1. INPUT DATA

1.1. LOADING DATA


Ultimate force in axial from telfer crane reaction, Pu = 260000 N
Ultimate force in moment from telfer crane reaction, Mu = 157000000 Nmm
Ultimate force in shear from telfer crane reaction, Vu = 40000 N
Surcharge load Qs = 10 kN/m2
Reduction factor for flexural φf = 0.8
Reduction factor for shear φv = 0.75
Reduction factor for tension φt = 0.9

1.2. CONCRETE

Compression strength fc' = 30 MPa


Modulus Elasticity Ec = 25742.9602 MPa
Unit weight ϒC = 24 kN/m3
Depth of column H= 3850 mm
Thickness of column ( 1.1 m x 1.1 m ) t= 1100 mm
Foundation depth D= 500 mm
Foundation heel length c= 0 mm
Foundation toe length i= 500 mm
Width of column Lc = 1100 mm
Width of foundation Lf = 2000 mm
Depth of column into ground level J= 3350 mm
Total foundation length B= 1600 mm
Concrete cover d' = 70 mm

Page 1 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output

1.3. SOIL

Unit weight ϒS = 18 kN/m3


Coefficient of active soil ka = 1.0
Depth of soil area that affect to heel foundation h= 2350 mm

1.4. REBAR

Diameter of rebar (assuming) dia. = 16 mm


Tensile strength fy = 390 MPa
Modulus elasticity Es = 200000 MPa

2. ANALYSIS

2.1. DESIGN CAPACITY OF THE COLUMN

Design capacity of the column φt Pn = φt * ( 0.85 * fc' * A ) = 27769500 N


Factored tension load 1.2 Pu = 312000.00 N
The design capacity result is :
1.2 Pu £ φt Pn
312 kN < 27770 kN ® (OK)

2.2. STABILITY CHECK FOR MOMENT

SOIL
Soil volume Vsoil = h1 * i * Lf= 1.9 m3
Soil weight W1 = gs * Vsoil= 33.3 kN
Moment arm of soil weight Armsoil = 1.4 m
Moment resistance from soil reaction Mr1 = W1 * Armsoil = 45.0 kNm
CONCRETE COLUMN
Column volume Vcol = J * t * Lc= 4.1 m3
Column weight W2 = gc * Vcol= 97.3 kN
Moment arm of column Armcol = 0.6 m
Moment resistance from concrete column Mr2 = W2 * Armcol = 53.5 kNm
FOOTING FOUNDATION
Footing volume Vfoot = D * B * Lf= 1.6 m3
Footing weight W3 = gc * Vfoot= 38.4 kN
Moment arm of footing Armfoot = 0.8 m
Moment resistance from footing Mr3 = W3 * Armfoot = 30.7 kNm
MONORAIL CRANE FORCE
Vertical force of the monorail crane reaction PV = 260.0 kN

Page 2 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
Moment arm ArmV = 0.6 m
Moment resistance from crane reaction MrV = PV * ArmV = 143.0 kNm
TOTAL MOMENT CAPACITY
MR = Mr1 + Mr2 + Mr3 + MrV = 272.2 kNm

TOS

PH1
FOOTING

PH2
BS

HORIZONTAL FORCE FROM T.O.S TO FOOTING (PH1)


Horizontal force TOS - Footing PH1 = gs * ka * h1 * Lc = 46.5 kN
Moment arm Arm1 = 1.1 m
Moment resistance from footing Mu1 =PH1 * Arm1 = 52.0 kNm
HORIZONTAL FORCE FROM FOOTING TO BS
Horizontal force TOS - Footing PH2 = gs * ka * Hfooting * Lf = 37.8 kN
Moment arm Arm2= 0.3 m
Moment resistance from footing Mu2 =PH1 * Arm1 = 9.5 kNm
MOMENT REACTION FROM MONORAIL CRANE
Moment reaction Mucrane = 32.0 kNm
Safety Factor SF = 1.5
TOTAL ULTIMATE MOMENT
MU = (Mu1 + Mu2 + Mucrane) * 1.5 = 140 kNm

The moment capacity result is :


MU £ MR
140 kNm < 272 kNm ® (OK)

2.3. CHECK OF FRICTION

Coefficient of friction concrete to concrete µ= 0.65


Weight of soil PV1 = W1 = 33.3 kN
Weight of column PV2 = W2 = 97.3 kN
Weight of footing foundation PV3 = W3 = 38.4 kN
Vertical force due to reaction force of crane PV4 = PV = 260.0 kN
Horizontal Load due to soil pressure PH1 = 47 kN
Horizontal Load due to moment of crane PH2 = 38 kN
Total vertical force PV = 429.0 kN
Total horizontal force PH = 84.330 kN
The friction capacity result is :

Page 3 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output
PH £ m * PV
84 kN < 279 kN ® (OK)

2.4. SHEAR CONDITION

Ultimate force in shear from telfer crane reaction, Vu + PH = 124330.0 N


For non prestressed of footing foundation, Vc should be minimum value from (a), (b), (c )
Ratio of long to short dimensions β= 0.80
modification factor reflecting the reduced mechanical properties of lightweight
to normalweight concrete of the same compressive strengt λ= 1.00
Constant value αs = 20.00
perimeter of critical section for shear bo = 1000.00 mm
Compression strength of concrete fc' = 30.00 Mpa
distance from extreme compression fiber to centroid of longitudinal tension reinforcement
d = D - d' - dia/2 = 422.00 mm
Shear Strength (a) Vc = 0.17 * ( 1 + 2 / β ) * λ * (SQRT (fc')) * bo * d = 1375277 N
Shear Strength (b) Vc = 0.083 * (αs*d/bo+2) * λ * (SQRT (fc'))*bo*d = 2002865 N
Shear Strength (c) Vc = 0.33 * λ * (SQRT (fc')) * bo * d = 762758 N
Shear Capacity is the minimum of (a), (b), and (c) Vcmin = 762758.4 N
The shear capacity result is :
PH £ m * PV
124 kN < 763 kN ® (OK)

2.5. SHEAR REINFORCEMENT

Diameter of stirrup dia = 10 mm


Distance of stirrup is provided s= 150 mm
Area section of stirrup Av = 2 * (π/4 * dia2) = 157.08 mm2
smin = (Av*fy) / (0.062*SQRT(fc)*Lc) =
Minimum distance of stirrup 164.00 mm
The design result is :
Smin £ S
164 mm > 150 mm ® (OK)

2.6. FLEXURAL REINFORCEMENT

Flexural moment Mmax = Mu= 157000000 Nmm


Moment capacity Mn = Mmax / φf = 196250000 Nmm
Mn = As fy (d - a/2) ; with assume (d-a/2) = 0.9d
As = Mn / 400 * ( 0.9 * d ) =1291.7983 mm2
Ratio of rebar area (width b = 1000 mm ) ρ = As / ( b * d ) = 0.0031
ρmin = 0.0020
Use = ρ
ρ ρmin
0.0031 > 0.0020 ® 0.0031

Page 4 of 6
Jakarta MRT Sheet : Date :
COMPANY Monorail Crane Foundation Designed : RJ 11/14/2015
PEMUDA STATUE Checked :
Ref. Calculation Output

Rebar area is required (width b = 1000 mm ) Asreq = ρuse * b * d = 1291.80 mm2


Reinforcement for tension area
Diameter of rebar that is used dia. = 19 mm
Distance of rebar s= 150 mm
Rebar area is provided Asprov = (p / 4 * dia ) / s * 1000 =
2
1890.19 mm2
The flexural reinforcement design result is :
Asreq £ Asprov
1292 mm < 1890 mm ® (OK)
Reinforcement for compression area
Rebar area is required (width b = 1000 mm ) As'req = Asreq / 2 = 645.90 mm2
Diameter of rebar that is used dia. = 16 mm
Distance of rebar s= 200 mm
Rebar area is provided Asprov = (p / 4 * dia2) / s * 1000 = 1005.31 mm2
The flexural reinforcement design result is :
Asreq £ Asprov
646 mm < 1005 mm ® (OK)