm2;20KV;UG 12.4 0

TERMINATION KABEL
TERMINATION 0.0
### 233 Termination OD 3 X 150 MM2 u/XLPE 7.5 0
### 234 Termination OD 3 X 240 MM2 u/ XLPE 7.5 0
### 95 Jointing Termination 24 Kv - uk. 150 mm - 3 Core/XLPE 7.5 0
### 97 Jointing Termination 24 Kv - uk. 240 mm - 3 Core/XLPE 7.5 0
### 231 Termination ID 3 X 150 MM2 u/XLPE 7.5 0
### 232 Termination ID 3 X 240 MM2 u/XLPE 7.5 0

PELAKSANAAN PENGGELARAN KABEL


IDENTIFIKASI & PENGGALIAN KABEL
### 126 Load Segel @ tiap 5 meter 1.8 0
### 158 Patok Tanda Kabel (169/K/2009) 5.0 0

PENGGALIAN KABEL
### 157 Pasir urug 0.0 0
### 439 Galian tanah & pengurugan kembali 0.0 0
### 39 Concrete Slove / pengaman kabel uk.450x300x40 mm 0.0 0
PENGGALIAN ASPAL DAN PERBAIKAN KEMBALI
### 157 Pasir urug 0.0 0
### 298 Galian Aspal & pengurugan kembali Aspal (tebal Aspal 30 cm + 0.0 0
### 176 Pipa Air 4" - 6 mter u/ pelindung jalan (555/U/2009) 9.9 0

ARRESTER & ACCESORIES :


ARRESTER
### 420 Polymer Arrester 24 kV - 10 kA 1.7 0.0

ACCESORIESS
### 142 NYA 35 sqmm ( SPLN ) 0.1
### 146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.1
### 219 Terminal Lug 35 mm - Cu (507/U/2009) 0.4
### 23 Klem C 50 mm 0.4
### 177 Pipa Air 4" - 6 mtr (555/U/2009) 9.9
### 18 Begel Ornament 4" - 10" - (l=44mm, t=6mm) 2.1
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 2.1

GROUNDING ARRESTER :
GROUNDING DALAM 0.0
### 73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatti 0.8
### 17 BC 50 MM 0.2
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 406 C Clamp 25 mm 0.4
### 146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.1
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1

GROUNDING LUAR 0.0


### 73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatti 0.8
### 17 BC 50 MM 0.2
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 406 C Clamp 25 mm 0.4
### 202 Stainless Steel Strip non magnetic 0.0
### 203 Stoping Buckle non magnetic 0.2
### 123 Link (506/U/2009) 0.2
### 162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) 0.9

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

RECLOSER / LBS MOTO

NO.
MAT PEKERJAAN Ton/Kg

1.1 REKONFI1.1 REKONFIGURASI JTM - KONSTRUKSI RECLOSER / LBS MOTORIZED

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 5 (Murni) 0.0
KONTRUKSI TM - 5 ( Underbuilt ) 0.0

LBS MOTORIZED & ACCESORIES :


LBS MOTORIZED 3,375.00
424 LBS Motorized + RTU + Kabel Data 165.000
425 Recloser Motorized + RTU + Kabel Data 185.000
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel data 25.000
TAMBAHAN DUDUKAN RECLOSER 22.46
103 Klem Begel U 10" - TM - (l=44mm, t=6mm) 2.240
27 Bolt & Nut M.16 x 120 (517/U/2009) 0.255

PENGAMAN JUMPERAN 164.12

LIGHTNING ARRESTER & ACCESORIES :


LIGHTNING ARRESTER 17.01

JUMPERAN 10.22

TAMBAHAN DUDUKAN PT OD 114.44

CUT OUT SWITCH : 16.52

TAMBAHAN DUDUKAN CONTROL BOX 32.81

GROUNDING :
GROUNDING RECLOSER 29.28

GROUNDING CONTROL BOX 13.68

PONDASI & RETOUR


ACCESSORIES 0.00
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.000
172 Pipa Air PVC 2" - 3 meter ( AW ) 0.000

RETOUR / BONGKAR 657.00


160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain 8.000
288 Bongkar Konstruksi TM-1 Murni & Retour 31.500
289 Bongkar Konstruksi TM-1 Numpang & Retour 33.500

PEKERJAAN PENDUKUNG :
### 540 Commisioning test LBS / Recloser 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

I. PROGRAM PERKUATAN JAR

SUTR TWISTED CABLE 3x70 + 1

NO.
MAT PEKERJAAN Ton/Kg

I. PROGRAM PERKUATAN JARINGAN (PRK.2019.DJT.1.1)


1.2 REKONF1.2 Rekonfigurasi JTR

TIANG BETON
248 Tiang Beton 9 - 200 daN + E 0.00
247 Tiang Beton 9 - 200 daN 0.00

PONDASI
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.00

POLE TOP SUPPORTER


GUY WIRE ( TR ) 0.00
GUY WIRE NUMPANG ( TR ) 0.00
HORIZONTAL GUY WIRE MURNI ( TR ) 0.00
HORIZONTAL GUY WIRE NUMPANG ( TR ) 0.00
STRUT POLE 0.0

POLE TOP ARRANGEMENT (Underbuilt)


KONSTRUKSI TR - 1 ( Underbuilt ) 0.00
197 Small Angle Assembly ( SAA ) 1.760

KONSTRUKSI TR - 1 Jumper (Underbuilt) 0.00


197 Small Angle Assembly ( SAA ) 1.760
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 2 ( Underbuilt ) 0.00


115 Large Angle Assembly ( LAA ) 2.750

KONSTRUKSI TR - 3 ( Underbuilt ) 0.00


69 Dead End Assembly ( DEA ) - komplit 1.780
434 Dead End Tubes / Bundled End Protection + komplit 0.185

KONSTRUKSI TR - 3A ( Underbuilt ) 0.00


69 Dead End Assembly ( DEA ) - komplit 1.780
36 Comp. Joint Bimetal Al/Cu - 70/70 mm (507/U/2009) 0.400

KONSTRUKSI TR - 4 ( Underbuilt ) 0.00


197 Small Angle Assembly ( SAA ) 1.760
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 4A ( Underbuilt ) 0.00


197 Small Angle Assembly ( SAA ) 1.760
115 Large Angle Assembly ( LAA ) 2.750
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 4B ( Underbuilt ) 0.00


115 Large Angle Assembly ( LAA ) 2.750
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 5 ( Underbuilt ) 0.00


69 Dead End Assembly ( DEA ) - komplit 1.780
431 Tension Bracket ( Load 600 kg ) 0.685
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 6 ( Underbuilt ) 0.00


69 Dead End Assembly ( DEA ) - komplit 1.780
197 Small Angle Assembly ( SAA ) 1.760
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 6A ( Underbuilt ) 0.00


69 Dead End Assembly ( DEA ) - komplit 1.780
115 Large Angle Assembly ( LAA ) 2.750
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 7 ( Underbuilt ) 0.00


69 Dead End Assembly ( DEA ) - komplit 1.780
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

POLE TOP ARRANGEMENT


KONSTRUKSI TR - 1 0.00
197 Small Angle Assembly ( SAA ) 1.760

KONSTRUKSI TR - 1 Jumper 0.00


197 Small Angle Assembly ( SAA ) 1.760
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 2 0.00
115 Large Angle Assembly ( LAA ) 2.750

KONSTRUKSI TR - 3 0.00
69 Dead End Assembly ( DEA ) - komplit 1.780
434 Dead End Tubes / Bundled End Protection + komplit 0.185

KONSTRUKSI TR - 4 0.00
197 Small Angle Assembly ( SAA ) 1.760
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 4A 0.00
197 Small Angle Assembly ( SAA ) 1.760
115 Large Angle Assembly ( LAA ) 2.750
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 4B 0.00
115 Large Angle Assembly ( LAA ) 2.750
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400
KONSTRUKSI TR - 5 0.00
69 Dead End Assembly ( DEA ) - komplit 1.780
431 Tension Bracket ( Load 600 kg ) 0.685
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 6 0.00
69 Dead End Assembly ( DEA ) - komplit 1.780
197 Small Angle Assembly ( SAA ) 1.760
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

KONSTRUKSI TR - 6A 0.00
69 Dead End Assembly ( DEA ) - komplit 1.780
115 Large Angle Assembly ( LAA ) 2.750
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400

GROUNDING JTR
GROUNDING DALAM JTR 0.00
GROUNDING LUAR JTR 0.00

CONDUCTOR & ACCESSORIES


CONDUCTOR
214 NFA2X-T;3x70 + 1x50 mm2 1.051 0.00

JOINT ACCESSORIES
87 Insulated Tension Joint 70 mm 0.095 0.00
88 Insulated Non Tension Joint 50 mm 0.095 0.00

PEKERJAAN PENDUKUNG :
### 539 Commisioning test JTR 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

I. PROGRAM PERKUATAN JAR


PEKERJAAN JARINGAN JTM

NO.
MAT PEKERJAAN Ton/Kg

I. PROGRAM PERKUATAN JARINGAN (PRK.2019.DJT.1.1)


1.3 REKON 1.3 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Pecah b

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

POLLE SUPORTER :
GUY WIRE MURNI 1,845.8
GUY WIRE NUMPANG 1,609.5
HORIZONTAL GUY WIRE MURNI 153.8
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 64.3
GUARDNET 0.0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 7,428.6
KONTRUKSI TM - 1A ( Underbuilt ) 0.0
KONTRUKSI TM - 2 ( Underbuilt ) 1,901.5
KONTRUKSI TM - 4 ( Underbuilt ) 0.0
KONTRUKSI TM - 4X ( Underbuilt ) 287.7
KONTRUKSI TM - 4XC ( Underbuilt ) 0.0
KONTRUKSI TM - 5 ( Underbuilt ) 732.2
KONTRUKSI TM - 8 ( Underbuilt ) 754.1
KONTRUKSI TM - 8A ( Underbuilt ) 0.0
KONTRUKSI TM - 8X ( Underbuilt ) 0.0
KONTRUKSI TM - 10 ( Underbuilt ) 1,117.5
KONTRUKSI TM - 10 X ( Underbuilt ) 0.0
KONTRUKSI TM - 10 XC ( Underbuilt ) 0.0
KONTRUKSI TM - 11 ( Underbuilt ) 190.6
KONTRUKSI TM - 12 ( Underbuilt ) 0.0
KONTRUKSI TM - 13 ( Underbuilt ) 0.0
KONTRUKSI TM - TP2 ( Underbuilt ) 262.7
KONTRUKSI TM - TP2A ( Underbuilt ) 0.0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 1,740.5
KONTRUKSI TM - 1A 0.0
KONTRUKSI TM - 2 526.7
KONTRUKSI TM - 4 0.0
KONTRUKSI TM - 5 36.7
KONTRUKSI TM - 8 173.7
KONTRUKSI TM - 8A 0.0
KONTRUKSI TM - 10 712.0
KONTRUKSI TM - 11 (akhir dan kabel) 62.6
KONTRUKSI TM - 12 (Trafo Portal Akhir) 0.0
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 0.0
KONTRUKSI TM - TP2 395.1
KONTRUKSI TM - TP2A 0.0

ANTI CLIMBING + DANGER PLATE 182.61


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, besi 10mm 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136
CONDUCTOR ACCESSORIES
### 5 AAAC - S 150 sqmm ( SPLN ) 1 14,184.7
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0
### 93 Joint Sleeve 150 mm (507/U/2009) 9.7 666.5
### 94 Joint Sleeve 240 mm 0.0 0.0
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 10,074.7

GROUNDING GW STEEL WIRE 35 MM


GROUNDING DALAM 52.0
GROUNDING LUAR 266.1
Pekerjaan utama :
118 Line Tap Connector 50-70 mm type G 0.400
17 BC 50 MM 0.190
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatting tembaga 35 0.750
Accesories :
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.1
### 202 Stainless Steel Strip non magnetic 0.0
### 203 Stoping Buckle non magnetic 0.2
### 123 Link (506/U/2009) 0.2
### 162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) 0.9

Pemasangan Arrester Jaringan Tiang Lama 0.00

POLE BLOCK
PONDASI TYPE A - Tiang JTM)
VERLENK STUCK JARINGAN
VERLENK STUCK STEEL WIRE

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

PEKERJAAN JARINGAN MVTIC

NO.
MAT PEKERJAAN Ton/Kg

1.3 REKON 1.3 REKONFIGURASI PECAH BEBAN - KONSTRUKSI MVTIC SINGLE

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
240 Tiang Beton 12 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

POLLE SUPORTER :
GUY WIRE MURNI 192.3
GUY WIRE NUMPANG 0.0
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 0.0

ANTI CLIMBING + DANGER PLATE 88.9


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

2,849
54
CONDUCTOR ACCESSORIES
### 140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS 5.3 0.0
### 141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS 9.5 514.1

CLAMP CONNECTION
Perlengkapan penggantung
### 78 Galvanized Steel Wire 70 mm (542/U/2009) 1.0 2,629.6
### 523 Connection Clamp For Netral + Bolt M12 x 25 - (Acc.MVTIC) 0.3 675.2

POLE TOP ARRANGEMENT UNDER BUILD - (UB) :


KONTRUKSI MVTIC - 1 (lurus) - (UB) 0.0
KONTRUKSI MVTIC - 2 (sudut >150) - (UB) 0.0
KONTRUKSI MVTIC - 3 (Trafo Portal) - (UB) 0.0
KONTRUKSI MVTIC - 4 (akhir) - (UB) 47.4
KONTRUKSI MVTIC - 5 (jumper atas) - (UB) 0.0
KONTRUKSI MVTIC - 5A (Jointing) - (UB) 0.0
KONTRUKSI MVTIC - 5B (Jointing ditengah) - (UB) 0.0
KONTRUKSI MVTIC - 10 - (UB) 0.0

POLE TOP ARRANGEMENT MURNI - (M) :


KONTRUKSI MVTIC - 1 (lurus) 1,833.6
KONTRUKSI MVTIC - 2 (sudut >150) 36.2
KONTRUKSI MVTIC - 4 (akhir) 21.8
KONTRUKSI MVTIC - 5 (jumper atas) 116.9
KONTRUKSI MVTIC - 5A (Jointing) 0.0
KONTRUKSI MVTIC - 5B (Jointing ditengah) 0.0
KONTRUKSI MVTIC - 10 0.0

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

PEKERJAAN UGC / KABEL

NO.
MAT PEKERJAAN Ton/Kg

1.3 REKON 1.3 REKONFIGURASI PECAH BEBAN - KONSTRUKSI KABEL TANAH

KONSTRUKSI UGC XLPE 150 mm


KONSTRUKSI UGC XLPE 240 mm
Kabel ditanam
Spelling Kabel yang ditanam
Spelling Kabel Termination
### 138 NA2XSEYBY 3 x 150 mm2;20KV;UG 10.5 0
### 139 NA2XSEYBY 3 x 240 mm2;20KV;UG 12.4 2,473

TERMINATION KABEL
TERMINATION 0.0
### 233 Termination OD 3 X 150 MM2 u/XLPE 7.5 15
### 234 Termination OD 3 X 240 MM2 u/ XLPE 7.5 0
### 95 Jointing Termination 24 Kv - uk. 150 mm - 3 Core/XLPE 7.5 0
### 97 Jointing Termination 24 Kv - uk. 240 mm - 3 Core/XLPE 7.5 0
### 231 Termination ID 3 X 150 MM2 u/XLPE 7.5 30
### 232 Termination ID 3 X 240 MM2 u/XLPE 7.5 0

PELAKSANAAN PENGGELARAN KABEL


IDENTIFIKASI & PENGGALIAN KABEL
### 126 Load Segel @ tiap 5 meter 1.8 60
### 158 Patok Tanda Kabel (169/K/2009) 5.0 170
PENGGALIAN KABEL
### 157 Pasir urug 0.0 0
### 439 Galian tanah & pengurugan kembali 0.0 0
### 39 Concrete Slove / pengaman kabel uk.450x300x40 mm 0.00540 2

PENGGALIAN ASPAL DAN PERBAIKAN KEMBALI


### 157 Pasir urug 0.0 0
### 298 Galian Aspal & pengurugan kembali Aspal (tebal Aspal 30 cm + 0.0 0
### 176 Pipa Air 4" - 6 mter u/ pelindung jalan (555/U/2009) 9.9 0

ARRESTER & ACCESORIES :


ARRESTER
### 420 Polymer Arrester 24 kV - 10 kA 1.7 90.0

ACCESORIESS
### 142 NYA 35 sqmm ( SPLN ) 0.1
### 219 Terminal Lug 35 mm - Cu (507/U/2009) 0.4
### 23 Klem C 50 mm 0.4
### 177 Pipa Air 4" - 6 mtr (555/U/2009) 9.9
### 18 Begel Ornament 4" - 10" - (l=44mm, t=6mm) 2.1
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 2.1

GROUNDING ARRESTER :
GROUNDING DALAM 3.3
### 73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatti 0.8
### 17 BC 50 MM 0.2
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 406 C Clamp 25 mm 0.4
### 146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.1
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1

GROUNDING LUAR 0.0

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0
Jumlah Harga Material
Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

LBS MOTO

NO.
MAT PEKERJAAN Ton/Kg

1.3 REKON 1.3 REKONFIGURASI PECAH BEBAN - KONSTRUKSI RECLOSER/LBS MO

MATERIAL DISTRIBUSI UTAMA


### 245 Tiang Beton 14 - 350 daN + E 1,350 0.0
### 243 Tiang Beton 13 - 350 daN + E 1,150 0.0
### 462 Polymer Pin Insulator 20 kV 1 2.6
### 463 Polymer Strain Insulator 20 kV lengkap (SIR) 4 16.0
### 420 Polymer Arrester 24 kV - 10 kA 2 13.6
### 419 Polymer Cut Out Switch 24 Kv - 100 kA 2 4.0
### 424 LBS Motorized + RTU + Kabel Data 0

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 5 (Murni) 0.0
KONTRUKSI TM - 5 ( Underbuilt ) 77.1
LBS MOTORIZED & ACCESORIES :
LBS MOTORIZED 1,500.00
424 LBS Motorized + RTU + Kabel Data 165.000
425 Recloser Motorized + RTU + Kabel Data 185.000
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel data 25.000

TAMBAHAN DUDUKAN RECLOSER 9.98


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) 2.240
27 Bolt & Nut M.16 x 120 (517/U/2009) 0.255

PENGAMAN JUMPERAN 72.94


405 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu - (l=50mm, t=5mm, tgg=100 16.800
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) 1.300
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain 8.000
436 Isolated All. Binding - 4 mm Ø 6 0.095

LIGHTNING ARRESTER & ACCESORIES :


LIGHTNING ARRESTER 7.56
420 Polymer Arrester 24 kV - 10 kA 1.700
142 NYA 35 sqmm ( SPLN ) 0.095
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.095
219 Terminal Lug 35 mm - Cu (507/U/2009) 0.400
32 Bolt M.12 x 30 - CU 0.136
446 Klem C - 25/25 mm - Cu 0.200

JUMPERAN 4.54
122 Line Tap Connector Type Al - 150 mm 0.800
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) 0.200
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

TAMBAHAN DUDUKAN PT OD 50.86


59 Cross Arm type 500 - NP. 8 1.785
58 Cross Arm type 900 NP. 8 3.570
70 Double Arm Band 8" - 7" - TM (504/U/2009) 2.240
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) 2.110
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) 1.300
28 Double Arm Bolt & Nut M.16 x 350 (besi as) 0.680
142 NYA 35 sqmm ( SPLN ) 0.095
219 Terminal Lug 35 mm - Cu (507/U/2009) 0.400
119 Line Tap Connector Al 150 - 50 mm type G 0.400

CUT OUT SWITCH : 7.34


419 Polymer Cut Out Switch 24 Kv - 100 kA 1.500
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) 0.200
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

TAMBAHAN DUDUKAN CONTROL BOX 14.58


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) 2.110
196 Single Guy Wire Band 8" - TM (513/U/2009) 1.400
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

GROUNDING :
GROUNDING RECLOSER 13.01
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatting tembaga 0.750
17 BC 50 MM 0.190
226 Terminal Lug 70 mm Al (507/U/2009) 0.100
223 Terminal Lug 70 mm - Al/Cu 2 Nut 0.400
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) 0.400
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) 0.933
202 Stainless Steel Strip non magnetic 0.020
203 Stoping Buckle non magnetic 0.230
123 Link (506/U/2009) 0.230

GROUNDING CONTROL BOX 6.08


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatting tembaga 0.750
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) 0.000
226 Terminal Lug 70 mm Al (507/U/2009) 0.100
17 BC 50 MM 0.190
202 Stainless Steel Strip non magnetic 0.020
203 Stoping Buckle non magnetic 0.230
123 Link (506/U/2009) 0.230

PONDASI & RETOUR


ACCESSORIES 0.00
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.000
172 Pipa Air PVC 2" - 3 meter ( AW ) 0.000

RETOUR / BONGKAR 146.00


160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain 8.000
288 Bongkar Konstruksi TM-1 Murni & Retour 31.500
289 Bongkar Konstruksi TM-1 Numpang & Retour 33.500

PEKERJAAN PENDUKUNG :
### 540 Commisioning test LBS / Recloser 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

I. PROGRAM PERKUATAN JAR

I. PROGRAM PERKUATAN JARINGAN (PRK.2019.DJT.1.1)


1.4 REKONF 1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Operas
NO.
MAT PEKERJAAN Ton/Kg

MATERIAL DISTRIBUSI UTAMA


### 5 AAAC - S 150 sqmm ( SPLN ) 1 0.0
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0
### 462 Polymer Pin Insulator 20 kV 1 0.0
### 463 Polymer Strain Insulator 20 kV lengkap (SIR) 4 0.0
### 420 Polymer Arrester 24 kV - 10 kA 2 0.0
### 419 Polymer Cut Out Switch 24 Kv - 100 kA 2 0.0
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

POLLE SUPORTER :
GUY WIRE MURNI 0.0
GUY WIRE NUMPANG 0.0
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 0.0
GUARDNET 0.0

POLE TOP ARRANGEMENT : 0


KONTRUKSI TM - 1 ( Underbuilt ) 0.0
KONTRUKSI TM - 1A ( Underbuilt ) 0.0
KONTRUKSI TM - 2 ( Underbuilt ) 0.0
KONTRUKSI TM - 4 ( Underbuilt ) 0.0
KONTRUKSI TM - 4X ( Underbuilt ) 0.0
KONTRUKSI TM - 4XC ( Underbuilt ) 0.0
KONTRUKSI TM - 5 ( Underbuilt ) 0.0
KONTRUKSI TM - 8 ( Underbuilt ) 0.0
KONTRUKSI TM - 8A ( Underbuilt ) 0.0
KONTRUKSI TM - 8X ( Underbuilt ) 0.0
KONTRUKSI TM - 10 ( Underbuilt ) 0.0
KONTRUKSI TM - 10 X ( Underbuilt ) 0.0
KONTRUKSI TM - 10 XC ( Underbuilt ) 0.0
KONTRUKSI TM - 11 ( Underbuilt ) 0.0
KONTRUKSI TM - 12 ( Underbuilt ) 0.0
KONTRUKSI TM - 13 ( Underbuilt ) 0.0
KONTRUKSI TM - TP2 ( Underbuilt ) 0.0
KONTRUKSI TM - TP2A ( Underbuilt ) 0.0

POLE TOP ARRANGEMENT : 0


KONTRUKSI TM - 1 0.0
KONTRUKSI TM - 1A 0.0
KONTRUKSI TM - 2 0.0
KONTRUKSI TM - 4 0.0
KONTRUKSI TM - 5 0.0
KONTRUKSI TM - 8 0.0
KONTRUKSI TM - 8A 0.0
KONTRUKSI TM - 10 0.0
KONTRUKSI TM - 11 (akhir dan kabel) 0.0
KONTRUKSI TM - 12 (Trafo Portal Akhir) 0.0
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 0.0
KONTRUKSI TM - TP2 0.0
KONTRUKSI TM - TP2A 0.0

ANTI CLIMBING + DANGER PLATE 0.00


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, besi 10mm 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136
CONDUCTOR ACCESSORIES
### 5 AAAC - S 150 sqmm ( SPLN ) 1 0.0
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0
### 93 Joint Sleeve 150 mm (507/U/2009) 0.0 0.0
### 94 Joint Sleeve 240 mm 0.0 0.0
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 0.0

GROUNDING GW STEEL WIRE 35 MM


GROUNDING DALAM 0.0
GROUNDING LUAR 0.0

Arrester Jaringan Tiang Lama 0.00

POLE BLOCK
### 182 Pole Block (504/U/2009) 0.0 0.0
### 183 Pole Block Band 12" - TM (557/U/2009) 0.0 0.0

PONDASI TYPE A - Tiang JTM)


### 186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.0 0.0

VERLENK STUCK JARINGAN


### 277 Verlenk stuck Pipa 4" - 3 mt - Medium 0.0 0.0
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 0.0 0.0
### 31 Bolt & Nut M.16 x 75 (517/U/2009) 0.0 0.0

VERLENK STUCK STEEL WIRE


### 276 Verlenk stuck Pipa 3" - 3 mt - Medium 0.0 0.0
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 0.0 0.0
### 31 Bolt & Nut M.16 x 75 (517/U/2009) 0.0 0.0

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Opera

NO.
MAT PEKERJAAN Ton/Kg

1.4 REKONF 1.4 REKONFIGURASI GI BARU - KONSTRUKSI MVTIC SINGLE

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
240 Tiang Beton 12 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

POLLE SUPORTER :
GUY WIRE MURNI 0.0
GUY WIRE NUMPANG 0.0
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 0.0

ANTI CLIMBING + DANGER PLATE 0.0


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

0
0
CONDUCTOR ACCESSORIES
### 140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS 5.3 0.0
### 141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS 9.5 0.0

CLAMP CONNECTION
Perlengkapan penggantung #DIV/0!
### 78 Galvanized Steel Wire 70 mm (542/U/2009) 1.0 0.0
### 523 Connection Clamp For Netral + Bolt M12 x 25 - (Acc.MVTIC) 0.3 0.0

POLE TOP ARRANGEMENT UNDER BUILD - (UB) :


KONTRUKSI MVTIC - 1 (lurus) - (UB) 0.0
KONTRUKSI MVTIC - 2 (sudut >150) - (UB) 0.0
KONTRUKSI MVTIC - 3 (Trafo Portal) - (UB) 0.0
KONTRUKSI MVTIC - 4 (akhir) - (UB) 0.0
KONTRUKSI MVTIC - 5 (jumper atas) - (UB) 0.0
Jumper menggunakan Plat Tembaga
Jumper menggunakan Pin Insulator
KONTRUKSI MVTIC - 5A (Jointing) - (UB) 0.0
KONTRUKSI MVTIC - 5B (Jointing ditengah) - (UB) 0.0
KONTRUKSI MVTIC - 10 - (UB) 0.0
POLE TOP ARRANGEMENT MURNI - (M) :
KONTRUKSI MVTIC - 1 (lurus) 0.0
KONTRUKSI MVTIC - 2 (sudut >150) 0.0
KONTRUKSI MVTIC - 3 (Trafo Portal) - (UB) 0.0
KONTRUKSI MVTIC - 4 (akhir) 0.0
KONTRUKSI MVTIC - 5 (jumper atas) 0.0
Jumper menggunakan Plat Tembaga
Jumper menggunakan Pin Insulator
KONTRUKSI MVTIC - 5A (Jointing) 0.0
KONTRUKSI MVTIC - 5B (Jointing ditengah) 0.0
KONTRUKSI MVTIC - 10 0.0

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Opera

NO.
MAT PEKERJAAN Ton/Kg

1.4 REKONF 1.4 REKONFIGURASI GI BARU - KONSTRUKSI MVTIC DOUBLE

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0
236 Tiang Beton 11 - 200 daN (524/U/2009) 0
### 247 Tiang Beton 9 - 200 daN 0

ANTI CLIMBING + DANGER PLATE 0.0


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, 1.400
### 448 Tanda Bahaya Kecil 0.080
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

0
0
CONDUCTOR ACCESSORIES
### 140 NFA2XSEY-T 3 x 150 + 1 x 95 mm2 - CWS 5.3 0.0
### 141 NFA2XSEY-T 3 x 240 + 1 x 95 mm2 - CWS 9.5 0.0

CLAMP CONNECTION
Perlengkapan penggantung #REF!
### 78 Galvanized Steel Wire 70 mm (542/U/2009) 1.0 0.0
### 523 Connection Clamp For Netral + Bolt M12 x 25 - (Acc.MVTIC) 0.3 0.0

POLLE SUPORTER :
GUY WIRE MURNI 0.0
GUY WIRE NUMPANG 0.0
HORIZONTAL GUY WIRE MURNI 0.0
HORIZONTAL GUY WIRE NUMPANG 0.0
STRUT POLE 0.0

POLE TOP ARRANGEMENT NUMPANG (UB) :


KONTRUKSI 2MVTIC - 1 (lurus) - Numpang 0.0
KONTRUKSI 2MVTIC - 2 (sudut 150) - Numpang 0.0
KONTRUKSI 2MVTIC - 3 (Trafo Portal) - Numpang 0.0
KONTRUKSI 2MVTIC - 4 (Akhir) - Numpang 0.0
KONTRUKSI 2MVTIC - 5 (Jumper atas) - Numpang 0.0
Jumper menggunakan Plat Tembaga
Jumper menggunakan Pin Insulator
KONTRUKSI 2MVTIC - 5A (Jointing) - Numpang 0.0
KONTRUKSI 2MVTIC - 5B (Jointing ditengah) - Numpang 0.0
KONTRUKSI 2MVTIC - 10 (sudut 600) - Numpang 0.0

POLE TOP ARRANGEMENT MURNI :


KONTRUKSI 2MVTIC - 1 (lurus) 0.0
KONTRUKSI 2MVTIC - 2 (sudut 150) 0.0
KONTRUKSI 2MVTIC - 4 (Akhir) 0.0
KONTRUKSI 2MVTIC - 5 (Jumper atas) 0.0
Jumper menggunakan Plat Tembaga
Jumper menggunakan Pin Insulator
KONTRUKSI 2MVTIC - 5A (Jointing) 0.0
KONTRUKSI 2MVTIC - 5B (Jointing ditengah) 0.0
KONTRUKSI 2MVTIC - 10 (sudut 600) 0.0

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Opera

NO.
MAT PEKERJAAN Ton/Kg

1.4 REKONF 1.4 REKONFIGURASI GI BARU - KONSTRUKSI KABEL TANAH

MATERIAL DISTRIBUSI UTAMA


### 138 NA2XSEYBY 3 x 150 mm2;20KV;UG 11 0.0
### 139 NA2XSEYBY 3 x 240 mm2;20KV;UG 12 0.0
### 420 Polymer Arrester 24 kV - 10 kA 2 0.0

KONSTRUKSI UGC XLPE 150 mm


KONSTRUKSI UGC XLPE 240 mm
Kabel ditanam
Spelling Kabel yang ditanam
Spelling Kabel Termination
### 138 NA2XSEYBY 3 x 150 mm2;20KV;UG 10.5 0
### 139 NA2XSEYBY 3 x 240 mm2;20KV;UG 12.4 0

TERMINATION KABEL
TERMINATION 0.0
### 233 Termination OD 3 X 150 MM2 u/XLPE 7.5 0
### 234 Termination OD 3 X 240 MM2 u/ XLPE 7.5 0
### 95 Jointing Termination 24 Kv - uk. 150 mm - 3 Core/XLPE 7.5 0
### 97 Jointing Termination 24 Kv - uk. 240 mm - 3 Core/XLPE 7.5 0
### 231 Termination ID 3 X 150 MM2 u/XLPE 7.5 0
### 232 Termination ID 3 X 240 MM2 u/XLPE 7.5 0

PELAKSANAAN PENGGELARAN KABEL


IDENTIFIKASI & PENGGALIAN KABEL
### 126 Load Segel @ tiap 5 meter 1.8 0
### 158 Patok Tanda Kabel (169/K/2009) 5.0 0

PENGGALIAN KABEL
### 157 Pasir urug 0.0 0
### 439 Galian tanah & pengurugan kembali 0.0 0
### 39 Concrete Slove / pengaman kabel uk.450x300x40 mm 0.0 0

PENGGALIAN ASPAL DAN PERBAIKAN KEMBALI


### 157 Pasir urug 0.0 0
### 298 Galian Aspal & pengurugan kembali Aspal (tebal Aspal 30 cm + 0.0 0
### 176 Pipa Air 4" - 6 mter u/ pelindung jalan (555/U/2009) 9.9 0

ARRESTER & ACCESORIES :


ARRESTER
### 420 Polymer Arrester 24 kV - 10 kA 1.7 0.0

ACCESORIESS
### 142 NYA 35 sqmm ( SPLN ) 0.1
### 219 Terminal Lug 35 mm - Cu (507/U/2009) 0.4
### 23 Klem C 50 mm 0.4
### 177 Pipa Air 4" - 6 mtr (555/U/2009) 9.9
### 18 Begel Ornament 4" - 10" - (l=44mm, t=6mm) 2.1
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 2.1

GROUNDING ARRESTER :
GROUNDING DALAM 0.0
### 73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatti 0.8
### 17 BC 50 MM 0.2
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 406 C Clamp 25 mm 0.4
### 146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.1
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
GROUNDING LUAR 0.0
### 73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatti 0.8
### 17 BC 50 MM 0.2
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 406 C Clamp 25 mm 0.4
### 146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.1
### 227 Terminal Lug 70 mm Al - Cu (507/U/2009) 0.1
### 202 Stainless Steel Strip non magnetic 0.0
### 203 Stoping Buckle non magnetic 0.2
### 123 Link (506/U/2009) 0.2
### 162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) 0.9

PEKERJAAN PENDUKUNG :
### 537 Commisioning test Jaringan Kabel JTM 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

1.4 Rekonfigurasi JTM - Pembangunan Penyulang Baru untuk Opera

NO.
MAT PEKERJAAN Ton/Kg

1.4 REKONF 1.4 REKONFIGURASI PECAH BEBAN - KONSTRUKSI RECLOSER/LBS MO


TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0
### 243 Tiang Beton 13 - 350 daN + E 0

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 5 (Murni) 0.0
KONTRUKSI TM - 5 ( Underbuilt ) 0.0

LBS MOTORIZED & ACCESORIES :


LBS MOTORIZED 0.00
424 LBS Motorized + RTU + Kabel Data 165.000
425 Recloser Motorized + RTU + Kabel Data 185.000
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel data 25.000

TAMBAHAN DUDUKAN RECLOSER 0.00


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) 2.240
27 Bolt & Nut M.16 x 120 (517/U/2009) 0.255

PENGAMAN JUMPERAN 0.00

LIGHTNING ARRESTER & ACCESORIES :


LIGHTNING ARRESTER 0.00

JUMPERAN 0.00
122 Line Tap Connector Type Al - 150 mm 0.800
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) 0.200
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

TAMBAHAN DUDUKAN PT OD 0.00

CUT OUT SWITCH : 0.00


419 Polymer Cut Out Switch 24 Kv - 100 kA 1.500
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) 0.200
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

TAMBAHAN DUDUKAN CONTROL BOX 0.00


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) 2.110
196 Single Guy Wire Band 8" - TM (513/U/2009) 1.400
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136

GROUNDING :
GROUNDING RECLOSER 0.00

GROUNDING CONTROL BOX 0.00


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electroplatting tembaga 0.750
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) 0.000
226 Terminal Lug 70 mm Al (507/U/2009) 0.100
17 BC 50 MM 0.190
202 Stainless Steel Strip non magnetic 0.020
203 Stoping Buckle non magnetic 0.230
123 Link (506/U/2009) 0.230

PONDASI & RETOUR


ACCESSORIES 0.00
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.000
172 Pipa Air PVC 2" - 3 meter ( AW ) 0.000

RETOUR / BONGKAR 0.00


160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain 8.000
288 Bongkar Konstruksi TM-1 Murni & Retour 31.500
289 Bongkar Konstruksi TM-1 Numpang & Retour 33.500

PEKERJAAN PENDUKUNG :
### 538 Commisioning test GD 0.0
### 534 Angkutan Material 0.0
### 535 Asuransi Material PLN 0.0

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan
INGAN JTM AAACS MALANG
KUATAN JARINGAN (PRK.2019.DJT.1.1)
### HARGA SATUAN JUMLAH HARGA
Sat Volume JUMLAH
### MATERIAL JASA MATERIAL JASA

11,330,346,285 5,713,223,651

0 0 0
B ###
B 60 ###
B 1 ###
B ###

S 20 1,171,920 177,500 23,438,400 3,550,000 26,988,400


S 39 891,600 98,315 34,772,400 3,834,285 38,606,685
S 0 0 0
S 0 0 0
S 1 637,200 83,380 637,200 83,380 720,580
S 0 0 0

S 26 890,400 101,995 23,150,400 2,651,870 25,802,270


S 0 0 0
S 23 1,683,600 162,750 38,722,800 3,743,250 42,466,050
S 2 1,135,200 140,550 2,270,400 281,100 2,551,500
S 4 375,120 112,095 1,500,480 448,380 1,948,860
S 0 0 0
S 2 1,510,320 250,335 3,020,640 500,670 3,521,310
S 0 0 0
S 0 0 0
S 4 1,307,400 170,310 5,229,600 681,240 5,910,840
S 1 2,838,720 359,440 2,838,720 359,440 3,198,160
S 2 1,443,000 190,635 2,886,000 381,270 3,267,270
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

S 37 865,200 100,525 32,012,400 3,719,425 35,731,825


S 0 0 0
S 2 1,785,480 180,915 3,570,960 361,830 3,932,790
S 7 1,256,340 153,935 8,794,380 1,077,545 9,871,925
S 3 1,668,600 268,170 5,005,800 804,510 5,810,310
S 0 0 0
S 0 0 0
S 3 2,868,720 362,715 8,606,160 1,088,145 9,694,305
S 0 0 0
S 0 0 0
S 0 0 0
S 4 3,298,320 600,545 13,193,280 2,402,180 15,595,460
S 0 0 0

S 60 6,984,000 733,800 7,717,800


S 60 ### 82,800 8,700 4,968,000 522,000 5,490,000
B 60 ### 16,800 1,250 1,008,000 75,000 1,083,000
B 120 ### 8,400 1,140 1,008,000 136,800 1,144,800

150 5,175
240
MS 5,175 83,343,600 52,602,340 135,945,940
M 15,757 ### 2,770 43,646,890 43,646,890
M ###
B 15 ### 174,240 13,980 2,613,600 209,700 2,823,300
B ###
M 5,175 ### 15,600 1,690 80,730,000 8,745,750 89,475,750

14
S 15 634,230 52,813 9,513,450 792,188 10,305,638
S 12 1,412,940 85,535 16,955,280 1,026,420 17,981,700
S 0 0 0

M 0 0 0
S 0 ###
S 0 ###

B 1 390,000 163,170 390,000 163,170 553,170


B 1 ### 390,000 163,170 390,000 163,170 553,170

S 0 0 0
S 0 ###
B 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###
B 0 ###

1 8,299,450 8,299,450
Loks. 10 ### -- 391,630 3,916,300 3,916,300
Ton/M3 10.6 ### -- 255,700 2,714,200 2,714,200
Ls 1.0 ### -- 1,668,950 1,668,950 1,668,950

326,836,350
89,585,888
416,422,238
41,642,224
458,064,461
458,064,000
NGAN MVTIC SINGLE MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

113 0 0 0
B ###
B 112 ###
B ###
B 1 ###

15
S 37 45,137,040 6,699,220 51,836,260
S 3 2,674,800 294,945 2,969,745
S 0 0 0
S 0 0 0
S 1 637,200 83,380 720,580

S 135 15,714,000 1,651,050 17,365,050


S 135 ### 82,800 8,700 11,178,000 1,174,500 12,352,500
B 135 ### 16,800 1,250 2,268,000 168,750 2,436,750
B 270 ### 8,400 1,140 2,268,000 307,800 2,575,800

150 5,014
240
MS 5,014 0 167,797,260 167,797,260
M 5,100 ### 32,625 166,387,500 166,387,500
M 36 ### 39,160 1,409,760 1,409,760
285,427,200 15,068,400 300,495,600
M 5,014 ### 24,000 1,780 120,336,000 8,924,920 129,260,920
S 4,744 ### 34,800 1,295 165,091,200 6,143,480 171,234,680

23
8 2,179,200 428,800 2,608,000
1,824,000 270,160 2,094,160
B 16 ### 63,600 11,715 1,017,600 187,440 1,205,040
B 64 ### 8,400 1,140 537,600 72,960 610,560
B 8 ### 33,600 1,220 268,800 9,760 278,560
8 355,200 158,640 513,840
B 8 ### 20,400 1,220 163,200 9,760 172,960
B 32 ### 3,000 2,970 96,000 95,040 191,040
S 16 ### 6,000 3,365 96,000 53,840 149,840

3 2,611,440 290,580 2,902,020


0 0 0 0
12 101,676,240 21,109,905 122,786,145
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

112
76 20,702,400 4,073,600 24,776,000
9 7,834,320 871,740 8,706,060
0 0 0 0
17 133,675,080 29,384,968 163,060,048
3 58,298,040 10,771,658 69,069,698
1 8,871,480 1,507,970 10,379,450
0 0 0 0
6 6,503,760 783,780 7,287,540

1 89,686,362 89,686,362
Loks. 29 ### 0 2,447,705 70,983,445 70,983,445
Ton/M3 41.4 ### 0 255,700 10,577,522 10,577,522
Ls 1.0 ### 0 8,125,395 8,125,395 8,125,395
691,942,200
350,503,617
1,042,445,817
104,244,582
1,146,690,399
1,146,690,000

GAN MVTIC DOUBLE MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

B ###
B ###
B ###
B ###

S 0 0 0 0
S 0 ###
B 0 ###
B 0 ###

150
240
MS 0 0 0 0
M 0 ###
M 0 ###
0 0 0
M 0 ###
S 0 ###

S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

#DIV/0!
Loks. 0 ###
Ton/M3 0.0 ### 255,700
Ls ###

0
0
0
0
0
0
UGC / KABEL TANAH MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

ms 32
ms 0
M 0
M 0 0 695,840 695,840
M 0 0 695,840 695,840
M 32 ### 21,745 695,840 695,840
M 0 ###

0 0 0
MS 0 0 0
S ###
S ###
S ###
S ###
S ###
S ###

0 0 0
MS 0 0 0
B 0 ###
B 0 ###

MS 0 0 0 0
M3 0.00 ###
M3 0.00 ###
B 0 ###
MS 0 0 0 0
M3 0.00 ###
M3 0.00 ###
B 0 ###

0 0 0 0
0 0 0
S 0 ###

MS 0 0 0 0
M 0 ###
M 0 ###
B 0 ###
B 0 ###
B 0 ###
B 0 ###
B 0 ###

0 0 0
0 0 0 0
S 0 ###
M 0 ###
B 0 ###
B 0 ###
M 0 ###
B 0 ###

0 0 0 0
S 0 ###
M 0 ###
B 0 ###
B 0 ###
M 0 ###
B 0 ###
B 0 ###
B 0 ###

#DIV/0! 120,266 120,266


Loks. 0 ###
Ton/M3 0.3 ### 0 255,700 85,944 85,944
Ls ### 34,322 34,322

0
816,106
816,106
81,611
897,717
897,000

LBS MOTORIZED MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

MOTORIZED

3
B ###
B 3 ###

S 0 0 0
S 0 0 0

22,146,750 15,399,270 37,546,020


S 9 0 14,098,770 14,098,770
S 9 ### 1,305,445 11,749,005 11,749,005
S 0 ###
S 9 ### 261,085 2,349,765 2,349,765
S 9 2,970,000 116,010 3,086,010
B 18 ### 144,000 3,915 2,592,000 70,470 2,662,470
S 36 ### 10,500 1,265 378,000 45,540 423,540

S 9 19,176,750 1,184,490 20,361,240

52,651,620 8,037,225 60,688,845


S 9 14,275,980 3,134,250 17,410,230

S 9 5,738,040 515,565 6,253,605

S 9 23,744,880 3,045,825 26,790,705

S 9 7,326,720 1,068,480 8,395,200

S 9 1,566,000 273,105 1,839,105

20,955,240 1,506,263 22,461,503


S 9 15,195,600 1,011,690 16,207,290

9 5,759,640 494,573 6,254,213

6,864,750 665,925 7,530,675


3 1,393,200 499,200 1,892,400
B 3 ### 390,000 163,170 1,170,000 489,510 1,659,510
B 3 ### 74,400 3,230 223,200 9,690 232,890

9 5,471,550 166,725 5,638,275


S 27 ### 202,650 6,175 5,471,550 166,725 5,638,275
S 0 ###
S 0 ###

#DIV/0! 10,062,109 10,062,109


Loks. 14 ### 0 469,955 6,344,393 6,344,393
Ton/M3 4.5 ### 0 255,700 1,138,518 1,138,518
Ls ### 2,579,198 2,579,198

102,618,360
35,670,791
138,289,151
13,828,915
152,118,066
152,118,000

KUATAN JARINGAN (PRK.2019.DJT.1.1)

BLE 3x70 + 1x50 mm MALANG


HARGA SATUAN JUMLAH HARGA
Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

0 0 0
0 0 0 0
B 0 ###
B 0 ###

0 0 0
B 0 ###

S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0 0

S 0 0 0
S 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###
B 0 ###

S 0 0 0
S 0 ###
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###
S 0 0 0
S 0 ###
B 0 ###
B 0 ###

S 0 0 0
S 0 ###
S 0 ###
B 0 ###

S 0 0 0
S 0 ###
S 0 ###
B 0 ###

0 0 0
S 0 0 0
S 0 0 0

0 0 0
MS 0 0 0 0
M 0 ###

MS 0 0 0
B 0 ###
B 0 ###

#DIV/0!
Loks. 0 ### 250,000
Ton/M3 0.0 ### 255,700
Ls ###

0
0
0
0
0
0

KUATAN JARINGAN (PRK.2019.DJT.1.1)


INGAN JTM AAACS MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

untuk Pecah beban

0 0 0
B ###
B 114 ###
B 12 ###
B ###

S 48 1,219,920 181,060 58,556,160 8,690,880 67,247,040


S 183 891,600 98,315 163,162,800 17,991,645 181,154,445
S 4 1,879,920 250,110 7,519,680 1,000,440 8,520,120
S 0 0 0
S 8 637,200 83,380 5,097,600 667,040 5,764,640
S 0 0 0

S 235 890,400 101,995 209,244,000 23,968,825 233,212,825


S 0 0 0
S 60 1,683,600 162,750 101,016,000 9,765,000 110,781,000
S 0 0 0
S 19 375,120 112,095 7,127,280 2,129,805 9,257,085
S 0 0 0
S 19 1,510,320 250,335 28,696,080 4,756,365 33,452,445
S 13 2,103,000 258,385 27,339,000 3,359,005 30,698,005
S 0 0 0
S 0 0 0
S 29 2,838,720 359,440 82,322,880 10,423,760 92,746,640
S 0 0 0
S 0 0 0
S 6 3,624,840 408,840 21,749,040 2,453,040 24,202,080
S 0 0 0
S 0 0 0
S 4 3,167,520 600,130 12,670,080 2,400,520 15,070,600
S 0 0 0

S 61 865,200 100,525 52,777,200 6,132,025 58,909,225


S 0 0 0
S 17 1,785,480 180,915 30,353,160 3,075,555 33,428,715
S 0 0 0
S 1 1,668,600 268,170 1,668,600 268,170 1,936,770
S 3 2,422,020 302,460 7,266,060 907,380 8,173,440
S 0 0 0
S 18 2,868,720 362,715 51,636,960 6,528,870 58,165,830
S 2 3,912,840 414,200 7,825,680 828,400 8,654,080
S 0 0 0
S 0 0 0
S 6 3,298,320 600,545 19,789,920 3,603,270 23,393,190
S 0 0 0

S 113 13,153,200 1,381,990 14,535,190


S 113 ### 82,800 8,700 9,356,400 983,100 10,339,500
B 113 ### 16,800 1,250 1,898,400 141,250 2,039,650
B 226 ### 8,400 1,140 1,898,400 257,640 2,156,040

150 22,897
240
MS 22,897 369,215,760 232,787,720 602,003,480
M 69,721 ### 2,770 193,127,170 193,127,170
M ###
B 69 ### 174,240 13,980 12,022,560 964,620 12,987,180
B ###
M 22,897 ### 15,600 1,690 357,193,200 38,695,930 395,889,130

S 33 634,230 52,813 20,929,590 1,742,813 22,672,403


S 89 1,443,960 92,774 128,512,440 8,256,864 136,769,304
97,417,620 4,906,125 102,323,745
B 89 ### 26,400 5,200 2,349,600 462,800 2,812,400
M 1201.5 ### 58,200 1,650 69,927,300 1,982,475 71,909,775
S 89 ### 282,480 27,650 25,140,720 2,460,850 27,601,570
89 31,094,820 3,350,739 34,445,559
B 89 ### 92,400 7,830 8,223,600 696,870 8,920,470
B 89 ### 8,400 1,140 747,600 101,460 849,060
M 333.75 ### 18,480 2,605 6,167,700 869,419 7,037,119
B 445 ### 5,280 1,625 2,349,600 723,125 3,072,725
B 445 ### 3,960 1,220 1,762,200 542,900 2,305,100
B 89 ### 133,080 4,685 11,844,120 416,965 12,261,085

S 0 0 0

M 0 0 0
B 0 0 0
S 0 0 0
S 0 0 0

1 27,603,940 27,603,940
Loks. 22 ### -- 391,630 8,615,860 8,615,860
Ton/M3 45.4 ### -- 255,700 11,618,567 11,618,567
Ls ### - - 7,369,513 7,369,513

1,427,629,170
380,723,321
1,808,352,491
180,835,249
1,989,187,740
1,989,187,000

NGAN MVTIC SINGLE MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

C SINGLE

55 0 0 0
B ###
B 55 ###
B ###
B ###

S 5 6,099,600 905,300 7,004,900


S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

S 55 6,402,000 672,650 7,074,650


S 55 ### 82,800 8,700 4,554,000 478,500 5,032,500
B 55 ### 16,800 1,250 924,000 68,750 992,750
B 110 ### 8,400 1,140 924,000 125,400 1,049,400

150 2,768
240
MS 2,768 0 2,114,640 2,114,640
M 0 ###
M 54 ### 39,160 2,114,640 2,114,640

158,582,400 8,356,200 166,938,600


M 2,768 ### 24,000 1,780 66,432,000 4,927,040 71,359,040
S 2,648 ### 34,800 1,295 92,150,400 3,429,160 95,579,560

5
0 0 0 0
0 0 0 0
0 0 0 0
5 42,365,100 8,795,794 51,160,894
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

55
46 12,530,400 2,465,600 14,996,000
5 4,352,400 484,300 4,836,700
1 7,863,240 1,728,528 9,591,768
3 58,298,040 10,771,658 69,069,698
0 0 0 0
0 0 0 0
0 0 0 0

1 16,425,492 16,425,492
Loks. 6 ### 0 2,447,705 14,686,230 14,686,230
Ton/M3 6.2 ### 0 255,700 1,591,326 1,591,326
Ls ### 147,936 147,936

296,493,180
52,720,161
349,213,341
34,921,334
384,134,675
384,134,000

UGC / KABEL TANAH MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

L TANAH

ms 0
ms 192
M 172
M 0 0 4,870,525 4,870,525
M 6 0 4,870,525 4,870,525
M 0 ###
M 199 ### 24,475 4,870,525 4,870,525

35,760,000 7,832,670 43,592,670


MS 35,760,000 7,832,670 43,592,670
S 2 ### 6,720,000 1,305,445 13,440,000 2,610,890 16,050,890
S ###
S ###
S ###
S 4 ### 5,580,000 1,305,445 22,320,000 5,221,780 27,541,780
S ###

28,920,430 5,591,983 34,512,413


MS 4,610,400 532,100 5,142,500
B 34 ### 42,000 2,605 1,428,000 88,570 1,516,570
B 34 ### 93,600 13,045 3,182,400 443,530 3,625,930
MS 172 24,310,030 5,059,883 29,369,913
M3 5.50 ### 367,060 10,030 2,018,830 55,165 2,073,995
M3 27.52 ### 0 163,170 4,490,438 4,490,438
B 344 ### 64,800 1,495 22,291,200 514,280 22,805,480

MS 0 0 0 0
M3 0.00 ###
M3 0.00 ###
B 0 ###

4,944,600 664,468 5,609,068


0 130,470 130,470
S 6 ### 21,745 130,470 130,470

MS 6 4,944,600 533,998 5,478,598


M 5 ### 30,000 3,915 135,000 17,618 152,618
B 12 ### 50,160 7,830 601,920 93,960 695,880
B 6 ### 52,800 4,895 316,800 29,370 346,170
B 2 ### 882,000 55,945 1,764,000 111,890 1,875,890
B 6 ### 116,880 11,715 701,280 70,290 771,570
B 18 ### 79,200 11,715 1,425,600 210,870 1,636,470

2,532,780 216,515 2,749,295


2 2,532,780 216,515 2,749,295
S 2 ### 282,480 27,650 564,960 55,300 620,260
M 6 ### 58,200 1,650 349,200 9,900 359,100
B 6 ### 92,400 7,830 554,400 46,980 601,380
B 2 ### 31,680 4,895 63,360 9,790 73,150
M 9 ### 70,140 7,025 631,260 63,225 694,485
B 4 ### 92,400 7,830 369,600 31,320 400,920

0 0 0

#DIV/0! 3,477,025 3,477,025


Loks. 1 ### 0 2,447,705 2,447,705 2,447,705
Ton/M3 2.8 ### 0 255,700 726,794 726,794
Ls ### 302,525 302,525
72,157,810
22,653,185
94,810,995
9,481,100
104,292,095
104,292,000

LBS MOTORIZED MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

OSER/LBS MOTORIZED

B ###
B ###
S 14 ###
S 12 ###
S 24 ###
S 8 ###
S 3 ###

B ###
B ###

S 0 0 0
S 2 1,510,320 252,645 3,020,640 505,290 3,525,930
8,899,080 6,791,860 15,690,940
S 4 0 6,266,120 6,266,120
S 3 ### 1,305,445 3,916,335 3,916,335
S 1 ### 1,305,445 1,305,445 1,305,445
S 4 ### 261,085 1,044,340 1,044,340

S 4 1,320,000 51,560 1,371,560


B 8 ### 144,000 3,915 1,152,000 31,320 1,183,320
S 16 ### 10,500 1,265 168,000 20,240 188,240

S 4 7,579,080 474,180 8,053,260


B 12 ### 364,800 22,945 4,377,600 275,340 4,652,940
B 12 ### 44,400 2,970 532,800 35,640 568,440
B 12 ### 8,400 1,140 100,800 13,680 114,480
S 12 ### 202,650 10,295 2,431,800 123,540 2,555,340
M 12 ### 11,340 2,165 136,080 25,980 162,060

23,400,720 3,572,100 26,972,820


S 4 6,344,880 1,393,000 7,737,880
S 24 ### 21,745 521,880 521,880
M 24 ### 30,000 3,915 720,000 93,960 813,960
M 20 ### 70,140 7,025 1,402,800 140,500 1,543,300
B 72 ### 50,160 7,830 3,611,520 563,760 4,175,280
B 48 ### 4,800 295 230,400 14,160 244,560
B 12 ### 31,680 4,895 380,160 58,740 438,900

S 4 2,550,240 229,140 2,779,380


B 12 ### 42,600 7,025 511,200 84,300 595,500
B 12 ### 153,120 9,790 1,837,440 117,480 1,954,920
B 24 ### 8,400 1,140 201,600 27,360 228,960

S 4 10,553,280 1,353,700 11,906,980


B 8 ### 64,200 3,275 513,600 26,200 539,800
B 8 ### 96,120 5,200 768,960 41,600 810,560
B 4 ### 116,400 11,715 465,600 46,860 512,460
B 4 ### 63,600 11,715 254,400 46,860 301,260
B 32 ### 8,400 1,140 268,800 36,480 305,280
B 16 ### 44,400 2,970 710,400 47,520 757,920
S 4 ### 36,000 2,065 144,000 8,260 152,260
M 8 ### 30,000 3,915 240,000 31,320 271,320
B 8 ### 50,160 7,830 401,280 62,640 463,920
B 8 ### 34,200 7,025 273,600 56,200 329,800

S 4 3,256,320 474,880 3,731,200


S 8 ### 26,100 208,800 208,800
B 16 ### 153,120 9,790 2,449,920 156,640 2,606,560
B 96 ### 8,400 1,140 806,400 109,440 915,840

S 4 696,000 121,380 817,380


B 4 ### 63,600 11,715 254,400 46,860 301,260
S 4 ### 60,000 11,790 240,000 47,160 287,160
B 24 ### 8,400 1,140 201,600 27,360 228,960

9,390,000 683,765 10,073,765


S 4 6,830,160 463,955 7,294,115
S 4 ### 282,480 27,650 1,129,920 110,600 1,240,520
M 56 ### 58,200 1,650 3,259,200 92,400 3,351,600
B 8 ### 31,680 7,830 253,440 62,640 316,080
B 4 ### 155,760 7,830 623,040 31,320 654,360
B 12 ### 50,160 5,170 601,920 62,040 663,960
B 4 ### 133,080 4,685 532,320 18,740 551,060
M 15 ### 18,480 2,605 277,200 39,075 316,275
B 20 ### 5,280 1,625 105,600 32,500 138,100
B 12 ### 3,960 1,220 47,520 14,640 62,160

4 2,559,840 219,810 2,779,650


S 4 ### 282,480 27,650 1,129,920 110,600 1,240,520
B 4 ### 46,800 3,275 187,200 13,100 200,300
B 4 ### 31,680 7,830 126,720 31,320 158,040
M 16 ### 58,200 1,650 931,200 26,400 957,600
M 6 ### 18,480 2,605 110,880 15,630 126,510
B 8 ### 5,280 1,625 42,240 13,000 55,240
B 8 ### 3,960 1,220 31,680 9,760 41,440

1,215,900 178,020 1,393,920


0 0 0 0
B 0 ###
B 0 ###

2 1,215,900 178,020 1,393,920


S 6 ### 202,650 6,175 1,215,900 37,050 1,252,950
S 3 ### 0 46,990 140,970 140,970
S 0 ###

#DIV/0! 4,742,969 4,742,969


Loks. 6 ### 0 469,955 2,819,730 2,819,730
Ton/M3 1.9 ### 0 255,700 488,383 488,383
Ls ### 1,434,856 1,434,856

45,926,340
16,474,004
62,400,344
6,240,034
68,640,378
68,640,000

KUATAN JARINGAN (PRK.2019.DJT.1.1)

untuk Operasi GI Baru


HARGA SATUAN JUMLAH HARGA
Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

M ###
M ###
S ###
S ###
S ###
S ###
B ###
B ###
B ###
B ###

0 0 0
B ###
B ###
B ###
B ###

S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

S 0 0 0
S ###
B ###
B ###

150
240
MS 0 0 0
M ###
M ###
B ###
B ###
M ###

0
S 0 0 0
S 0 0 0

S 0 0 0

M 0 0 0
S 0 ###
S 0 ###

B 0 0 0
B 0 ###

S 0 0 0
S 0 ###
B 0 ###
B 0 ###

S 0 0 0
S 0 ###
B 0 ###
B 0 ###

#DIV/0!
Loks. 0 ### - -
Ton/M3 0.0 ### - 255,700 -
Ls ### - -

0
0
0
0
0
0

u untuk Operasi GI Baru MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

0 0 0
B ###
B ###
B ###
B ###

S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

S 0 0 0 0
S 0 ###
B 0 ###
B 0 ###

150
240
MS 0 0 0 0
M 0 ###
M 0 ###

0 0 0
M 0 ###
S 0 ###

0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0

0 0 0 0
0 0 0 0
0 0 0 0
0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0

0 0 0 0
0 0 0 0
0 0 0 0

#DIV/0!
Loks. 0 ###
Ton/M3 0.0 ### 255,700
Ls ###

0
0
0
0
0
0

u untuk Operasi GI Baru MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

B ###
B ###
B ###
B ###

S 0 0 0 0
S 0 ###
B 0 ###
B 0 ###

150
240
MS 0 0 0 0
M 0 ###
M 0 ###

0 0 0
M 0 ###
S 0 ###
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0
S 0 0 0

0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0

0 0 0 0
0 0 0 0
0 0 0 0

0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0

0 0 0 0
0 0 0 0
0 0 0 0

#DIV/0!
Loks. 0 ###
Ton/M3 0.0 ### 255,700
Ls ###

0
0
0
0
0
0

u untuk Operasi GI Baru MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

M ###
M ###
S ###

ms 0
ms 0
M 0
M 0 0 0 0
M 0 0 0 0
M 0 ###
M 0 ###

0 0 0
MS 0 0 0
S ###
S ###
S ###
S ###
S ###
S ###

0 0 0
MS 0 0 0
B 0 ###
B 0 ###

MS 0 0 0 0
M3 0.00 ###
M3 0.00 ###
B 0 ###

MS 0 0 0 0
M3 0.00 ###
M3 0.00 ###
B 0 ###

0 0 0
0 0 0
S 0 ###

MS 0 0 0 0
M 0 ###
B 0 ###
B 0 ###
B 0 ###
B 0 ###
B 0 ###

0 0 0
0 0 0 0
S 0 ###
M 0 ###
B 0 ###
B 0 ###
M 0 ###
B 0 ###
0 0 0
S 0 ###
M 0 ###
B 0 ###
B 0 ###
M 0 ###
B 0 ###
M 0 ###
B 0 ###
B 0 ###
B 0 ###

#DIV/0!
Loks. 0 ###
Ton/M3 0.0 ### 255,700
Ls ###

0
0
0
0
0
0

u untuk Operasi GI Baru MALANG

HARGA SATUAN JUMLAH HARGA


Sat Volume JUMLAH
MATERIAL JASA MATERIAL JASA

OSER/LBS MOTORIZED
B ###
B ###

S 0 0 0
S 0 0 0

0 0 0
S 0 0 0 0
S 0 ###
S 0 ###
S 0 ###

S 0 0 0 0
B 0 ###
S 0 ###

S 0 0 0 0

0 0 0
S 0 0 0 0

S 0 0 0 0
B 0 ###
B 0 ###
B 0 ###

S 0 0 0 0

S 0 0 0 0
S 0 ###
B 0 ###
B 0 ###

S 0 0 0 0
B 0 ###
S 0 ###
B 0 ###

0 0 0
S 0 0 0 0

0 0 0 0
S 0 ###
B 0 ###
B 0 ###
M 0 ###
M 0 ###
B 0 ###
B 0 ###

0 0 0
0 0 0 0
B 0 ###
B 0 ###

0 0 0 0
S 0 ###
S 0 ###
S 0 ###

#DIV/0!
Loks. 0 ###
Ton/M3 0.0 ### 255,700
Ls ###

0
0
0
0
0
0
M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###

###
###
###
###
###
###

###
###
###

###
###
###

###
###

###
###
###
###

###
###
###
###

###

###

###
###
###

M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###
###

###
###
###
###

###
###
###
###
###
###

###

###
###
###

###
###
###

###
###
###
###
###
###
###

###
###
###
###
###
###
###
###

###
###

###

M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###

###
###
###
###
###
###

###
###
###
###
###

###
###
###
###
###
###
###
###

###
###
###
###
###
###
###

###

###
###
M
a
t
e
r
i
a
l

###

###
###

###

###
###
###
###
###
###

###

###
###

###
###
###
###
###
###

###

###

###
###
###
###
###
###
###

###

###
###
###
###
###
###

###
###
###
###
###
###
###
###

###
###

###

M
a
t
e
r
i
a
l

###
###
###

###
###

###

###
###
###
###
###

###

###

###

###
###

###
###
###

###
###

###

M
a
t
e
r
i
a
l

###

###
###

###
###

###
###
###
###
###

###
###

###
###
###

###
###

###
###
###

###
###
###

###
###
###

###
###
###
###

###
###
###

###
###
###
###

###
###
###
###

###
###
###
###

###
###
###

###
###

###
###
###

###
###

###
###
###

###
###
###

###
###
###
###

###
###
###
###
###
###
###

###
###
###
###

###
###
###
###

###

###

###

###
###

###

###
###

M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###

###
###

###
###
###

###
###
###
###
###
###

###

###
###
###
###

###

###
M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###
###

###
###
###
###

###
###
###

###
###
###

###
###
###
###
###
###
###
###

###
###
###
###
###
###
###

###

###
###

M
a
t
e
r
i
a
l

###

###
###

###

###
###
###
###
###
###

###

###
###
###
###
###

###
###
###

###

###

###
###
###
###
###
###

###

###
###
###
###
###
###

###
###

###

M
a
t
e
r
i
a
l

###
###
###
###
###
###
###
###

###
###
###

###
###
###

###
###
###

###
###

###
###
###
###
###

###

###
###
###
###
###
###

###
###
###

###
###
###
###
###
###
###
###
###
###

###
###
###

###
###
###

###

###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###

###

###
###

###
###
###

###

###

###
M
a
t
e
r
i
a
l

###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###

###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###

###
###

###

###
###
###

###
###

###
###
###
###

###
###
###
###

###

###
M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###
###

###
###
###
###

###
###
###

###
###
###

###
###
###
###
###

###
###
###

###
###
###
###
###

###
###
###

###

###
###

M
a
t
e
r
i
a
l

###
###
###
###
###

###
###
###
###

###
###
###

###
###
###
###
###
###
###
###

###
###
###
###
###

###
###
###

###
###
###
###

###
###
###

###

###
###

M
a
t
e
r
i
a
l

###
###
###
###

###

###
###

###

###
###
###
###
###
###

###

###
###

###
###
###

###
###
###

###

###

###
###
###
###
###
###

###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###

###

###

M
a
t
e
r
i
a
l
###
###
###

###
###

###

###
###
###

###
###

###

###
###
###

###
###
###
###
###
###

###

###
###
###
###
###
###
###

###

###
###

###
###
###

###

###
###
PT PLN (PERSERO) DISTRIBUSI JAWA TIMUR

I PROGRAM PERKUATAN JARINGAN :


sesuai normalisasi
REKONFIGURASI JARINGAN
PRK.2018
PEKERJAAN JARINGAN JTM AA

NO.
MAT PEKERJAAN Ton/Kg Sat

II. PROGRAM PENURUNAN SUSUT DISTRIBUSI


2.1 Uprating Jaringan TM (JTM,MVTIC)

POLE TOP ARRANGEMENT :


Konstruksi TM-1 Set S
Konstruksi TM-1 Jumper Set S
Konstruksi TM-2 Set S
Konstruksi TM-4 Set S
Konstruksi TM-4A Set S
Konstruksi TM-5 Set S
Konstruksi TM-8 Set S
Konstruksi TM-8A Set S
Konstruksi TM-10 Set S
Konstruksi TM-12 Set S
Konstruksi TM-13 Set S
Konstruksi TM-4X Set S
Konstruksi TM-4XC Set S
Konstruksi TM-8X Set S
Konstruksi TM-8XC Set S
Konstruksi TM-10X Set S
Konstruksi TM-10XC Set S
Konstruksi AVS Portal Set S
Konstruksi LBS Motorized Set S
Konstruksi LBS Manual Set S
Konstruksi Trafo Cantol Set S
Konstruksi Trafo Portal Set S

CONDUCTOR & ACCESSORIES


MATERIAL JARINGAN
436 Isolated All. Binding - 4 mm Ø 6 0.095 897.41 M
205 Strain Clamp 150 - 240 mm - 3 nut 1.200 654.00 S
445 Joint Sleeve Non Tenion 150 mm 0.570 492.48 B
122 Line Tap Connector Type Al - 150 mm 0.800 235.20 B
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) 0.200 9.20 B
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 12.51 B
418 Live Line Connector / LTC 70-150 0.600 280.80 B

POLLE SUPORTER :
GUY WIRE MURNI 0.0 S
GUY WIRE NUMPANG 0.0 S
HORIZONTAL GUY WIRE MURNI 0.0 S
HORIZONTAL GUY WIRE NUMPANG 0.0 S
STRUT POLE 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 2 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 5 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 ( Underbuilt ) 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 0.0 S
KONTRUKSI TM - 2 0.0 S
KONTRUKSI TM - 5 0.0 S
KONTRUKSI TM - 10 0.0 S

ANTI CLIMBING + DANGER PLATE 0.00 S


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, bes 1.400 S
### 448 Tanda Bahaya Kecil 0.080 B
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B

150
240
CONDUCTOR ACCESSORIES MS
### 5 AAAC - S 150 sqmm ( SPLN ) 1 48,759.2 M
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0 M
### 93 Joint Sleeve 150 mm (507/U/2009) 33.5 7,996.9 B
### 94 Joint Sleeve 240 mm 0.0 0.0 B
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 0.0 M

RETOUR
205 Strain Clamp 150 - 240 mm - 3 nut 1.200 654.00 S
1 AAAC - 70 sqmm ( SPLN ) 0.235 55,429.40 M
2 AAAC - 150 sqmm ( SPLN ) 0.470 0.00 M

GROUNDING
GROUNDING DALAM 0.0 S
GROUNDING LUAR 0.0 S
Arrester Jaringan Tiang Lama 514.36 S

POLE BLOCK M
PONDASI TYPE A - Tiang JTM) B
VERLENK STUCK JARINGAN S
VERLENK STUCK STEEL WIRE S

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan
2.2 Uprating Jaringan TR (LV

NO.
MAT PEKERJAAN Ton/Kg Sat

II. PROGRAM PENURUNAN SUSUT DISTRIBUSI


2.2 Uprating Jaringan TR (LVTC)

TIANG BETON
248 Tiang Beton 9 - 200 daN + E 0.00 B
247 Tiang Beton 9 - 200 daN 0.00 B

PONDASI
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.00 B

POLE TOP SUPPORTER


GUY WIRE ( TR ) 1,499.37 S
GUY WIRE NUMPANG ( TR ) 866.03 S
HORIZONTAL GUY WIRE MURNI ( TR ) 0.00 S
HORIZONTAL GUY WIRE NUMPANG ( TR ) 0.00 S
STRUT POLE 0.0 S

POLE TOP ARRANGEMENT (Underbuilt)


KONSTRUKSI TR - 1 ( Underbuilt ) 1,532.96 S
KONSTRUKSI TR - 1 Jumper ( Underbuilt ) 17.60 S
KONSTRUKSI TR - 2 ( Underbuilt ) 418.00 S
KONSTRUKSI TR - 3 ( Underbuilt ) 265.28 S
KONSTRUKSI TR - 3A ( Underbuilt ) 28.34 S
KONSTRUKSI TR - 4 ( Underbuilt ) 6.48 S
KONSTRUKSI TR - 4A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4B ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 5 ( Underbuilt ) 83.09 S
KONSTRUKSI TR - 6 ( Underbuilt ) 323.08 S
KONSTRUKSI TR - 6A ( Underbuilt ) 4.93 S
KONSTRUKSI TR - 7 ( Underbuilt ) 102.46 S

POLE TOP ARRANGEMENT


KONSTRUKSI TR - 1 96.80 S
KONSTRUKSI TR - 1 Jumper 0.00 S
KONSTRUKSI TR - 2 77.00 S
KONSTRUKSI TR - 3 17.69 S
KONSTRUKSI TR - 4 4.32 S
KONSTRUKSI TR - 4A 0.00 S
KONSTRUKSI TR - 4B 0.00 S
KONSTRUKSI TR - 5 8.60 S
KONSTRUKSI TR - 6 7.88 S
KONSTRUKSI TR - 6A 4.93 S

GROUNDING JTR
GROUNDING DALAM JTR 374.66 S
GROUNDING LUAR JTR 0.00 S

CONDUCTOR & ACCESSORIES


CONDUCTOR MS
214 NFA2X-T;3x70 + 1x50 mm2 1.051 70,322.57 M

RETOUR
214 NFA2X-T;3x70 + 1x50 mm2 1.051 68,275.15 M
1 AAAC - 70 sqmm ( SPLN ) 0.235 0.00 M

KONSTRUKSI TR - 1 1.76 1,629.76 S


KONSTRUKSI TR - 2 2.75 495.00 S
KONSTRUKSI TR - 3 1.97 282.96 S
KONSTRUKSI TR - 3A ( Underbuilt ) 2.18 28.34 S
KONSTRUKSI TR - 4 2.16 10.80 S
KONSTRUKSI TR - 4A 4.91 0.00 S
KONSTRUKSI TR - 4B 3.15 0.00 S
KONSTRUKSI TR - 5 2.87 91.68 S
KONSTRUKSI TR - 6 3.94 330.96 S
KONSTRUKSI TR - 6A 4.93 9.86 S
KONSTRUKSI TR - 7 ( Underbuilt ) 2.18 102.46 S

JOINT ACCESSORIES MS
87 Insulated Tension Joint 70 mm 0.095 18.81 B
88 Insulated Non Tension Joint 50 mm 0.095 6.27 B

PEKERJAAN PENDUKUNG :
### 539 Commisioning test JTR 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

NO.
MAT PEKERJAAN Ton/Kg Sat

II. PROGRAM PENURUNAN SUSUT DISTRIBUSI


2.3 Trafo Sisipan dan Jaringan penunjang

TRANSFORMATOR CAN
NO.
MAT PEKERJAAN Ton/Kg Sat

TRAFO & PHB TR 2 JURUSAN


TRANSFORMATOR S
253 Trafo Distribusi 20 kV 3 PH 50 KVA Yzn5 ( D3 ) 465.5 0.00 B
254 Trafo Distribusi 20 kV 3 PH 100 KVA Yzn5 ( D3 ) 680.5 13,610.00 B

TIANG BETON :
243 Tiang Beton 13 - 350 daN + E 0.000 B
245 Tiang Beton 14 - 350 daN + E 0.000 B

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 1 487.1 S
KONTRUKSI TM - 4 55.7 S

CONDUCTOR & ACCESSORIES GARDU CANTOL


CONDUCTOR & ACCESSORIES 35.60 S
ARRESTER & CUT OUT :

GROUNDING DALAM 1.47 S


GROUNDING LUAR 22.33 S

RANGKA DUDUKAN TRAFO & PHB TR 2 JURUSAN


DUDUKAN CUT OUT SWITCH 476.20 S

DUDUKAN LIGHTNING ARRESTER 252.02 S

DUDUKAN TRANSFORMATOR 489.06 S

DUDUKAN PHB TR & PIPA 13.00 S


DUDUKAN PHB TR 123.40 S
58 Cross Arm type 900 NP. 8 3.570 B
104 Klem Begel U 11" - TM - (l=44mm, t=6mm) 2.464 B
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B

PHB, KABEL & ACCESORIES


DANGER PLATE 37.04 S
213 Tanda Bahaya Besar - (l=400mm, tgg=450mm) 0.080 B
202 Stainless Steel Strip non magnetic 0.020 M
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B
### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, bes 1.400 S
### 448 Tanda Bahaya Kecil 0.080 B
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B

PHB TR 2 JURUSAN 1,500.00 S


470 LV Panel 250A, 2 Jurusan (SPLN D3.016-1 : 2010)-LBS 75.000 S

KABEL 22.80
149 NYY 4 x 70 sqmm - Output ( SPLN ) 0.760 M
148 NYY 1 x 150 sqmm - Input ( SPLN ) 0.380 M

ACCESORIES 32.00
225 Terminal Lug 70 mm - Cu (507/U/2009) 0.400 B
228 Terminal Lug 150 mm - Cu (507/U/2009) 0.800 B
36 Comp. Joint Bimetal Al/Cu - 70/70 mm (507/U/2009) 0.400 B

PONDASI & PENGAMAN


PONDASI TRAFO 453.60 S
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.000 B
182 Pole Block (504/U/2009) 1.680 S
183 Pole Block Band 12" - TM (557/U/2009) 21.000 S

UNTUK PENGAMAN JTR : 0.00 S


69 Dead End Assembly ( DEA ) - komplit 1.780 S
35 Bundled End Assembly ( BEA ) - komplit 0.750 S
214 NFA2X-T;3x70 + 1x50 mm2 1.051 M

UNTUK PENGAMAN SR : 0.00 S


384 Line Tap Connector ( type press ) 6-25 / 35-70 mm + heatshrink 0.400 B
383 Conn.press Al 35-50 mm + cover vinil untuk kumisan 0.400 B

PEKERJAAN PENDUKUNG :
### 538 Commisioning test GD 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

TRANSFORMATOR POR

NO.
MAT PEKERJAAN Ton/Kg Sat

TIANG BETON :
243 Tiang Beton 13 - 350 daN + E 0.000 B
245 Tiang Beton 14 - 350 daN + E 0.000 B

TRAFO & PHB TR 4 JURUSAN


TRANSFORMATOR S
255 Trafo Distribusi 20 kV 3 PH 160 KVA Yzn5 ( D3 ) 886 9,741 B
256 Trafo Distribusi 20 kV 3 PH 200 KVA Dyn5 ( D3 ) 1,096 12,051 B
257 Trafo Distribusi 20 kV 3 PH 250 KVA Dyn5 ( D3 ) 1,250 B

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 1 548.0 S
KONTRUKSI TM - 12 (Trafo Portal Akhir) 388.3 S
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 32.7 S

CONDUCTOR & ACCESSORIES TRAFO PORTAL S


CONDUCTOR & ACCESSORIES 39.16 S
418 Live Line Connector / LTC 70-150 0.600 B
143 NYA 50 sqmm ( SPLN ) 0.190 M
222 Terminal Lug 50 mm - Cu (507/U/2009) 0.400 B
220 Terminal Lug 35-50 mm - Cu (507/U/2009) 0.400 B
142 NYA 35 sqmm ( SPLN ) 0.095 M
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) 0.095 M

ARRESTER & CUT OUT


420 Polymer Arrester 24 kV - 10 kA 1.700 S
419 Polymer Cut Out Switch 24 Kv - 100 kA 1.500 S

GROUNDING LUAR GARDU PORTAL : 37.21 S


GROUNDING DALAM GARDU PORTAL : 16.18 S

RANGKA DUDUKAN TRAFO & PHB TR 2 JURUSAN


TEMPAT DUDUKAN CUT OUT SWITCH : 363.44 S
52 Cross Arm UNP 100 x 50 x 5 mm - 2500 mm - (l=50mm, t=5mm, tg 14.280 B
70 Double Arm Band 8" - 7" - TM (504/U/2009) 2.240 B
352 Cross Arm type 2.000 NP.10 14.280 B

TEMPAT DUDUKAN ARRESTER : 245.63 S


51 Cross Arm UNP-80 - 2500 (l=45mm,t=3,5mm,tgg=80mm) 8.000 S
195 Single Arm Band 8" (504/U/2009) 2.240 B
351 Cross Arm type 2.000 NP. 8 8.925 B

Penjepit Tiang dg plat bordes u/ Dudukan Trafo: 892.34 S


DUDUKAN TRAFO PHB TR PORTAL 729.54 S

DUDUKAN LV PANEL : 253.55 S

PHB, KABEL & ACCESORIES


DANGER PLATE 40.74 S
213 Tanda Bahaya Besar - (l=400mm, tgg=450mm) 0.080 B
202 Stainless Steel Strip non magnetic 0.020 M
30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B
### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, bes 1.400 S
### 448 Tanda Bahaya Kecil 0.080 B
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B

PHB TR 4 JURUSAN 400 A - 2 PINTU : 2,615.58 S


471 LV Panel 400A, 4 Jurusan (SPLN D3.016-1 : 2010)-LBS 115.000 S

KABEL
149 NYY 4 x 70 sqmm - Output ( SPLN ) 0.760 M
148 NYY 1 x 150 sqmm - Input ( SPLN ) 0.380 M

ACCESORIES
225 Terminal Lug 70 mm - Cu (507/U/2009) 0.400 B
228 Terminal Lug 150 mm - Cu (507/U/2009) 0.800 B
36 Comp. Joint Bimetal Al/Cu - 70/70 mm (507/U/2009) 0.400 B
273 L Bow PVC 2" 0.500 B
274 L Bow PVC 3" 0.650 B

PONDASI & PENGAMAN


PONDASI TRAFO S
187 Pondasi type D ( 2 Tiang ) (91/U/2009) 0.000 B
182 Pole Block (504/U/2009) 1.680 S
183 Pole Block Band 12" - TM (557/U/2009) 21.000 S

UNTUK PENGAMAN JTR : S


69 Dead End Assembly ( DEA ) - komplit 1.780 1.78 S
35 Bundled End Assembly ( BEA ) - komplit 0.750 9.00 S
214 NFA2X-T;3x70 + 1x50 mm2 1.051 170.37 M

UNTUK PENGAMAN SR : 0.00 S


384 Line Tap Connector ( type press ) 6-25 / 35-70 mm + heatshrink 0.400 B
383 Conn.press Al 35-50 mm + cover vinil untuk kumisan 0.400 B

PEKERJAAN PENDUKUNG :
### 538 Commisioning test GD 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls
Jumlah Harga Material
Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

PEKERJAAN JARINGAN JTM AA

NO.
MAT PEKERJAAN Ton/Kg Sat

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0 B
### 243 Tiang Beton 13 - 350 daN + E 0 B
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0 B
### 247 Tiang Beton 9 - 200 daN 0 B

POLLE SUPORTER :
GUY WIRE MURNI 2,884.1 S
GUY WIRE NUMPANG 17.6 S
HORIZONTAL GUY WIRE MURNI 76.9 S
HORIZONTAL GUY WIRE NUMPANG 0.0 S
STRUT POLE 0.0 S
GUARDNET 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 1A ( Underbuilt ) 0.0 S
KONTRUKSI TM - 2 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4X ( Underbuilt ) 89.6 S
KONTRUKSI TM - 4XC ( Underbuilt ) 0.0 S
KONTRUKSI TM - 5 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8A ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8X ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 X ( Underbuilt ) 38.6 S
KONTRUKSI TM - 10 XC ( Underbuilt ) 0.0 S
KONTRUKSI TM - 11 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 12 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 13 ( Underbuilt ) 0.0 S
KONTRUKSI TM - TP2 ( Underbuilt ) 0.0 S
KONTRUKSI TM - TP2A ( Underbuilt ) 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 2,153.2 S
KONTRUKSI TM - 1A 0.0 S
KONTRUKSI TM - 2 954.2 S
KONTRUKSI TM - 4 139.4 S
KONTRUKSI TM - 5 292.3 S
KONTRUKSI TM - 8 115.0 S
KONTRUKSI TM - 8A 0.0 S
KONTRUKSI TM - 10 314.8 S
KONTRUKSI TM - 11 (akhir dan kabel) 0.0 S
KONTRUKSI TM - 12 (Trafo Portal Akhir) 43.1 S
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 32.7 S
KONTRUKSI TM - TP2 0.0 S
KONTRUKSI TM - TP2A 0.0 S

ANTI CLIMBING + DANGER PLATE 216.54 S

150
240
CONDUCTOR ACCESSORIES MS
### 5 AAAC - S 150 sqmm ( SPLN ) 1 4,607.1 M
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0 M
### 93 Joint Sleeve 150 mm (507/U/2009) 3.1 67.8 B
### 94 Joint Sleeve 240 mm 0.0 0.0 B
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 3,168.0 M

GROUNDING GW STEEL WIRE 35 MM


GROUNDING DALAM 60.0 S
GROUNDING LUAR 0.0 S
Arrester Jaringan Tiang Lama 0.00 S

POLE BLOCK M
PONDASI TYPE A - Tiang JTM) B
VERLENK STUCK JARINGAN S
VERLENK STUCK STEEL WIRE S

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

SUTR TWISTED CABLE 3x70 + 1x50

NO.
MAT PEKERJAAN Ton/Kg Sat
TIANG BETON
248 Tiang Beton 9 - 200 daN + E 0.00 B
247 Tiang Beton 9 - 200 daN 0.00 B

PONDASI
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.00 B

POLE TOP SUPPORTER


GUY WIRE ( TR ) 2,379.44 S
GUY WIRE NUMPANG ( TR ) 38.49 S
HORIZONTAL GUY WIRE MURNI ( TR ) 0.00 S
HORIZONTAL GUY WIRE NUMPANG ( TR ) 0.00 S
STRUT POLE 0.0 S

POLE TOP ARRANGEMENT (Underbuilt)


KONSTRUKSI TR - 1 ( Underbuilt ) 3.52 S
KONSTRUKSI TR - 1 Jumper (Underbuilt) 0.00 S
KONSTRUKSI TR - 2 ( Underbuilt ) 11.00 S
KONSTRUKSI TR - 3 ( Underbuilt ) 11.79 S
KONSTRUKSI TR - 3A ( Underbuilt ) 124.26 S
KONSTRUKSI TR - 4 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4B ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 5 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 6 ( Underbuilt ) 7.88 S
KONSTRUKSI TR - 6A ( Underbuilt ) 4.93 S
KONSTRUKSI TR - 7 ( Underbuilt ) 13.08 S

POLE TOP ARRANGEMENT


KONSTRUKSI TR - 1 31.68 S
KONSTRUKSI TR - 1 Jumper 0.00 S
KONSTRUKSI TR - 2 35.75 S
KONSTRUKSI TR - 3 112.01 S
KONSTRUKSI TR - 4 6.48 S
KONSTRUKSI TR - 4A 0.00 S
KONSTRUKSI TR - 4B 0.00 S
KONSTRUKSI TR - 5 0.00 S
KONSTRUKSI TR - 6 3.94 S
KONSTRUKSI TR - 6A 9.86 S

GROUNDING JTR
GROUNDING DALAM JTR 122.55 S
GROUNDING LUAR JTR 14.66 S

CONDUCTOR & ACCESSORIES


CONDUCTOR MS
214 NFA2X-T;3x70 + 1x50 mm2 1.051 2,507.54 M

JOINT ACCESSORIES MS

PEKERJAAN PENDUKUNG :
### 539 Commisioning test JTR 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

SUTR TWISTED CABLE 3x70 + 1x50

NO.
MAT PEKERJAAN Ton/Kg Sat

II. PROGRAM PENURUNAN SUSUT DISTRIBUSI


2.6 Penambahan SUTR untuk Tegangan drop ( seri SR Renteng diatas 5

TIANG BETON
248 Tiang Beton 9 - 200 daN + E 0.00 B
247 Tiang Beton 9 - 200 daN 0.00 B

PONDASI
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.00 B

POLE TOP SUPPORTER


GUY WIRE ( TR ) 3,292.10 S
GUY WIRE NUMPANG ( TR ) 76.98 S
HORIZONTAL GUY WIRE MURNI ( TR ) 0.00 S
HORIZONTAL GUY WIRE NUMPANG ( TR ) 0.00 S
STRUT POLE 32.2 S

POLE TOP ARRANGEMENT (Underbuilt)


KONSTRUKSI TR - 1 ( Underbuilt ) 40.48 S
KONSTRUKSI TR - 1 Jumper (Underbuilt) 0.00 S
KONSTRUKSI TR - 2 ( Underbuilt ) 22.00 S
KONSTRUKSI TR - 3 ( Underbuilt ) 23.58 S
KONSTRUKSI TR - 3A ( Underbuilt ) 8.72 S
KONSTRUKSI TR - 4 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4B ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 5 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 6 ( Underbuilt ) 3.94 S
KONSTRUKSI TR - 6A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 7 ( Underbuilt ) 82.84 S

POLE TOP ARRANGEMENT


KONSTRUKSI TR - 1 109.12 S
KONSTRUKSI TR - 1 Jumper 0.00 S
KONSTRUKSI TR - 2 104.50 S
KONSTRUKSI TR - 3 96.29 S
KONSTRUKSI TR - 4 4.32 S
KONSTRUKSI TR - 4A 0.00 S
KONSTRUKSI TR - 4B 0.00 S
KONSTRUKSI TR - 5 5.73 S
KONSTRUKSI TR - 6 39.40 S
KONSTRUKSI TR - 6A 19.72 S

GROUNDING JTR
GROUNDING DALAM JTR 141.81 S
GROUNDING LUAR JTR 39.80 S

CONDUCTOR & ACCESSORIES


CONDUCTOR MS
214 NFA2X-T;3x70 + 1x50 mm2 1.051 9,328.44 M

SR
SDES - 1 ( SR 1 Phasa, tarikan dari tiang ke Plgg ) S
SDES - 2 ( SR 1 Phasa, tarikan Plgg ke Plgg ) S

KUMISAN S
383 Conn.press Al 35-50 mm + cover vinil untuk kumisan 0.400 404.80 B
385 Line Tap Connector ( type press ) 35-70 / 35-70 mm + scoth 0.400 304.80 B
384 Line Tap Connector ( type press ) 6-25 / 35-70 mm + heatshrink 0.400 459.20 B

CONDUCTOR ACCESSORIES SR MS
268 Twisted Cable 2 x 10 mm² - Al 0.550 0.00 M

CONDUCTOR ACCESSORIES MS
JOINT ACCESSORIES MS
87 Insulated Tension Joint 70 mm 0.095 2.28 B
88 Insulated Non Tension Joint 50 mm 0.095 0.76 B

PEKERJAAN PENDUKUNG :
### 539 Commisioning test JTR 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls
Jumlah Harga Material
Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

PEKERJAAN JARINGAN JTM AA

NO.
MAT PEKERJAAN Ton/Kg Sat

PRK.2018.DJT.1.3
1.3 REKONFIGURASI PECAH BEBAN - KONSTRUKSI JTM

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0 B
### 243 Tiang Beton 13 - 350 daN + E 0 B
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0 B
### 247 Tiang Beton 9 - 200 daN 0 B

POLLE SUPORTER :
GUY WIRE MURNI 1,845.8 S
GUY WIRE NUMPANG 1,609.5 S
HORIZONTAL GUY WIRE MURNI 153.8 S
HORIZONTAL GUY WIRE NUMPANG 0.0 S
STRUT POLE 64.3 S
GUARDNET 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 7,381.6 S
KONTRUKSI TM - 1A ( Underbuilt ) 0.0 S
KONTRUKSI TM - 2 ( Underbuilt ) 1,889.5 S
KONTRUKSI TM - 4 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4X ( Underbuilt ) 14.9 S
KONTRUKSI TM - 4XC ( Underbuilt ) 0.0 S
KONTRUKSI TM - 5 ( Underbuilt ) 728.4 S
KONTRUKSI TM - 8 ( Underbuilt ) 748.9 S
KONTRUKSI TM - 8A ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8X ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 ( Underbuilt ) 1,111.7 S
KONTRUKSI TM - 10 X ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 XC ( Underbuilt ) 0.0 S
KONTRUKSI TM - 11 ( Underbuilt ) 237.6 S
KONTRUKSI TM - 12 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 13 ( Underbuilt ) 0.0 S
KONTRUKSI TM - TP2 ( Underbuilt ) 261.7 S
KONTRUKSI TM - TP2A ( Underbuilt ) 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 1,728.3 S
KONTRUKSI TM - 1A 0.0 S
KONTRUKSI TM - 2 523.3 S
KONTRUKSI TM - 4 0.0 S
KONTRUKSI TM - 5 36.5 S
KONTRUKSI TM - 8 172.5 S
KONTRUKSI TM - 8A 0.0 S
KONTRUKSI TM - 10 708.4 S
KONTRUKSI TM - 11 (akhir dan kabel) 78.3 S
KONTRUKSI TM - 12 (Trafo Portal Akhir) 0.0 S
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 0.0 S
KONTRUKSI TM - TP2 393.6 S
KONTRUKSI TM - TP2A 0.0 S

ANTI CLIMBING + DANGER PLATE 184.22 S

150
240
CONDUCTOR ACCESSORIES MS
### 5 AAAC - S 150 sqmm ( SPLN ) 1 14,184.7 M
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0 M
### 93 Joint Sleeve 150 mm (507/U/2009) 9.7 666.5 B
### 94 Joint Sleeve 240 mm 0.0 0.0 B
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 1,912.7 M

GROUNDING GW STEEL WIRE 35 MM


GROUNDING DALAM 53.5 S
GROUNDING LUAR 299.8 S
Arrester Jaringan Tiang Lama 0.00 S

POLE BLOCK M
PONDASI TYPE A - Tiang JTM) B
VERLENK STUCK JARINGAN S
VERLENK STUCK STEEL WIRE S

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan
H
A
JTM AAACS MALANG R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L

1,010
24
267
90

70
67

109
3
1
19

6
1
19
1
12
144

399,052,656 46,682,211 445,734,867


399,052,656 46,682,211 445,734,867
9,446.4 ### 11,340 2,165 107,122,176 20,451,456 127,573,632
545 ### 120,960 4,345 65,923,200 2,368,025 68,291,225
864 ### 95,040 13,980 82,114,560 12,078,720 94,193,280
294 ### 42,600 7,025 12,524,400 2,065,350 14,589,750
46 ### 153,120 9,790 7,043,520 450,340 7,493,860
92 ### 8,400 1,140 772,800 104,880 877,680
468 ### 264,000 19,580 123,552,000 9,163,440 132,715,440

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
###
###
###

78,707

78,707 41,643,360 667,204,960 708,848,320


239,662 ### 2,770 663,863,740 663,863,740
###
239 ### 174,240 13,980 41,643,360 3,341,220 44,984,580
###
###

0 222,192,860 222,192,860
545 ### 2,605 1,419,725 1,419,725
236,121 ### 935 220,773,135 220,773,135
0 ###

0 0 0
0 0 0
89 4,632,930 278,715 412,330,770 24,805,657 437,136,427

0 0 0
59,616,000 25,240,200 84,856,200
138 216,000 91,450 29,808,000 12,620,100 42,428,100
0 0 0

#DIV/0! 155,409,759 155,409,759


26 ### -- 391,630 10,182,380 10,182,380
494.1 ### -- 255,700 126,353,996 126,353,996
### - - 18,873,383 18,873,383

942,450,786
1,154,155,747
2,096,606,533
209,660,653
2,306,267,186
2,306,267,000
H
A
ngan TR (LVTC) MALANG R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L

0 0 0
0 0 0 0
0 ###
0 ###

0 0 0
0 ###

46 821,520 149,605 37,789,920 6,881,830 44,671,750


135 512,400 65,800 69,174,000 8,883,000 78,057,000
0 0 0
0 0 0
0 0 0

871 92,400 11,935 80,480,400 10,395,385 90,875,785


10 179,760 43,775 1,797,600 437,750 2,235,350
152 145,200 48,950 22,070,400 7,440,400 29,510,800
135 180,360 44,445 24,348,600 6,000,075 30,348,675
13 465,960 85,115 6,057,480 1,106,495 7,163,975
3 359,520 87,550 1,078,560 262,650 1,341,210
0 0 0
0 0 0
29 201,720 76,770 5,849,880 2,226,330 8,076,210
82 276,120 85,430 22,641,840 7,005,260 29,647,100
1 328,920 122,445 328,920 122,445 451,365
47 183,720 73,495 8,634,840 3,454,265 12,089,105

55 92,400 11,935 5,082,000 656,425 5,738,425


0 0 0
28 145,200 48,950 4,065,600 1,370,600 5,436,200
9 180,360 44,445 1,623,240 400,005 2,023,245
2 359,520 87,550 719,040 175,100 894,140
0 0 0
0 0 0
3 201,720 76,770 605,160 230,310 835,470
2 276,120 85,430 552,240 170,860 723,100
1 328,920 122,445 328,920 122,445 451,365

85,893,715 11,342,000 97,235,715


214 401,373 53,000 85,893,715 11,342,000 97,235,715
0 0 0

13,764,960 864,415,410 878,180,370


64,993 0 545,577,300 545,577,300
66,942 ### 8,150 545,577,300 545,577,300

0 317,815,770 317,815,770
64,993 ### 4,890 317,815,770 317,815,770
0 ###

926
180
144
13
5
0
0
32
84
2
47

1 13,764,960 1,022,340 14,787,300


198 ### 52,800 3,980 10,454,400 788,040 11,242,440
66 ### 50,160 3,550 3,310,560 234,300 3,544,860

1 59,149,709 59,149,709
53 ### 0 250,000 13,250,000 13,250,000
147.3 ### 0 255,700 37,675,885 37,675,885
### 8,223,825 8,223,825

392,887,315
992,248,749
1,385,136,064
138,513,606
1,523,649,671
1,523,649,000

H
A
R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L

MATOR CANTOL MALANG


HARGA SATUAN JUMLAH HARGA
Volume JUMLAH
MATERIAL JASA MATERIAL JASA

20 0 13,054,300 13,054,300
0 ###
20 ### 652,715 13,054,300 13,054,300

18 0 0 0
18 ###
0 ###

0 0 0
0 0 0
16 11,760,480 1,693,480 13,453,960
2 2,512,680 307,870 2,820,550

70,625,165 10,108,290 80,733,455


20 57,133,650 5,791,200 62,924,850
20 0 2,870,700 2,870,700

1 856,505 87,810 944,315


6 12,635,010 1,358,580 13,993,590

221,672,000 13,736,200 235,408,200


20 36,696,000 2,725,900 39,421,900

20 57,499,200 3,854,400 61,353,600

20 35,155,200 2,588,900 37,744,100

20 81,468,800 4,111,200 85,580,000


20 10,852,800 455,800 11,308,600
40 ### 96,120 5,200 3,844,800 208,000 4,052,800
40 ### 158,400 3,915 6,336,000 156,600 6,492,600
80 ### 8,400 1,140 672,000 91,200 763,200

62,793,600 27,258,100 90,051,700


20 6,825,600 639,000 7,464,600
20 ### 73,200 2,605 1,464,000 52,100 1,516,100
20 ### 18,480 2,605 369,600 52,100 421,700
40 ### 8,400 1,140 336,000 45,600 381,600
40 ### 82,800 8,700 3,312,000 348,000 3,660,000
40 ### 16,800 1,250 672,000 50,000 722,000
80 ### 8,400 1,140 672,000 91,200 763,200

20 0 6,527,100 6,527,100
20 ### 326,355 6,527,100 6,527,100

20 0 14,735,600 14,735,600
380.0 ### 22,020 8,367,600 8,367,600
800.0 ### 7,960 6,368,000 6,368,000

20 55,968,000 5,356,400 61,324,400


40 ### 79,200 7,830 3,168,000 313,200 3,481,200
160 ### 145,200 9,790 23,232,000 1,566,400 24,798,400
320 ### 92,400 10,865 29,568,000 3,476,800 33,044,800

14,817,360 5,833,660 20,651,020


20 12,312,000 4,659,900 16,971,900
20 ### 390,000 163,170 7,800,000 3,263,400 11,063,400
20 ### 150,000 55,945 3,000,000 1,118,900 4,118,900
20 ### 75,600 13,880 1,512,000 277,600 1,789,600

2,505,360 1,173,760 3,679,120


18 ### 96,360 41,655 1,734,480 749,790 2,484,270
8 ### 96,360 37,715 770,880 301,720 1,072,600
15 ### 8,150 122,250 122,250

0 0 0
###
###

1 13,775,456 13,775,456
20 ### 0 250,000 5,000,000 5,000,000
17.6 ### 0 255,700 4,503,218 4,503,218
### 4,272,238 4,272,238

384,181,285
85,767,356
469,948,641
46,994,864
516,943,505
516,943,000

H
A
MATOR PORTAL MALANG R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L
94 0 37,857,590 37,857,590
36 ### 979,075 35,246,700 35,246,700
2 ### 1,305,445 2,610,890 2,610,890

22 0 17,981,040 17,981,040
11 ### 783,265 8,615,915 8,615,915
11 ### 851,375 9,365,125 9,365,125
###

0 0 0
18 13,230,540 1,905,165 15,135,705
9 14,180,400 1,419,030 15,599,430
1 1,569,600 225,750 1,795,350

22 103,315,331 13,914,586 117,229,918


22 62,847,015 6,370,320 69,217,335
66 ### 264,000 19,580 17,424,000 1,292,280 18,716,280
99.0 ### 77,525 7,025 7,674,975 695,475 8,370,450
66 ### 60,720 7,830 4,007,520 516,780 4,524,300
352 ### 68,640 7,830 24,161,280 2,756,160 26,917,440
165.0 ### 30,000 3,915 4,950,000 645,975 5,595,975
66.0 ### 70,140 7,025 4,629,240 463,650 5,092,890

22 0 3,157,770 3,157,770
66 ### 21,745 1,435,170 1,435,170
66 ### 26,100 1,722,600 1,722,600

10 25,638,900 2,713,850 28,352,750


11 14,829,416 1,672,646 16,502,063

279,114,110 19,730,810 298,844,920


22 46,437,600 3,705,900 50,143,500
44 ### 574,200 49,565 25,264,800 2,180,860 27,445,660
44 ### 116,400 11,715 5,121,600 515,460 5,637,060
44 ### 364,800 22,945 16,051,200 1,009,580 17,060,780

22 22,392,480 2,063,930 24,456,410


22 ### 292,560 41,655 6,436,320 916,410 7,352,730
44 ### 70,800 5,895 3,115,200 259,380 3,374,580
44 ### 291,840 20,185 12,840,960 888,140 13,729,100

22 38,651,580 3,431,450 42,083,030


22 140,770,850 8,934,090 149,704,940

22 30,861,600 1,595,440 32,457,040

68,001,120 39,687,010 107,688,130


22 7,914,720 760,210 8,674,930
22 ### 73,200 2,605 1,610,400 57,310 1,667,710
44 ### 18,480 2,605 813,120 114,620 927,740
44 ### 8,400 1,140 369,600 50,160 419,760
44 ### 82,800 8,700 3,643,200 382,800 4,026,000
44 ### 16,800 1,250 739,200 55,000 794,200
88 ### 8,400 1,140 739,200 100,320 839,520

22 0 8,615,860 8,615,860
22 ### 391,630 8,615,860 8,615,860

22 0 25,413,520 25,413,520
836 ### 22,020 18,408,720 18,408,720
880 ### 7,960 7,004,800 7,004,800

22 60,086,400 4,897,420 64,983,820


88 ### 79,200 7,830 6,969,600 689,040 7,658,640
176 ### 145,200 9,790 25,555,200 1,723,040 27,278,240
176 ### 92,400 10,865 16,262,400 1,912,240 18,174,640
176 ### 42,000 2,605 7,392,000 458,480 7,850,480
44 ### 88,800 2,605 3,907,200 114,620 4,021,820

37,605,480 13,345,322 50,950,802


22 36,352,800 11,529,320 47,882,120
22 ### 750,000 244,760 16,500,000 5,384,720 21,884,720
88 ### 150,000 55,945 13,200,000 4,923,160 18,123,160
88 ### 75,600 13,880 6,652,800 1,221,440 7,874,240

1,252,680 1,816,002 3,068,682


1 ### 96,360 41,655 96,360 41,655 138,015
12 ### 96,360 37,715 1,156,320 452,580 1,608,900
162 ### 8,150 1,321,767 1,321,767

0 0 0
###
###

1 21,116,783 21,116,783
22 ### 0 326,355 7,179,810 7,179,810
28.2 ### 0 255,700 7,204,220 7,204,220
### 6,732,753 6,732,753
517,016,581
167,183,086
684,199,667
68,419,967
752,619,634
752,619,000

H
JTM AAACS MALANG A
R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L
0 0 0
###
134 ###
2 ###
###

75 1,219,920 181,060 91,494,000 13,579,500 105,073,500


2 891,600 98,315 1,783,200 196,630 1,979,830
2 1,879,920 250,110 3,759,840 500,220 4,260,060
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0
6 307,800 109,905 1,846,800 659,430 2,506,230
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
1 1,297,020 188,710 1,297,020 188,710 1,485,730
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

76 646,230 90,708 49,113,480 6,893,770 56,007,250


0 0 0
31 1,347,540 187,770 41,773,740 5,820,870 47,594,610
5 1,256,340 153,935 6,281,700 769,675 7,051,375
8 1,578,600 268,290 12,628,800 2,146,320 14,775,120
2 2,143,668 294,278 4,287,336 588,556 4,875,892
0 0 0
8 2,722,740 360,790 21,781,920 2,886,320 24,668,240
0 0 0
1 1,575,600 157,670 1,575,600 157,670 1,733,270
1 1,569,600 225,750 1,569,600 225,750 1,795,350
0 0 0
0 0 0

134 15,597,600 1,638,820 17,236,420

7,437

7,437 116,153,280 75,202,210 191,355,490


22,645 ### 2,770 62,726,650 62,726,650
###
22 ### 174,240 13,980 3,833,280 307,560 4,140,840
###
7,200 ### 15,600 1,690 112,320,000 12,168,000 124,488,000

33
37 549,371 52,305 20,326,736 1,935,285 22,262,021
0 0 0
0 0 0

0 0 0
9 966,000 407,037 8,694,000 3,663,330 12,357,330
12 216,000 91,450 2,592,000 1,097,400 3,689,400
0 0 0

1 9,657,210 9,657,210
7 ### -- 391,630 2,741,410 2,741,410
18.1 ### -- 255,700 4,636,074 4,636,074
### - - 2,279,726 2,279,726

402,556,652
127,807,676
530,364,328
53,036,433
583,400,761
583,400,000

x70 + 1x50 mm MALANG H


A
R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L
0 0 0
94 0 0 0
64 ###
30 ###

0 0 0
0 ###

73 821,520 149,605 59,970,960 10,921,165 70,892,125


6 512,400 65,800 3,074,400 394,800 3,469,200
0 0 0
0 0 0
0 0 0 0

2 92,400 11,935 184,800 23,870 208,670


0 0 0
4 145,200 48,950 580,800 195,800 776,600
6 180,360 44,445 1,082,160 266,670 1,348,830
57 465,960 85,115 26,559,720 4,851,555 31,411,275
0 0 0
0 0 0
0 0 0
0 0 0
2 276,120 85,430 552,240 170,860 723,100
1 328,920 122,445 328,920 122,445 451,365
6 183,720 73,495 1,102,320 440,970 1,543,290

18 92,400 11,935 1,663,200 214,830 1,878,030


0 0 0
13 145,200 48,950 1,887,600 636,350 2,523,950
57 180,360 44,445 10,280,520 2,533,365 12,813,885
3 359,520 87,550 1,078,560 262,650 1,341,210
0 0 0
0 0 0
0 0 0
1 276,120 85,430 276,120 85,430 361,550
2 328,920 122,445 657,840 244,890 902,730

32,144,525 4,273,929 36,418,454


70 401,373 53,000 28,096,075 3,710,000 31,806,075
7 578,350 80,561 4,048,450 563,929 4,612,379

417,120 19,485,030 19,902,150


2,318 0 19,454,050 19,454,050
2,387 ### 8,150 19,454,050 19,454,050

4 417,120 30,980 448,100

1 10,184,154 10,184,154
34 ### 0 250,000 8,500,000 8,500,000
5.4 ### 0 255,700 1,390,911 1,390,911
### 293,243 293,243

141,841,805
55,308,762
197,150,567
19,715,057
216,865,624
216,865,000

H
A
x70 + 1x50 mm MALANG R
G
A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L
ng diatas 5)

41,340,000 17,296,020 58,636,020


177 41,340,000 17,296,020 58,636,020
70 ###
107 ###

20,670,000 8,648,010 29,318,010


53 ### 390,000 163,170 20,670,000 8,648,010 29,318,010

101 821,520 149,605 82,973,520 15,110,105 98,083,625


12 512,400 65,800 6,148,800 789,600 6,938,400
0 0 0
0 0 0
4 637,200 83,380 2,548,800 333,520 2,882,320

23 92,400 11,935 2,125,200 274,505 2,399,705


0 0 0
8 145,200 48,950 1,161,600 391,600 1,553,200
12 180,360 44,445 2,164,320 533,340 2,697,660
4 465,960 85,115 1,863,840 340,460 2,204,300
0 0 0
0 0 0
0 0 0
0 0 0
1 276,120 85,430 276,120 85,430 361,550
0 0 0
38 183,720 73,495 6,981,360 2,792,810 9,774,170

62 92,400 11,935 5,728,800 739,970 6,468,770


0 0 0
38 145,200 48,950 5,517,600 1,860,100 7,377,700
49 180,360 44,445 8,837,640 2,177,805 11,015,445
2 359,520 87,550 719,040 175,100 894,140
0 0 0
0 0 0
2 201,720 76,770 403,440 153,540 556,980
10 276,120 85,430 2,761,200 854,300 3,615,500
4 328,920 122,445 1,315,680 489,780 1,805,460

43,499,823 5,823,664 49,323,486


81 401,373 53,000 32,511,173 4,293,000 36,804,173
19 578,350 80,561 10,988,650 1,530,664 12,519,314

1,668,480 72,495,920 74,164,400


8,622 0 72,372,000 72,372,000
8,880 ### 8,150 72,372,000 72,372,000

207,129,240 112,745,670 319,874,910


381 181,080 100,320 68,991,480 38,221,920 107,213,400
574 121,440 94,715 69,706,560 54,366,410 124,072,970

253 270,479 79,673 68,431,200 20,157,340 88,588,540


1,012 ### 26,400 4,895 26,716,800 4,953,740 31,670,540
762 ### 21,840 7,960 16,642,080 6,065,520 22,707,600
1,148 ### 21,840 7,960 25,072,320 9,138,080 34,210,400

0 ###

11,790 142 11 1,668,480 123,920 1,792,400


17 1,668,480 123,920 1,792,400
24 ### 52,800 3,980 1,267,200 95,520 1,362,720
8 ### 50,160 3,550 401,280 28,400 429,680

1 24,130,390 24,130,390
40 ### 0 250,000 10,000,000 10,000,000
45.1 ### 0 255,700 11,530,200 11,530,200
### 2,600,190 2,600,190
447,502,983
268,365,559
715,868,541
71,586,854
787,455,395
787,455,000

H
A
R
G
JTM AAACS MALANG A
M
HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L

0 0 0
###
114 ###
12 ###
###

48 1,219,920 181,060 58,556,160 8,690,880 67,247,040


183 891,600 98,315 163,162,800 17,991,645 181,154,445
4 1,879,920 250,110 7,519,680 1,000,440 8,520,120
0 0 0
8 637,200 83,380 5,097,600 667,040 5,764,640
0 0 0

235 671,430 92,178 157,786,050 21,661,713 179,447,763


0 0 0
60 1,245,660 169,605 74,739,600 10,176,300 84,915,900
0 0 0
1 307,800 109,905 307,800 109,905 417,705
0 0 0
19 1,443,000 250,455 27,417,000 4,758,645 32,175,645
13 1,824,648 250,203 23,720,424 3,252,639 26,973,063
0 0 0
0 0 0
29 2,692,740 357,515 78,089,460 10,367,935 88,457,395
0 0 0
0 0 0
6 9,436,560 1,613,510 56,619,360 9,681,060 66,300,420
0 0 0
0 0 0
4 3,009,120 597,350 12,036,480 2,389,400 14,425,880
0 0 0

61 646,230 90,708 39,420,030 5,533,158 44,953,188


0 0 0
17 1,347,540 187,770 22,908,180 3,192,090 26,100,270
0 0 0
1 1,578,600 268,290 1,578,600 268,290 1,846,890
3 2,143,668 294,278 6,431,004 882,834 7,313,838
0 0 0
18 2,722,740 360,790 49,009,320 6,494,220 55,503,540
2 9,546,960 1,609,690 19,093,920 3,219,380 22,313,300
0 0 0
0 0 0
6 3,139,920 597,765 18,839,520 3,586,590 22,426,110
0 0 0

114 13,269,600 1,394,220 14,663,820

22,897

22,897 79,835,760 201,438,220 281,273,980


69,721 ### 2,770 193,127,170 193,127,170
###
69 ### 174,240 13,980 12,022,560 964,620 12,987,180
###
4,347 ### 15,600 1,690 67,813,200 7,346,430 75,159,630

27
33 525,611 52,610 17,345,171 1,736,130 19,081,301
89 977,231 100,845 86,973,581 8,975,205 95,948,786
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

1 17,127,874 17,127,874
1 ### -- 391,630 391,630 391,630
37.0 ### -- 255,700 9,458,378 9,458,378
### - - 7,277,866 7,277,866

1,019,757,101
344,595,812
1,364,352,912
136,435,291
1,500,788,203
1,500,788,000
PROGRAM PERKUATAN JARINGAN :
PENGADAAN DAN PEMASANGAN SECTIONALIZER
PRK.2013.DJT.1.7

RECLOSER 20 KV

NO URAIAN PEKERJAAN SAT EXSIST

1
2

NO.
MAT PEKERJAAN Sat Volume

RECLOSER 20 KV - 400 A + RTU S 1


425 Recloser Motorized + RTU + Kabel Data S 1
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel S 1

TAMBAHAN DUDUKAN RECLOSER S 1


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 2
27 Bolt & Nut M.16 x 120 (517/U/2009) S 4

PENGAMAN JUMPERAN S 1
405 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu - (l=50mm, t= B 3
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) B 3
30 Bolt & Nut M.16 x 50 (517/U/2009) B 3
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 3
436 Isolated All. Binding - 4 mm Ø 6 M 3

LIGHTNING ARRESTER S 1
420 Polymer Arrester 24 kV - 10 kA S 6
142 NYA 35 sqmm ( SPLN ) M 6
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 5
219 Terminal Lug 35 mm - Cu (507/U/2009) B 18
32 Bolt M.12 x 30 - CU B 12
446 Klem C - 25/25 mm - Cu B 3

JUMPERAN S 1
122 Line Tap Connector Type Al - 150 mm B 3
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) B 3
30 Bolt & Nut M.16 x 50 (517/U/2009) B 6

TAMBAHAN DUDUKAN PT OD S 1
59 Cross Arm type 500 - NP. 8 B 2
58 Cross Arm type 900 NP. 8 B 2
70 Double Arm Band 8" - 7" - TM (504/U/2009) B 1
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 8
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) B 4
28 Double Arm Bolt & Nut M.16 x 350 (besi as) S 1
142 NYA 35 sqmm ( SPLN ) M 2
219 Terminal Lug 35 mm - Cu (507/U/2009) B 2
119 Line Tap Connector Al 150 - 50 mm type G B 2

TAMBAHAN DUDUKAN CONTROL BOX S 1


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
196 Single Guy Wire Band 8" - TM (513/U/2009) S 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 6

GROUNDING RECLOSER S 1
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
1 AAAC - 70 sqmm ( SPLN ) M 14
226 Terminal Lug 70 mm Al (507/U/2009) B 2
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 1
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 3
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 1
202 Stainless Steel Strip non magnetic M 3
203 Stoping Buckle non magnetic B 4
123 Link (506/U/2009) B 3

GROUNDING CONTROL BOX 1


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) B 1
226 Terminal Lug 70 mm Al (507/U/2009) B 1
1 AAAC - 70 sqmm ( SPLN ) M 4
202 Stainless Steel Strip non magnetic M 2
203 Stoping Buckle non magnetic B 2
123 Link (506/U/2009) B 2

ACCESSORIES 1
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 1
172 Pipa Air PVC 2" - 3 meter ( AW ) B 1

RETOUR / BONGKAR 1
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 1

Jumlah Harga Material 0


Jumlah Harga Jasa
Asuransi Material Ls
Asuransi Tenaga Kerja Pekerja
Sertifikasi ( SLO ) 1 lokasi Lokasi 1
Angkutan Material Ton/M3
- Angkutan Zona 1 Ton/M3 61,600
- Angkutan Zona 2 Ton/M3 114,000
- Angkutan Zona 3 Ton/M3 166,400
LBS MOTORIZED 20
NO.
MAT PEKERJAAN Sat Volume

LBS MOTORIZED 20 KV - 400 A + RTU S 1


424 LBS Motorized + RTU + Kabel Data S 1
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel S 1
290 Plat nama Penyulang Besar Double 0.000 1
282 1 Unit External PT 20 kV (phasa-phasa) S 1

LIGHTNING ARRESTER S 1
420 Polymer Arrester 24 kV - 10 kA S 6

ACCESORIES LIGHTNING ARRESTER 1


142 NYA 35 sqmm ( SPLN ) M 6
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 5
219 Terminal Lug 35 mm - Cu (507/U/2009) B 18
32 Bolt M.12 x 30 - CU B 12
446 Klem C - 25/25 mm - Cu B 3

DUDUKAN PT EXTERNAL + COS S 1


70 Double Arm Band 8" - 7" - TM (504/U/2009) B 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 8
219 Terminal Lug 35 mm - Cu (507/U/2009) B 2
57 Cross Arm type 1.000 NP. 6,5 B 1
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 2
419 Polymer Cut Out Switch 24 Kv - 100 kA S 2
1 AAAC - 70 sqmm ( SPLN ) M 6
224 Terminal lug 70 mm AL/CU u/ CO (507/U/2009) B 6
122 Line Tap Connector Type Al - 150 mm B 2

TAMBAHAN DUDUKAN LBS S 1


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 2
27 Bolt & Nut M.16 x 120 (517/U/2009) S 4

TAMBAHAN DUDUKAN CONTROL BOX S 1


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
196 Single Guy Wire Band 8" - TM (513/U/2009) S 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 6

GROUNDING LBS S 1
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
1 AAAC - 70 sqmm ( SPLN ) M 14
226 Terminal Lug 70 mm Al (507/U/2009) B 2
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 1
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 3
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 1
202 Stainless Steel Strip non magnetic M 3
203 Stoping Buckle non magnetic B 4
123 Link (506/U/2009) B 3

GROUNDING CONTROL BOX 1


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) B 1
226 Terminal Lug 70 mm Al (507/U/2009) B 1
1 AAAC - 70 sqmm ( SPLN ) M 4
202 Stainless Steel Strip non magnetic M 2
203 Stoping Buckle non magnetic B 2
123 Link (506/U/2009) B 2

ACCESSORIES 1
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 1
172 Pipa Air PVC 2" - 3 meter ( AW ) B 1

RETOUR / BONGKAR 1
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 1
Jumlah Harga Material 0
Jumlah Harga Jasa
Asuransi Material Ls
Asuransi Tenaga Kerja Pekerja
Sertifikasi ( SLO ) 1 lokasi Lokasi 1
Angkutan Material Ton/M3
- Angkutan Zona 1 Ton/M3 68,700
- Angkutan Zona 2 Ton/M3 127,200
- Angkutan Zona 3 Ton/M3 185,700

LBS MOTORIZED 20 KV
NO.
MAT PEKERJAAN Sat Volume

LBS MOTORIZED 20 KV - 400 A TANPA RTU S 0


443 LBS Motorized Non RTU S 0

TAMBAHAN DUDUKAN LBS S 0


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 0
27 Bolt & Nut M.16 x 120 (517/U/2009) S 0

TAMBAHAN DUDUKAN CONTROL BOX S 0


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 0
196 Single Guy Wire Band 8" - TM (513/U/2009) S 0
30 Bolt & Nut M.16 x 50 (517/U/2009) B 0

GROUNDING LBS S 0
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 0
1 AAAC - 70 sqmm ( SPLN ) M 0
226 Terminal Lug 70 mm Al (507/U/2009) B 0
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 0
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 0
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 0
202 Stainless Steel Strip non magnetic M 0
203 Stoping Buckle non magnetic B 0
123 Link (506/U/2009) B 0

ACCESSORIES 0
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 0
172 Pipa Air PVC 2" - 3 meter ( AW ) B 0

RETOUR / BONGKAR 0
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 0

Jumlah Harga Material 0


Jumlah Harga Jasa
Asuransi Material Ls
Asuransi Tenaga Kerja Pekerja
Sertifikasi ( SLO ) 1 lokasi Lokasi 1
Angkutan Material Ton/M3
- Angkutan Zona 1 Ton/M3 0
- Angkutan Zona 2 Ton/M3 0
- Angkutan Zona 3 Ton/M3 0
Sesuai gbr. JTM/REC/001

OSER 20 KV - 400 A + RTU

EXSIST Recloser LBS + RTU LBS Non RTU

HARGA JUMLAH JUMLAH JASA


MATERIAL JASA MATERIAL Zona 1 Zona 2 Zona 3

0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0

330,000 0 330,000 0 0 0
144,000 0 288,000 0 0 0
10,500 0 42,000 0 0 0

1,894,770 0 1,894,770 0 0 0
364,800 0 1,094,400 0 0 0
44,400 0 133,200 0 0 0
8,400 0 25,200 0 0 0
202,650 0 607,950 0 0 0
11,340 0 34,020 0 0 0

5,583,570 0 5,583,570 0 0 0
666,225 0 3,997,350 0 0 0
30,000 0 180,000 0 0 0
70,140 0 350,700 0 0 0
50,160 0 902,880 0 0 0
4,800 0 57,600 0 0 0
31,680 0 95,040 0 0 0

637,560 0 637,560 0 0 0
42,600 0 127,800 0 0 0
153,120 0 459,360 0 0 0
8,400 0 50,400 0 0 0

1,010,160 0 1,010,160 0 0 0
64,200 0 128,400 0 0 0
96,120 0 192,240 0 0 0
116,400 0 116,400 0 0 0
63,600 0 63,600 0 0 0
8,400 0 67,200 0 0 0
44,400 0 177,600 0 0 0
36,000 0 36,000 0 0 0
30,000 0 60,000 0 0 0
50,160 0 100,320 0 0 0
34,200 0 68,400 0 0 0

174,000 0 174,000 0 0 0
63,600 0 63,600 0 0 0
60,000 0 60,000 0 0 0
8,400 0 50,400 0 0 0

1,012,550 0 1,012,550 0 0 0
282,480 0 282,480 0 0 0
9,925 0 138,950 0 0 0
31,680 0 63,360 0 0 0
155,760 0 155,760 0 0 0
50,160 0 150,480 0 0 0
133,080 0 133,080 0 0 0
18,480 0 55,440 0 0 0
5,280 0 21,120 0 0 0
3,960 0 11,880 0 0 0

446,860 0 446,860 0 0 0
282,480 0 282,480 0 0 0
46,800 0 46,800 0 0 0
31,680 0 31,680 0 0 0
9,925 0 39,700 0 0 0
18,480 0 27,720 0 0 0
5,280 0 10,560 0 0 0
3,960 0 7,920 0 0 0

464,400 0 464,400 0 0 0
390,000 0 390,000 0 0 0
74,400 0 74,400 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0

11,553,870 ###
0 0 0
28,800
0
0

61,600
114,000
166,400
Zona 1 Zona 2 Zona 3
Jumlah 11,644,270 11,696,670 11,749,070
PPN 10% 1,164,427 1,169,667 1,174,907
Total 12,808,697 12,866,337 12,923,977
Dibulatkan 12,808,000 12,866,000 12,923,000
PAGU
TORIZED 20 KV - 400 A + RTU
HARGA JUMLAH JUMLAH JASA
MATERIAL JASA MATERIAL Zona 1 Zona 2 Zona 3

89,775,000 0 89,775,000 0 0 0
89,775,000 0 89,775,000 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0

3,997,350 0 3,997,350 0 0 0
666,225 0 3,997,350 0 0 0

1,586,220 0 1,586,220 0 0 0
30,000 0 180,000 0 0 0
70,140 0 350,700 0 0 0
50,160 0 902,880 0 0 0
4,800 0 57,600 0 0 0
31,680 0 95,040 0 0 0

3,288,690 0 3,288,690 0 0 0
116,400 0 116,400 0 0 0
8,400 0 67,200 0 0 0
50,160 0 100,320 0 0 0
91,560 0 91,560 0 0 0
63,600 0 63,600 0 0 0
8,400 0 16,800 0 0 0
876,750 0 1,753,500 0 0 0
9,925 0 59,550 0 0 0
155,760 0 934,560 0 0 0
42,600 0 85,200 0 0 0

330,000 0 330,000 0 0 0
144,000 0 288,000 0 0 0
10,500 0 42,000 0 0 0

174,000 0 174,000 0 0 0
63,600 0 63,600 0 0 0
60,000 0 60,000 0 0 0
8,400 0 50,400 0 0 0

1,012,550 0 1,012,550 0 0 0
282,480 0 282,480 0 0 0
9,925 0 138,950 0 0 0
31,680 0 63,360 0 0 0
155,760 0 155,760 0 0 0
50,160 0 150,480 0 0 0
133,080 0 133,080 0 0 0
18,480 0 55,440 0 0 0
5,280 0 21,120 0 0 0
3,960 0 11,880 0 0 0

446,860 0 446,860 0 0 0
282,480 0 282,480 0 0 0
46,800 0 46,800 0 0 0
31,680 0 31,680 0 0 0
9,925 0 39,700 0 0 0
18,480 0 27,720 0 0 0
5,280 0 10,560 0 0 0
3,960 0 7,920 0 0 0

464,400 0 464,400 0 0 0
390,000 0 390,000 0 0 0
74,400 0 74,400 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
99,488,850 ###
0 0 0
248,700
0
0

68,700
127,200
185,700
Zona 1 Zona 2 Zona 3
Jumlah 99,806,250 99,864,750 99,923,250
PPN 10% 9,980,625 9,986,475 9,992,325
Total 109,786,875 109,851,225 109,915,575
Dibulatkan 109,786,000 109,851,000 109,915,000
PAGU

RIZED 20 KV - 400 A TANPA RTU


HARGA JUMLAH JUMLAH JASA
MATERIAL JASA MATERIAL Zona 1 Zona 2 Zona 3

0 0 0 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0
144,000 0 0 0 0 0
10,500 0 0 0 0 0

0 0 0 0 0 0
63,600 0 0 0 0 0
60,000 0 0 0 0 0
8,400 0 0 0 0 0

0 0 0 0 0 0
282,480 0 0 0 0 0
9,925 0 0 0 0 0
31,680 0 0 0 0 0
155,760 0 0 0 0 0
50,160 0 0 0 0 0
133,080 0 0 0 0 0
18,480 0 0 0 0 0
5,280 0 0 0 0 0
3,960 0 0 0 0 0

0 0 0 0 0 0
390,000 0 0 0 0 0
74,400 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0

0 ###
0 0 0
0
0
0

0
0
0
Zona 1 Zona 2 Zona 3
Jumlah 0 0 0
PPN 10% 0 0 0
Total 0 0 0
Dibulatkan 0 0 0
PAGU
PROGRAM PERKUATAN JARINGAN :
PENGADAAN DAN PEMASANGAN SECTIONALIZER
PRK.2015.DJT.1.7

Pembangunan PT-C

NO.
MAT PEKERJAAN Sat Volume

Concrete Pole S 1
244 Tiang Beton 13 - 350 daN + E BC B 2
447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2 S 2
448 Tanda Bahaya Kecil B 2
187 Pondasi type D ( 2 Tiang ) (91/U/2009) B 2

Konstruksi TM-Pole S 1
### 46 Cross arm - UNP 100 x 50 x 5 mm - 3000 mm - (l=50mm, t B 2
### 206 Strain Rod Insulator (88/U/2009) S 6
### 205 Strain Clamp 150 - 240 mm - 3 nut S 6
### 48 Cross Arm Clevis - TM - (l=50mm, t=6mm) B 6
### 183 Pole Block Band 12" - TM (557/U/2009) S 2
### 183 Pole Block Band 12" - TM (557/U/2009) S 2
### 14 Arm Tie Type 900 - 3/4" - (t=2,3 mm) B 4
### 12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 2
### 70 Double Arm Band 8" - 7" - TM (504/U/2009) B 2
### 30 Bolt & Nut M.16 x 50 (517/U/2009) B 8
### 27 Bolt & Nut M.16 x 120 (517/U/2009) S 6
### 29 Double Arm Bolt & Nut M.16 x 400 (besi as) S 2
### 201 Square Washer - (l=50mm, p=50mm, t=2,5mm) B 4

Ground Shield Wire ( GSW) 1


### 195 Single Arm Band 8" (504/U/2009) B 2
### 412 Besi Siku L 50x50x4,5 mm - 2500 mm B 1
### 389 Ground Wire Clamp Type B - TM - (l=50mm, t=6mm, p=300 B 1
### 391 Cousen/Thimble - (t=2,5mm) B 2
### 189 Preformed Termination 35 mm (542/U/2009) B 2
### 395 Bolt & Nut M.8 x 30 B 4

Accesories Pengukuran S 1
### 486 Potensial Trafo (PT) 20 kV - Outdoor B 3
### 487 Current Trafo (CT) 20 kV - Outdoor B 3
### 488 Meter Elektronik (ME) 3 ph - 4 W , teg: 57,7/100V; Arus :5A. S 1
### 489 Kotak APP type VI 1 (satu) pintu/kaca S 1
### 327 0 0.000 1
### 457 NYY 4 x 4 mm u/ Wirring Panel M 6.5
### 490 NYY 4 x 10 mm u/ Wirring CT M 6.5
### 491 Mountage PT-CT Exim Ls 1

Dudukan PT-CT S 1
### 493 Cross Arm type 1.200 NP. 8,0 B 4
### 30 Bolt & Nut M.16 x 50 (517/U/2009) B 16
### 53 Cross Arm UNP-80 - 3000 (l=45mm,t=3,5mm,tgg=80mm) B 2
### 70 Double Arm Band 8" - 7" - TM (504/U/2009) B 2

Jumper PT/CT S 1
142 NYA 35 sqmm ( SPLN ) M 6
219 Terminal Lug 35 mm - Cu (507/U/2009) B 8
446 Klem C - 25/25 mm - Cu B 6
32 Bolt M.12 x 30 - CU B 8

Lightning Arrester S 1
420 Polymer Arrester 24 kV - 10 kA S 6
142 NYA 35 sqmm ( SPLN ) M 6
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 5
219 Terminal Lug 35 mm - Cu (507/U/2009) B 18
32 Bolt M.12 x 30 - CU B 12
446 Klem C - 25/25 mm - Cu B 6

Dudukan PHB & Pipa pengaman S 1


59 Cross Arm type 500 - NP. 8 B 4
103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 2
104 Klem Begel U 11" - TM - (l=44mm, t=6mm) B 2
492 Gaspijp 1,5" - 4,0 m, Galvanized B 1
101 Klem Begel U 2" - (t=3mm, l=35mm) B 2
337 Pipa Galvanized 3" - 6 meter (tebal= 2,5 mm) B 2

Grounding S 1
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 2
1 AAAC - 70 sqmm ( SPLN ) M 18
226 Terminal Lug 70 mm Al (507/U/2009) B 4
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 1
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 3
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 1
202 Stainless Steel Strip non magnetic M 3
203 Stoping Buckle non magnetic B 4
123 Link (506/U/2009) B 3

Jumlah Harga Material 1


Jumlah Harga Jasa
Asuransi Material Ls
Asuransi Tenaga Kerja Pekerja
Sertifikasi ( SLO ) 1 lokasi Lokasi 1
Angkutan Material Ton/M3
- Angkutan Zona 1 Ton/M3 342,500
- Angkutan Zona 2 Ton/M3 634,000
- Angkutan Zona 3 Ton/M3 925,300
ngunan PT-CT Export - Import

HARGA JUMLAH JUMLAH JASA


MATERIAL JASA MATERIAL Zona 1 Zona 2 Zona 3

165,600 0 165,600 0 0 0
0 0 0 0 0 0
82,800 0 165,600 0 0 0
16,800 0 33,600 0 0 0
750,000 0 1,500,000 0 0 0

5,190,660 0 5,190,660 0 0 0
531,600 0 1,063,200 0 0 0
330,750 0 1,984,500 0 0 0
120,960 0 725,760 0 0 0
52,500 0 315,000 0 0 0
75,600 0 151,200 0 0 0
75,600 0 151,200 0 0 0
51,600 0 206,400 0 0 0
63,600 0 127,200 0 0 0
116,400 0 232,800 0 0 0
8,400 0 67,200 0 0 0
10,500 0 63,000 0 0 0
44,400 0 88,800 0 0 0
3,600 0 14,400 0 0 0

448,680 0 448,680 0 0 0
70,800 0 141,600 0 0 0
98,400 0 98,400 0 0 0
55,200 0 55,200 0 0 0
7,140 0 14,280 0 0 0
63,600 0 127,200 0 0 0
3,000 0 12,000 0 0 0

29,925,000 0 29,925,000 0 0 0
9,975,000 0 29,925,000 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0

1,069,200 0 1,069,200 0 0 0
0 0 0 0 0 0
8,400 0 134,400 0 0 0
351,000 0 702,000 0 0 0
116,400 0 232,800 0 0 0

809,760 0 809,760 0 0 0
30,000 0 180,000 0 0 0
50,160 0 401,280 0 0 0
31,680 0 190,080 0 0 0
4,800 0 38,400 0 0 0

5,678,610 0 5,678,610 0 0 0
666,225 0 3,997,350 0 0 0
30,000 0 180,000 0 0 0
70,140 0 350,700 0 0 0
50,160 0 902,880 0 0 0
4,800 0 57,600 0 0 0
31,680 0 190,080 0 0 0

2,649,600 0 2,649,600 0 0 0
64,200 0 256,800 0 0 0
144,000 0 288,000 0 0 0
158,400 0 316,800 0 0 0
0 0 0 0 0 0
28,800 0 57,600 0 0 0
865,200 0 1,730,400 0 0 0

1,398,090 0 1,398,090 0 0 0
282,480 0 564,960 0 0 0
9,925 0 178,650 0 0 0
31,680 0 126,720 0 0 0
155,760 0 155,760 0 0 0
50,160 0 150,480 0 0 0
133,080 0 133,080 0 0 0
18,480 0 55,440 0 0 0
5,280 0 21,120 0 0 0
3,960 0 11,880 0 0 0

47,335,200
0 0 0
118,300
345,000
250,000

342,500
634,000
925,300
Zona 1 Zona 2 Zona 3
Jumlah 48,391,000 48,682,500 48,973,800
PPN 10% 4,839,100 4,868,250 4,897,380
Total 53,230,100 53,550,750 53,871,180
Dibulatkan 53,230,000 53,550,000 53,871,000
PT PLN (PERSERO) DISTRIBUSI JAWA TIMUR

I PROGRAM PERKUATAN JARINGAN :


sesuai normalisasi
REKONFIGURASI JARINGAN
PRK.2018

NO.
MAT PEKERJAAN Ton/Kg Sat

III. PROGRAM PENINGKATAN PEMASARAN


3.1 Jaringan penunjang

3.1 TRANSFORMATOR POR

NO.
MAT PEKERJAAN Ton/Kg Sat

MATERIAL DISTRIBUSI UTAMA


### 243 Tiang Beton 13 - 350 daN + E 1,150 0.0 B
### 245 Tiang Beton 14 - 350 daN + E 1,350 0.0 B
### 462 Polymer Pin Insulator 20 kV 1 0.0 S
### 463 Polymer Strain Insulator 20 kV lengkap (SIR) 4 0.0 S
### 420 Polymer Arrester 24 kV - 10 kA 2 0.0 S
### 419 Polymer Cut Out Switch 24 Kv - 100 kA 2 0.0 S
### 254 Trafo Distribusi 20 kV 3 PH 100 KVA Yzn5 ( D3 ) 0 B
### 255 Trafo Distribusi 20 kV 3 PH 160 KVA Yzn5 ( D3 ) 0 B
### 256 Trafo Distribusi 20 kV 3 PH 200 KVA Dyn5 ( D3 ) 0 B
### 257 Trafo Distribusi 20 kV 3 PH 250 KVA Dyn5 ( D3 ) 0 B
### 365 LV Panel 250A s/d 400A, lubang atas 0 S
### 148 NYY 1 x 150 sqmm - Input ( SPLN ) 0 M
TIANG BETON :
243 Tiang Beton 13 - 350 daN + E 0.000 B
245 Tiang Beton 14 - 350 daN + E 0.000 B

TRAFO & PHB TR 4 JURUSAN


TRANSFORMATOR S
254 Trafo Distribusi 20 kV 3 PH 100 KVA Yzn5 ( D3 ) 680.5 0.00 B
255 Trafo Distribusi 20 kV 3 PH 160 KVA Yzn5 ( D3 ) 886 B
256 Trafo Distribusi 20 kV 3 PH 200 KVA Dyn5 ( D3 ) 1,096 B
257 Trafo Distribusi 20 kV 3 PH 250 KVA Dyn5 ( D3 ) 1,250 B

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 0.0 S

KONTRUKSI TM - 1 0.0 S
KONTRUKSI TM - 12 (Trafo Portal Akhir) 0.0 S
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 0.0 S

TRAFO PORTAL TYPE - A


CONDUCTOR & ACCESSORIES TRAFO PORTAL S
CONDUCTOR & ACCESSORIES 0.00 S

ARRESTER & CUT OUT

GROUNDING LUAR GARDU PORTAL : 0.00 S


GROUNDING DALAM GARDU PORTAL : 0.00 S

RANGKA DUDUKAN TRAFO & PHB


TEMPAT DUDUKAN CUT OUT SWITCH : 0.00 S

TEMPAT DUDUKAN ARRESTER : 0.00 S

Penjepit Tiang dg plat bordes u/ Dudukan Trafo: 0.00 S

DUDUKAN PHB - TR : 0.00 S

PHB, KABEL & ACCESORIES


DANGER PLATE 0.00 S

PEMIPAAN DAN ACCESORIES : 0.00 S

KABEL
148 NYY 1 x 150 sqmm - Input ( SPLN ) 0.380 M
228 Terminal Lug 150 mm - Cu (507/U/2009) 0.800 B

PONDASI & PENGAMAN


PONDASI TRAFO S
187 Pondasi type D ( 2 Tiang ) (91/U/2009) 0.000 B
182 Pole Block (504/U/2009) 1.680 S
183 Pole Block Band 12" - TM (557/U/2009) 21.000 S

TRAFO PORTAL TYPE - B


CONDUCTOR & ACCESSORIES TRAFO PORTAL S
CONDUCTOR & ACCESSORIES 0.00 S

ARRESTER & CUT OUT

GROUNDING LUAR GARDU PORTAL : 0.00 S


GROUNDING DALAM GARDU PORTAL : 0.00 S

RANGKA DUDUKAN TRAFO & PHB


TEMPAT DUDUKAN CUT OUT SWITCH : 0.00 S

TEMPAT DUDUKAN ARRESTER : 0.00 S

Penjepit Tiang dg plat bordes u/ Dudukan Trafo: 0.00 S

DUDUKAN TRAFO PHB TR PORTAL 0.00 S

DUDUKAN PHB - TR : 0.00 S

PHB, KABEL & ACCESORIES


DANGER PLATE 0.00 S
PEMIPAAN DAN ACCESORIES : 0.00 S

KABEL
148 NYY 1 x 150 sqmm - Input ( SPLN ) 0.380 M
228 Terminal Lug 150 mm - Cu (507/U/2009) 0.800 B

PONDASI & PENGAMAN


PONDASI TRAFO S
187 Pondasi type D ( 2 Tiang ) (91/U/2009) 0.000 B
182 Pole Block (504/U/2009) 1.680 S
183 Pole Block Band 12" - TM (557/U/2009) 21.000 S

PEKERJAAN PENDUKUNG :
### 538 Commisioning test GD 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

3.2 PEKERJAAN JARINGAN JTM AA

NO.
MAT PEKERJAAN Ton/Kg Sat

MATERIAL DISTRIBUSI UTAMA


### 5 AAAC - S 150 sqmm ( SPLN ) 1 0.0 M
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0 M
### 462 Polymer Pin Insulator 20 kV 1 0.0 S
### 463 Polymer Strain Insulator 20 kV lengkap (SIR) 4 0.0 S
### 420 Polymer Arrester 24 kV - 10 kA 2 0.0 S
### 419 Polymer Cut Out Switch 24 Kv - 100 kA 2 0.0 S
### 245 Tiang Beton 14 - 350 daN + E 0 B
### 243 Tiang Beton 13 - 350 daN + E 0 B
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0 B
### 247 Tiang Beton 9 - 200 daN 0 B

TIANG BETON
### 245 Tiang Beton 14 - 350 daN + E 0 B
### 243 Tiang Beton 13 - 350 daN + E 0 B
### 236 Tiang Beton 11 - 200 daN (524/U/2009) 0 B
### 247 Tiang Beton 9 - 200 daN 0 B

POLLE SUPORTER :
GUY WIRE MURNI 0.0 S
GUY WIRE NUMPANG 0.0 S
HORIZONTAL GUY WIRE MURNI 0.0 S
HORIZONTAL GUY WIRE NUMPANG 0.0 S
STRUT POLE 0.0 S
GUARDNET 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 1A ( Underbuilt ) 0.0 S
KONTRUKSI TM - 2 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4X ( Underbuilt ) 0.0 S
KONTRUKSI TM - 4XC ( Underbuilt ) 0.0 S
KONTRUKSI TM - 5 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8A ( Underbuilt ) 0.0 S
KONTRUKSI TM - 8X ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 X ( Underbuilt ) 0.0 S
KONTRUKSI TM - 10 XC ( Underbuilt ) 0.0 S
KONTRUKSI TM - 11 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 12 ( Underbuilt ) 0.0 S
KONTRUKSI TM - 13 ( Underbuilt ) 0.0 S
KONTRUKSI TM - TP2 ( Underbuilt ) 0.0 S
KONTRUKSI TM - TP2A ( Underbuilt ) 0.0 S

POLE TOP ARRANGEMENT :


KONTRUKSI TM - 1 0.0 S
KONTRUKSI TM - 1A 0.0 S
KONTRUKSI TM - 2 0.0 S
KONTRUKSI TM - 4 0.0 S
KONTRUKSI TM - 5 0.0 S
KONTRUKSI TM - 8 0.0 S
KONTRUKSI TM - 8A 0.0 S
KONTRUKSI TM - 10 0.0 S
KONTRUKSI TM - 11 (akhir dan kabel) 0.0 S
KONTRUKSI TM - 12 (Trafo Portal Akhir) 0.0 S
KONTRUKSI TM - 13 (Trafo Portal Akhir Sejajar) 0.0 S
KONTRUKSI TM - TP2 0.0 S
KONTRUKSI TM - TP2A 0.0 S

ANTI CLIMBING + DANGER PLATE 0.00 S


### 447 Penghalang Panjat / Anti climbing 9" - 10" (l=35mm, t=3,2mm, bes 1.400 S
### 448 Tanda Bahaya Kecil 0.080 B
### 30 Bolt & Nut M.16 x 50 (517/U/2009) 0.136 B

150
240
CONDUCTOR ACCESSORIES MS
### 5 AAAC - S 150 sqmm ( SPLN ) 1 0.0 M
### 6 AAAC - S 240 sqmm ( SPLN ) 1 0.0 M
### 93 Joint Sleeve 150 mm (507/U/2009) 0.0 0.0 B
### 94 Joint Sleeve 240 mm 0.0 0.0 B
### 77 Galvanized Steel Wire 35 mm (542/U/2009) 0.4 0.0 M

GROUNDING GW STEEL WIRE 35 MM


GROUNDING DALAM 0.0 S
GROUNDING LUAR 0.0 S
Arrester Jaringan Tiang Lama 0.00 S

POLE BLOCK M
### 182 Pole Block (504/U/2009) 0.0 0.0 S
### 183 Pole Block Band 12" - TM (557/U/2009) 0.0 0.0 S

PONDASI TYPE A - Tiang JTM) B


### 186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.0 0.0 B

VERLENK STUCK JARINGAN S


### 277 Verlenk stuck Pipa 4" - 3 mt - Medium 4.9 0.0 S
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 2.1 0.0 B
### 31 Bolt & Nut M.16 x 75 (517/U/2009) 0.2 0.0 B

VERLENK STUCK STEEL WIRE S


### 276 Verlenk stuck Pipa 3" - 3 mt - Medium 0.0 0.0 S
### 19 Begel Ornament 4" - 3 u/ Ferlengk - (l=44mm, t=6mm) 0.0 0.0 B
### 31 Bolt & Nut M.16 x 75 (517/U/2009) 0.0 0.0 B

PEKERJAAN PENDUKUNG :
### 536 Commisioning test Jaringan JTM 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan

3.3 SUTR TWISTED CABLE 3x70 + 1x50


NO.
MAT PEKERJAAN Ton/Kg Sat

MATERIAL DISTRIBUSI UTAMA


### 214 NFA2X-T;3x70 + 1x50 mm2 1 0.0 M
### 248 Tiang Beton 9 - 200 daN + E 530 0.0 B
### 247 Tiang Beton 9 - 200 daN 350 0.0 B

TIANG BETON
248 Tiang Beton 9 - 200 daN + E 0.00 B
247 Tiang Beton 9 - 200 daN 0.00 B

PONDASI
186 Pondasi type A ( 1 tiang ) (91/U/2009) 0.00 B

POLE TOP SUPPORTER


GUY WIRE ( TR ) 0.00 S
GUY WIRE NUMPANG ( TR ) 0.00 S
HORIZONTAL GUY WIRE MURNI ( TR ) 0.00 S
HORIZONTAL GUY WIRE NUMPANG ( TR ) 0.00 S
STRUT POLE 0.0 S

POLE TOP ARRANGEMENT (Underbuilt)


KONSTRUKSI TR - 1 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 1 Jumper (Underbuilt) 0.00 S
KONSTRUKSI TR - 2 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 3 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 3A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 4B ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 5 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 6 ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 6A ( Underbuilt ) 0.00 S
KONSTRUKSI TR - 7 ( Underbuilt ) 0.00 S

POLE TOP ARRANGEMENT


KONSTRUKSI TR - 1 0.00 S
KONSTRUKSI TR - 1 Jumper 0.00 S
KONSTRUKSI TR - 2 0.00 S
KONSTRUKSI TR - 3 0.00 S
KONSTRUKSI TR - 4 0.00 S
KONSTRUKSI TR - 4A 0.00 S
KONSTRUKSI TR - 4B 0.00 S
KONSTRUKSI TR - 5 0.00 S
KONSTRUKSI TR - 6 0.00 S
KONSTRUKSI TR - 6A 0.00 S

GROUNDING JTR
GROUNDING DALAM JTR 0.00 S
73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electrop 0.750 S
1 AAAC - 70 sqmm ( SPLN ) 0.235 M
221 Terminal Lug 50 mm - Al (507/U/2009) 0.230 B
32 Bolt M.12 x 30 - CU 0.136 B
118 Line Tap Connector 50-70 mm type G 0.400 B

GROUNDING LUAR JTR 0.00 S


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electrop 0.750 S
1 AAAC - 70 sqmm ( SPLN ) 0.235 M
221 Terminal Lug 50 mm - Al (507/U/2009) 0.230 B
202 Stainless Steel Strip non magnetic 0.020 M
203 Stoping Buckle non magnetic 0.230 B
123 Link (506/U/2009) 0.230 B
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) 0.000 B
118 Line Tap Connector 50-70 mm type G 0.400 B

CONDUCTOR & ACCESSORIES


CONDUCTOR MS
214 NFA2X-T;3x70 + 1x50 mm2 1.051 0.00 M

JOINT ACCESSORIES MS
87 Insulated Tension Joint 70 mm 0.095 0.00 B
88 Insulated Non Tension Joint 50 mm 0.095 0.00 B
PEKERJAAN PENDUKUNG :
### 539 Commisioning test JTR 0.0 Loks.
### 534 Angkutan Material 0.0 Ton/M3
### 535 Asuransi Material PLN 0.0 Ls

Jumlah Harga Material


Jumlah Harga Jasa
Jumlah Harga
PPN 10%
TOTAL
Dibulatkan
HARGA SATUAN JUMLAH HARGA
Volume JUMLAH
MATERIAL JASA MATERIAL JASA

MATOR PORTAL MALANG

HARGA SATUAN JUMLAH HARGA


Volume JUMLAH
MATERIAL JASA MATERIAL JASA

0
0
0
0
0
0
0
0
0
0
0
0
0 0 0
0 0
0 0

0 0 0 0
0 0
0
0
0

0 0 0

0 0 0
0 0 0
0 0 0

0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
0 0 0 0

0 0 0

0 0 0 0
0
0

0 0 0
0 0 0
0
0
0

0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0

0 0 0
0 0 0 0
0 0 0

0 0 0 0
0
0

0 0 0
0 0 0
0
0
0

#DIV/0!
0 0
0.0 0 255,700
0

0
0
0
0
0
0

JTM AAACS MALANG

HARGA SATUAN JUMLAH HARGA


Volume JUMLAH
MATERIAL JASA MATERIAL JASA
0
0
0
0
0
0
0
0
0
0

0 0 0
0
0
0
0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0
0
0

0 0 0
0
0
0
0
0

0
0 0 0
0 0 0
0 0 0

0 0 0
0 0
0 0

0 0 0
0 0

0 0 0
0 0
0 0
0 0

0 0 0
0 0
0 0
0 0

#DIV/0!
0 0 - -
0.0 0 - 255,700 -
0 - -

0
0
0
0
0
0

x70 + 1x50 mm MALANG


HARGA SATUAN JUMLAH HARGA
Volume JUMLAH
MATERIAL JASA MATERIAL JASA

0
0
0

0 0 0
0 0 0 0
0 0
0 0

0 0 0
0 0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0
0 0
0 0
0 0
0 0

0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

0 0 0
0 0 0 0
0 0

0 0 0
0 0
0 0
#DIV/0!
0 0 250,000
0.0 0 255,700
0

0
0
0
0
0
0
PT PLN (PERSERO) DISTRIBUSI JAWA TIMUR

I PROGRAM PERKUATAN JARINGAN :


sesuai normalisasi
REKONFIGURASI JARINGAN
PRK.2018

NO.
MAT PEKERJAAN Ton/Kg Sat

IV. PROGRAM ......


4.1 Jaringan .......
H
A
R
G
A
M
0 HARGA SATUAN JUMLAH HARGA A
ST
Volume JUMLAH A
E
### MATERIAL JASA MATERIAL JASA TR
U
I
A
A
N
L
PT PLN (PERSERO) DISTRIBUSI JAWA TIMUR

I PROGRAM PERKUATAN JARINGAN :


sesuai normalisasi
REKONFIGURASI JARINGAN
PRK.2018

NO.
MAT PEKERJAAN Ton/Kg Sat

IV. PROGRAM ......


4.1 Jaringan .......
HARGA SATUAN JUMLAH HARGA
Volume JUMLAH
MATERIAL JASA MATERIAL JASA
PT.PLN (PERSERO)
DISTRIBUSI JAKARTA RAYA

BILL OF QUANTITY (BOQ)


JASA PEKERJAAN BORING HORIZONTAL DIRECT DRILLING (HDD) TAHUN 2017
DOK. PENGADAAN NO : 252.RKS/RENDAN/DISJAYA/2017

I PEKERJAAN PERSIAPAN SATUAN HPS

I PERSIAPAN
1 Perencanaan, pendataan utilitas Lks 469,315
jaringan
Ijin penggalian &SPS ( dibayar sesuai kwitansi resmi )
2 Direksi KITT ( 2x4 M )= 8 M2 Lokasi 950,076
3 Trafic management Lot 1,996,714
- Lampu CR - Rambu peringatan
(120x90)
- Lampu LS cm - Rambu "Ada
Pengerjaan Pengeboran "
- Trafic Cone
-
II PEKERJAAN GALIAN DAN PERBAIKAN LUBANG BOR HDD (3.0x1.3x1.5)m3
1 Pada Tanah Keras/Koral Berm bh 378,530
2 Pada Tanah Biasa/Rumput/Taman bh 334,521
3 Pada Trotoar Interblok bh 790,660
4 Pada Trotoar Floor Beton bh 789,271
5 Pada Jalan Lapis Penutup Hotmix lebar jalan > 7 m bh 3,955,866
6 Pada Jalan Lapis Paving Blok bh 1,602,841
7 Pada Jalan Dengan Kostruksi Beton 1 segmen Uk 3.5 x 5 m2 bh 3,310,680
-
III PEKERJAAN PENGEBORAN HDD
1 Pendataan & Penyuntikan Utilitas Ttk 53,553
terpasang
2 Pagar Pengaman (Spandek) go green standar Pemda BH 133,328
3 Mobilisasi Mesin Boring HDD & perlengkapannya RIT 5,512,403
4 Demobilisasi Mesin Boring HDD & perlengkapannya RIT 3,674,934
5 Pengeboran pipa Diameter 8 '' tanpa M 913,920
casing -
IV PENGADAAN DAN PEMASANGAN
1 Pengadaan & pemasangan Pipa HDPE PN 12,5/PE 100 SDR 13,6, diameter 6" M
180 mm, ketebalan 13,3 mm berwarna merah 371,850
2 Karet Pelindung Kabel untuk menahan air & tanah (reducer) bh 520,915
3 Pengikat Reducer bagian Depan ( klem) Utk menahan air & tanah ( Stainless
bh
steel 8") 185,547
4 Pengikat Reducer bagian belakang ( klem) Utk menahan air & tanah
bh
( Stainless steel 8") 151,313
5 Pengelasan Pipa HDPE btg 79,377
6 Tali Pancing M 7,079
7 Papan Penahan Tanah M3 1,404,716
8 Tanda Patok boring /kabel bh 30,754
9 Foto Dokumentasi ( 1 set; 12lmbr) set 204,236
10 AS BUILT DRAWING 1:5000 (1 kalkir + set 443,917
5 blue print)
11 AS BUILT DRAWING 1:200 (1 kalkir + 5 blue print) + 1 film M 1,632
12 Pengadaan/pengangkutan Air untuk Ltr -
Boring
13 Pembersihan Umum Lokasi 622,876
14 DOP HDPE bh 207,072
15 Pengadaan Timah Lebel bh 10,499
16 Pengadaan batu pengaman bh 5,433
-
PT.PLN (PERSERO)
DISTRIBUSI JAKARTA RAYA

BILL OF QUANTITY (BOQ)


JASA PEKERJAAN BORING HORIZONTAL DIRECT DRILLING (HDD) TAHUN 2017
DOK. PENGADAAN NO : 252.RKS/RENDAN/DISJAYA/2017

I PEKERJAAN PERSIAPAN SATUAN HPS

V PEKERJAAN PENARIKAN KABEL


1 Angkutan SKTM 20 KV 3x240 mm/300 RIT 1,145,425
mm, 1 Haspel
Angkutan SKTM 20 KV 3x240 mm/300 RIT 1,848,210
mm, 3 Haspel
Angkutan SKTM 20 KV 3x240 mm/300 RIT 696,319
mm, (50 - 200) m
2 Penarikan SKTM 20 KV 3x240 mm/300 mm dengan mesin Winch M 53,925
3 Pelindung ( DOP Kabel ) 3x 240 mm / bh 55,003
300mm -
VI MATERIAL PELENGKAP
1 Pasir urug 20 cm M3 262,557
-
VII PEKERJAAN LAIN - LAIN
1 Pembuangan Tanah Bekas Galian M3 141,717
2 Penjagaan HKL 75,874

IIX PENGGANTIAN BIAYA PERIZINAN


1 Penggantian SKRD Rp. 10,760
TITY (BOQ)
DIRECT DRILLING (HDD) TAHUN 2017
KS/RENDAN/DISJAYA/2017

PROSENTASI
Pemenang
KHS
100%

469,315 398,918

950,076 807,565
1,996,714 1,697,207

378,530 321,751
334,521 284,343
790,660 672,061
789,271 670,880
3,955,866 3,362,486
1,602,841 1,362,415
3,310,680 2,814,078

53,553 45,520
133,328 113,329
5,512,403 4,685,543
3,674,934 3,123,694
913,920 776,832

371,850 316,073
520,915 442,778

185,547 157,715

151,313 128,616
79,377 67,470
7,079 6,017
1,404,716 1,194,009
30,754 26,141
204,236 173,601
443,917 377,329
1,632 1,387
-
622,876 529,445
207,072 176,011
10,499 8,924
5,433
- 4,618
TITY (BOQ)
DIRECT DRILLING (HDD) TAHUN 2017
KS/RENDAN/DISJAYA/2017

PROSENTASI
Pemenang
KHS
100%

1,145,425 973,611
1,848,210 1,570,979
696,319 591,871
53,925 45,836
55,003 46,753
-

262,557 323,173
-

141,717 120,459
75,874 64,493

10,760
PT PLN (Persero)
DISTRIBUSI JAWA TIMUR
AREA SURABAYA SELATAN

HARGA PERHITUNGAN SENDIRI (HPS)


PEKERJAAN : PENGADAAN & PEMASANGAN SR-APP 1 & 3 PHASA (S/D 41,5 KV
LOKASI : WILAYAH NGAGEL
AREA SURABAYA SELATAN
SUMBER DANA : SKKI NO.01/DJT-SBS/2017 WBS.1.5121.17.09.3001.124 NO. PRK.

HARGA SATUAN ( Rp )
NO URAIAN BARANG/MATERIAL Sat VOL.
MATERIAL JASA PASANG

PEMASANGAN PELANGGAN 1 PHASA = 1001 SET

A SDES - 1 ( SR 1 Phasa, tarikan TIANG ke PLG ) S 1


1 Pole Bracket 3-6" B 0 30,800 2,198
2 Service wedge clamp 2/4 x 6/10 mm Bh. 2 4,400 1,953
3 Strainhook / ekor babi B 1 6,900 1,735
4 Cable suport (508/U/2009) B 5 1,050 387
KWh meter Electronic Anti Temper 1 Phasa 2 kawat 50 Hz, 5(20)
5 klass 1 lengkap MCB (Pra/Pasca) S 1 222,950 32,963
6 MCB 1 phs. 230 V - 2 A s/d 20 A B 1 29,000 3,000
7 Twisted Cable 2 x 10 mm² - Al M 20 3,999 767
8 Conn. press AL/AL type 10-16 mm2 / 16-35 mm2 + Scoot + Cov B 1 15,000 13539
9 Conn. press AL/AL type 10-16 mm2 / 50-70 mm2 + Scoot + Cove B 3 12,800 13539

I KUMISAN S 0
1 Bundl.Conn.3 x50 mm + 1 x 35 mm2 - 50 cm ( kumis ) Mt 0 23,700 13,604
2 Line Tap Connector ( type press ) 35-70 / 35-70 mm B 1 16,500 13,547
3 Line Tap Connector ( type press ) 16-35 / 35-70 mm B 0 14,500 13,547

B SDES - 2 ( SR 1 Phasa, tarikan Plgg ke Plgg ) S 1,000


1 Service wedge clamp 2/4 x 6/10 mm B 2,000 4,400 1,953
2 Strainhook / ekor babi B 2,000 6,900 1,735
3 Cable suport (508/U/2009) B 5,000 1,050 387
KWh meter Electronic Anti Temper 1 Phasa 2 kawat 50 Hz, 5(20)
4 S 1,000 222,950 32,963
klass 1 lengkap MCB
5 MCB 1 phs. 230 V - 2 A s/d 20 A B 1,000 29,000 3,000
6 Twisted Cable 2 x 10 mm² - Al M 20,000 3,999 767
7 Line Tap Connector ( type press ) 10-16 / 10-16mm B 2,000 12,500 13539

C Jasa Pasang Bongkar Layanan Khusus/Pesta/JBST Ls 88 PLN 37800

D Jasa Pasang Bongkar MIGRASI Ls 88 PLN 43,200

E Perubahan Daya ( Bongkar pasang MCB ) Ls 200 PLN 29,700

F Revisi SR/Atur seri SR Set 88 43,500

G Segel Plastik B 3,003 2,350 513

H Paku Beton B 4,002 500 385

I Transport Plg 1,001 250

SUB JUMLAH
Pemasangan Pelanggan 3 Phasa (Daya 6,6 kVA s/d 16,5kVA) = 36 SET
A MATERIAL DISTRIBUSI UTAMA : Set 36
1 Twisted Cable 4x16 mm2 (Al) Mt 720 11,500 1,839
2 kWh Meter 3 P-4 W 5 - 60 A 400 V Elektronik (Pra/Pasca) Bh 36 JPROC 183,128
3 MCB 3 Phase Type PLN 127-400 V, 10/16/20/25 A Bh 36 JPROC 30,521
4 Kotak APP Type III + Deksel Bh 36 360,000 97,668

B MATERIAL DISTRIBUSI NON UTAMA :


1 Connector Press 16-35/35-70 mm2+cover & tanda phasa Bh 108 8,800 13,539
Connector Press 10-16/16-35 mm2+cover & tanda phasa Bh 36 15,000 13539
2 Service Wedge Clamp 4x16/25 mm2 Set 72 5,500 1,953

E KUMISAN S
1 Bundl.Conn.3 x50 mm + 1 x 35 mm2 - 50 cm ( kumis ) B 18 22,400 13,359
2 Line Tap Connector ( type press ) 35-70 / 35-70 mm B 108 16,500 13,547
3 Line Tap Connector ( type press ) 16-35/ 35-70 mm B 36 14,500 13,547

C MATERIAL KONSTRUKSI :
1 Ground Rod 1,5 Mtr + Clamp Bh 36 110,000 58,265
2 Gembok "setara SOLEX" Bh 36 150,000 37,175
3 NYA 35 mm M 72 46,700 1,355
4 Terminal Lug 35 mm - Cu (507/U/2009) Bh 33 35,200 13,547
5 Joint Al/Cu 16 / 16 + heatshrink Bh 144 29,200 3,000
6 Pipa Pelindung 3/4" - 2000 (512/U/2009) M 72 34,000 4,644
7 Segel Bh 288 3,100 500

8 Jasa Pasang Bongkar Layanan Khusus /Pesta Ls 4 37,500

9 Jasa Pasang Bongkar Layanan JBST Ls 4 255,000

D MONTAGE : Set 18

F Transport Plg 36 10,000

SUB JUMLAH

Pemasangan Pelanggan 3 Phasa (Daya 23 kVA s/d 41,5kVA) = 25 SET


A MATERIAL DISTRIBUSI UTAMA : Set 25
1 Twisted Cable 4x25 mm2 (Al) Mt 750 22,000 1,839
2 Twisted Cable 3 x 70 + 1 x 50 sqmm ( SPLN ) Mt 25 PLN 2,500
3 kWh Meter 3 P-4 W 5 - 60 A 400 V Elektronik (pra/Pasca) Bh 25 JPROC 183,128
4 MCB 3 Phase Type PLN 127-400 V, 35/50 A Bh 25 230,000 30,521
5 MCCB 3 POLL 63 A ADJUSTABLE Bh - 1,650,000 45,000
Kotak APP Type VI 45 x 63 x 22 CM , jenis Sheet Steel d/ tebal
6 plat 2.8 mm, Cat Powder Coating tebal min 80 micro -meter 25 2,350,000 97,668
lengkap Bh
7 Modem Lengkap dengan Antena dan Kabel Data Bh 1,185,000 54,938

B MATERIAL DISTRIBUSI NON UTAMA :


1 Connector Press 16-35/35-70 mm2+cover & tanda phasa Bh 100 8,400 13,539
2 Service Wedge Clamp 4x16/25 mm2 Set 50 5,500 1,953

E KUMISAN S
1 Bundl.Conn.3 x50 mm + 1 x 35 mm2 - 50 cm ( kumis ) B 13 22,480 13,359
2 Line Tap Connector ( type press ) 35-70 / 35-70 mm B 75 14,500 13,547
3 Line Tap Connector ( type press ) 16-35 / 35-70 mm B 25 16,500 13,547

C MATERIAL KONSTRUKSI :
1 Ground Rod 1,5 Mtr + Clamp Bh 25 110,000 58,265
2 Gembok "setara SOLEX" Bh 25 150,000 37,175
3 NYA 50 mm M 50 46,700 1,355
4 Terminal Lug 50 mm - Cu (507/U/2009) Bh 50 49,000 13,547
5 Gaspijp 3-6mtr HDG u Tiang APP Bh 725,000 30,938
6 Beugel U Dia 3" Bh 26,900 6,104
7 Bolt & Nut 16 x 50 Bh 5,750 1,122
8 Dinabolt 10x50 Bh 3,000 7,050
9 Segel Bh 200 3,100 500

10 Jasa Pasang Bongkar Layanan Khusus /Pesta Ls 3 150,000

11 Jasa Pasang Bongkar Layanan JBST Ls 3 375,000

D MONTAGE : Set 20

E Transport Plg 25 15,000

SUB TOTAL
SUB TOTAL 1+2+3
PPN 10 %
TOTAL

PLN
A (S/D 41,5 KVA) = 1062 SET

.124 NO. PRK.2017.DJT.3.4

JUMLAH HARGA
TOTAL (Rp)
MATERIAL JASA PASANG

PLN 550 550


PLN 3,906 3,906
PLN 1,735 1,735
5,250 1,935 7,185
PLN
32,963 32,963
PLN 3,000 3,000
PLN 15,340 15,340
PLN 13,539 13,539
PLN 40,617 40,617

- -
2,963 1,701 4,663
PLN 7,620 7,620
PLN 847 847

PLN 3,906,000 3,906,000


PLN 3,470,000 3,470,000
5,250,000 1,935,000 7,185,000
PLN
32,963,000 32,963,000
PLN 3,000,000 3,000,000
PLN 15,340,000 15,340,000
PLN 27,078,000 27,078,000

PLN 3,326,400 3,326,400


- -
PLN 3,801,600 3,801,600
- -
PLN 5,945,940 5,945,940

3,828,000 3,828,000
- -
PLN 1,540,539 1,540,539
- -
2,001,000 1,540,770 3,541,770
- -
- 250,250 250,250

7,259,213 108,049,251 115,308,463


T

8,280,000 1,324,080 9,604,080


PLN 6,592,608 6,592,608
PLN 1,098,756 1,098,756
PLN PLN -

PLN 1,462,212 1,462,212


PLN 487,404 487,404
PLN 140,616 140,616

403,200 240,462 643,662


PLN 1,463,076 1,463,076
PLN 487,692 487,692

PLN 2,097,540 2,097,540


PLN 1,338,300 1,338,300
3,362,400 97,560 3,459,960
PLN 447,051 447,051
PLN 432,000 432,000
2,448,000 334,368 2,782,368
PLN 144,000 144,000

- 135,000 135,000
- 918,000 918,000

PLN - -

360,000 360,000

14,494,000 19,601,000 34,095,000

16,500,000 1,379,250 17,879,250


PLN 62,500 62,500
PLN 4,578,200 4,578,200
PLN PLN -
PLN - -

PLN 2,441,700 2,441,700

PLN - -

PLN 1,353,900 1,353,900


PLN 97,650 97,650

281,000 166,988 447,988


PLN 1,016,025 1,016,025
PLN 338,675 338,675

PLN 1,456,625 1,456,625


PLN 929,375 929,375
2,335,000 67,750 2,402,750
PLN 677,350 677,350
- - -
- - -
- - -
- - -
PLN 100,000 100,000

- 375,000 375,000

- 937,500 937,500

PLN

- 375,000 375,000

19,116,000 16,353,488 35,469,488


40,869,213 144,003,738 184,872,951
18,487,295
203,360,246

Surabaya , 30 Mei 2017


ASMAN PERENCANAAN

PLN

ENDRI BUDI WITJAKSONO


PROGRAM PERKUATAN JARINGAN :
PENGADAAN DAN PEMASANGAN SECTIONALIZER
PRK.2013.DJT.1.7
Sesuai gbr no. JTM/RECL/001 - dengan Volume 1 Unit

No. Tonase
Uraian Pekerjaan Sat Set / Vol
Mat (kg)

RECLOSER 20 KV - 400 A + RTU 210.00 S 1


425 Recloser Motorized + RTU + Kabel Data S 1
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel S 1

TAMBAHAN DUDUKAN RECLOSER 2.50 S 1


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 2
27 Bolt & Nut M.16 x 120 (517/U/2009) S 4

LIGHTNING ARRESTER 2.63 1


420 Polymer Arrester 24 kV - 10 kA S 6
142 NYA 35 sqmm ( SPLN ) M 6
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 5
219 Terminal Lug 35 mm - Cu (507/U/2009) B 18
32 Bolt M.12 x 30 - CU B 12
446 Klem C - 25/25 mm - Cu B 3

PENGAMAN JUMPERAN 23.53 1


50 Cross Arm UNP 100 x 50 x 5 - 2.000 - tumpu/tarik B 3
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) B 3
30 Bolt & Nut M.16 x 50 (517/U/2009) B 3
160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 3
436 Isolated All. Binding - 4 mm Ø 6 M 3

JUMPERAN 34.72 2
122 Line Tap Connector Type Al - 150 mm B 6
217 Terminal Lug 150 mm - Al / Cu (507/U/2009) B 6
30 Bolt & Nut M.16 x 50 (517/U/2009) B 12

TAMBAHAN DUDUKAN PT OD 12.72 1


59 Cross Arm type 500 - NP. 8 B 2
58 Cross Arm type 900 NP. 8 B 2
70 Double Arm Band 8" - 7" - TM (504/U/2009) B 1
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 8
13 Arm Tie Type 750 - 3/4" - (t=2,3 mm) B 4
28 Double Arm Bolt & Nut M.16 x 350 (besi as) S 1
142 NYA 35 sqmm ( SPLN ) M 2
219 Terminal Lug 35 mm - Cu (507/U/2009) B 2
119 Line Tap Connector Al 150 - 50 mm type G B 2

TAMBAHAN DUDUKAN CONTROL BOX 3.65 S 1


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
196 Single Guy Wire Band 8" - TM (513/U/2009) S 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 6

GROUNDING RECLOSER 3.30 S 1


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
1 AAAC - 70 sqmm ( SPLN ) M 14
226 Terminal Lug 70 mm Al (507/U/2009) B 2
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 1
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 3
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 1
202 Stainless Steel Strip non magnetic M 3
203 Stoping Buckle non magnetic B 4
123 Link (506/U/2009) B 3

GROUNDING CONTROL BOX 1.56 1


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) B 1
226 Terminal Lug 70 mm Al (507/U/2009) B 1
1 AAAC - 70 sqmm ( SPLN ) M 4
202 Stainless Steel Strip non magnetic M 2
203 Stoping Buckle non magnetic B 2
123 Link (506/U/2009) B 2

ACCESSORIES 0.78 1
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 1
107 Knee 2" - PVC B 4
172 Pipa Air PVC 2" - 3 meter ( AW ) B 1

RETOUR / BONGKAR 8.00 1


160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 1
Jumlah Harga Material
Jumlah Harga Jasa
Asuransi Material Ls
Asuransi Tenaga Kerja 3 Pekerja
Sertifikasi ( SLO ) 1 lokasi 250,000 Lokasi 1
Angkutan Material 0.3 Ton/M3
- Angkutan Zona 1 234,300 Ton/M3 71,000
- Angkutan Zona 2 433,700 Ton/M3 131,500
- Angkutan Zona 3 633,000 Ton/M3 192,000

PROGRAM PERKUATAN JARINGAN :


PENGADAAN DAN PEMASANGAN SECTIONALIZER
PRK.2013.DJT.1.7
Sesuai gbr no. JTM/LBS/001 - dengan Volume 1 Unit

No. Tonase
Uraian Pekerjaan Sat Set / Vol
Mat (kg)

LBS MOTORIZED 20 KV - 400 A + RTU 260.00 S 1


424 LBS Motorized + RTU + Kabel Data S 1
283 Box RTU protocol DNP 3, IEC (siap komunikasi GSM ) + Kabel S 1
290 Plat nama Penyulang Besar Double 0.000 1
282 1 Unit External PT 20 kV (phasa-phasa) S 1

LIGHTNING ARRESTER 2.63 1


420 Polymer Arrester 24 kV - 10 kA S 6
142 NYA 35 sqmm ( SPLN ) M 6
146 NYAF 35 sqmm u/ bawah Arrester ( SPLN ) M 5
219 Terminal Lug 35 mm - Cu (507/U/2009) B 18
32 Bolt M.12 x 30 - CU B 12
446 Klem C - 25/25 mm - Cu B 3

DUDUKAN PT EXTERNAL + COS 12.49 S 1


70 Double Arm Band 8" - 7" - TM (504/U/2009) B 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 8
219 Terminal Lug 35 mm - Cu (507/U/2009) B 2
57 Cross Arm type 1.000 NP. 6,5 B 1
12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 2
419 Polymer Cut Out Switch 24 Kv - 100 kA S 2
1 AAAC - 70 sqmm ( SPLN ) M 6
224 Terminal lug 70 mm AL/CU u/ CO (507/U/2009) B 6
122 Line Tap Connector Type Al - 150 mm B 2

TAMBAHAN DUDUKAN LBS 2.50 S 1


103 Klem Begel U 10" - TM - (l=44mm, t=6mm) B 2
27 Bolt & Nut M.16 x 120 (517/U/2009) S 4

TAMBAHAN DUDUKAN CONTROL BOX 3.65 S 1


12 Arm Tie Band 8" - TM - (l=44mm, t=6mm) B 1
196 Single Guy Wire Band 8" - TM (513/U/2009) S 1
30 Bolt & Nut M.16 x 50 (517/U/2009) B 6

GROUNDING LBS 3.30 S 1


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
1 AAAC - 70 sqmm ( SPLN ) M 14
226 Terminal Lug 70 mm Al (507/U/2009) B 2
223 Terminal Lug 70 mm - Al/Cu 2 Nut B 1
286 Line Tap Connector Cu - 50 mm / Klem C (507/U/2009) B 3
162 Pipa Air 3/4" - 4 mtr. u/ pelindung Ground (555/U/2009) B 1
202 Stainless Steel Strip non magnetic M 3
203 Stoping Buckle non magnetic B 4
123 Link (506/U/2009) B 3

GROUNDING CONTROL BOX 1.56 1


73 Ground Rod 16 mm - 2,5 m+clamp - TM - besi As, Electropla S 1
161 Pipa Air 3/4" - 2 mtr. u/ pelindung Ground (555/U/2009) B 1
226 Terminal Lug 70 mm Al (507/U/2009) B 1
1 AAAC - 70 sqmm ( SPLN ) M 4
202 Stainless Steel Strip non magnetic M 2
203 Stoping Buckle non magnetic B 2
123 Link (506/U/2009) B 2

ACCESSORIES 0.00 1
186 Pondasi type A ( 1 tiang ) (91/U/2009) B 1
172 Pipa Air PVC 2" - 3 meter ( AW ) B 1

RETOUR / BONGKAR 8.00 1


160 Pin Post Insulator 20 Kv;12,5 kN - Porcelain S 1
Jumlah Harga Material
Jumlah Harga Jasa
Asuransi Material Ls
Asuransi Tenaga Kerja 3 Pekerja
Sertifikasi ( SLO ) 1 lokasi 250,000 Lokasi 1
Angkutan Material 0.3 Ton/M3
- Angkutan Zona 1 234,300 Ton/M3 68,900
- Angkutan Zona 2 433,700 Ton/M3 127,500
- Angkutan Zona 3 633,000 Ton/M3 186,100
Harga Jumlah Harga

Material Jasa Material Jasa Zona 1 Jasa Zona 2 Jasa Zona 3

181,650,000 0 181,650,000 0 0 0
181,650,000 0 181,650,000 0 0 0
0 0 0 0 0 0

330,000 0 330,000 0 0 0
144,000 0 288,000 0 0 0
10,500 0 42,000 0 0 0

5,590,584 0 5,590,584 0 0 0
666,225 0 3,997,350 0 0 0
30,000 0 180,000 0 0 0
70,140 0 357,714 0 0 0
50,160 0 902,880 0 0 0
4,800 0 57,600 0 0 0
31,680 0 95,040 0 0 0

1,149,570 0 1,149,570 0 0 0
116,400 0 349,200 0 0 0
44,400 0 133,200 0 0 0
8,400 0 25,200 0 0 0
202,650 0 607,950 0 0 0
11,340 0 34,020 0 0 0

637,560 0 1,275,120 0 0 0
42,600 0 255,600 0 0 0
153,120 0 918,720 0 0 0
8,400 0 100,800 0 0 0

1,022,160 0 1,022,160 0 0 0
64,200 0 128,400 0 0 0
96,120 0 192,240 0 0 0
116,400 0 116,400 0 0 0
63,600 0 63,600 0 0 0
8,400 0 67,200 0 0 0
44,400 0 177,600 0 0 0
36,000 0 36,000 0 0 0
30,000 0 72,000 0 0 0
50,160 0 100,320 0 0 0
34,200 0 68,400 0 0 0

174,000 0 174,000 0 0 0
63,600 0 63,600 0 0 0
60,000 0 60,000 0 0 0
8,400 0 50,400 0 0 0

1,012,550 0 1,012,550 0 0 0
282,480 0 282,480 0 0 0
9,925 0 138,950 0 0 0
31,680 0 63,360 0 0 0
155,760 0 155,760 0 0 0
50,160 0 150,480 0 0 0
133,080 0 133,080 0 0 0
18,480 0 55,440 0 0 0
5,280 0 21,120 0 0 0
3,960 0 11,880 0 0 0

446,860 0 446,860 0 0 0
282,480 0 282,480 0 0 0
46,800 0 46,800 0 0 0
31,680 0 31,680 0 0 0
9,925 0 39,700 0 0 0
18,480 0 27,720 0 0 0
5,280 0 10,560 0 0 0
3,960 0 7,920 0 0 0

613,200 0 613,200 0 0 0
390,000 0 390,000 0 0 0
37,200 0 148,800 0 0 0
74,400 0 74,400 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
193,264,044
0 0 0
483,100
345,000
250,000

71,000
131,500
192,000
Zona 1 Zona 2 Zona 3
Jumlah 194,413,144 194,473,644 194,534,144
PPN 10% 19,441,314 19,447,364 19,453,414
Total 213,854,458 213,921,008 213,987,558
Dibulatkan 213,854,000 213,921,000 213,987,000

Harga Jumlah Harga


Material Jasa Material Jasa Zona 1 Jasa Zona 2 Jasa Zona 3

89,775,000 0 89,775,000 0 0 0
89,775,000 0 89,775,000 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0

5,590,584 0 5,590,584 0 0 0
666,225 0 3,997,350 0 0 0
30,000 0 180,000 0 0 0
70,140 0 357,714 0 0 0
50,160 0 902,880 0 0 0
4,800 0 57,600 0 0 0
31,680 0 95,040 0 0 0

3,288,690 0 3,288,690 0 0 0
116,400 0 116,400 0 0 0
8,400 0 67,200 0 0 0
50,160 0 100,320 0 0 0
91,560 0 91,560 0 0 0
63,600 0 63,600 0 0 0
8,400 0 16,800 0 0 0
876,750 0 1,753,500 0 0 0
9,925 0 59,550 0 0 0
155,760 0 934,560 0 0 0
42,600 0 85,200 0 0 0

330,000 0 330,000 0 0 0
144,000 0 288,000 0 0 0
10,500 0 42,000 0 0 0

174,000 0 174,000 0 0 0
63,600 0 63,600 0 0 0
60,000 0 60,000 0 0 0
8,400 0 50,400 0 0 0

1,012,550 0 1,012,550 0 0 0
282,480 0 282,480 0 0 0
9,925 0 138,950 0 0 0
31,680 0 63,360 0 0 0
155,760 0 155,760 0 0 0
50,160 0 150,480 0 0 0
133,080 0 133,080 0 0 0
18,480 0 55,440 0 0 0
5,280 0 21,120 0 0 0
3,960 0 11,880 0 0 0

446,860 0 446,860 0 0 0
282,480 0 282,480 0 0 0
46,800 0 46,800 0 0 0
31,680 0 31,680 0 0 0
9,925 0 39,700 0 0 0
18,480 0 27,720 0 0 0
5,280 0 10,560 0 0 0
3,960 0 7,920 0 0 0

464,400 0 464,400 0 0 0
390,000 0 390,000 0 0 0
74,400 0 74,400 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0
101,082,084
0 0 0
252,700
345,000
250,000

68,900
127,500
186,100
Zona 1 Zona 2 Zona 3
Jumlah 101,998,684 102,057,284 102,115,884
PPN 10% 10,199,868 10,205,728 10,211,588
Total 112,198,552 112,263,012 112,327,472
Dibulatkan 112,198,000 112,263,000 112,327,000
PEKERJAAN : PEMASANGAN SAMBUNGAN RUMAH
MALANG

S R - 3 Phasa Rasio KWH 5/20 A s/d 13.200 VA S R - 3 Phasa Rasio KWH 20/60

Kode Mat.
NO. URAIAN SAT. DENGAN DAK DENGAN BAUT DENGAN GAS PIPE DENGAN DAK
STANDAR MATA 3" STANDAR

1 1 1 1

PERLENGKAPAN MATERIAL SR 3 PHS :

1 184 Pole Bracket 3-6" B 1 1 1 1


2 207 Strainhook & clamp u/. Gaspijp - 1.5' B 1 - 1
3 194 Service wedge clamp 4/4 x 10/16 mm B 2 2 2 2
4 79 Gaspijp 1,5" - 2,3 m, u/ dask Galv B 1 - - 1
5 80 Gaspijp 3 " - 6 m. Galv B - - 1 -
6 98 Kanal NP6-60 cm + Bolt&nut B - - 2 -
5 16 Baut mata B - 1 - -
6 21 Beugels 3"+Bolt & nut - (l=44mm, t=6mm) B - - 2 -
5 191 Protective cap 1.5 " B 1 - - 1
6 127 Lodden manchet 1.5 " berat 0.95 - 1 kg B 1 - - 1
7 208 Stroppen u/ loden manchet 1.5" B 1 - - 1
8 22 Beugels u/ dask 1.5 "/ fixing colar + dekschroeven B 2 - - 2
9 105 Klem kabel/ Cable suport (508/U/2009) B 5 5 - 5
10 270 Twisted Cable 4 x 16 mm² M 30 30 30 30
11 215 TC 3 x 50 + 1 x 35 sqmm ( SPLN ) M 1 1 1 1
12 43 Connector press AL/AL type 70-35mm2 & Cover+tanda phasa B 4 4 4 4
13 42 Connector press AL/AL type 35-16mm2 & Cover+tanda phasa B 4 4 4 4
14 152 OA Kast type III lengkap cat powder coating S 1 1 1 1
15 154 OA Kast type VI ,Kecil cat powder coating S - - 1 -
15 111 KWh meter 3 phs. 220/380 V - 5/20 A ST Clas 1 Elektronik S 1 1 1 -
16 110 KWh meter 3 phs. 220/380 V - 20/60 A ST Clas 1 Elektronik S - - - 1
16 130 MCB 230 V - 35 A s/d 50 A - 1 Phasa B - - 1 -
16 131 MCB 230 V - 2 A s/d 35 A - 1 Phasa B 1 1 - -
17 133 MCB 3 phs. 230 V - 25 A s/d 50 A B - - - 1
17 188 Pondasi u/Gaspijp 3" Ls - - 1 -
18 82 Gembok "setara SOLEX" B - - 1 -

159 Pipa Air 3/4" - 3 mtr. u/ pelindung Ground (555/U/2009) B


19 144 NYAF / NYA 2,5 mm² ( SPLN ) M 6 6 6 6
20 251 Timah solder + pasta Ls 1 1 1 1
21 25 Bolt & Nut 3/16 x 0,5" B 1 1 1 2
22 26 Bolt & Nut M.16 x 140 (517/U/2009) S 2 2 2 2
23 99 Kawat Segel @ 15 cm B 2 2 9 7
24 250 Timah Segel B 7 7 14 7
25 137 Mountage kWH 5/20 A S 1 1 1 1

ANGKUTAN MATERIAL Ton/M3 0.111 0.104 0.150 0.112

HARGA MATERIAL Rp. 1,046,720 956,880 1,906,920 2,797,880

HARGA JASA Rp. 810,175 767,685 1,011,280 1,190,290

HARGA ANGKUTAN MATERIAL Rp. 4,996,200 4,996,200 4,996,200 4,996,200

KONSUIL Ls

ASURANSI MATERIAL Ls 62,800 57,410 114,410 167,870

ASURANSI TENAGA KERJA Org 50,000 50,000 50,000 50,000

JUMLAH HARGA Rp. 6,965,895 6,828,175 8,078,810 9,202,240

PPN 10 % Rp. 696,590 682,818 807,881 920,224

TOTAL Rp. 7,662,485 7,510,993 8,886,691 10,122,464

DIBULATKAN Rp. 7,662,000 7,510,000 8,886,000 10,122,000


S R - 3 Phasa Rasio KWH 20/60 A s/d 16.500 VA HARGA SATUAN (Rp.) JUMLAH HARGA ( RP.)
JUMLAH
DENGAN BAUT DENGAN GAS PIPE JUMLAH ( Rp.
MATA 3"
MATERIAL JASA MATERIAL JASA )

1 1

1 1 6 51,720 2,605 310,320 15,630 325,950


- - 2 18,480 3,915 36,960 7,830 44,790
2 2 12 7,920 3,000 95,040 36,000 131,040
- - 2 0 14,055 28,110 28,110
- 1 2 789,600 23,430 1,579,200 46,860 1,626,060
- 1 3 48,240 3,275 144,720 9,825 154,545
1 - 2 0 1,295 2,590 2,590
- 2 4 33,600 6,015 134,400 24,060 158,460
- - 2 10,080 3,275 20,160 6,550 26,710
- - 2 42,720 7,025 85,440 14,050 99,490
- - 2 1,810 4,345 3,620 8,690 12,310
- - 4 8,375 5,585 33,500 22,340 55,840
5 - 20 1,320 2,790 26,400 55,800 82,200
30 30 180 17,400 13,980 3,132,000 2,516,400 5,648,400
1 1 6 0 7,300 43,800 43,800
4 4 24 21,600 9,790 518,400 234,960 753,360
4 4 24 11,400 9,790 273,600 234,960 508,560
1 1 6 154,200 230,370 925,200 1,382,220 2,307,420
- 1 2 0 163,170 326,340 326,340
- - 3 0 3,550 10,650 10,650
1 1 3 1,776,000 178,010 5,328,000 534,030 5,862,030
- - 1 34,800 26,100 34,800 26,100 60,900
- - 2 34,800 4,895 69,600 9,790 79,390
1 1 3 0 210,550 631,650 631,650
- 1 2 0 30,115 60,230 60,230
- 1 2 0 2,340 4,680 4,680

6 6 36 0 0
1 1 6 0 0
2 1 8 7,560 0 60,480 60,480
2 2 12 15,600 0 187,200 187,200
7 9 36 480 0 17,280 17,280
7 14 56 0 0
1 1 6 0

0.105 0.148

2,708,040 3,599,880 Jumlah 13,016,320 6,294,145 19,310,465

1,147,800 1,366,915

4,996,200 4,996,200

162,480 215,990

50,000 50,000

9,064,520 10,228,985

906,452 1,022,899

9,970,972 11,251,884

9,970,000 11,251,000

Anda mungkin juga menyukai