Anda di halaman 1dari 10

For R K Chavan Infrastructure Pvt Ltd

Project Name- Amravati Site


Period- 01.04.2019 To 31.03.2020

Basic Rate
Material Rate
Range
Sr Name Name of The Material UOM Required On Including Remark
2018-
which Site GST
2019
For R K Chavan Infrastructure Pvt Ltd
Project Name- Chilpi Kawardha site
Period- 01.04.2019 To 31.03.2020

Basic Rate
Material Rate
Range
Sr Name Name of The Material UOM Required On Including Remark
2018-
which Site GST
2019
For R K Chavan Infrastructure Pvt Ltd
Project Name- Kanker Bedma Site
Period- 01.04.2019 To 31.03.2020

Basic Rate
Material Rate
Range
Sr Name Name of The Material UOM Required On Including Remark
2018-
which Site GST
2019
For R K Chavan Infrastructure Pvt Ltd
Project Name- Pandharpur Sangola Site
Period- 01.04.2019 To 31.03.2020

Basic Rate
Material Rate
Range
Sr Name Name of The Material UOM Required On Including Remark
2018-
which Site GST
2019
For R K Chavan Infrastructure Pvt Ltd
Project Name- Mhaswad Tembhurni Site
Period- 01.04.2019 To 31.03.2020

Basic Rate
Material Rate
Range
Sr Name Name of The Material UOM Required On Including Remark
2018-
which Site GST
2019

Anda mungkin juga menyukai