PROPER MENUJU INDUSTRI BEKELANJUTAN 5 4 2017 Ibu Aty PDF
PROPER MENUJU INDUSTRI BEKELANJUTAN 5 4 2017 Ibu Aty PDF
PERINGKAT KINERJA
PERUSAHAAN
DALAM
PENGEDALIAN PENCEMARAN
LINGKUNGAN HIDUP
SPM BUDISUSANTI
DIREKTUR PENGENDALIAN PECEMARAN AIR
DIRJEN PENGENDALIAN PENCEMARAN DAN KERUSAKAN LINGKUNGAN
KLHK
DASAR HUKUM - UUD 1945
• CONSUMEN’s AWARNESS
MARKET DRIVE • PENINGKATAN JUMLAH
PRODUK RAMAH LINGKUNGAN
Substitute harmful
materials with less Carries lower regulatory
damaging alternative compliance burden
Increase use of
renewable and Reduces waste disposal
recyclable materials requirement
Hotel
Rumah Sakit
Jasa
Pengolah
Limbah,
Kawasan
Industri
Pertambangan,
Energi,
Migas
Agroindustri
Manufaktur
14
PROSEDUR PELAKSANAAN PROPER
Sosialisasi Verifikasi
Penyusunan Penyusunan
lapangan (bila
laporan laporan
Pengiriman diperlukan)
kuesioner
tidak tidak
Penyusunan Pemilihan Pengumpulan Verifikasi Penentuan Review Tahap I Review Tahap II
Kriteria Peserta Data & lapangan Peringkat Awal (Tim Teknis KLH (Dewan Pertimbangan)
Inspeksi & Pemda)
(1) (2) (3) (4) (5) (6) (7)
tidak tidak
Penentuan Review Hasil Klarifikasi oleh Tanggapan Terhadap Pemberitahuan Peringkat Penentuan Peringkat
Peringkat Akhir Dewan Pertimbangan Masukan Perusahaan Sementara ke Perusahaan Sementara
15
BASIC PRINCIPLE OF PROPER – RATING – CRITERIA
X
ENVIRONMENTAL EXCELENCES
S =
Management System
U
3 R of Hazardous
Conservation
GOLD
Envromental
Development
B
Biodiversity
Community
3 R of Solid
S
Reduction
Protection
Emmision
Efficiency
Water
Energy
Waste
Waste
S C Passing Grade
C O
O R GREEN
R
E E
Passing Grade
Best Practices ; Best Available Technology;
Best Corporate Social Responsibility
BEYOND COMPLIANCE AREA
COMPLY BLUE
SEA POLLUTION CONTROL REGULATION
HAZARDOUS WASTE REGULATION
AIR POLLUTION REGULATION INCOMPLIANCE RED
WATER POLLUTION REGULATION
EIA REGULATION BLACK
NO EFFORT
COMPLIANCE TO REGULATIONS
PENGENDALIAN PENCEMARAN AIR
REFERENCE
REGULATION
DISCHARGE PERMIT Government WASTE WATER STANDARD
Regulation
No..82 / 2001
Ministerial
Decree No.
COMPLIANCE POINT 05/2014
TECHNICAL REQUIREMENT
(Discharge Outlet) Ministerial
Decree
No. 08/2007
Ministerial
Decree
PARAMETER REPORTING
No. 09/2007
MONITORING
Ministerial
Decree
No. 10/2007
REFERENCE
REGULATION
COMPLIANCE POINT Government
Regulation
(Discharge Outlet)
No.41 / 99 TECHNICAL
Technical REQUIREMENT
Guidance for Air
Pollution Head of
PARAMETER Environmental
MONITORING Impact
Management REPORTING
Agency Decree Manual / CEM
No. 205/1996
Ministerial Decree
EMISSION STANDARD No. 13 / 1995
Ministerial Decree
No. 7 / 2007
PRODUCER
FINAL
DISPOSAL STORAGE
(DUMPING)
HAZARDOUS
WASTE
MANAGEMENT
(Government
PROCESSOR
(TREAT Regulation COLLECTING
MENT)
No. 101/2014)
TRANSPORTA
USER TION
EVALUASI PENGELOLAAN LIMBAH B3
Permit
Requirement
HAZARDOUS
WASTE
MANAGEMENT
Performance
www.themegallery.com
BLUE
1. Own and Implement Environmental
RED
Document (EIA/Environmental 1. Not Comply with the HITAM
Management Plan and Monitoring) / environmental document/
Permits permits’ requirements: The Company does not have
2. Implementation of the Environmental a. Area and/or production Environmental Document
Document and/or Permits’ capacity; (EIA/Environmental
Requirement: b. If new issues/concerns Management Plan and
a. Comply to the area and/or arise /found related to the Monitoring) / Permits with
production capacity as stated in companies’ environmental specification as describe in the
the document. impact not yet established NOTE below.
b. All environmental impacts related in the documents.
to the activities are stated in the 2.Not comply to the
document and implemented. Reporting System for the
3. Comply to the Reporting System for implementation of the
the implementation of the documents’ documents’ requirements.
requirements.
NOTE:
RED = for company established after 23 Feb 2012 having Environmental Document but have not
submitted permits application .
BLACK = for company established after 3 October 2009 have not had environmental document.
BLACK = for company established after 23 Feb 2012 have not had environmental document and permit
NO. ASPECTs RATING
BLUE RED BLACK
1. Comply with 1. Own waste water discharge permit The company does not have waste
the water to the water body or sea and/or water discharge permit to the water
pollution waste water land application body or sea and/or waste water land
permit. permit. For palm oil industries, or application permit.
2. The waste water discharge permit
to the water body or sea and/or
waste water land application
permit for palm oil industries is in
final process to be approved.
2. Comply with Monitor all compliance points and/or a. If company did not monitor the
the compliance waste water discharged which has to compliance point (one or more)
points be managed as required in the during the rating period.
regulation. b. For Hotels, Hospitals, and Industrial
domestic waste using waste water
for garden watering.
Note:
1. Industry treating the entire waste water to the industrial estate will be stated as 100% comply ( completed
with the cooperation agreement between the industries and the industrial estate)
2. Oil and gas industry injecting its produced water into formation level for pressure maintenance will be
stated as 100% comply.
3. Industry implementing 100% of waste water for reuse and/or recycle and equipped with Standard Operating
Procedure (SOP) and operational logbook will be stated as 100% comply.
4. Industry having waste water discharge permit to the sea but not monitoring sea water quality as required
in the permit will be rated as RED.
NO. ASPECTs RATING
BLUE RED BLACK
3. Comply with a. Monitor 100% parameter as required a. Monitor less then 100% parameter as
the in the: required in the:
parameter 1. Waste water discharge permit 1. Waste water discharge permit
for 2. National or province Effluent 2. National or province Effluent
monitoring. Standard. Standard.
Specifically for Palm Oil Industry Specifically for Palm Oil Industry
implementing land application, implementing land application,
parameter for monitoring for waste parameter for monitoring for waste
water land application, ground water, water land application, ground water,
and soil >90% ( pH and BOD have to and soil <90% ( pH and BOD have to
be monitored) be monitored)
b. Monitor parameter pH, TSS, COD and b. Does not Monitor parameter pH, TSS,
daily debit for industries required to COD and daily debit for industry
do daily monitoring. required to do daily monitoring.
c. Calculate pollution load (effluent c. Does not Calculate pollution load
load) (effluent load)
Note:
1. Specifically for Manufacture, Infrastructure and Service Industry, Total Dissolved Solid (TDS) for water body for waste
water discharge to the sea not considered in the rating process.
2. Manganese Mining refer to waste water standard for Nickel Mining
3. Compliance to the parameter for monitoring refer to effluent standard hierarchy:
a. Effluent Standard as mentioned in the Waste water discharge permit,
b. Province waste water standard (specific)
c. National waste water standard (specific)
d. Effluent standard as mentioned in the EIA or Environmental Management Planning and Monitor
e. Effluent standard as mentioned in the Ministerial Decree No. 51 Year 1995 Attachment C Group 1,
NO. ASPECTs RATING
BLUE RED BLACK
4. Comply with a. Reporting ≥ 90% data as required for : a. Reporting less then 90% data Reporting
the number 1) Waste water quality monitoring as required for : fake data
of data 2) Monthly production (riel) or raw 1) Waste water quality and cause
reported for material, and monitoring pollution.
each 3) Debit for waste water discharge. 2) Monthly production (riel)
parameter b. Providing >90% daily average monitoring or raw material, and
data in every month as required in the 3) Debit for waste water
regulation: discharge.
1) Parameter COD and pH for b. Providing less then 90% daily
Petrochemical industry, industrial average monitoring data in
estate, rayon, basic oleo chemical. every month as required in
2) Parameter pH for Ceramic industry. the regulation for parameter
3) Parameter pH and TSS for Manganese daily pH and/or daily debit
Mining and/or daily TSS and/or daily
4) Parameter pH for Coal, Tin, and Gold COD.
Mining
5) Parameter pH for Agro industry.
Note:
Specifically for palm oil industry implementing land application, number data calculated per outlet base on parameter
monitored multiplied with frequent monitoring and divided with total data must be provided during rating period.
NO. ASPECTs RATING
BLUE RED BLACK
5. Comply with a. Self Monitoring Data (secondary data): a. Self Monitoring Data (secondary data): Exceed the
effluent 1) ≥ 90 % monitoring data during rating 1) Less then 90 % monitoring data during effluent and
standard period meet the effluent standard rating period meet the effluent have been
for each parameter in each standard for each parameter in each penalized with
compliance point. compliance point. administrative
Monitoring data for daily pH and/or Monitoring data for daily pH and/or sanction
daily debit and/or daily TSS and/or daily debit and/or daily TSS and/or
daily COD meet ≥ 95% compliance daily COD meet less then 95%
from average daily data reported compliance from average daily data
every month in a year during rating reported every month in a year during
period. rating period.
2) For off shore mining, compliance 2) For off shore mining, compliance
point for sea water monitoring refer point for sea water monitoring refer
to EIA document. Monitoring data to EIA document. Monitoring data for
for TSS and Turbidity meet ≥ 95% TSS and Turbidity meet less then 95%
compliance. compliance.
3) Discharge Load Data meet ≥ 90% 3) Discharge load Data meet less then
compliance. 90% compliance.
b. Primer data from PROPER Team b. Primer data from PROPER Team
Inspection meet 100% compliance Inspection exceed the effluent standard.
Note
1. Waste water effluent sample can be taken by PROPER Tim Inspector not in rating period and, base on the regulation, the industry can
not exceed waste water effluent standard at any time.
2. Industry can do split sampel from the sample taken by PROPER Team Indpector and noted in the official inpection report.
3. Specifically for tin mining industry using suction dredger or vessel should meets the quality standards of TSS and turbidity.
4. Specifically for hospital, NH 3 free parameters and phosphate does not included in the quality standards fulfillment assessment .
NO. ASPECTs RATING
BLUE RED BLACK
6. Comply with a. Using external or internal accredited laboratory or governor designated Does not meet Discharge/di
technical laboratory. one of the spose
requirement b. Separating sewage with storm water runoff. technical wastewater
c. Sewerage made water impermeable. requirements. to the
d. Installing discharge gauge (flow meter) in the waste water discharge outlet. environment
e. Not doing dilution. without
f. Not disposing of waste water directly into the environment without treatment
treatment (by-pass). (by-pass)
g. Meet all the provisions required in administrative sanctions.
h. Additional technical requirements for the oil palm industry implementing
land application:
1) Conducted land application on land other than peat land.
2) Conducted land application on land other than land with permeability
greater than 15 cm / hour.
3) Conducted land application on land other than land with permeability
less than 1.5 cm / hour.
4) Land application should not be implemented on land with ground water
level less than 2 meters.
5) Eliminate water runoff (run off) to the river.
6) Does not dilute waste water used.
7) Does not dispose waste water on the land outside the location specified
in the permit.
8) Does not discharge wastewater into the river when exceeding permit
requirement.
Note
Specific for mining, energy generation and gas industry are not required to install waste water discharge gauge or low mater to the waste
water and cooling water sewer .
NO. ASPECTs RATING
BLUE RED BLACK
1. Comply with a. Monitor all emission source Does not monitor all emission source
emission source 100% 100%.
NOTE:
1. Specific for manufacture, infrastructure, and service and agro industry:
a. Emission source from non combustion process, emissions source monitoring represented by the one chimney for
each production unit alternately so that all emission sources can be monitored;
b. Emission source from chemical process must be monitored
c. Chimney which only to flow incoming and exit air may not be monitored
d. Chimney which only to flow water vapor may not be monitored
2. Dryer in agro industry must be monitored
3. Incinerator for empty fruit bunch in palm oil industry must be monitored and meet the emission standard in the
Ministerial Decree No. 13 year 1995 Attachment V-B .
4. Emission source shall not be monitored:
a. Combustion units (generators, transfer pump (transfer pump engine):
1)capacity <100 HP (76.5 KVA);
2)operates <1000 hours / year;
3)which is used for the benefit of emergency, repair activities, maintenance activities <200 hours / year; or
4)which is used to drive the crane and welding equipment.
b. Chimney flue gases in the laboratory (laboratory exhaust fire assay).
5. Specific for industrial area required to conduct monitoring on the location or ambient monitoring points referring to
the environmental document (EIA).
NO. ASPECTs RATING
BLUE RED BLACK
2 Comply with a. Monitor 100% of the required parameters: Monitor less
monitoring 1) for industry having specific emission standard refer to this then 100%
parameter specific emission standard, and parameters as
2) For industry not having specific emission standard refer to required in
the environmental document, if the emission standard not the
yet established in the environmental document the Ministerial
emission standard refer to the Ministerial Decree No. 13 Decree No. 13
year 1995 Attachment V-B except for electrical generator Year 1995
set (gen-set) which refer to the Ministerial Decree No. 13 Attachment
Year 2009 Attachment I character a. VB.
b. For emission source from combustion process with capacity <
25 MW or other unit measures equivalent to gas fuel not
required to monitor S02 and Total Particulate if the total sulfur
content in the fuel is less than or equal to 0.5% by weight.
NOTE:
Specific for agro industry:
1. emission source from dryer and smoking room for latex or crumb rubber industries, and direct combustion must
monitor SO2, NO2, Particulate, NH3, and for not direct combustion must monitor particulate and NH3 referring to
emission standard stated in Ministerial Decree No. 13 Year 1995 attachment VB.
2. Emission standard for dryer in industry beside latex or crumb rubber and having direct combustion must monitor
SO2, NO2, particulate. For not having direct combustion must monitor particulate referring to the Ministerial Decree
No. 13 Year 1995 attachment VB.
3. Smoking room for fisheries industry, must monitor SO2, NO2, particulate with emission standard refer to Ministerial
Decree No. 13 Year 1995 attachment VB.
NO. ASPECTs RATING
BLUE RED BLACK
3. Comply with a. Reports periodically: a. Reports < 75% data in Reports fake data
number of 1) CEMS: having at less > 75% data from all everage daily data every 3 monthes and cause
data for in every 3 months (data considered valid if only the industry from CEMS environmental
each has at less 18 hours monitoring data every day) b. Reports < 100% data pollution.
reported 2) Manual Monitoring: conduct monitoring at less once in 6 during rating period
parameter (six) months, except combution porcess with: from manual
3) Design Capacity < 570 KW: conduct monitoring at less once monitoring.
in 3 (three) years; c. Does not calculate
4) Design Capacity in between 570 Kw and 3MW: conduct pollution load as
monitoring at less one in every year. required in the
5) Design capacity > 3MW: conduct monitoring at less once in regulation.
evry 6(six) months;
Boiler in operation less then 6 (six) months: conduct
monitoring at less once in every year.
b. Calculate pollution load as required in the regulation.
4. Comply a. Manual Monitoring: 100% data for every emission a. Manual Monitoring:
with source meet the standard. <100% data for every
emission source meet
emission b. CEMs Monitoring: ≥ 95% data form average daily
the standard.
standard data reported in 3 (three) months of operation period b. CEMs Monitoring: <
meet the standard. 95% data form
c. Meet the Pollution Load standard.. average daily data
reported in 3 (three)
months of operation
period meet the
standard.
c. Does not meet the
Pollution Load
standard.
NO. ASPECTs RATING
BLUE RED BLACK
5. Comply with a. Comply with all technical requirement for chimney. a. Does not meet one of
technical b. Install and operate CEMS for Industries as follow: the technical
requirements 1) Catalyst regeneration unit requirements.
2) Sulfur neutralization unit b. Does not install CEMs
3) Combustion process > 25 MW if content sulfur > 2% as required.
from all capacity
4) Steel Smelter
5) Pulp and paper
6) Fertilizer
7) Cement
8) Carbon black
c. CEMs equipment in normal operation.
d. All fugitive emission source must be managed and using
chimney to discharge
e. Using accredited laboratory or governor designated
laboratory.
f. Fulfill the administrative sanction in time.
g. If any problem with CEMS (out of order), industries
must conduct manual monitoring once in three moths
within one year rating period.
NOTE:
1. Specific for emission source not required to monitor particulate, not necessary to meet the position of sampling hole
at 2D and 8D.
2. Combustion Unit or electrical generator set (Gen-set) having chimney’s diameter < 10 cm is not required to complete
it with sampling hole.
NO. ASPECTs RATING
BLUE RED BLACK
1. Inventory the type and Identify and record the management of a. Does not identify the management of ---
volume of waste generated: the entire hazardous waste generated the entire hazardous waste generated * 1)
a. Identify types of and /or potential generated. or potential generated
hazardous waste; b. Does not record the type of hazardous
b. Recording type waste produced regularly.
hazardous waste c. Does not collect data for the
generated; and collecting advanced management of hazardous
data for advanced waste
management of d. Recurrent (repeated) violation (from
hazardous waste last year or previous rating period
generated. violation)
2. Reporting B3 waste a. Reporting hazardous waste a. Reporting with frequency less then ---
management activities. management activities regularly as required for hazardous waste * 2)
required in the permit; management.
b. Deliver the hazardous waste b. Does not report Hazardous waste
management reporting to Ministry document for hazardous waste
of environment, Environmental managed by third parties as required .
Agency at Provincial Level, (copy #2 for original hazardous waste
Environmental Agencies at document for producer).
district/city level (include with c. Deliver report only to one of
Center of Eco region Management ) environmental agency (ministry of
as required in the permit. Environment , provincial level, or
c. Reporting hazardous waste district/city level)
documents (manifest) as required d. Recurrent (repeated) violation (from
for hazardous waste managed by last year or previous rating period
third parties. violation)
NO. ASPECTs RATING
BLUE RED BLACK
3. Hazardous waste management a. Own valid hazardous waste a. Applied or submitted permits Does not have
permit management permit as application for hazardous waste permit for
required. management but have not met the hazardous waste
b. Applied or submitted technical requirement and / or found management.
permits application for violation in the implementation.
hazardous waste b. Submitted permit renewal and during
management and have met inspection found violation (not
the technical requirement (- implement the technical requirement
in final status to be stated in the previous permit).
approved-)
c. Submitted permit renewal
and have met the technical
requirement as stated in the
previous permit.
4. Implementation of the Comply with > 90% Comply with < 90% requirement in the Does not comply
requirement stated in the requirement in the permit and permit and not indicate potential with requirement
permit, Comply with the not indicate potential environmental pollution and/or human in the permit and
technical requirement in the environmental pollution. health problem. indicate
hazardous waste environmental
management permit, not pollution and/or
only for environmental human health
standard, effluent standard, problem.
emission standard., and *3).
quality standard. Discharge
untreated waste
(bypass).
NO. ASPECTs RATING
BLUE RED BLACK
Emission from treatment a. Monitor all parameter a. Only monitor partial Does not comply
and/or calorie utilization required in the permit parameter (not all) as with all requirement
of hazardous waste: b. All parameter meet the required in the permit or in the permit and
1. Comply with the emission standard as regulation. indicate
emission standard; and required in the permit. b. Does not comply with the environmental
2. Comply with number of c. Comply with the frequency of monitoring as pollution and human
parameter to monitor- frequency of monitoring required in the permit or health problem.
analyst. as required in the regulation.
permit or regulation. c. Never conduct emission
monitoring and have not
been penalized with
administrative sanction.
Waste water (effluent) a. Monitor all parameter a. Only monitor partial Does not comply
from hazardous waste required in the permit parameter (not all) as with all
landfill and/or other b. All parameter meet the required in the permit or requirement in the
hazardous waste emission standard as regulation. permit and
management: required in the permit. b. Does not comply with the indicate
Comply with waste water c. Comply with the frequency of monitoring environmental
(effluent) standard frequency of monitoring as required in the permit pollution and
include with monitoring as required in the or regulation. human health
well, permit or regulation. problem.
Comply with number of
parameter monitoring or
analyzed as required in
the permit.
NO. ASPECTs RATING
BLUE RED BLACK
Quality standard for product and/or 1) Comply with all quality 1) Only comply with partial quality Does not comply
Hazardous quality for utilization: standard and/or quality of standard and/or quality of utilized with all
1) Compliance with standard (for utilized hazardous waste as hazardous waste as required in requirement in the
example compressive strength, required in the permit. the permit. permit and
tolerance levels of pollutants in 2) Comply with frequency of 2) Does not Comply with frequency indicate
the utilized hazardous waste, monitoring as required in the of monitoring as required in the environmental
and others); permit. permit. pollution and
2) Compliance with frequency of human health
monitoring and analysis. problem.
5. a. Open dumping, spill 1) Own management plan for 1) Own management plan for Does not have
management, and handling of land contaminated with land contaminated with management
land contaminated with hazardous waste or hazardous waste or hazardous planning for land
hazardous waste: hazardous waste spills as spills but not in accordance contaminated with
1) management plans; required in the regulation. with the regulation hazardous waste
2) management of spills; and 2) Implementing of hazardous 2) Implementing of hazardous or hazardous
3) Number (-Amount-) of waste contaminated land waste contaminated land waste spills and/or
hazardous waste spills recovery and handling of recovery and handling does not recovery
hazardous waste spills as hazardous waste spill but not of hazardous
stated in the planning. conform with the plan. waste open
3) Number (amount) or volume 3) Number (amount) or volume of dumping and/or
of hazardous waste and hazardous waste and hazardous waste
contaminated land and contaminated soil with spills and/or
hazardous spills are properly hazardous waste hazardous contaminated
recorded. waste spill are not well land. .
4) Implement all requirement as recorded .
stated in the Letter of 4) Does not implement all or
Contaminated Soil partial requirement as stated
Completion Status (SSPLT). in the SSPLT.
NO. ASPECTs RATING
BLUE RED BLACK
b. Open burning 1. Does not conduct open burning Has stopped and further Indicated that
activities. manage the hazardous waste intentional
2. Has stopped open burning activities waste, but not conform with conduct
and further manage hazardous waste the planning and regulation. hazardous waste
as stated in the planning (conform with open burning
the planning ) and regulation activities.
6. Total percentage of 1) 100% of hazardous waste have been 1) <100% of hazardous waste Indicated that
hazardous waste managed as required. have been managed as there is
managed confirm
2) all type of hazardous waste have required. hazardous
with the regulation.
been managed as required 2) Not all (partially) type of waste which
3) Material (Hazardous Waste) Balance hazardous waste have been have not been
have been recorded during the rating managed as required managed and
period. 3) Material (Hazardous found indication
Waste) Balance have been of
recorded but not conform environmental
with the rating period. pollution and/or
human health
problem.
NO. ASPECTs RATING
BLUE RE BLACK
7. Hazardous waste management a. Third parties designated as a. Third parties designated as Third parties
(treatment) involving third hazardous waste collectors: hazardous waste collectors: does not have
parties: 1) have valid permit 1) have expired permit permit.
a. Hazardous waste management 2) Type of hazardous waste 2) Type of hazardous waste
involving hazardous waste collected conform with the collected does not conform
collector permit. with the permit.
b. Hazardous waste management 3) Own service contact 3) Does not have service contact
without involving collectors but agreement between agreement between
directly send to hazardous producers and collector. producers and collector.
waste processor. 4) Own service contract 4) Does not have service
c. Hazardous waste agreement between the contract agreement between
transportation collector with processor. collector and processor.
d. Use of B3 waste document 5) Does not have environmental 5) In environmental pollution
(manifest) pollution problems . litigation (problems)
b. Third parties designated as b. Third parties designated as Third parties
hazardous waste advance hazardous waste advance does not have
treatment or process (user/ treatment or process (user/ permit.
processor/final disposal processor/final disposal
facilities): facilities):
1) has valid permit 1) has expired permit
2) Type of hazardous waste 2) Type of hazardous waste
collected conform with the collected does not conform
permit. with the permit.
3) Own service contract 3) Does not have service
agreement between contract agreement between
producer and processor. producers and processor.
4) Does not have 4) In environmental pollution
environmental pollution litigation (problems)
problems .
NO. ASPECTs RATING
BLUE RE BLACK
c. Third parties designated as hazardous c. Third parties designated as hazardous waste c. Third parties
waste transporter : transporter : designated as
1) Own hazardous waste transporter 1) Hazardous waste transportation permit is hazardous
recommendation from Ministry of expired, but in process for renewal. waste
Environment and permit from Ministry 2) hazardous waste transporter does not transporter
of Transportation have recommendation from Ministry of does not have
2) Hazardous waste transported conform Environment Hazardous
with the recommendation and permit. 3) Hazardous waste transported not conform waste
3) transportation equipment used with the recommendation and permit. transportation
conform with the recommendation 4) Transportation equipment used does not permit.
and permit. conform with the recommendation and
4) Transportation area conform with the permit.
recommendation and permit. 5) Transportation area does not conform
5) Use proper hazardous waste with the recommendation and permit.
document (manifest) 6) Use not proper hazardous waste
document (manifest)
d. Hazardous waste document (manifest ) d. Hazardous waste document (manifest ) : --
: Using and filling hazardous waste 1) Using and filling hazardous waste
document (manifest) as stated in the document (manifest) which is not
Head Of Environmental Impact conform with the Head Of
Management Agency Decree No. Kep- Environmental Impact Management
02/BAPEDAL/09/1995 Agency Decree No. Kep-
02/BAPEDAL/09/1995.
2) the final location of hazardous waste
management (dumping/disposal/ etc)
can not be accounted.
3) Still conduct not proper hazardous
waste document usage procedure as
required (repeat previous violation).
NO. ASPECTs RATING
BLUE RE BLACK
8. Final disposal (dumping) a. Own final hazardous waste Applied or submitted permit for final disposal Dumping
and hazardous waste disposal (dumping) permits (dumping) but have not met the technical without permit.
process with special b. Own permit for hazardous requirement and indicated violation during
treatment: waste process with special implementation.
a. Permit for final treatment.
disposal (dumping)
b. Permit for hazardous
waste process with
special treatment
c. Amount/Number/Vol
ume of hazardous
waste final disposed
(dumping).
Proper Criteria for environmental degradation management aspect is based on the results of assessment for all stages
/ mine site using the potential degradation criteria to land on mining activities area. The total value (score) resulted
from each stage give the conclude and status of environmental management for of environmental degredation
aspects control.
Environmental a. All stages / mine site (100%) with a total value Not all stages / mine More than 50%
degradation (score) of potential environmental degradation site (<100%) with a of all stages /
Control. assessment aspects is greater than or equal to total value (score) of mine get total
80 (no potential degradation) potential value (score)
environmental less then 55
degradation (potential
assessment aspects damaged).
is greater than or
equal to 80 (no
potential
degradation)
Status of activity:
Land clearing / Top Soil Removal / Overburden Removal / Mining / Hoarding / Reclamation
PROPER CRITERIA – GREEN
ATTACHEMENT III MINISTERIAL DECREE No. 03/2014
NO. COMPONENT FOR EVALUATION SCORE
1 Summary Document for Environmental Management Performance 150
Organizational
Structure &
Internal company Responsible Person
management Environmental Training awareness
External (suplyer) System and Competency
Management Communication
SPENT OF Documentation
IMPLEMENTATION
INFLUENCE Document Control
Operational Control
Emergency Response
System
Strategic Planning,
Benchmarking for completed with
similar type of determination of
industries in national or Goal, Target, Strategy,
international Indicator of
Conduct benchmarking Achievement, Agenda
in internal or external of Implementation,
company management. etc.
Conduct Benchmarking
with similar industries,
national or international
Own energy
manager which is
responsible for Achievement of
energy energy efficiency:
management. 25% of the best
Having Team from all
candidate,
responsible for
achievment of 25-
energy management 75%, below 25%
percentile
Written Award and
Recognition
Policy
In line with
known and Comdev
understood
for all level
management
ASSESSMENT ASPECT
FOR AIR EMISSION REDUCTION
Conduct inventory, identification, description,
recording method , documentation , discretion of
sampling method and analyst , calculation of
Company has strategic planning: emission load. Provide competent staff to conduct
goal, target for emission reduction emission inventory base on training
which is relevant to the and education record.
environmental policy.
Determine clear program to achieve
the target and goal with proper
indicators
Social
Working Relationship (cooperation) relationships COMMUNITY
Allocation fund
Realization of fund for the implementation of
Dispute/Confllict management System for community
(internal and DEVELOPMENT development community development for the last 3
external) consecutive years.
Submit Data of Comparison for community
Have governance system of community development funding with the last year
development monitoring and evaluation business unit profit
Participation of stakeholders in the monitoring
and evaluation
Having evaluation document approved by the top Monitoring
and Planning
management in the unit that being assessed
Evaluation
Conformity of implementation with the work
Implementatio
n plan
Conformity of implementation with the work plan Implementation of programs and activities as
Implementation of programs and activities that are planned stated in the planning document
Participation of stakeholders in the implementation of programs and
activities
NO. ASPECTs RATING
GOLD
1. Innovation In Aspects of Resource 1) Environmental Management System.
Utilization 2) Energy Efficiency.
The company showed a significant 3) Efficiency Air and Water Pollution Load Reduction.
innovation in: 4) Pollutant Reduction.
5) Reduction and Utilization B3.
6) Solid Waste 3R Non-B3.
7) Biodiversity protection.
8) Community Empowerment.
2. Implementation of Community 1) The company is committed in solving critical impact caused by the company and has an obvious attempt to mitigate the
Development Program impact as reflected in policies, organizational structure, and corporate finance.
a. The approach used in community 2) The company has written strategy and communicated to all stakeholders to develop sustainable community livelihoods.
development (CD) 3) Companies can show that in terms of funding, community development activities is greater than the charitable activities.
g.Social Relations 1) There is institutionalized mechanism of communication between the company and the community.
2) The ability of the beneficiaries to develop a network (external).
3) Community development program raise the social solidarity of society.
4) Conflicts in the community related with the company in the last 1 year.
5) Conflicts between companies (including associates) with the community in the last 1 year.
6) Conflicts between the company and local government in the last 1 year.
7) Industrial strife during the last 1 year (internal relations) .
HASIL PENILAIAN PERINGKAT PROPER TAHUN 2016
KINERJA PENGELOLAAN LINGKUNGAN SEKTORAL – PROPER TAHUN 2016
1. Pengolahan Sawit 29
2. Migas Eksplorasi Produksi 35
3. Makanan & Minuman, Consumer Goods, Susu 28
4. Tambang Mineral, Tambang BAtubara 12
5. Migas LNG, Migas RU, Semen, Pupuk, PLTU, Pulp, Petrokimia, Peleburan Logam, 27
6. Gula 8
7. PLTP, PLTGU, PLTG 19
8. Farmasi, Sepatu, Kertas, Industri Kimia 7