1x6.

0 MW CPP, ABD SITE, THERMAX LT

SL.NO AREA JOB DESCRIPTION

FD Compartment-3 Damper power cylinder Seal Kit Replacement


1 BOILER work.
FD/PA compartment damper power cylinders inspection and SOV
2 BOILER replacement if required.
Furnace Draft and all flue gas line draft Gauge impulse line Flushing
3 BOILER work
Bed Compartment - 1,2,3 & 4 Thermowell inspection and
4 BOILER Maintenance if Required and cable inspection and replacement if
required.
Bed Compartment - 1,2,3 & 4 Thermowell inspection and location
5 BOILER changing work

6 BOILER
APH oulet flue gas temperature element checking and tapping
locatinon changing work if required.
7 BOILER Startup vent Control valve Inspection work.
8 BOILER MSSV motorized valve starter inspection and dressing work.

Soot blower Control valve maintanace work and actuator


9 BOILER replacement work.

ID/FD/PA Regulating Suction damper Inspection, Calibration & Spare


10 BOILER replacement if Necessary.

All Transmitters Calibration Checking along with mounting error


11 BOILER correction, impulse line flush out work.

12 BOILER
Boiler furnaces thermocouple inspection and replacement if
required

13 BOILER Furness Draught point arrangement

BOILER/TURBI All Control Valves Checking along with Operation Person and
14 NE Calibration If Required.
Control Oil Pressure Transmitter Oil Line Leakage checking and
15 TURBINE arresting work if required.
Turbine Gauge Board panel Instruments Tubing Leakage checking and
16 TURBINE arresting work if required.
Lube Oil Pressure Transmitter Oil Line Leakage checking and tightness
17 TURBINE work if required.
ACOP no-1 auto ON/OFF pressure switch inspection, and
18 TURBINE replacement work if required.
19 TURBINE
Turbine Auxilary pump discharge pressure gauge checking work
and replacement if required.

20 TURBINE
Turbine Exchaust line temperature after desuperheating
Thermocouple checking and replacement

21 MCC TSSV Motorized Valve Proper Control ternimation from Feeder.

22 CCR DCS Cabinets Inspection along with its Bulbs/ Cooling Fans Checking.

23 CCR Controll room UPS cleaaning work

All turbine related panel loging parameters along with monitoring


24 CCR taking in to the DCS by arrenging the RS485 communication.

25 CCR Operator/Engineering Stations CPU Cleaning work.


26 DEAERATOR Deaerator Level Switches Calibration Work.

27 WTP UF system bottom drain valve inspection and replacement if required

Coal feeder VFD Speed reference isolator checking and replacement


28 CCR If required.
6.0 MW CPP, ABD SITE, THERMAX LTD.

SERVICE MANPOWER REQUIRED


MATERIAL AVAILABILITY SCOPE OF
MATERIALS REQUIRED ENG.
instore WORK REQUIRED
Engg Tech Fitter Welder
Seal Kit/Power Cylinder Assembly Available TL NO 1 1 1 0
with Limits.

SOV Available TL NO 1 1 0 0

NIL Not Applicable TL NO 1 1 0 0

16 AWG 1pair cable Available TL NO 1 1 0 1

NIL Mechanical scope TL NO 1 1 1 1

16 AWG 1pair cable,K-type Available TL NO


thermocouple. 1 1 1 1
NIL Not Applicable TL NO 1 0 1 0
NIL Not Applicable TL NO 1 1 0 0

Positioner link, actuator assembly, actuator assembly TL NO 1 0 1 0


gaskitsgraphite paste Not Available

Positioner, Position Transmitter & Seal Kits TL NO 2 1 0 1


Seal Kits, Teflon Tape Not Available

HART Calibrator Available TL NO 2 1 0 0

Available TL NO
K-type thermocouple 1 1
Not Applicable Mechanical scope TL NO
1 1
NIL Not Applicable TL NO 2 1 0 0

Teflon Tape. Available TL NO 1 1 0 0

Teflon Tape. Available TL NO 1 1 0 0

Teflon Tape. Available TL NO 1 1 0 0

Pressure switch (0-20)BAR Not available TL NO 1 1 0 0


pressure gauge(0-10 KSC, 150mm Available TL NO
Dial) - 1 No, Teflon Tape. 1 1

Available TL NO
K-type thermocouple. 1 1
Indicator Lamps, Push Buttons, Available TL NO 2 1 0 0
NO/NC Elements.

LED/IC Bulb(9W/60W) - 1 No,


Cooling Fans(200*200mm) - 2 CFL Tubes not TL NO 1 2 0 0
Nos, 11W CFL Tubes(Single Plug) - Available.
4 No
NIL Not Applicable TL NO 1 1 0 0
TL & Third
NIL Not Applicable Party YES 1 0 0 0
Support
Blower Not Applicable TL NO 1 1 0 0
Contact Cleaner Available TL NO 2 1 0 0

8" pnuematic actuator Available TL NO 1 1 1 0

Signal Isolators Available TL NO


1 1 0 0
REQUIRED
DAY

R REQUIRED Quantity
1 2 3 4 Remarks Indent no Indent Date
indented
Helper

1 _ _ _ _

1 _ _ _ _

1 _ _ _ _

1
2 _ _ _ _
0 _ _ _ _

SB control valve parts used


in SUV control valve,
1 1 243 30/11/2018
material indent raised for
SUV control valve

1 Material indent raised 5 244 6/12/2018

0 _ _ _ _

0 _ _ _ _

0 _ _ _ _

0 Material indent raised 1 523 28/3/2019


0 _ _ _ _

CFL tubes not avilable now


0 _ _ _
in store stock .

0 _ _ _ _

0 _ _ _ _
0 _ _ _ _

1 _ _ _ _

0
1x6.0 MW CPP, ABD SITE, THERMAX LT

SL.NO AREA JOB DESCRIPTION

FD compartment damper -1,2,3,4 power cylinders seating and


1 BOILER damper lever adjustment with respect to cylinder stroke.
Bed Compartment -4 top and bottom thermocouples with wells
2 BOILER changing work.

Feed water control valve maintanace work and valve steam, seat
3 BOILER replacement.

Feed water control valve and feed water bypass control valve
8 BOILER instrument air line saparation work.

4 BOILER Boiler Temperature Junction Box-2 replacement work


BOILER/TURBI Boiler and turbine all control valve copper tubing checking and
5 NE replacing with SS tubing if required.
Auxilary steam header Temperature sensor (RTD) checking,
6 TURBINE replacement work if required.
DCS V-net Cable Joint Removal By permanent termination using BNC
7 CCR Connector.

8 AHP Ash handling plant field JB pressure gauges installation work.

Ash handling system no-3,4 air filter cum lubricater unit changing
9 AHP work.
Ash handling system no-1,2 slide gate power cylinder seal kits
10 AHP checking and changing work.

11 CHP Belt sway switches installation and cable laying for BC-1,2,3,4.

12 CHP Zero speed switches installetion and cable laying work in CHP

13 CHP SEQUNTIAL TIMER installetion for Dust colecting system in CHP

14 CHP Emergency siren arrangement and cable laying work For CHP

DEAERATOR Deaerator Instrument Air Line Socket Leak arresting/Permanent Line


22 joining Near HP Dosing Tank.

DEAERATOR Deareator steam flow transmitter isolation valve checking and


23 replacement if required.
ESP/ECO & APH Conveying Line's rusted Vent line/Cap replacement
26 AHP with Ball Valves if Available.

PLC Inspection, Termination Check along with Necessary Changes as


22 WTP per the Operation dept.
6.0 MW CPP, ABD SITE, THERMAX LTD.

SERVICE MANPOWER REQUIRED


MATERIAL AVAILABILITY SCOPE OF
MATERIALS REQUIRED ENG.
instore WORK REQUIRED
Engg Tech Fitter Welder

Not Applicable Mechanical scope TL NO 1 0 1 1

K-type thermocouple with well Not Available TL NO 1 0 1 1

Gland Rope(4mm) - 200 mm Valve steam and


Length, Graphite Paste, Valve TL NO 1 0 1 0
seat Not Available
steam and seat

1/2" GI pipe
4m,1/2"sockets,Welding Available TL NO 0 1 0 1
Electrodes
Juction box Not Available TL NO 1 0 1 1
SS fittings Not
6mm SS tube, SS tube fittings TL NO 2 1 0 0
available

RTD (PT-100) Not Available TL NO 1 1 0 0

BNC Connector(With Not Available YIL/TL NO 1 1 0 0


Accessoroes) - 2 Nos

pressure gauge(0-7 KSC, 100mm Available TL NO 1 1 0 0


Dial) - 1 No, Teflon Tape.

Not Available TL NO 1 1 0 0
air filter cum lubricater unit
Available TL NO 1 1 0 0
Seal kits

TL NO 1 1 1 1
3C X 1.5 sqmm copper cable,16C
X 1.5 sqmm copper cable, BSS- Not Available
8no, ZSS-8no. TL NO 1 1 1 1

SEQUNTIAL TIMER Not Available TL NO 1 1 0 0

SIREN, 2C X 1.5 sqmm cable Not Available TL NO 1 1 0 0

Welding Electrodes/ Teflontape Available TL NO 1 0 0 1

1/2" ss ball valve Available TL NO 1 1 0


Ball Valves(1") - 5 No, MS pipe(1") Mechanical scope TL NO 1 0 0 1
- 1 Mtr, Welding Electrodes.

TL & Third
NIL Not Applicable Party YES 1 1 0 0
Support
REQUIRED
DAY

R REQUIRED Quantity
1 2 3 4 Remarks Indent no Indent Date
indented
Helper

1 _ _ _ _

1 Material indent raised 3 243 30/11/2018

1 Material indent raised 1 242 30/11/2018

1 _ _ _ _

1 Material indent raised 2 505 22-Feb-2019

1 Material indent raised 100 510 24-Feb-2019

0 Material indent raised 2 501 22-Feb-2019

0 Material indent raised 2 525 31/03/2019

0 Material indent raised _ _ _

0 Material indent raised 4 511 24-Feb-2019

1 _ _ _ _

4 Material indent raised 8 1007 17/01/2019

4 Material indent raised 4 1007 17/01/2019

1 Material indent raised 1 1008 17/01/2019

1 Aprovel taken from TL HO, _ _ _


procurement under progress
1 _ _ _ _

1 _ _ _ _