PROJECT REPORT
ON
Year : 2013
Submitted to
Mrs.APARNA BORKER
PRINCIPAL
Mr.Abishek vaishnav
Date Date
Designation Designation
PT.RAVISHANKAR SHUKLA UNIVERSITY,
RAIPUR
PROJECT EVALUATION WORK
1.Candidate Roll no -
2. Candidate Name - DHANAU KUMAR N NISHAD &
ASHWANI KUMAR SAHU
3. Project Title - COLLEGE SPORTS MANAGEMENT
4. Software Base - Not Required
5. Sponsoring Address -
6.Submitted for course - PGDCA 2012-2013 & year
7.Study center code - KRUTI SCHOOL OF BUSINESS
MANAGEMENT RAIPUR
8.Total Internal assignment
And exam work evaluation - Marks Out Of 100
SELF CERTIFICATE
SIGNATURE OF STUDENT
NAME OF STUDENT
(PGDCA II SEM.)
SYNOPSIS
SYNOPSIS OF THE PROJECT
Main Report
Project objective
Theoretical Background of project
Definition of Problem
System analysis & Design
System implementation & Detail or Hardware & Software
Used
Detailed Life cycle of the project
1. Entity Relationship Diagram
2. Data Flow Diagram
3. Data Dictionary
4. Input Output Screen Design
5. Methodology used for testing
6. Printout of the code Sheet
System Security measures
Conclusion
Bibliography/Reference
Soft copy of the project on CD
OBJECTIVE ACHIEVED SUCCESSFULLY
FEASIBILITY STUDY
SYSTEM IMPLEMENTATION
The final phase of the process is the implementation of the new
system. This phase is the fulmination of the previous phase and will
be performed only after each of the phases has been successfully
completed to the satisfaction of both the users and quality assurance.
The task which comprises the implementation phase includes the
installation of the hardware, proper scheduling of the resource
needed to production of a complete structure that supports both the
user and the environment and the necessary documentation to move
the program and the file in to production.
1. Hardware installation
2. Scheduling / Resources requirement
3. User instruction / Procedure
4. Turnover documentation / certification reviews
The reviews will cover all the documentation that has been
generated for the product. In particular the review will examine the
certification checklist to ensure it has completed and will compare
this checklist to project documentation to ensure that all necessary
items have been developed in addition to the certificates checklist
item, the reviewed to determine they are correct.
HARDWARE USED
SOFTWARE USED
S_enrolno S_email
C_name
C_id
Student
study
ing
C_id C_name
Yr/sem
Course
Playi
ng
TOOLS
date
S_enrol
T_QUY
S_name
T_name
T_id
DATA FLOW
DIAGRAM
1.O lavel :-
SPORTS FESSDATA
USER
MANAGEMENT
BASE
2. 1lavel :-
Admin
Log in Log In table
Student
details
Tools Sports
details details
Report
DATA DICTIONARY
1.STUDENT DETAILS
2. TOOLS DETAIL.
3.SPORTS DETAILS.
LIST OF FORMS
1.LOGIN FORM
2. SPALSH SCREEN FORM
3.MAIN MENU FORM
4. STUDENT DETAIL FORM
5. ISSUE DETAIL FORM
6.TOOLS DETAIL FORM
7. REPORT FORM
1. STUDENT REPORT.
2. ISSUE REPORT
3. TOOLS REPORT.
TESTING(TECHNIQUES & STRATEGIES)
TESTING FUNDAMENTALS AND OBJECTIVES
Testing Techniques
White Box testing
Unit Testing
System Testing
System testing is a series of different tests whose primary
purpose is to fully exercise the computer-based system. It
verifies that system elements have been properly integrated
and Performa allocated functions.
The different types of system test are applied are as
follows.
Recovery testing.
Security testing.
Stress testing.
Performance testing.
Alpha & beta testing
End Sub
The database forms the basic for running a system to obtain the
required output hence the database security major factor which
considering the user should keep in mind which considering
system/database security. The integrity of the system in terms of
system requirement and user requirement is of greater importance
for any system developer. The database once stored may not be
accessed by any user hence database should be permanently stored
in the system.
Physical Security
URL’s:-
www.freecomputerbooks.com
www.bigbanyantree.com
www.forumempire.com