Anda di halaman 1dari 6

RFQ FOR Bonga Detailed Engineering-OCEON

CTR n°7
Task
Product Activity Code

CTR n°7 - DETAILED ENGINEERING SCOPE


INS RPT/CAL 01
INS RPT 01
INS RPT 01
INS RPT 01
INS RPT 01
INS RPT 01
INS RPT 02
INS RPT 01
INS RPT 01
INS RPT/CAL 02
INS RPT 02 D
INS RPT 03 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 03 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D
INS RPT 02 D

INS DRW 03
INS DRW 03 D
INS DRW 04
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
INS DRW 03 D
D

CAL CIV
DRW PSS
RPT DRW
PIP
MEC
COR
SAF
PMT
ELE
INS
Activity Register & Manhours
Hours
Rev 0.0 - 09/04/19

Draft Lead Project Eng. Lead Eng.


Engineering Task Description / Deliverable Name
man Draftman hours status hours

TOTAL: 932 139.8 3314 1712


Basic Preparation 0 0 66 - 226
Attendance to Project Meetings 10 office 24
Kick off meetings office 10
Input to HAZID Report 12 office 8
Input to HAZOP Report 12 office 32
Site Visit office 40
Site Visit Report office 40
Design Review Attendance office 32
Procurement Support 32 office 40
Detailed Design 0 0 2448 - 1104
Instruments Index 32 office 16
Instrument Valve Summery 30 office 16
Instruments I/O List 50 office 20
Instruments Cable Schedule 60 office 32
Instrumentation Basis of Design 32 office 16
Control and Safety System Philosophy 60 office 16
ESD & Safeguard Philosophy 32 office 16
Metering Philosophy 32 office 16
Specification for Instrumentation & Control 32 office 16
Specification for Instrumentation Installation 32 office 16
Specification for Integrated Control and Safety System (lCSS) 80 office 24
Specification for System and Marshalling Cabinets 32 office 12
Specification for Transmitters 32 office 16
Specification for Pressure Gauges 32 office 16
Specification for Level Gauges 32 office 16
Specification for Meters 32 office 16
Specification for Restraction Orifices 32 office 16
Specification for Control Valves 32 office 16
Specification for Shunt Down Valves 32 office 16
Specification for PSVs 32 office 16
Specification for Level Switches 32 office 16
Specification for Instrument Junction Box 32 office 16
Specification for Instrument Cables 32 office 16
Specification for Instrument Cable Trays 32 office 16
Specification for Instrument Earthing 32 office 16
Instrument Tie-In Schedule 32 office 16
office

Instruments Datasheet for Temperature Transmitter 32 office 16


Instruments Datasheets for Level Transmitter / Level Differential Transmitter 32 office 16
Instrument Datasheet for Pressure Transmitter/Pressure Differential Transmitter 32 office 16
Instrument Datasheet for Level Switches 32 office 16
Instruments Datasheet for Flow Transmitter 32 office 16
Instruments Datasheet for Pressure Gauge 32 office 16
Instrument Datasheet For Flow Gauge 32 office 16
Instruments Datasheet for Temperature Gauge 32 office 16
Instruments Datasheet for Restriction Orifices 32 office 16
Instruments Datasheet for PDI/PIDA 32 office 16
Instruments Datasheets for Level Gauges 32 office 16
Instrument Datasheet for Pressure Control Valve 32 office 16
Instrument Datasheet for Flow Control Valve 32 office 16
Instrument Datasheet for Temperature Control Valve 32 office 16
Instrument Datasheet for ESDVs 32 office 16
Instruements Datasheet for Differential Pressure Meters 32 office 16
Instruements Datasheet for Ultrasonic Flow Meters 32 office 16
Instruements Datasheet for Positive Displacement Meters 32 office 16
Instruements Datasheet for Turbine Flow Meters 32 office 16
Instruements Datasheet for Flow Meters 32 office 16
Instrument Cable Schedule 32 office 16
FO Cable Schedule 32 office 16
Instrument Equirment Sizing 32 office 16
Alarm & Trip List 32 office 80
Instrument equipment list 32 office 10
SIL calculation 32 office 10
Instrument MTO 160 office 40
Junction Box MTO 60 office 20
Instrument Bulk MTO 60 office 16
Control Valves & Self Actuated Control Valves - Material Requisition (MR) 32 office 10
Multiphase Flowmeter Material Requisition - MR 32 office 10
Transmitters Material Requisition - MR 32 office 10
Gauge Material Requisition - MR 32 office 10
Safety Relief valves Material Requisition - MR 32 office 10
SDV Material Requisition - MR 32 office 10
Flow Meters Material Requisition - MR 32 office 10
Flow Element & Restriction Orifice Material Requisition - MR 32 office 10
Junction boxes Material Requisition - MR 32 office 10
Instrumentation Bulk Materials Requisition - MR 32 office 10
Cable Trays Material Requisition - MR 32 office 10
Instrument Cables Material Requisition - MR 32 office 10
office

Drawings 932 139.8 800 - 382


Instruments Drawing Index 30 4.5 16 office 8
Instrument Legends and Sysmbols 30 4.5 16 office 8
Cause & Effect Diagram 40 6 32 office 16
Instrument Cable Block Diagram 40 6 32 office 16
Instrument Cable Routing Diagrams 40 6 32 office 16
ICSS Block Diagram 50 7.5 80 office 32
Instrument Location Drawings 80 12 50 office 22
Typical Instrument Hook-Ups 80 12 70 office 22
Control & Safety System / Architectural Drawing 50 7.5 60 office 22
JB Termination Drawing 50 7.5 60 office 22
Interconnection Diagram 50 7.5 40 office 20
Instrument Loop Diagrams 80 12 80 office 22
Instrument Cable Tray Routing Layouts 60 9 40 office 22
Instrument Cable Tray Installation Details/Support 60 9 32 office 22
Typical Panels Drawings 40 6 32 office 22
Fiber Optic Termination Drawing 40 6 32 office 22
Fusible Loop system Layout 32 4.8 32 office 22
Control Room Equirment Arrangement Layout 40 6 32 office 22
Logic Block Diagram 40 6 32 office 24
DRW LDRW PE LE
932 139.8 3314 office 1712
Equivalent Man-month 6.3 0.9 22.3 11.5
overall CTR
duration
[months] Comments
Lead Eng. Disc.
status Leader

1712 0
- 0
office
office
office
office
office
onshore
office
office

- 0
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office

- 0
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
office
LE DL
office 0
11.5 0.0