The BED LANCES system consists of ten nos. of lances located five in front pant leg and five in
rear pant leg of the combustor, at the elevation just above the nozzle grate in the combustor. These
LANCES are capable of burning HFO with steam atomization as fuel.
Lances are used to increase the combustor temperature during the cold or hot start up beyond 595 C
up to lignite ignition temperature (>680 C).
Required no of lances can be put in service, and it is recommended to select the lances one by one and
also in opposite sides. Lances1, 3, 5 are located in front side and lance no. 2, 4 are located at rear side
of the Front pant leg.
Lances can be operated during load conditions also, if necessary, to maintain the combustor
temperature if requirement arises.
This Lances HFO system consists essentially of the following equipments / system.
COMMON SYSTEM
HFO SYSTEM
A. DP SWITCH ACROSS HFO SUCTION STRAINERS FOR DP HIGH ALARM (0HJF21/22
CP001)
B. HFO PUMP I / II (0HJF21 AP001 /0HJF22 AP001)
C. HFO PUMP OUTLET PRESSURE CONTROLLER (0HJF34 AA001)
D. HFO HEATER TEMPERATURE CONTROLLER (0HJT31 AA001, 0HJT32 AA001)
E. DPS ACROSS HFO HEATER OUTLET STRAINER for DP high alarm (0HJF31 CP001,
0HJF32 CP001)
F. HFO PRESSURE O.K. (1HJF70 CP001)
G. HFO TEMPERATURE O.K. (1HJF70 CT901) 2 of 3
H. HFO MASTER TRIP VALVE (1HJF70 AA101)
I. ATOMISING STEAM PRESSURE OK (1HJT70 CP901)
J. BED LANCES ATOMISING STEAM PR CONTROLLER (1HJT80 AA001)
K. BED LANCES ATOMISING STEAM PR LOW (1HJT80 CP901)
L. HFO FORWARD FLOW METER (1HJF70 CF001)
M. HFO RETURN FLOW METER (1HJR70 CF001)
N. BED LANCES CV (1HJF80 AA001)
O. BED LANCES HFO PRESSURE HIGH (1HJF80 CP901)
P. BED LANCES HFO PRESSURE LOW (1HJF80 CP901)
Q. BED LANCES ATOMISING STEAM PRESSURE LOW SWITCH (1HJT80 CP901)
420721944.doc0 Page 1 of 3
BECL- Bhavnagar, 2 x 250 MW CFBC BOILER
WRITE UP ON BURNER MANAGEMENT SYSTEM
FUNCTION GROUP: BED LANCES 1 TO 5
3. OPERATING LOGIC
Before starting the system all the following conditions should be satisfied.
3.1.1 Permissive
3.1.2 Sequence
Following actions will happen when START command given for the selected BED
LANCE example BED LANCE-1:
420721944.doc0 Page 2 of 3
BECL- Bhavnagar, 2 x 250 MW CFBC BOILER
WRITE UP ON BURNER MANAGEMENT SYSTEM
FUNCTION GROUP: BED LANCES 1 TO 5
3.2.1 Permissive
3.2.2 Sequence
Following actions will occur automatically, when STOP command given for a selected
BED LANCE or TRIP occurs.
3.3 Protection
ALL BED LANCES will trip and trip indication / signal will be ON, when any one of the
following condition occurs.
3.4 Note
1. Similar operations are applicable for other bed lances with respective accessories and
its tag no. as per the selected bed lances. For the tag no of the selected lances,
wherever no. 81 meant for bed lance-1 to be changed as 82,83,84, & 85 for bed lances
2,3,4 & 5 respectively.
3. If the combustor temp. > 595 deg C any of the BED LANCES located in the relevant
pant leg can be started independently irrespective of SUB – I / II /III/IV is in operation or
not.
4. The Start cycle should be completed within 120 sec i.e., from Start PB pressed to
opening of BTV of selected Bed Lances.
5. Bed Lances start and stop sequence actions shall be done as per the indicated order
of sequence and also confirming the completion of previous action through feedback.
420721944.doc0 Page 3 of 3