Change Request / Validation

Change No: Requester Mgr. approver: Benjamin Chemweno

Change Requestor: Omwenga Jeffrey Requester Dept./Organization: NPO

Change Implementer: Charles Kimunyi Airtel Network approver:


Date Raised: 13.03.2019 NSN Network approver: Benjamin Chemweno
Proposed Start Date/Time 14.03.2019 01:00HRS Proposed End Date/Time: 18.03.2019 05:00HRS
Change Urgency:
Emergency: [] Urgent :[ ] Critical : [] Major : [X]
Minor :[ ]

Priority: High [ x ] Medium [ ] Low [ ]


Objective Driver
To improve quality and reduce drops
Description of Change:

AMR Progressive Power Control (PPC)( BSS20776)-: Feature activation on 14th March,2019
Enhanced Fast Return to LTE(RG302343)-: Feature activation on 15th March,2019
Driver (reason) Expected Impact On the Network
KPI improvement  None outage
Nature of change Node
 Proactive Attached
Pre activity checklist Test Plan checklist
1. Check site status  Check Network performance
Summary rollback checklist: Post activity checklist:

1. Restore old configuration x ] 1. Check DCN status [ ]


2. Item xyz [ x ] 2. Check site status [ ]
3. Item xyz [ x ] 3. Item xyz [ ].

Supporting Documentation:
1. MOP attached[ x ]
2. Detailed rollback plan and contingencies(spare parts) :[ ]
3. Detailed Post activity test plan & responsibility Matrix:[ ]
Technical Feasibility
Team Leads to sign and indicate their satisfaction to proceed.
CMB Approval: [ ]
Reasons: Name Signature

Date: ___/___/____ TL 1 ______________________ _______________________

Name Signature: TL 2 ______________________ _______________________

_______________________ _______________________ TL 3 _________________ __________________

TL 4 _________________ __________________
_______________________ _______________________

TL 5 _________________ __________________
Affected 2G Sites:

S/No Site Site ID


1 Attached

MIGRATION MILESTONES ( MOP )


# Activity duration start time End Time Responsible Contacts
1 00:30 05:00
2