Anda di halaman 1dari 48

METRADO COSTO

OBRAS PRELIMINARES 104,728.47 68969.93


OBRAS PROVISIONALES 21,736.02 15215.21
CARTEL DE OBRA und 1.00 714.13 1,020.19 714.13
LIMPIEZA DE TERRENO MANUAL m2 1230.00 2.20 3,862.20 2703.54
CAMPAMENTO PROVISIONAL CON TECHO CALAMINA m2 85.00 72.81 8,841.70 6189.19
CERCO PROVISIONAL m 260.00 9.25 3,437.20 2406.04
TRAZO Y REPLANTEO m2 1369.68 2.34 4,574.73 3202.31
MOVILIZACION DE EQUIPOS Y MAQUINARIAS 1,919.35 1343.55
MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA GLB 1.00 1,343.55 1,919.35 1343.55
SEGURIDAD Y SALUD EN EL TRABAJO 22,700.00 15890
EQUIPOS DE PROTECCIÓN INDIVIDUAL GLB 1.00 10,150.00 14,500.00 10150
EQUIPOS DE PROTECCIÓN COLECTIVA GLB 1.00 2,660.00 3,800.00 2660
SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 980.00 1,400.00 980
CAPACITACIÓN EN SEGURIDAD GLB 1.00 840.00 1,200.00 840
RECURSOS ANTE AMERGENCIAS DE SEGURIDAD Y SALUD GLB 1.00 1,260.00 1,800.00 1260
DEMOLICIONES 8,458.60 5921.02
DEMOLICIONES DE OBRAS DE ADOBE CON CALAMINA m2 1200.00 4.42 7,572.00 5300.4
ELIMINACION DE MATERIAL DE DEMOLICION m3 124.00 5.01 886.60 620.62
INSTALACION DE MODULO DE AULA PREFABRICADA 49,914.50 30600.15
LIMPIEZA DE TERRENO MANUAL m2 215.00 2.20 675.10 472.57
TRAZO Y REPLANTEO m2 215.00 2.28 700.90 490.63
FALSO PISO DE 2" DE CONCRETO 1:10 m2 215.00 16.73 5,138.50 3596.95
MODULO PREFABRICADO glb 6.00 4,340.00 43,400.00 26040
Costo Directo 104,728.47 68969.93
CONSTRUCCION DE 03 AULAS PEDAGOGICAS 257,356.15 179551.42
OBRAS PRELIMINARES 2,537.12 1178.11
LIMPIEZA DE TERRENO MANUAL m2 291.18 2.20 914.31 640.01
TRAZO Y REPLANTEO m2 291.18 1.85 768.72 538.1
MOVIMIENTO DE TIERRAS 6,887.14 4821
EXCAVACION DE ZANJAS H>=2.0M. m3 77.91 50.72 5,645.36 3951.75
RELLENO CON MATERIAL PROPIO m3 34.65 6.50 321.90 225.33
ELIMINACION MATERIAL EXCEDENTE m3 75.40 8.54 919.88 643.92
CONCRETO SIMPLE 12,817.42 8972.19
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 19.62 18.24 511.10 357.77
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 7.14 126.59 1,291.20 903.84
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 19.29 169.23 4,663.36 3264.35
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 178.32 24.93 6,351.76 4446.23
CONCRETO ARMADO 61,741.97 43219.34
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 8.46 282.98 3,419.96 2393.97
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 307.74 3.84 1,686.42 1180.49
CONCRETO EN VIGAS DE CIMENTACION F'C= 175 KG/CM2 m3 7.41 212.90 2,253.68 1577.57
ENCOFRADO DE VIGAS DE CIMENTACION m2 68.34 41.69 4,070.33 2849.23
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1193.13 3.84 6,538.35 4576.85
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 282.98 3,820.16 2674.11
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 134.40 47.38 9,096.19 6367.33
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 1559.85 3.84 8,547.98 5983.58
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 9.54 265.40 3,617.00 2531.9
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 105.48 51.13 7,704.26 5392.98
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1460.22 3.84 8,002.01 5601.4
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 2.25 265.40 853.07 597.15
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 18.00 51.13 1,314.72 920.3
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 149.24 3.84 817.84 572.48
ALBAÑILERIA 22,655.07 15858.56
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 72.81 68.62 7,137.56 4996.3
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 92.57 117.34 15,517.51 10862.26
TECHO Y/O COBERTURA 38,056.64 26639.65
TIJERAL SEGUN DISEÑO TIPO I und 14.00 1,132.99 22,659.84 15861.89
CORREAS DE MADERA m 480.00 10.74 7,363.20 5154.24
COBERTURA CON CALAMINA GALVANIZADA m2 319.20 16.71 7,619.30 5333.51
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 30.00 9.67 414.30 290.01
REVOQUES ENLUCIDOS Y MOLDURAS 21,994.54 15396.18
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 198.51 27.76 7,870.92 5509.65
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 174.06 17.25 4,288.84 3002.19
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 110.07 19.26 3,029.13 2120.39
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 74.52 23.19 2,468.85 1728.19
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 180.00 9.83 2,527.20 1769.04
BRUÑAS DE 1 cm m 312.00 4.06 1,809.60 1266.72
CIELORRASOS 18,699.01 13089.31
CIELORRASOS CON TRIPLAY m2 180.54 40.24 10,379.24 7265.47
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 55.77 104.43 8,319.77 5823.84
PISOS Y PAVIMENTOS 26,859.21 18801.45
FALSO PISO DE 4" DE CONCRETO 1:10 m2 180.36 25.02 6,446.07 4512.25
PISO DE MADERA MACHIHEMBRADA AGUANO m2 180.36 79.23 20,413.14 14289.2
ZOCALOS Y CONTRAZOCALOS 1,510.85 1057.6
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 93.90 11.26 1,510.85 1057.6
CARPINTERIA METALICA 6,411.00 4487.7
VENTANA METALICA m2 60.00 74.80 6,411.00 4487.7
CARPINTERIA DE MADERA 2,606.58 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 2,606.58 1824.61
VIDRIOS, CRISTALES Y SIMILARES 4,841.36 3388.95
VIDRIOS SEMIDOBLES NACIONAL p2 642.09 5.28 4,841.36 3388.95
PINTURA 10,588.39 7411.87
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 551.16 9.39 7,391.06 5173.74
PINTURA EN CIELO RASO - TRIPLAY M2 180.48 9.70 2,499.65 1749.75
PINTURA EN CIELO RASO DE MADERA m2 55.77 8.76 697.68 488.38
SISTEMA DE AGUAS PLUVIALES 4,778.16 3344.71
CANALETA DE AGUAS PLUVIALES m 60.00 44.84 3,843.60 2690.52
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 35.40 18.48 934.56 654.19
INSTALACIONES ELECTRICAS 13,291.69 9304.19
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 24.00 41.57 1,425.36 997.75
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 18.00 43.01 1,105.92 774.14
INTERRUPTOR SIMPLE DE BAKELITA und 6.00 13.31 114.06 79.84
INTERRUPTOR DOBLE DE BAKELITA und 3.00 35.36 151.53 106.07
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 12.00 73.00 1,251.48 876.04
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 12.00 80.05 1,372.20 960.54
CABLE ELECTRICO TW No. 10(6 mm2) m 150.00 3.00 643.50 450.45
CABLE ELECTRICO TW No. 12(4 mm2) m 300.00 2.63 1,128.00 789.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 314.33 1.53 688.38 481.87
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 45.00 6.86 441.00 308.7
TUBERIA TOMACORRIENTE PVC D=3/4" m 60.00 6.67 571.80 400.26
TUBERIA INTERRUPTOR PVC D=3/4" m 30.00 6.50 278.40 194.88
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 3.00 29.61 126.90 88.83
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 3.00 43.61 186.90 130.83
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 582.75 407.93
SISTEMA DE PUESTA A TIERRA m 1.00 2,256.46 3,223.51 2256.46
VARIOS 1,080.00 756
CONTROL DE CALIDAD GLB 6.00 126.00 1,080.00 756
CONSTRUCCION DE SALON DE USOS MULTIPLES 106737.48
TRABAJOS PRELIMINARES 574.30 402.01
LIMPIEZA DE TERRENO MANUAL m2 99.36 2.20 311.99 218.39
TRAZO Y REPLANTEO m2 99.36 1.85 262.31 183.62
MOVIMIENTO DE TIERRAS 8,043.60 5630.51
EXCAVACION EN ROCA CON PRE-CORTE RENDIMIENTO= 180 M3/DIA m3 71.11 45.02 4,573.80 3201.66
EXCAVACION DE ZANJAS H>=2.0M. m3 42.60 50.72 3,086.80 2160.76
RELLENO CON MATERIAL PROPIO m3 14.92 6.50 138.61 97.02
ELIMINACION MATERIAL EXCEDENTE m3 25.04 6.83 244.39 171.07
CONCRETO SIMPLE 7,853.45 5497.42
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 34.20 18.24 890.91 623.64
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 8.50 126.59 1,537.14 1076
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 10.34 169.23 2,499.70 1749.79
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 60.80 33.68 2,925.70 2047.99
CONCRETO ARMADO 33,055.48 23138.83
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 10.70 282.98 4,325.48 3027.83
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 425.00 3.84 2,329.00 1630.3
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.40 282.98 3,395.70 2376.99
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 71.20 47.38 4,818.82 3373.17
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 754.00 3.84 4,131.92 2892.34
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 8.50 265.40 3,222.69 2255.88
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 45.20 51.13 3,301.41 2310.99
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 855.00 3.84 4,685.40 3279.78
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 2.40 265.40 909.94 636.96
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 15.60 51.13 1,139.42 797.6
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 145.20 3.84 795.70 556.99
ALBAÑILERIA 13,208.20 9245.74
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 41.20 68.62 4,038.84 2827.19
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 54.70 117.34 9,169.36 6418.55
TECHO Y/O COBERTURA 35,346.28 24742.4
TIJERAL SEGUN DISEÑO TIPO I und 14.00 1,132.99 22,659.84 15861.89
CORREAS DE MADERA m 234.70 10.74 3,600.30 2520.21
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 160.00 38.91 8,892.80 6224.96
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 14.00 9.67 193.34 135.34
REVOQUES ENLUCIDOS Y MOLDURAS 10,659.83 7461.89
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 85.20 27.76 3,378.18 2364.73
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 99.73 17.25 2,457.35 1720.14
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 50.44 19.26 1,388.11 971.68
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 29.10 23.19 964.08 674.86
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 72.80 9.83 1,022.11 715.48
BRUÑAS DE 1 cm m 250.00 4.06 1,450.00 1015
CIELORRASOS 7,752.15 5426.51
FALSO TECHO DE PLANCHA DE FIBROCEMENTO DE e=4mm m2 80.50 67.41 7,752.15 5426.51
PISOS Y PAVIMENTOS 16,679.04 11675.33
FALSO PISO DE 4" DE CONCRETO 1:10 m2 112.00 25.02 4,002.88 2802.02
PISO DE MADERA MACHIHEMBRADA AGUANO m2 112.00 79.23 12,676.16 8873.31
ZOCALOS Y CONTRAZOCALOS 503.62 352.53
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 31.30 11.26 503.62 352.53
CARPINTERIA METALICA 1,868.25 1307.79
VENTANA METALICA TIPO VII und 2.00 251.20 717.70 502.39
VENTANA METALICA TIPO VIII und 1.00 127.79 182.55 127.79
VENTANA METALICA TIPO IX und 1.00 251.20 358.85 251.2
VENTANA METALICA TIPO X und 3.00 142.14 609.15 426.41
CARPINTERIA DE MADERA 2,606.58 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 2,606.58 1824.61
VIDRIOS, CRISTALES Y SIMILARES 3,423.16 2396.21
VIDRIOS SEMIDOBLES NACIONAL p2 454.00 5.28 3,423.16 2396.21
PINTURA 4,239.82 2967.88
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 237.25 9.39 3,181.52 2227.07
PINTURA EN CIELO RASO - TRIPLAY M2 59.15 9.70 819.23 573.46
PINTURA EN CIELO RASO DE MADERA m2 19.11 8.76 239.07 167.35
SISTEMA DE AGUAS PLUVIALES 1,592.72 1114.9
CANALETA DE AGUAS PLUVIALES m 20.00 44.84 1,281.20 896.84
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 11.80 18.48 311.52 218.06
INSTALACIONES ELECTRICAS 3,995.57 2796.92
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 6.00 41.57 356.34 249.44
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 6.00 43.01 368.64 258.05
INTERRUPTOR SIMPLE DE BAKELITA und 3.00 13.31 57.03 39.92
INTERRUPTOR DOBLE DE BAKELITA und 1.00 35.36 50.51 35.36
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 6.00 73.00 625.74 438.02
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 3.00 80.05 343.05 240.14
CABLE ELECTRICO TW No. 10(6 mm2) m 75.00 3.00 321.75 225.23
CABLE ELECTRICO TW No. 12(4 mm2) m 75.00 2.63 282.00 197.4
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 149.98 1.53 328.46 229.92
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 20.00 6.86 196.00 137.2
TUBERIA TOMACORRIENTE PVC D=3/4" m 30.00 6.67 285.90 200.13
TUBERIA INTERRUPTOR PVC D=3/4" m 10.00 6.50 92.80 64.96
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 1.00 29.61 42.30 29.61
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 62.30 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 582.75 407.93
VARIOS 1,080.00 756
CONTROL DE CALIDAD GLB 6.00 126.00 1,080.00 756
Costo Directo 152,482.05 106737.48
CONSTRUCCION DE AULA DE INNOVACION PEDAGOGICA + BIBLIOTECA + COCINA 239,280.23 167496.18
OBRAS PRELIMINARES 1,234.80 864.36
LIMPIEZA DE TERRENO MANUAL m2 210.00 2.20 659.40 461.58
TRAZO Y REPLANTEO m2 210.00 1.92 575.40 402.78
MOVIMIENTO DE TIERRAS 4,941.17 3458.82
EXCAVACION DE ZANJAS H>=2.0M. m3 60.24 50.72 4,364.99 3055.49
RELLENO CON MATERIAL PROPIO m3 25.01 6.50 232.34 162.64
ELIMINACION MATERIAL EXCEDENTE m3 35.23 6.83 343.84 240.69
CONCRETO SIMPLE 13,716.43 9601.51
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 16.44 18.24 428.26 299.78
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 7.12 126.59 1,287.58 901.31
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 23.80 169.23 5,753.65 4027.56
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 129.82 33.68 6,246.94 4372.86
CONCRETO ARMADO 55,649.42 38954.6
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 6.58 282.98 2,659.97 1861.98
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 197.71 3.84 1,083.45 758.42
CONCRETO EN VIGAS DE CIMENTACION F'C= 175 KG/CM2 m3 6.49 212.90 1,973.87 1381.71
ENCOFRADO DE VIGAS DE CIMENTACION m2 51.93 41.69 3,092.95 2165.07
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 712.45 3.84 3,904.23 2732.96
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 14.70 282.98 5,942.48 4159.73
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 142.00 47.38 9,610.56 6727.39
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 1976.00 3.84 10,828.48 7579.94
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 7.12 265.40 2,699.48 1889.63
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 86.34 51.13 6,306.27 4414.39
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 973.34 3.84 5,333.90 3733.73
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 1.64 265.40 621.79 435.25
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 13.12 51.13 958.28 670.8
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 115.64 3.84 633.71 443.6
ALBAÑILERIA 21,628.93 15140.25
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 75.80 68.62 7,430.67 5201.47
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 84.70 117.34 14,198.26 9938.78
TECHO Y/O COBERTURA 42,154.61 29508.23
TIJERAL SEGUN DISEÑO TIPO I und 14.00 1,132.99 22,659.84 15861.89
TIJERAL SEGUN DISEÑO TIPO II und 6.00 782.99 6,711.36 4697.95
CORREAS DE MADERA m 369.00 10.74 5,660.46 3962.32
COBERTURA CON CALAMINA GALVANIZADA m2 284.00 16.71 6,779.08 4745.36
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 24.90 9.67 343.87 240.71
REVOQUES ENLUCIDOS Y MOLDURAS 16,406.48 11484.53
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 198.60 27.76 7,874.49 5512.14
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 44.06 17.25 1,085.64 759.95
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 71.63 19.26 1,971.26 1379.88
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 53.97 23.19 1,788.03 1251.62
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 101.50 9.83 1,425.06 997.54
BRUÑAS DE 1 cm m 390.00 4.06 2,262.00 1583.4
CIELORRASOS 19,005.26 13303.68
CIELORRASOS CON TRIPLAY m2 210.70 40.24 12,113.14 8479.2
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 46.20 104.43 6,892.12 4824.48
PISOS Y PAVIMENTOS 31,273.20 21891.24
FALSO PISO DE 4" DE CONCRETO 1:10 m2 210.00 25.02 7,505.40 5253.78
PISO DE MADERA MACHIHEMBRADA AGUANO m2 210.00 79.23 23,767.80 16637.46
ZOCALOS Y CONTRAZOCALOS 1,176.66 823.66
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 73.13 11.26 1,176.66 823.66
CARPINTERIA METALICA 3,697.01 2587.91
VENTANA METALICA m2 34.60 74.80 3,697.01 2587.91
CARPINTERIA DE MADERA 2,606.58 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 2,606.58 1824.61
VIDRIOS, CRISTALES Y SIMILARES 2,870.48 2009.33
VIDRIOS SEMIDOBLES NACIONAL p2 380.70 5.28 2,870.48 2009.33
PINTURA 8,029.98 5620.98
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 423.00 9.39 5,672.43 3970.7
PINTURA EN CIELO RASO - TRIPLAY M2 128.49 9.70 1,779.59 1245.71
PINTURA EN CIELO RASO DE MADERA m2 46.20 8.76 577.96 404.57
SISTEMA DE AGUAS PLUVIALES 3,441.68 2409.18
CANALETA DE AGUAS PLUVIALES m 44.00 44.84 2,818.64 1973.05
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 23.60 18.48 623.04 436.13
INSTALACIONES ELECTRICAS 9,647.54 6753.29
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 12.00 41.57 712.68 498.88
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 12.00 43.01 737.28 516.1
INTERRUPTOR SIMPLE DE BAKELITA und 6.00 13.31 114.06 79.84
INTERRUPTOR DOBLE DE BAKELITA und 6.00 35.36 303.06 212.14
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 12.00 73.00 1,251.48 876.04
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 12.00 80.05 1,372.20 960.54
CABLE ELECTRICO TW No. 10(6 mm2) m 100.00 3.00 429.00 300.3
CABLE ELECTRICO TW No. 12(4 mm2) m 300.00 2.63 1,128.00 789.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 300.79 1.53 658.73 461.11
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 100.00 6.86 980.00 686
TUBERIA TOMACORRIENTE PVC D=3/4" m 100.00 6.67 953.00 667.1
TUBERIA INTERRUPTOR PVC D=3/4" m 30.00 6.50 278.40 194.88
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 2.00 29.61 84.60 59.22
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 62.30 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 582.75 407.93
VARIOS 1,800.00 1260
CONTROL DE CALIDAD GLB 10.00 126.00 1,800.00 1260
Costo Directo 239,280.23 167496.18
CONSTRUCCION DE AMBIENTES ADMINISTRATIVOS 86,037.98 60226.54
TRABAJOS PRELIMINARES 428.07 299.64
LIMPIEZA DE TERRENO MANUAL m2 74.06 2.20 232.55 162.78
TRAZO Y REPLANTEO m2 74.06 1.85 195.52 136.86
MOVIMIENTO DE TIERRAS 2,734.65 1914.25
EXCAVACION DE ZANJAS H>=2.0M. m3 33.33 50.72 2,415.09 1690.56
RELLENO CON MATERIAL PROPIO m3 12.23 6.50 113.62 79.53
ELIMINACION MATERIAL EXCEDENTE m3 21.10 6.83 205.94 144.16
CONCRETO SIMPLE 4,543.81 3180.67
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 9.18 18.24 239.14 167.4
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 5.20 126.59 940.37 658.26
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.80 169.23 1,160.40 812.28
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 45.80 33.68 2,203.90 1542.73
CONCRETO ARMADO 17,665.42 12365.78
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 3.67 282.98 1,483.60 1038.52
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 110.04 3.84 603.02 422.11
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 3.72 282.98 1,503.81 1052.67
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 48.94 47.38 3,312.26 2318.58
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 576.13 3.84 3,157.19 2210.03
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.77 265.40 1,429.36 1000.55
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 36.64 51.13 2,676.19 1873.33
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 396.54 3.84 2,173.04 1521.13
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 1.00 265.40 379.14 265.4
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 8.00 51.13 584.32 409.02
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 66.33 3.84 363.49 254.44
ALBAÑILERIA 11,217.73 7852.4
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 15.14 68.62 1,484.17 1038.92
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 50.63 117.34 8,487.11 5940.97
MUROS DE SISTEMA DRYWALL 5CM m2 16.47 52.98 1,246.45 872.51
TECHO Y/O COBERTURA 14,472.46 10130.72
TIJERAL SEGUN DISEÑO TIPO I und 5.00 1,132.99 8,092.80 5664.96
CORREAS DE MADERA m 120.00 10.74 1,840.80 1288.56
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 79.80 38.91 4,435.28 3104.7
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 7.50 9.67 103.58 72.5
REVOQUES ENLUCIDOS Y MOLDURAS 7,636.99 5345.89
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 48.89 27.76 1,938.49 1356.94
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 82.64 17.25 2,036.25 1425.37
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 41.68 19.26 1,147.03 802.92
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 26.10 23.19 864.69 605.29
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 43.20 9.83 606.53 424.57
BRUÑAS DE 1 cm m 180.00 4.06 1,044.00 730.8
CIELORRASOS 4,374.75 3062.32
CIELORRASOS CON TRIPLAY m2 41.48 40.24 2,384.69 1669.28
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 13.34 104.43 1,990.06 1393.04
PISOS Y PAVIMENTOS 6,177.21 4324.04
FALSO PISO DE 4" DE CONCRETO 1:10 m2 41.48 25.02 1,482.50 1037.75
PISO DE MADERA MACHIHEMBRADA AGUANO m2 41.48 79.23 4,694.71 3286.29
ZOCALOS Y CONTRAZOCALOS 415.12 290.59
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 25.80 11.26 415.12 290.59
CARPINTERIA METALICA 1,082.80 757.96
VENTANA METALICA TIPO VII und 2.00 251.20 717.70 502.39
VENTANA METALICA TIPO VIII und 2.00 127.79 365.10 255.57
CARPINTERIA DE MADERA 1,737.72 1216.4
PUERTA DE MADERA AGUANO TIPO I und 2.00 608.20 1,737.72 1216.4
VIDRIOS, CRISTALES Y SIMILARES 1,068.34 747.84
VIDRIOS SEMIDOBLES NACIONAL p2 141.69 5.28 1,068.34 747.84
PINTURA 3,642.10 2549.47
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 216.31 9.39 2,900.72 2030.5
PINTURA EN CIELO RASO - TRIPLAY M2 41.48 9.70 574.50 402.15
PINTURA EN CIELO RASO DE MADERA m2 13.34 8.76 166.88 116.82
SISTEMA DE AGUAS PLUVIALES 1,272.42 890.69
CANALETA DE AGUAS PLUVIALES m 15.00 44.84 960.90 672.63
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 11.80 18.48 311.52 218.06
INSTALACIONES ELECTRICAS 2,912.39 2038.68
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 4.00 41.57 237.56 166.29
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 4.00 43.01 245.76 172.03
INTERRUPTOR SIMPLE DE BAKELITA und 4.00 13.31 76.04 53.23
INTERRUPTOR DOBLE DE BAKELITA und 1.00 35.36 50.51 35.36
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 4.00 73.00 417.16 292.01
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 2.00 80.05 228.70 160.09
CABLE ELECTRICO TW No. 10(6 mm2) m 50.00 3.00 214.50 150.15
CABLE ELECTRICO TW No. 12(4 mm2) m 50.00 2.63 188.00 131.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 75.00 1.53 164.25 114.98
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 15.00 6.86 147.00 102.9
TUBERIA TOMACORRIENTE PVC D=3/4" m 20.00 6.67 190.60 133.42
TUBERIA INTERRUPTOR PVC D=3/4" m 7.00 6.50 64.96 45.47
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 1.00 29.61 42.30 29.61
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 62.30 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 582.75 407.93
VARIOS 4,656.00 3259.2
CONTROL DE CALIDAD GLB 4.00 126.00 720.00 504
FLETE TERRESTRE: DIRECCION+SECRETARIA+TOPICO+PSICOLOGIA GLB 1.00 2,755.20 3,936.00 2755.2
Costo Directo 60226.54
CONSTRUCCION DE SERVICIOS HIGIENICOS 47913.12
CONSTRUCCION DE SS.HH. ALUMNOS 58,809.04 41166.37
TRABAJOS PRELIMINARES 224.00 156.8
LIMPIEZA DE TERRENO MANUAL m2 35.00 2.20 109.90 76.93
TRAZO Y REPLANTEO m2 35.00 2.28 114.10 79.87
MOVIMIENTO DE TIERRAS 818.06 572.66
EXCAVACION PARA ZAPATAS Y CIMIENTOS EN TERRENO NORMAL m3 10.05 50.72 728.22 509.76
RELLENO CON MATERIAL PROPIO m3 7.15 6.50 66.42 46.5
ELIMINACION MATERIAL EXCEDENTE m3 2.40 6.83 23.42 16.4
CONCRETO SIMPLE 3,285.65 2299.95
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 3.84 18.24 100.03 70.02
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 8.67 126.59 1,567.88 1097.52
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 3.04 169.23 734.92 514.44
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 18.50 33.40 882.82 617.97
CONCRETO ARMADO 6,403.90 4482.73
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 2.30 282.98 929.78 650.84
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 36.63 3.84 200.73 140.51
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 0.83 282.98 335.53 234.87
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 12.45 47.09 837.51 586.26
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 74.23 3.84 406.78 284.75
CONCRETO EN VIGAS F'C=175 KG/CM2 m3 2.32 204.48 677.72 474.4
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 15.34 50.75 1,112.15 778.51
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 106.47 3.84 583.46 408.42
CONCRETO EN LAVADERO m3 0.95 180.81 245.39 171.77
ENCOFRADO Y DESENCOFRADO EN LAVADERO m2 14.93 38.96 831.00 581.7
ACERO EN LAVADERO kg 40.68 3.72 216.01 151.21
CONCRETO EN URINARIO m3 0.11 177.18 27.84 19.49
ALBAÑILERIA 6,235.26 4364.68
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 14.70 68.62 1,441.04 1008.73
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 28.60 117.34 4,794.22 3355.95
TECHO Y/O COBERTURA 6,161.02 4312.73
TIJERAL SEGUN DISEÑO TIPO II und 3.00 782.99 3,355.68 2348.98
CORREAS DE MADERA m 52.00 10.74 797.68 558.38
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 34.83 38.91 1,935.85 1355.1
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 5.20 9.67 71.81 50.27
REVOQUES ENLUCIDOS Y MOLDURAS 4,346.99 3042.9
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 35.34 27.76 1,401.23 980.86
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 52.94 17.25 1,304.44 913.11
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 9.45 19.26 260.06 182.04
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 14.32 23.19 474.42 332.1
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 46.00 9.83 645.84 452.09
BRUÑAS DE 1 cm m 45.00 4.06 261.00 182.7
CIELORRASOS 957.09 669.96
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 27.79 24.11 957.09 669.96
PISOS Y PAVIMENTOS 1,556.21 1089.34
PISO DE CONCRETO PULIDO F'C=140 kG/CM2 E=2" m2 20.79 29.45 874.64 612.24
VEREDA DE CONCRETO DE 4" m2 12.96 36.81 681.57 477.1
ZOCALOS Y CONTRAZOCALOS 4,949.42 3464.6
ZOCALO DE CEMENTO FROTACHADO m2 4.58 13.95 91.28 63.9
ZOCALO DE MAYOLICA BLANCA DE 11 X 11 CM DE 1RA m2 65.28 52.09 4,858.14 3400.7
CARPINTERIA METALICA 885.40 619.78
VENTANA METALICA TIPO XI und 2.00 177.91 508.30 355.81
VENTANA METALICA TIPO XII und 2.00 131.99 377.10 263.97
CARPINTERIA DE MADERA 5,679.14 3975.4
PUERTA DE MADERA AGUANO TIPO V und 2.00 507.40 1,449.72 1014.8
PUERTA DE MADERA AGUANO TIPO VI und 3.00 478.70 2,051.58 1436.11
PUERTA DE MADERA AGUANO TIPO VII und 4.00 381.12 2,177.84 1524.49
VIDRIOS, CRISTALES Y SIMILARES 394.79 276.36
VIDRIOS SEMIDOBLES NACIONAL p2 52.36 5.28 394.79 276.36
PINTURA 1,940.89 1358.63
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 125.34 9.39 1,680.81 1176.57
PINTURA EN CIELO RASO DE MADERA m2 20.79 8.76 260.08 182.06
INSTALACIONES ELECTRICAS 2,446.73 1712.71
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 6.00 58.08 497.82 348.47
INTERRUPTOR SIMPLE DE BAKELITA und 6.00 13.31 114.06 79.84
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 6.00 80.05 686.10 480.27
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 100.00 1.53 219.00 153.3
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 20.00 6.86 196.00 137.2
TUBERIA INTERRUPTOR PVC D=3/4" m 5.00 6.50 46.40 32.48
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 1.00 29.61 42.30 29.61
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 62.30 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 582.75 407.93
SISTEMA DE AGUA FRIA 2,196.69 1537.68
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 8.00 57.43 656.32 459.42
SALIDA DE AGUA CALIENTE CON TUBERIA CPVC pto 4.00 66.16 378.08 264.66
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 50.00 10.44 745.50 521.85
VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 4.00 56.81 324.60 227.22
VALVULA DE COMPUERTA 3/4" und 1.00 64.53 92.19 64.53
APARATOS Y ACCESORIOS SANITARIOS 3,994.56 2796.19
INODORO TANQUE BAJO BLANCO pza 2.00 287.00 820.00 574
INODORO TANQUE ALTO BLANCO pza 4.00 373.10 2,132.00 1492.4
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 6.00 17.22 147.60 103.32
LAVATORIO BLANCO pza 2.00 111.93 319.80 223.86
COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES jgo 8.00 26.96 308.16 215.71
URINARIOS DE LOZA m 1.00 186.90 267.00 186.9
SISTEMA DE DESAGUE 2,163.64 1514.55
SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8.00 53.25 608.56 425.99
SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 6.00 59.60 510.84 357.59
RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 15.00 16.21 347.40 243.18
RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m 13.00 21.34 396.37 277.46
SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 2.00 41.83 119.50 83.65
CAJA DE REGISTRO DE DESAGUE 12" X 24" und 1.00 126.68 180.97 126.68
VARIOS 4,169.60 2918.72
CONTROL DE CALIDAD und 4.00 82.18 469.60 328.72
TERMA SOLAR DE 1000 LT INC INSTALACION GLB 1.00 2,590.00 3,700.00 2590
CONSTRUCCION DE TANQUE SEPTICO DE 4.5M3 4,324.33 3027.02
OBRAS PRELIMINARES 276.00 193.2
LIMPIEZA DE TERRENO m2 7.50 24.30 260.40 182.28
TRAZO Y REPLANTEO m2 7.50 1.46 15.60 10.92
MOVIMIENTO DE TIERRAS 571.36 399.95
EXCAVACION MANUAL ' m3 8.40 38.78 465.36 325.75
ACARREO DE MATERIAL EXCEDENTE m3 7.80 9.51 106.00 74.2
OBRAS DE CONCRETO SIMPLE 1,406.89 984.83
FALSO PISO MEZCLA 1:8 E=4" m2 7.90 17.86 201.61 141.13
POZO SEPTICO DE MAMPOSTERIA DE PIEDRA m2 30.20 27.94 1,205.28 843.7
OBRAS DE CONCRETO ARMADO 1,092.67 764.86
LOSAS MACIZAS, CONCRETO 175 KG/CM2 m3 1.05 214.89 322.33 225.63
LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO m2 8.40 31.77 381.28 266.89
LOSAS MACIZAS, ACERO F'Y=4200 KG/CM2 kg 75.40 3.61 389.06 272.34
ALBAÑILERIA 289.19 202.43
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 2.95 68.62 289.19 202.43
REVOQUES Y ENLUCIDOS Y MOLDURAS 555.38 388.76
TARRAJEO FROTACHADO MUROS INT/EXT C:A 1:5 m2 30.20 12.87 555.38 388.76
VARIOS 132.84 92.99
SUMINISTRO Y COLOCACION DE ACCESORIOS DESAGUE und 1.00 92.99 132.84 92.99
CONSTRUCCIÓN DE TANQUE DE AGUA 2 M3 5,313.90 3719.73
TANQUE DE AGUA DE 2 M3 5,313.90 3719.73
TANQUE ELEVADO DE ETERNIT ACCESORIOS pza 1.00 2,083.83 2,976.90 2083.83
ESTRUCTURA METALICA APOYO TANQUE und 1.00 1,635.90 2,337.00 1635.9
Costo Directo 68,447.27 47913.12
CONSTRUCCION DE VIVIENDA DOCENTE 63,857.99 44700.62
TRABAJOS PRELIMINARES 260.10 182.07
LIMPIEZA DE TERRENO MANUAL m2 45.00 2.20 141.30 98.91
TRAZO Y REPLANTEO m2 45.00 1.85 118.80 83.16
MOVIMIENTO DE TIERRAS 1,403.00 982.09
EXCAVACION DE ZANJAS H>=2.0M. m3 17.10 50.72 1,239.07 867.35
RELLENO CON MATERIAL PROPIO m3 6.33 6.50 58.81 41.16
ELIMINACION MATERIAL EXCEDENTE m3 10.77 6.83 105.12 73.58
CONCRETO SIMPLE 3,452.64 2416.86
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 4.84 18.24 126.08 88.26
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 1.97 126.59 356.25 249.38
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 3.23 169.23 780.85 546.6
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 45.50 33.68 2,189.46 1532.62
CONCRETO ARMADO 14,330.84 10031.59
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 2.50 282.98 1,010.63 707.44
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 80.40 3.84 440.59 308.41
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.14 282.98 865.10 605.57
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 24.48 47.38 1,656.81 1159.76
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 843.40 3.84 4,621.83 3235.28
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.87 265.40 1,088.13 761.69
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 19.32 51.13 1,411.13 987.79
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 372.15 3.84 2,039.38 1427.57
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 1.10 265.40 417.05 291.94
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 6.00 51.13 438.24 306.77
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 62.40 3.84 341.95 239.37
ALBAÑILERIA 5,560.43 3892.3
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 15.34 68.62 1,503.78 1052.65
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 24.20 117.34 4,056.65 2839.65
TECHO Y/O COBERTURA 8,398.70 5879.1
TIJERAL SEGUN DISEÑO TIPO II und 5.00 782.99 5,592.80 3914.96
CORREAS DE MADERA m 52.00 10.74 797.68 558.38
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 34.84 38.91 1,936.41 1355.49
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 5.20 9.67 71.81 50.27
REVOQUES ENLUCIDOS Y MOLDURAS 4,184.53 2929.16
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 45.30 27.76 1,796.15 1257.3
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 28.20 17.25 694.85 486.39
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 17.47 19.26 480.77 336.54
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 16.58 23.19 549.30 384.51
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 26.60 9.83 373.46 261.42
BRUÑAS DE 1 cm m 50.00 4.06 290.00 203
CIELORRASOS 5,901.74 4131.22
CIELORRASOS CON TRIPLAY m2 30.00 40.24 1,724.70 1207.29
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 28.00 104.43 4,177.04 2923.93
PISOS Y PAVIMENTOS 4,467.60 3127.32
FALSO PISO DE 4" DE CONCRETO 1:10 m2 30.00 25.02 1,072.20 750.54
PISO DE MADERA MACHIHEMBRADA AGUANO m2 30.00 79.23 3,395.40 2376.78
ZOCALOS Y CONTRAZOCALOS 691.87 484.31
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 43.00 11.26 691.87 484.31
CARPINTERIA METALICA 2,136.77 1495.74
VENTANA METALICA TIPO II und 2.00 608.41 1,738.30 1216.81
VENTANA METALICA TIPO VI und 1.00 278.93 398.47 278.93
CARPINTERIA DE MADERA 2,606.58 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 2,606.58 1824.61
VIDRIOS, CRISTALES Y SIMILARES 1,319.50 923.65
VIDRIOS SEMIDOBLES NACIONAL p2 175.00 5.28 1,319.50 923.65
PINTURA 1,528.26 1069.78
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 90.44 9.39 1,212.80 848.96
PINTURA EN CIELO RASO - TRIPLAY M2 14.62 9.70 202.49 141.74
PINTURA EN CIELO RASO DE MADERA m2 9.03 8.76 112.97 79.08
SISTEMA DE AGUAS PLUVIALES 1,537.44 1076.21
CANALETA DE AGUAS PLUVIALES m 24.00 44.84 1,537.44 1076.21
INSTALACIONES ELECTRICAS 2,908.29 2035.82
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 2.00 41.57 118.78 83.15
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 2.00 43.01 122.88 86.02
INTERRUPTOR SIMPLE DE BAKELITA und 2.00 13.31 38.02 26.61
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 1.00 73.00 104.29 73
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 24.00 18.48 633.60 443.52
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 2.00 80.05 228.70 160.09
CABLE ELECTRICO TW No. 10(6 mm2) m 100.00 3.00 429.00 300.3
CABLE ELECTRICO TW No. 12(4 mm2) m 50.00 2.63 188.00 131.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 50.01 1.53 109.52 76.67
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 5.00 6.86 49.00 34.3
TUBERIA TOMACORRIENTE PVC D=3/4" m 7.00 6.67 66.71 46.7
TUBERIA INTERRUPTOR PVC D=3/4" m 3.00 6.50 27.84 19.49
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 2.00 29.61 84.60 59.22
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 2.00 43.61 124.60 87.22
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 582.75 407.93
SISTEMA DE AGUA FRIA 1,401.82 981.27
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 8.00 57.43 656.32 459.42
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 50.00 10.44 745.50 521.85
SISTEMA DE DESAGUE 1,767.88 1237.52
SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8.00 53.25 608.56 425.99
SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 6.00 59.60 510.84 357.59
RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 28.00 16.21 648.48 453.94
Costo Directo 44700.62
CONSTRUCCION DE CERCO PERIMETRICO 271,972.77 190380.93
OBRAS PRELIMINARES 3,417.76 2392.44
LIMPIEZA DE TERRENO MANUAL m2 612.00 2.20 1,921.68 1345.18
TRAZO Y REPLANTEO m2 458.92 2.28 1,496.08 1047.26
MOVIMIENTO DE TIERRAS 13,029.82 9120.88
EXCAVACION PARA ZAPATAS Y CIMIENTOS EN TERRENO NORMAL m3 158.72 50.72 11,500.85 8050.6
RELLENO CON MATERIAL PROPIO m3 42.84 6.50 397.98 278.59
ELIMINACION MATERIAL EXCEDENTE m3 115.88 6.83 1,130.99 791.69
CONCRETO SIMPLE 52,770.70 36939.49
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 92.16 18.24 2,400.77 1680.54
ZAPATAS DE CONCRETO CICLOPEO 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 36.86 137.31 7,230.09 5061.06
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1073.52 4.05 6,215.68 4350.98
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 65.70 126.59 11,881.19 8316.83
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 28.35 169.23 6,853.61 4797.53
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 378.00 33.68 18,189.36 12732.55
CONCRETO ARMADO 72,755.80 50929.06
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 27.90 282.98 11,278.58 7895
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 278.71 47.38 18,863.09 13204.16
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 3504.96 3.84 19,207.18 13445.03
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 14.80 265.40 5,611.27 3927.89
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 146.70 51.13 10,714.97 7500.48
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1292.10 3.84 7,080.71 4956.5
ALBAÑILERIA 64,355.80 45049.06
MURO CARAVISTA DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM m2 582.30 77.36 64,355.80 45049.06
REVOQUES ENLUCIDOS Y MOLDURAS 43,727.97 30609.56
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 582.30 27.15 22,587.42 15811.19
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 312.48 19.26 8,599.45 6019.61
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 182.90 23.19 6,059.48 4241.63
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 15.50 9.83 217.62 152.33
BRUÑAS DE 1 cm m 1080.00 4.06 6,264.00 4384.8
ZOCALOS Y CONTRAZOCALOS 3,235.14 2264.6
ZOCALO DE CEMENTO FROTACHADO m2 162.00 13.98 3,235.14 2264.6
CARPINTERIA METALICA 2,960.84 2072.58
PUERTA METALICA TIPO I und 1.00 1,407.29 2,010.42 1407.29
PUERTA METALICA TIPO II und 1.00 665.29 950.42 665.29
PINTURA 14,693.34 10285.34
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 1095.70 9.39 14,693.34 10285.34
VARIOS 1,025.60 717.92
JUNTA DE CONSTRUCCION CON TEKNOPORT m2 32.40 13.30 615.60 430.92
LIMPIEZA FINAL DE OBRA GLB 1.00 287.00 410.00 287
Costo Directo 271,972.77 190380.93
OBRAS COMPLEMENTARIAS 112778.68
CONSTRUCCION DE PLATAFORMA DEPORTIVA 177,658.59 70759.76
TRABAJOS PRELIMINARES 5,187.00 3630.9
LIMPIEZA DE TERRENO m2 650.00 1.27 1,176.50 823.55
TRAZO DE NIVELES Y REPLANTEO m2 650.00 1.26 1,170.00 819
TRAZO DURANTE LA EJECUCION DE LA OBRA m2 650.00 3.06 2,840.50 1988.35
MOVIMIENTO DE TIERRAS 10,848.25 7593.78
CORTE DE MATERIAL SUELTO R=810 M3/DIA m3 128.00 12.01 2,196.48 1537.54
NIVELACION Y COMPACTACION CON EQUIPO LIVIANO m2 63.89 1.45 132.25 92.58
ENROCADO CON PIEDRA MEDIANA m3 128.00 36.99 6,763.52 4734.46
ELIMINACION DE MATERIAL EXCEDENTE m3 400.00 3.07 1,756.00 1229.2
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 148.45 35.59 7,547.20 5283.04
REVOQUES ENLUCIDOS Y MOLDURAS 2,503.94 1752.76
TARRAJEO EN EXTERIORES + FROTACHADO m2 180.24 7.58 1,952.00 1366.4
TARRAJEO EN CIMIENTOS CORRIDOS m2 15.40 25.09 551.94 386.36
PISOS Y PAVIMENTOS 62,556.85 43789.8
CONCRETO f'c = 175 kg/cm2 LOSA DEPORTIVA m3 144.00 274.95 56,561.76 39593.23
ENCOFRADO Y DESENCOFRADO LOSA DEPORTIVA m2 83.00 32.39 3,840.41 2688.29
JUNTAS ASFALTICAS m 332.00 4.54 2,154.68 1508.28
PINTURA 2,805.32 1963.72
PINTADO DE GRADERIOS m2 195.64 5.76 1,610.12 1127.08
PINTADO DE MARCAS DE LOSA DEPORTIVA m 480.00 1.74 1,195.20 836.64
EQUIPAMIENTO DE LOSA DEPORTIVA 10,600.00 7420
ARCO METALICO DE FULBITO Y BASKET und 2.00 2,730.00 7,800.00 5460
POSTES DE FIERRO Y NET PARA VOLEY und 1.00 1,960.00 2,800.00 1960
PRUEBAS DE CONTROL DE CALIDAD 984.00 688.8
PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO und 20.00 34.44 984.00 688.8
PARARRAYOS INC INSTALACIÓN 5,600.00 3920
INSTALACIÓN DE PARARRAYOS GLB 1.00 3,920.00 5,600.00 3920
CONSTRUCCION DE VEREDAS 12,319.39 5879.58
COMPONENTE: 03 AULA 2,506.96 1754.87
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 11.85 41.29 698.91 489.24
VEREDA DE CONCRETO DE 4" m2 30.67 36.81 1,612.94 1129.05
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 130.86 91.6
JUNTAS ASFALTICAS m 9.90 4.54 64.25 44.98
COMPONENTE: ADMINISTRACIÓN 2,128.76 1490.14
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 10.35 41.29 610.44 427.31
VEREDA DE CONCRETO DE 4" m2 25.42 36.81 1,336.84 935.79
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 130.86 91.6
JUNTAS ASFALTICAS m 7.80 4.54 50.62 35.44
COMPONENTE: COCINA + COMEDOR + DEPOSITO 2,506.96 1754.87
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 11.85 41.29 698.91 489.24
VEREDA DE CONCRETO DE 4" m2 30.67 36.81 1,612.94 1129.05
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 130.86 91.6
JUNTAS ASFALTICAS m 9.90 4.54 64.25 44.98
COMPONENTE: CERCO PERIMETRICO 1,256.72 879.7
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 3.00 41.29 176.94 123.86
VEREDA DE CONCRETO DE 4" m2 15.00 36.81 788.85 552.2
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 6.00 30.53 261.72 183.2
JUNTAS ASFALTICAS m 4.50 4.54 29.21 20.44
INSTALACION DE AREAS VERDES 11,552.64 8086.85
SEMBRADO DE GRASS EN JARDINERAS m2 100.87 80.17 11,552.64 8086.85
SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES 16,774.97 11742.49
EXCAVACION PARA CANALES DE DRENAJE EN TERRENO NORMAL m3 50.00 50.72 3,623.00 2536.1
CANAL DE AGUAS PLUVIALES CONCRETO FC'175 KG/CM2 m3 13.40 121.30 2,321.95 1625.37
ENCOFRADO Y DESENCOFRADO CANALES m2 76.00 40.65 4,413.32 3089.32
TARRAJEO EN CANALES m2 82.58 21.69 2,559.15 1791.41
REJILLA SUMIDERO-PLAT 1 1/4"X1/4"@1/2" Y MARCO "L" 1 1/4" m2 42.40 63.69 3,857.55 2700.29
FLETE TERRESTRE POR VOLUMEN Y PESO 24,400.00 12670
FLETE TERRESTRE: 03 AULAS GLB 1.00 3,640.00 5,200.00 3640
FLETE TERRESTRE: COCINA+COMEDOR GLB 1.00 1,960.00 2,800.00 1960
FLETE TERRESTRE: SSHH GLB 1.00 1,960.00 2,800.00 1960
FLETE TERRESTRE: CERCO PERIMETRICO GLB 1.00 2,240.00 3,200.00 2240
FLETE TERRESTRE: CONTRUCCION DE VEREDAS GLB 1.00 1,050.00 1,500.00 1050
FLETE TERRESTRE: EQUIPAMIENTO Y MOBILIARIO GLB 1.00 1,820.00 2,600.00 1820
IMPACTO AMBIENTAL 5,200.00 3640
IMPACTO AMBIENTAL GLB 1.00 3,640.00 5,200.00 3640
Costo Directo 247,905.59 112778.68
EQUIPAMIENTO Y MOBILIARIO 112,550.00 78785
EQUIPAMIENTO Y MOBILIARIO GLB 1.00 78,785.00 112,550.00 78785
Costo Directo 112,550.00 78785
CAPACITACION 23,946.00 16762.2
MATERIALES Y RECURSOS 3,446.00 2412.2
MATERIALES PARA CAPACITACION est 2.00 681.10 1,946.00 1362.2
PREPARACION DE REFRIGERIOS DIA 10.00 105.00 1,500.00 1050
SERVICIOS DE TERCEROS 20,500.00 14350
PAGO PROFESIONALES ESPECIALIZADOS DIA 5.00 2,100.00 15,000.00 10500
SUPERVISION GLB 1.00 1,750.00 2,500.00 1750
ELABORACION DE TERMINOS DE REFERENCIA GLB 1.00 2,100.00 3,000.00 2100
Costo Directo 23,946.00 16762.2
METRADO COSTO 01 AULA + 01 INNOVA 02 AULA + 01 INNOVA 01 INNOVA COMEDOR BIBLIOTECA ADMINISTRACION 01 AULA + 01 INNOV
104728.47 0
21736.02 0
1.00 1,020.19 1020.19 0
1230.00 3.14 3862.2 0
85.00 104.02 8841.7 0
260.00 13.22 3437.2 0
1369.68 3.34 4574.73 0
1919.35 0
1.00 1,919.35 1919.35 0
22700 0
1.00 14,500.00 14500 0
1.00 3,800.00 3800 0
1.00 1,400.00 1400 0
1.00 1,200.00 1200 0
1.00 1,800.00 1800 0
8458.6 0
1200.00 6.31 7572 0
124.00 7.15 886.6 0
49914.5 0
215.00 3.14 675.1 0
215.00 3.26 700.9 0
215.00 23.90 5138.5 0
7.00 6,200.00 43400 0
104728.47 0
257356.15 148655.23
2537.12 924.49
291.18 3.14 914.31 228.50 325.56 131.44 131.44 131.44 131.44 502.23
291.18 2.64 768.72 228.50 325.56 131.44 131.44 131.44 131.44 422.26
6887.14 4017.5
77.91 72.46 5645.36 64.93 86.57 43.28 43.28 43.28 43.28 3293.13
34.65 9.29 321.9 28.88 38.50 19.25 19.25 19.25 19.25 187.77
75.40 12.20 919.88 62.83 83.78 41.89 41.89 41.89 41.89 536.6
12817.42 7476.82
19.62 26.05 511.1 16.35 21.80 10.90 10.90 10.90 10.90 298.14
7.14 180.84 1291.2 5.95 7.93 3.97 3.97 3.97 3.97 753.2
19.29 241.75 4663.36 16.08 21.43 10.72 10.72 10.72 10.72 2720.29
178.32 35.62 6351.76 148.60 198.13 99.07 99.07 99.07 99.07 3705.19
61741.97 36387.95
8.46 404.25 3419.96 7.05 9.40 4.70 4.70 4.70 4.70 1994.97
307.74 5.48 1686.42 256.45 341.93 170.97 170.97 170.97 170.97 983.74
7.41 304.14 2253.68 6.18 8.23 4.12 4.12 4.12 4.12 1314.65
68.34 59.56 4070.33 56.95 75.93 37.97 37.97 37.97 37.97 2374.36
1193.13 5.48 6538.35 994.28 1325.70 662.85 662.85 662.85 662.85 3814.04
9.45 404.25 3820.16 7.88 10.50 5.25 5.25 5.25 5.25 2228.43
134.40 67.68 9096.19 112.00 149.33 74.67 74.67 74.67 74.67 5306.11
1559.85 5.48 8547.98 1299.88 1733.17 866.58 866.58 866.58 866.58 4986.32
9.54 379.14 3617 8.18 10.90 5.45 5.45 5.45 5.45 2170.2
105.48 73.04 7704.26 90.41 120.55 60.27 60.27 60.27 60.27 4622.56
1460.22 5.48 8002.01 1251.62 1668.82 834.41 834.41 834.41 834.41 4801.2
2.25 379.14 853.07 1.93 2.57 1.29 1.29 1.29 1.29 511.84
18.00 73.04 1314.72 15.43 20.57 10.29 10.29 10.29 10.29 788.83
149.24 5.48 817.84 127.92 170.56 85.28 85.28 85.28 85.28 490.7
22655.07 13876.23
72.81 98.03 7137.56 63.71 100.11 45.51 45.51 45.51 45.51 4371.76
92.57 167.63 15517.51 81.00 127.28 57.86 57.86 57.86 57.86 9504.47
38056.64 20904.74
14.00 1,618.56 22659.84 10.99 15.65 6.32 6.32 6.32 6.32 12447.18
480.00 15.34 7363.2 376.67 536.67 216.67 216.67 216.67 216.67 4044.65
319.20 23.87 7619.3 250.48 356.88 144.08 144.08 144.08 144.08 4185.33
30.00 13.81 414.3 23.54 33.54 13.54 13.54 13.54 13.54 227.58
21994.54 13471.65
198.51 39.65 7870.92 173.70 272.95 124.07 124.07 124.07 124.07 4820.94
174.06 24.64 4288.84 152.30 239.33 108.79 108.79 108.79 108.79 2626.91
110.07 27.52 3029.13 96.31 151.35 68.79 68.79 68.79 68.79 1855.34
74.52 33.13 2468.85 65.21 102.47 46.58 46.58 46.58 46.58 1512.17
180.00 14.04 2527.2 157.50 247.50 112.50 112.50 112.50 112.50 1547.91
312.00 5.80 1809.6 273.00 429.00 195.00 195.00 195.00 195.00 1108.38
18699.01 10271.48
180.54 57.49 10379.24 141.67 201.85 81.49 81.49 81.49 81.49 5701.38
55.77 149.18 8319.77 43.76 62.35 25.17 25.17 25.17 25.17 4570.1
26859.21 14753.91
180.36 35.74 6446.07 141.53 201.65 81.41 81.41 81.41 81.41 3540.86
180.36 113.18 20413.14 141.53 201.65 81.41 81.41 81.41 81.41 11213.05
1510.85 829.92
93.90 16.09 1510.85 73.69 104.99 42.39 42.39 42.39 42.39 829.92
6411 3739.75
60.00 106.85 6411 50.00 66.67 33.33 33.33 33.33 33.33 3739.75
2606.58 1520.51
3.00 868.86 2606.58 2.50 3.33 1.67 1.67 1.67 1.67 1520.51
4841.36 2824.13
642.09 7.54 4841.36 535.08 713.43 356.72 356.72 356.72 356.72 2824.13
10588.39 6485.38
551.16 13.41 7391.06 482.27 757.85 344.48 344.48 344.48 344.48 4527.02
180.48 13.85 2499.65 157.92 248.16 112.80 112.80 112.80 112.80 1531.03
55.77 12.51 697.68 48.80 76.68 34.86 34.86 34.86 34.86 427.33
4778.16 2787.26
60.00 64.06 3843.6 50.00 66.67 33.33 33.33 33.33 33.33 2242.1
35.40 26.40 934.56 29.50 39.33 19.67 19.67 19.67 19.67 545.16
13291.69 7753.51
24.00 59.39 1425.36 20.00 26.67 13.33 13.33 13.33 13.33 831.46
18.00 61.44 1105.92 15.00 20.00 10.00 10.00 10.00 10.00 645.12
6.00 19.01 114.06 5.00 6.67 3.33 3.33 3.33 3.33 66.54
3.00 50.51 151.53 2.50 3.33 1.67 1.67 1.67 1.67 88.39
12.00 104.29 1251.48 10.00 13.33 6.67 6.67 6.67 6.67 730.03
12.00 114.35 1372.2 10.00 13.33 6.67 6.67 6.67 6.67 800.45
150.00 4.29 643.5 125.00 166.67 83.33 83.33 83.33 83.33 375.38
300.00 3.76 1128 250.00 333.33 166.67 166.67 166.67 166.67 658
314.33 2.19 688.38 261.94 349.26 174.63 174.63 174.63 174.63 401.56
45.00 9.80 441 37.50 50.00 25.00 25.00 25.00 25.00 257.25
60.00 9.53 571.8 50.00 66.67 33.33 33.33 33.33 33.33 333.55
30.00 9.28 278.4 25.00 33.33 16.67 16.67 16.67 16.67 162.4
3.00 42.30 126.9 2.50 3.33 1.67 1.67 1.67 1.67 74.03
3.00 62.30 186.9 2.50 3.33 1.67 1.67 1.67 1.67 109.03
1.00 582.75 582.75 0.83 1.11 0.56 0.56 0.56 0.56 339.94
1.00 3,223.51 3223.51 0.83 1.11 0.56 0.56 0.56 0.56 1880.38
1080 630
6.00 180.00 1080 5.00 6.67 3.33 3.33 3.33 3.33 630
152482.05 0
574.3 0
99.36 3.14 311.99 0
99.36 2.64 262.31 0
8043.6 0
71.11 64.32 4573.8 0
42.60 72.46 3086.8 0
14.92 9.29 138.61 0
25.04 9.76 244.39 0
7853.45 0
34.20 26.05 890.91 0
8.50 180.84 1537.14 0
10.34 241.75 2499.7 0
60.80 48.12 2925.7 0
33055.48 0
10.70 404.25 4325.48 0
425.00 5.48 2329 0
8.40 404.25 3395.7 0
71.20 67.68 4818.82 0
754.00 5.48 4131.92 0
8.50 379.14 3222.69 0
45.20 73.04 3301.41 0
855.00 5.48 4685.4 0
2.40 379.14 909.94 0
15.60 73.04 1139.42 0
145.20 5.48 795.7 0
13208.2 0
41.20 98.03 4038.84 0
54.70 167.63 9169.36 0
35346.28 0
14.00 1,618.56 22659.84 0
234.70 15.34 3600.3 0
160.00 55.58 8892.8 0
14.00 13.81 193.34 0
10659.83 0
85.20 39.65 3378.18 0
99.73 24.64 2457.35 0
50.44 27.52 1388.11 0
29.10 33.13 964.08 0
72.80 14.04 1022.11 0
250.00 5.80 1450 0
7752.15 0
80.50 96.30 7752.15 0
16679.04 0
112.00 35.74 4002.88 0
112.00 113.18 12676.16 0
503.62 0
31.30 16.09 503.62 0
1868.25 0
2.00 358.85 717.7 0
1.00 182.55 182.55 0
1.00 358.85 358.85 0
3.00 203.05 609.15 0
2606.58 0
3.00 868.86 2606.58 0
3423.16 0
454.00 7.54 3423.16 0
4239.82 0
237.25 13.41 3181.52 0
59.15 13.85 819.23 0
19.11 12.51 239.07 0
1592.72 0
20.00 64.06 1281.2 0
11.80 26.40 311.52 0
3995.57 0
6.00 59.39 356.34 0
6.00 61.44 368.64 0
3.00 19.01 57.03 0
1.00 50.51 50.51 0
6.00 104.29 625.74 0
3.00 114.35 343.05 0
75.00 4.29 321.75 0
75.00 3.76 282 0
149.98 2.19 328.46 0
20.00 9.80 196 0
30.00 9.53 285.9 0
10.00 9.28 92.8 0
1.00 42.30 42.3 0
1.00 62.30 62.3 0
1.00 582.75 582.75 0
1080 0
6.00 180.00 1080 0
152482.05 0
239280.23 0
1234.8 0
210.00 3.14 659.4 0
210.00 2.74 575.4 0
4941.17 0
60.24 72.46 4364.99 0
25.01 9.29 232.34 0
35.23 9.76 343.84 0
13716.43 0
16.44 26.05 428.26 0
7.12 180.84 1287.58 0
23.80 241.75 5753.65 0
129.82 48.12 6246.94 0
55649.42 0
6.58 404.25 2659.97 0
197.71 5.48 1083.45 0
6.49 304.14 1973.87 0
51.93 59.56 3092.95 0
712.45 5.48 3904.23 0
14.70 404.25 5942.48 0
142.00 67.68 9610.56 0
1976.00 5.48 10828.48 0
7.12 379.14 2699.48 0
86.34 73.04 6306.27 0
973.34 5.48 5333.9 0
1.64 379.14 621.79 0
13.12 73.04 958.28 0
115.64 5.48 633.71 0
21628.93 0
75.80 98.03 7430.67 0
84.70 167.63 14198.26 0
42154.61 0
14.00 1,618.56 22659.84 0
6.00 1,118.56 6711.36 0
369.00 15.34 5660.46 0
284.00 23.87 6779.08 0
24.90 13.81 343.87 0
16406.48 0
198.60 39.65 7874.49 0
44.06 24.64 1085.64 0
71.63 27.52 1971.26 0
53.97 33.13 1788.03 0
101.50 14.04 1425.06 0
390.00 5.80 2262 0
19005.26 0
210.70 57.49 12113.14 0
46.20 149.18 6892.12 0
31273.2 0
210.00 35.74 7505.4 0
210.00 113.18 23767.8 0
1176.66 0
73.13 16.09 1176.66 0
3697.01 0
34.60 106.85 3697.01 0
2606.58 0
3.00 868.86 2606.58 0
2870.48 0
380.70 7.54 2870.48 0
8029.98 0
423.00 13.41 5672.43 0
128.49 13.85 1779.59 0
46.20 12.51 577.96 0
3441.68 0
44.00 64.06 2818.64 0
23.60 26.40 623.04 0
9647.54 0
12.00 59.39 712.68 0
12.00 61.44 737.28 0
6.00 19.01 114.06 0
6.00 50.51 303.06 0
12.00 104.29 1251.48 0
12.00 114.35 1372.2 0
100.00 4.29 429 0
300.00 3.76 1128 0
300.79 2.19 658.73 0
100.00 9.80 980 0
100.00 9.53 953 0
30.00 9.28 278.4 0
2.00 42.30 84.6 0
1.00 62.30 62.3 0
1.00 582.75 582.75 0
1800 0
10.00 180.00 1800 0
239280.23 0
86037.98 0
428.07 0
74.06 3.14 232.55 0
74.06 2.64 195.52 0
2734.65 0
33.33 72.46 2415.09 0
12.23 9.29 113.62 0
21.10 9.76 205.94 0
4543.81 0
9.18 26.05 239.14 0
5.20 180.84 940.37 0
4.80 241.75 1160.4 0
45.80 48.12 2203.9 0
17665.42 0
3.67 404.25 1483.6 0
110.04 5.48 603.02 0
3.72 404.25 1503.81 0
48.94 67.68 3312.26 0
576.13 5.48 3157.19 0
3.77 379.14 1429.36 0
36.64 73.04 2676.19 0
396.54 5.48 2173.04 0
1.00 379.14 379.14 0
8.00 73.04 584.32 0
66.33 5.48 363.49 0
11217.73 0
15.14 98.03 1484.17 0
50.63 167.63 8487.11 0
16.47 75.68 1246.45 0
14472.46 0
5.00 1,618.56 8092.8 0
120.00 15.34 1840.8 0
79.80 55.58 4435.28 0
7.50 13.81 103.58 0
7636.99 0
48.89 39.65 1938.49 0
82.64 24.64 2036.25 0
41.68 27.52 1147.03 0
26.10 33.13 864.69 0
43.20 14.04 606.53 0
180.00 5.80 1044 0
4374.75 0
41.48 57.49 2384.69 0
13.34 149.18 1990.06 0
6177.21 0
41.48 35.74 1482.5 0
41.48 113.18 4694.71 0
415.12 0
25.80 16.09 415.12 0
1082.8 0
2.00 358.85 717.7 0
2.00 182.55 365.1 0
1737.72 0
2.00 868.86 1737.72 0
1068.34 0
141.69 7.54 1068.34 0
3642.1 0
216.31 13.41 2900.72 0
41.48 13.85 574.5 0
13.34 12.51 166.88 0
1272.42 0
15.00 64.06 960.9 0
11.80 26.40 311.52 0
2912.39 0
4.00 59.39 237.56 0
4.00 61.44 245.76 0
4.00 19.01 76.04 0
1.00 50.51 50.51 0
4.00 104.29 417.16 0
2.00 114.35 228.7 0
50.00 4.29 214.5 0
50.00 3.76 188 0
75.00 2.19 164.25 0
15.00 9.80 147 0
20.00 9.53 190.6 0
7.00 9.28 64.96 0
1.00 42.30 42.3 0
1.00 62.30 62.3 0
1.00 582.75 582.75 0
4656 0
4.00 180.00 720 0
1.00 3,936.00 3936 0
86037.98 0
68447.27 0
58809.04 0
224 0
35.00 3.14 109.9 0
35.00 3.26 114.1 0
818.06 0
10.05 72.46 728.22 0
7.15 9.29 66.42 0
2.40 9.76 23.42 0
3285.65 0
3.84 26.05 100.03 0
8.67 180.84 1567.88 0
3.04 241.75 734.92 0
18.50 47.72 882.82 0
6403.9 0
2.30 404.25 929.78 0
36.63 5.48 200.73 0
0.83 404.25 335.53 0
12.45 67.27 837.51 0
74.23 5.48 406.78 0
2.32 292.12 677.72 0
15.34 72.50 1112.15 0
106.47 5.48 583.46 0
0.95 258.30 245.39 0
14.93 55.66 831 0
40.68 5.31 216.01 0
0.11 253.12 27.84 0
6235.26 0
14.70 98.03 1441.04 0
28.60 167.63 4794.22 0
6161.02 0
3.00 1,118.56 3355.68 0
52.00 15.34 797.68 0
34.83 55.58 1935.85 0
5.20 13.81 71.81 0
4346.99 0
35.34 39.65 1401.23 0
52.94 24.64 1304.44 0
9.45 27.52 260.06 0
14.32 33.13 474.42 0
46.00 14.04 645.84 0
45.00 5.80 261 0
957.09 0
27.79 34.44 957.09 0
1556.21 0
20.79 42.07 874.64 0
12.96 52.59 681.57 0
4949.42 0
4.58 19.93 91.28 0
65.28 74.42 4858.14 0
885.4 0
2.00 254.15 508.3 0
2.00 188.55 377.1 0
5679.14 0
2.00 724.86 1449.72 0
3.00 683.86 2051.58 0
4.00 544.46 2177.84 0
394.79 0
52.36 7.54 394.79 0
1940.89 0
125.34 13.41 1680.81 0
20.79 12.51 260.08 0
2446.73 0
6.00 82.97 497.82 0
6.00 19.01 114.06 0
6.00 114.35 686.1 0
100.00 2.19 219 0
20.00 9.80 196 0
5.00 9.28 46.4 0
1.00 42.30 42.3 0
1.00 62.30 62.3 0
1.00 582.75 582.75 0
2196.69 0
8.00 82.04 656.32 0
4.00 94.52 378.08 0
50.00 14.91 745.5 0
4.00 81.15 324.6 0
1.00 92.19 92.19 0
3994.56 0
2.00 410.00 820 0
4.00 533.00 2132 0
6.00 24.60 147.6 0
2.00 159.90 319.8 0
8.00 38.52 308.16 0
1.00 267.00 267 0
2163.64 0
8.00 76.07 608.56 0
6.00 85.14 510.84 0
15.00 23.16 347.4 0
13.00 30.49 396.37 0
2.00 59.75 119.5 0
1.00 180.97 180.97 0
4169.6 0
4.00 117.40 469.6 0
1.00 3,700.00 3700 0
4324.33 0
276 0
7.50 34.72 260.4 0
7.50 2.08 15.6 0
571.36 0
8.40 55.40 465.36 0
7.80 13.59 106 0
1406.89 0
7.90 25.52 201.61 0
30.20 39.91 1205.28 0
1092.67 0
1.05 306.98 322.33 0
8.40 45.39 381.28 0
75.40 5.16 389.06 0
289.19 0
2.95 98.03 289.19 0
555.38 0
30.20 18.39 555.38 0
132.84 0
1.00 132.84 132.84 0
5313.9 0
5313.9 0
1.00 2,976.90 2976.9 0
1.00 2,337.00 2337 0
68447.27 0
63857.99 0
260.1 0
45.00 3.14 141.3 0
45.00 2.64 118.8 0
1403 0
17.10 72.46 1239.07 0
6.33 9.29 58.81 0
10.77 9.76 105.12 0
3452.64 0
4.84 26.05 126.08 0
1.97 180.84 356.25 0
3.23 241.75 780.85 0
45.50 48.12 2189.46 0
14330.84 0
2.50 404.25 1010.63 0
80.40 5.48 440.59 0
2.14 404.25 865.1 0
24.48 67.68 1656.81 0
843.40 5.48 4621.83 0
2.87 379.14 1088.13 0
19.32 73.04 1411.13 0
372.15 5.48 2039.38 0
1.10 379.14 417.05 0
6.00 73.04 438.24 0
62.40 5.48 341.95 0
5560.43 0
15.34 98.03 1503.78 0
24.20 167.63 4056.65 0
8398.7 0
5.00 1,118.56 5592.8 0
52.00 15.34 797.68 0
34.84 55.58 1936.41 0
5.20 13.81 71.81 0
4184.53 0
45.30 39.65 1796.15 0
28.20 24.64 694.85 0
17.47 27.52 480.77 0
16.58 33.13 549.3 0
26.60 14.04 373.46 0
50.00 5.80 290 0
5901.74 0
30.00 57.49 1724.7 0
28.00 149.18 4177.04 0
4467.6 0
30.00 35.74 1072.2 0
30.00 113.18 3395.4 0
691.87 0
43.00 16.09 691.87 0
2136.77 0
2.00 869.15 1738.3 0
1.00 398.47 398.47 0
2606.58 0
3.00 868.86 2606.58 0
1319.5 0
175.00 7.54 1319.5 0
1528.26 0
90.44 13.41 1212.8 0
14.62 13.85 202.49 0
9.03 12.51 112.97 0
1537.44 0
24.00 64.06 1537.44 0
2908.29 0
2.00 59.39 118.78 0
2.00 61.44 122.88 0
2.00 19.01 38.02 0
1.00 104.29 104.29 0
24.00 26.40 633.6 0
2.00 114.35 228.7 0
100.00 4.29 429 0
50.00 3.76 188 0
50.01 2.19 109.52 0
5.00 9.80 49 0
7.00 9.53 66.71 0
3.00 9.28 27.84 0
2.00 42.30 84.6 0
2.00 62.30 124.6 0
1.00 582.75 582.75 0
1401.82 0
8.00 82.04 656.32 0
50.00 14.91 745.5 0
1767.88 0
8.00 76.07 608.56 0
6.00 85.14 510.84 0
28.00 23.16 648.48 0
63857.99 0
271972.77 0
3417.76 0
612.00 3.14 1921.68 0
458.92 3.26 1496.08 0
13029.82 0
158.72 72.46 11500.85 0
42.84 9.29 397.98 0
115.88 9.76 1130.99 0
52770.7 0
92.16 26.05 2400.77 0
36.86 196.15 7230.09 0
1073.52 5.79 6215.68 0
65.70 180.84 11881.19 0
28.35 241.75 6853.61 0
378.00 48.12 18189.36 0
72755.8 0
27.90 404.25 11278.58 0
278.71 67.68 18863.09 0
3504.96 5.48 19207.18 0
14.80 379.14 5611.27 0
146.70 73.04 10714.97 0
1292.10 5.48 7080.71 0
64355.8 0
582.30 110.52 64355.8 0
43727.97 0
582.30 38.79 22587.42 0
312.48 27.52 8599.45 0
182.90 33.13 6059.48 0
15.50 14.04 217.62 0
1080.00 5.80 6264 0
3235.14 0
162.00 19.97 3235.14 0
2960.84 0
1.00 2,010.42 2010.42 0
1.00 950.42 950.42 0
14693.34 0
1095.70 13.41 14693.34 0
1025.6 0
32.40 19.00 615.6 0
1.00 410.00 410 0
271972.77 0
247905.59 #REF!
177658.59 #REF!
5187 0
650.00 1.81 1176.5 0
650.00 1.80 1170 0
650.00 4.37 2840.5 0
10848.25 0
128.00 17.16 2196.48 0
63.89 2.07 132.25 0
128.00 52.84 6763.52 0
400.00 4.39 1756 0
148.45 50.84 7547.2 0
2503.94 0
180.24 10.83 1952 0
15.40 35.84 551.94 0
62556.85 0
144.00 392.79 56561.76 0
83.00 46.27 3840.41 0
332.00 6.49 2154.68 0
2805.32 0
195.64 8.23 1610.12 0
480.00 2.49 1195.2 0
10600 0
2.00 3,900.00 7800 0
1.00 2,800.00 2800 0
984 0
20.00 49.20 984 0
5600 0
1.00 5,600.00 5600 0
12319.39 #REF!
2506.96 0
11.85 58.98 698.91 0
30.67 52.59 1612.94 0
3.00 43.62 130.86 0
9.90 6.49 64.25 0
2128.76 0
10.35 58.98 610.44 0
25.42 52.59 1336.84 0
3.00 43.62 130.86 0
7.80 6.49 50.62 0
2506.96 0
11.85 58.98 698.91 0
30.67 52.59 1612.94 0
3.00 43.62 130.86 0
9.90 6.49 64.25 0
1256.72 0
3.00 58.98 176.94 0
15.00 52.59 788.85 0
6.00 43.62 261.72 0
4.50 6.49 29.21 0
11552.64 0
100.87 114.53 11552.64 0
16774.97 0
50.00 72.46 3623 0
13.40 173.28 2321.95 0
76.00 58.07 4413.32 0
82.58 30.99 2559.15 0
42.40 90.98 3857.55 0
24400 0
1.00 5,200.00 5200 0
1.00 2,800.00 2800 0
1.00 2,800.00 2800 0
1.00 3,200.00 3200 0
1.00 1,500.00 1500 0
1.00 2,600.00 2600 0
5200 0
1.00 5,200.00 5200 0
247905.59 #REF!
112550 0
1.00 112,550.00 112550 0
112550 0
23946 0
3446 0
2.00 973.00 1946 0
10.00 150.00 1500 0
20500 0
5.00 3,000.00 15000 0
1.00 2,500.00 2500 0
1.00 3,000.00 3000 0
23946 0
02 AULA + 01 INNOV 01 INNOVA COMEDOR BIBLIOTECA ADMINISTRACION
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
210623 96354.08 96354.08 96354.08 96354.08
1317.2 531.79 531.79 531.79 531.79
715.57 288.9 288.9 288.9 288.9
601.63 242.89 242.89 242.89 242.89
5356.66 2678.33 2678.33 2678.33 2678.33
4390.83 2195.42 2195.42 2195.42 2195.42
250.37 125.18 125.18 125.18 125.18
715.46 357.73 357.73 357.73 357.73
9969.1 4984.55 4984.55 4984.55 4984.55
397.52 198.76 198.76 198.76 198.76
1004.26 502.13 502.13 502.13 502.13
3627.06 1813.53 1813.53 1813.53 1813.53
4940.26 2470.13 2470.13 2470.13 2470.13
48517.29 24258.63 24258.63 24258.63 24258.63
2659.97 1329.98 1329.98 1329.98 1329.98
1311.66 655.83 655.83 655.83 655.83
1752.86 876.43 876.43 876.43 876.43
3165.81 1582.91 1582.91 1582.91 1582.91
5085.39 2542.69 2542.69 2542.69 2542.69
2971.24 1485.62 1485.62 1485.62 1485.62
7074.82 3537.41 3537.41 3537.41 3537.41
6648.43 3324.21 3324.21 3324.21 3324.21
2893.6 1446.8 1446.8 1446.8 1446.8
6163.41 3081.7 3081.7 3081.7 3081.7
6401.6 3200.8 3200.8 3200.8 3200.8
682.45 341.23 341.23 341.23 341.23
1051.78 525.89 525.89 525.89 525.89
654.27 327.13 327.13 327.13 327.13
21805.51 9911.59 9911.59 9911.59 9911.59
6869.91 3122.68 3122.68 3122.68 3122.68
14935.6 6788.91 6788.91 6788.91 6788.91
29784.61 12024.85 12024.85 12024.85 12024.85
17734.47 7159.88 7159.88 7159.88 7159.88
5762.73 2326.57 2326.57 2326.57 2326.57
5963.16 2407.49 2407.49 2407.49 2407.49
324.25 130.91 130.91 130.91 130.91
21169.74 9622.61 9622.61 9622.61 9622.61
7575.76 3443.53 3443.53 3443.53 3443.53
4128.01 1876.37 1876.37 1876.37 1876.37
2915.53 1325.24 1325.24 1325.24 1325.24
2376.27 1080.12 1080.12 1080.12 1080.12
2432.43 1105.65 1105.65 1105.65 1105.65
1741.74 791.7 791.7 791.7 791.7
14634.57 5908.37 5908.37 5908.37 5908.37
8123.2 3279.55 3279.55 3279.55 3279.55
6511.37 2628.82 2628.82 2628.82 2628.82
21021.06 8486.77 8486.77 8486.77 8486.77
5044.94 2036.78 2036.78 2036.78 2036.78
15976.12 6449.99 6449.99 6449.99 6449.99
1182.45 477.39 477.39 477.39 477.39
1182.45 477.39 477.39 477.39 477.39
4986.33 2493.17 2493.17 2493.17 2493.17
4986.33 2493.17 2493.17 2493.17 2493.17
2027.34 1013.67 1013.67 1013.67 1013.67
2027.34 1013.67 1013.67 1013.67 1013.67
3765.5 1882.75 1882.75 1882.75 1882.75
3765.5 1882.75 1882.75 1882.75 1882.75
10191.32 4632.43 4632.43 4632.43 4632.43
7113.89 3233.59 3233.59 3233.59 3233.59
2405.91 1093.6 1093.6 1093.6 1093.6
671.52 305.24 305.24 305.24 305.24
3716.35 1858.17 1858.17 1858.17 1858.17
2989.47 1494.73 1494.73 1494.73 1494.73
726.88 363.44 363.44 363.44 363.44
10337.97 5169.01 5169.01 5169.01 5169.01
1108.61 554.31 554.31 554.31 554.31
860.16 430.08 430.08 430.08 430.08
88.71 44.36 44.36 44.36 44.36
117.86 58.93 58.93 58.93 58.93
973.37 486.69 486.69 486.69 486.69
1067.27 533.63 533.63 533.63 533.63
500.5 250.25 250.25 250.25 250.25
877.33 438.67 438.67 438.67 438.67
535.41 267.7 267.7 267.7 267.7
343 171.5 171.5 171.5 171.5
444.73 222.37 222.37 222.37 222.37
216.53 108.27 108.27 108.27 108.27
98.7 49.35 49.35 49.35 49.35
145.37 72.68 72.68 72.68 72.68
453.25 226.63 226.63 226.63 226.63
2507.17 1253.59 1253.59 1253.59 1253.59
840 420 420 420 420
840 420 420 420 420
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
#REF! #REF! #REF! #REF! #REF!
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
#REF! #REF! #REF! #REF! #REF!
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
HOJA RESUMEN DEL PRESUPUESTO (PAQUETE 4 INSTITUCIONES)

SOLITARIO CALANGACHI QUEJONI CALAHUYO


COMPONENTES TOTAL
IEP 72400 IEP 72547 IEP 72250 IEP 70631
OBRAS PRELIMINARES 68,969.93 68,969.93 68,969.93 68,969.93 275,879.72
MODULO: AMBIENTES PEDAGOGICOS 455,456.92 210,623.00 148,655.23 148,655.23 963,390.38
TIPO I 359,102.84
TIPO II 210,623.00
TIPO III 148,655.23 148,655.23
TIPO IV 96,354.08
MODULO: COMEDOR Y COCINA 96,354.08 96,354.08 96,354.08 96,354.08 385,416.32
MODULO: BIBLIOTECA 57,495.74 57,495.74 57,495.74 57,495.74 229,982.98
MODULO: SERVICIOS DE ADMINISTRACION 96,354.08 96,354.08 96,354.08 96,354.08 385,416.32
MODULO: SERVICIOS HIGIENICOS 47,913.12 47,913.12 47,913.12 47,913.12 191,652.48
CERCO PERIMETRICO 46,039.83 89,466.59 64,704.63 77,769.99 277,981.04
OBRAS COMPLEMENTARIAS 112,778.68 112,778.68 112,778.68 112,778.68 451,114.72
EQUIPAMIENTO Y MOBILIARIO 196,962.50 118,177.50 78,785.00 78,785.00 472,710.00
CAPACITACION 12,571.65 12,571.65 12,571.65 12,571.65 50,286.60
COSTO DIRECTO 1,190,896.54 910,704.38 784,582.14 797,647.50 3,683,830.56
GASTOS GENERALES 9% 107,180.69 81,963.39 70,612.39 71,788.28 331,544.75
UTILIDAD 8 % 95,271.72 72,856.35 62,766.57 63,811.80 294,706.44
PARCIAL 1,393,348.95 1,065,524.12 917,961.10 933,247.58 4,310,081.75
IGV 250,802.81 191,794.34 165,233.00 167,984.56 775,814.71
TOTAL OBRA 1,644,151.76 1,257,318.46 1,083,194.10 1,101,232.14 5,085,896.46
SUPERVISION 3% 49,324.55 37,719.55 32,495.82 33,036.96 152,576.88
TOTAL PRESUPUESTO 1,693,476.31 1,295,038.01 1,115,689.92 1,134,269.10 5,238,473.34
METRADO COSTO
OBRAS PRELIMINARES 73309.93
OBRAS PROVISIONALES 15215.21
CARTEL DE OBRA und 1.00 714.13 714.13
LIMPIEZA DE TERRENO MANUAL m2 1230.00 2.20 2703.54
CAMPAMENTO PROVISIONAL CON TECHO CALAMINA m2 85.00 72.81 6189.19
CERCO PROVISIONAL m 260.00 9.25 2406.04
TRAZO Y REPLANTEO m2 1369.68 2.34 3202.31
MOVILIZACION DE EQUIPOS Y MAQUINARIAS 1343.55
MOVILIZACION DE MAQUINARIAS-HERRAMIENTAS PARA LA OBRA GLB 1.00 1,343.55 1343.55
SEGURIDAD Y SALUD EN EL TRABAJO 15890
EQUIPOS DE PROTECCIÓN INDIVIDUAL GLB 1.00 10,150.00 10150
EQUIPOS DE PROTECCIÓN COLECTIVA GLB 1.00 2,660.00 2660
SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 980.00 980
CAPACITACIÓN EN SEGURIDAD GLB 1.00 840.00 840
RECURSOS ANTE AMERGENCIAS DE SEGURIDAD Y SALUD GLB 1.00 1,260.00 1260
DEMOLICIONES 5921.02
DEMOLICIONES DE OBRAS DE ADOBE CON CALAMINA m2 1200.00 4.42 5300.4
ELIMINACION DE MATERIAL DE DEMOLICION m3 124.00 5.01 620.62
INSTALACION DE MODULO DE AULA PREFABRICADA 34940.15
LIMPIEZA DE TERRENO MANUAL m2 215.00 2.20 472.57
TRAZO Y REPLANTEO m2 215.00 2.28 490.63
FALSO PISO DE 2" DE CONCRETO 1:10 m2 215.00 16.73 3596.95
MODULO PREFABRICADO glb 7.00 4,340.00 30380
Costo Directo 73309.93
MODULO: AMBIENTES PEDAGOGICOS (03 AULAS) 179551.42
OBRAS PRELIMINARES 1178.11
LIMPIEZA DE TERRENO MANUAL m2 291.18 2.20 640.01
TRAZO Y REPLANTEO m2 291.18 1.85 538.1
MOVIMIENTO DE TIERRAS 4821
EXCAVACION DE ZANJAS H>=2.0M. m3 77.91 50.72 3951.75
RELLENO CON MATERIAL PROPIO m3 34.65 6.50 225.33
ELIMINACION MATERIAL EXCEDENTE m3 75.40 8.54 643.92
CONCRETO SIMPLE 8972.19
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 19.62 18.24 357.77
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 7.14 126.59 903.84
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 19.29 169.23 3264.35
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 178.32 24.93 4446.23
CONCRETO ARMADO 43219.34
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 8.46 282.98 2393.97
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 307.74 3.84 1180.49
CONCRETO EN VIGAS DE CIMENTACION F'C= 175 KG/CM2 m3 7.41 212.90 1577.57
ENCOFRADO DE VIGAS DE CIMENTACION m2 68.34 41.69 2849.23
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1193.13 3.84 4576.85
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 9.45 282.98 2674.11
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 134.40 47.38 6367.33
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 1559.85 3.84 5983.58
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 9.54 265.40 2531.9
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 105.48 51.13 5392.98
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1460.22 3.84 5601.4
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 2.25 265.40 597.15
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 18.00 51.13 920.3
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 149.24 3.84 572.48
ALBAÑILERIA 15858.56
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 72.81 68.62 4996.3
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 92.57 117.34 10862.26
TECHO Y/O COBERTURA 26639.65
TIJERAL SEGUN DISEÑO TIPO I und 14.00 1,132.99 15861.89
CORREAS DE MADERA m 480.00 10.74 5154.24
COBERTURA CON CALAMINA GALVANIZADA m2 319.20 16.71 5333.51
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 30.00 9.67 290.01
REVOQUES ENLUCIDOS Y MOLDURAS 15396.18
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 198.51 27.76 5509.65
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 174.06 17.25 3002.19
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 110.07 19.26 2120.39
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 74.52 23.19 1728.19
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 180.00 9.83 1769.04
BRUÑAS DE 1 cm m 312.00 4.06 1266.72
CIELORRASOS 13089.31
CIELORRASOS CON TRIPLAY m2 180.54 40.24 7265.47
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 55.77 104.43 5823.84
PISOS Y PAVIMENTOS 18801.45
FALSO PISO DE 4" DE CONCRETO 1:10 m2 180.36 25.02 4512.25
PISO DE MADERA MACHIHEMBRADA AGUANO m2 180.36 79.23 14289.2
ZOCALOS Y CONTRAZOCALOS 1057.6
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 93.90 11.26 1057.6
CARPINTERIA METALICA 4487.7
VENTANA METALICA m2 60.00 74.80 4487.7
CARPINTERIA DE MADERA 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 1824.61
VIDRIOS, CRISTALES Y SIMILARES 3388.95
VIDRIOS SEMIDOBLES NACIONAL p2 642.09 5.28 3388.95
PINTURA 7411.87
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 551.16 9.39 5173.74
PINTURA EN CIELO RASO - TRIPLAY M2 180.48 9.70 1749.75
PINTURA EN CIELO RASO DE MADERA m2 55.77 8.76 488.38
SISTEMA DE AGUAS PLUVIALES 3344.71
CANALETA DE AGUAS PLUVIALES m 60.00 44.84 2690.52
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 35.40 18.48 654.19
INSTALACIONES ELECTRICAS 9304.19
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 24.00 41.57 997.75
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 18.00 43.01 774.14
INTERRUPTOR SIMPLE DE BAKELITA und 6.00 13.31 79.84
INTERRUPTOR DOBLE DE BAKELITA und 3.00 35.36 106.07
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 12.00 73.00 876.04
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 12.00 80.05 960.54
CABLE ELECTRICO TW No. 10(6 mm2) m 150.00 3.00 450.45
CABLE ELECTRICO TW No. 12(4 mm2) m 300.00 2.63 789.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 314.33 1.53 481.87
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 45.00 6.86 308.7
TUBERIA TOMACORRIENTE PVC D=3/4" m 60.00 6.67 400.26
TUBERIA INTERRUPTOR PVC D=3/4" m 30.00 6.50 194.88
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 3.00 29.61 88.83
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 3.00 43.61 130.83
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 407.93
SISTEMA DE PUESTA A TIERRA m 1.00 2,256.46 2256.46
VARIOS 756
CONTROL DE CALIDAD GLB 6.00 126.00 756
CONSTRUCCION DE SALON DE USOS MULTIPLES 106737.48
TRABAJOS PRELIMINARES 402.01
LIMPIEZA DE TERRENO MANUAL m2 99.36 2.20 218.39
TRAZO Y REPLANTEO m2 99.36 1.85 183.62
MOVIMIENTO DE TIERRAS 5630.51
EXCAVACION EN ROCA CON PRE-CORTE RENDIMIENTO= 180 M3/DIA m3 71.11 45.02 3201.66
EXCAVACION DE ZANJAS H>=2.0M. m3 42.60 50.72 2160.76
RELLENO CON MATERIAL PROPIO m3 14.92 6.50 97.02
ELIMINACION MATERIAL EXCEDENTE m3 25.04 6.83 171.07
CONCRETO SIMPLE 5497.42
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 34.20 18.24 623.64
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 8.50 126.59 1076
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 10.34 169.23 1749.79
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 60.80 33.68 2047.99
CONCRETO ARMADO 23138.83
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 10.70 282.98 3027.83
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 425.00 3.84 1630.3
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.40 282.98 2376.99
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 71.20 47.38 3373.17
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 754.00 3.84 2892.34
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 8.50 265.40 2255.88
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 45.20 51.13 2310.99
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 855.00 3.84 3279.78
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 2.40 265.40 636.96
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 15.60 51.13 797.6
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 145.20 3.84 556.99
ALBAÑILERIA 9245.74
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 41.20 68.62 2827.19
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 54.70 117.34 6418.55
TECHO Y/O COBERTURA 24742.4
TIJERAL SEGUN DISEÑO TIPO I und 14.00 1,132.99 15861.89
CORREAS DE MADERA m 234.70 10.74 2520.21
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 160.00 38.91 6224.96
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 14.00 9.67 135.34
REVOQUES ENLUCIDOS Y MOLDURAS 7461.89
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 85.20 27.76 2364.73
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 99.73 17.25 1720.14
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 50.44 19.26 971.68
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 29.10 23.19 674.86
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 72.80 9.83 715.48
BRUÑAS DE 1 cm m 250.00 4.06 1015
CIELORRASOS 5426.51
FALSO TECHO DE PLANCHA DE FIBROCEMENTO DE e=4mm m2 80.50 67.41 5426.51
PISOS Y PAVIMENTOS 11675.33
FALSO PISO DE 4" DE CONCRETO 1:10 m2 112.00 25.02 2802.02
PISO DE MADERA MACHIHEMBRADA AGUANO m2 112.00 79.23 8873.31
ZOCALOS Y CONTRAZOCALOS 352.53
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 31.30 11.26 352.53
CARPINTERIA METALICA 1307.79
VENTANA METALICA TIPO VII und 2.00 251.20 502.39
VENTANA METALICA TIPO VIII und 1.00 127.79 127.79
VENTANA METALICA TIPO IX und 1.00 251.20 251.2
VENTANA METALICA TIPO X und 3.00 142.14 426.41
CARPINTERIA DE MADERA 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 1824.61
VIDRIOS, CRISTALES Y SIMILARES 2396.21
VIDRIOS SEMIDOBLES NACIONAL p2 454.00 5.28 2396.21
PINTURA 2967.88
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 237.25 9.39 2227.07
PINTURA EN CIELO RASO - TRIPLAY M2 59.15 9.70 573.46
PINTURA EN CIELO RASO DE MADERA m2 19.11 8.76 167.35
SISTEMA DE AGUAS PLUVIALES 1114.9
CANALETA DE AGUAS PLUVIALES m 20.00 44.84 896.84
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 11.80 18.48 218.06
INSTALACIONES ELECTRICAS 2796.92
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 6.00 41.57 249.44
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 6.00 43.01 258.05
INTERRUPTOR SIMPLE DE BAKELITA und 3.00 13.31 39.92
INTERRUPTOR DOBLE DE BAKELITA und 1.00 35.36 35.36
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 6.00 73.00 438.02
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 3.00 80.05 240.14
CABLE ELECTRICO TW No. 10(6 mm2) m 75.00 3.00 225.23
CABLE ELECTRICO TW No. 12(4 mm2) m 75.00 2.63 197.4
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 149.98 1.53 229.92
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 20.00 6.86 137.2
TUBERIA TOMACORRIENTE PVC D=3/4" m 30.00 6.67 200.13
TUBERIA INTERRUPTOR PVC D=3/4" m 10.00 6.50 64.96
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 1.00 29.61 29.61
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 407.93
VARIOS 756
CONTROL DE CALIDAD GLB 6.00 126.00 756
Costo Directo 106737.48
CONSTRUCCION DE AULA DE INNOVACION PEDAGOGICA + BIBLIOTECA + COCINA 167496.18
OBRAS PRELIMINARES 864.36
LIMPIEZA DE TERRENO MANUAL m2 210.00 2.20 461.58
TRAZO Y REPLANTEO m2 210.00 1.92 402.78
MOVIMIENTO DE TIERRAS 3458.82
EXCAVACION DE ZANJAS H>=2.0M. m3 60.24 50.72 3055.49
RELLENO CON MATERIAL PROPIO m3 25.01 6.50 162.64
ELIMINACION MATERIAL EXCEDENTE m3 35.23 6.83 240.69
CONCRETO SIMPLE 9601.51
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 16.44 18.24 299.78
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 7.12 126.59 901.31
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 23.80 169.23 4027.56
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 129.82 33.68 4372.86
CONCRETO ARMADO 38954.6
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 6.58 282.98 1861.98
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 197.71 3.84 758.42
CONCRETO EN VIGAS DE CIMENTACION F'C= 175 KG/CM2 m3 6.49 212.90 1381.71
ENCOFRADO DE VIGAS DE CIMENTACION m2 51.93 41.69 2165.07
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 712.45 3.84 2732.96
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 14.70 282.98 4159.73
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 142.00 47.38 6727.39
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 1976.00 3.84 7579.94
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 7.12 265.40 1889.63
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 86.34 51.13 4414.39
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 973.34 3.84 3733.73
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 1.64 265.40 435.25
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 13.12 51.13 670.8
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 115.64 3.84 443.6
ALBAÑILERIA 15140.25
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 75.80 68.62 5201.47
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 84.70 117.34 9938.78
TECHO Y/O COBERTURA 29508.23
TIJERAL SEGUN DISEÑO TIPO I und 14.00 1,132.99 15861.89
TIJERAL SEGUN DISEÑO TIPO II und 6.00 782.99 4697.95
CORREAS DE MADERA m 369.00 10.74 3962.32
COBERTURA CON CALAMINA GALVANIZADA m2 284.00 16.71 4745.36
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 24.90 9.67 240.71
REVOQUES ENLUCIDOS Y MOLDURAS 11484.53
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 198.60 27.76 5512.14
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 44.06 17.25 759.95
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 71.63 19.26 1379.88
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 53.97 23.19 1251.62
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 101.50 9.83 997.54
BRUÑAS DE 1 cm m 390.00 4.06 1583.4
CIELORRASOS 13303.68
CIELORRASOS CON TRIPLAY m2 210.70 40.24 8479.2
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 46.20 104.43 4824.48
PISOS Y PAVIMENTOS 21891.24
FALSO PISO DE 4" DE CONCRETO 1:10 m2 210.00 25.02 5253.78
PISO DE MADERA MACHIHEMBRADA AGUANO m2 210.00 79.23 16637.46
ZOCALOS Y CONTRAZOCALOS 823.66
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 73.13 11.26 823.66
CARPINTERIA METALICA 2587.91
VENTANA METALICA m2 34.60 74.80 2587.91
CARPINTERIA DE MADERA 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 1824.61
VIDRIOS, CRISTALES Y SIMILARES 2009.33
VIDRIOS SEMIDOBLES NACIONAL p2 380.70 5.28 2009.33
PINTURA 5620.98
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 423.00 9.39 3970.7
PINTURA EN CIELO RASO - TRIPLAY M2 128.49 9.70 1245.71
PINTURA EN CIELO RASO DE MADERA m2 46.20 8.76 404.57
SISTEMA DE AGUAS PLUVIALES 2409.18
CANALETA DE AGUAS PLUVIALES m 44.00 44.84 1973.05
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 23.60 18.48 436.13
INSTALACIONES ELECTRICAS 6753.29
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 12.00 41.57 498.88
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 12.00 43.01 516.1
INTERRUPTOR SIMPLE DE BAKELITA und 6.00 13.31 79.84
INTERRUPTOR DOBLE DE BAKELITA und 6.00 35.36 212.14
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 12.00 73.00 876.04
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 12.00 80.05 960.54
CABLE ELECTRICO TW No. 10(6 mm2) m 100.00 3.00 300.3
CABLE ELECTRICO TW No. 12(4 mm2) m 300.00 2.63 789.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 300.79 1.53 461.11
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 100.00 6.86 686
TUBERIA TOMACORRIENTE PVC D=3/4" m 100.00 6.67 667.1
TUBERIA INTERRUPTOR PVC D=3/4" m 30.00 6.50 194.88
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 2.00 29.61 59.22
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 407.93
VARIOS 1260
CONTROL DE CALIDAD GLB 10.00 126.00 1260
Costo Directo 167496.18
CONSTRUCCION DE AMBIENTES ADMINISTRATIVOS 60226.54
TRABAJOS PRELIMINARES 299.64
LIMPIEZA DE TERRENO MANUAL m2 74.06 2.20 162.78
TRAZO Y REPLANTEO m2 74.06 1.85 136.86
MOVIMIENTO DE TIERRAS 1914.25
EXCAVACION DE ZANJAS H>=2.0M. m3 33.33 50.72 1690.56
RELLENO CON MATERIAL PROPIO m3 12.23 6.50 79.53
ELIMINACION MATERIAL EXCEDENTE m3 21.10 6.83 144.16
CONCRETO SIMPLE 3180.67
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 9.18 18.24 167.4
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 5.20 126.59 658.26
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.80 169.23 812.28
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 45.80 33.68 1542.73
CONCRETO ARMADO 12365.78
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 3.67 282.98 1038.52
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 110.04 3.84 422.11
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 3.72 282.98 1052.67
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 48.94 47.38 2318.58
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 576.13 3.84 2210.03
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.77 265.40 1000.55
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 36.64 51.13 1873.33
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 396.54 3.84 1521.13
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 1.00 265.40 265.4
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 8.00 51.13 409.02
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 66.33 3.84 254.44
ALBAÑILERIA 7852.4
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 15.14 68.62 1038.92
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 50.63 117.34 5940.97
MUROS DE SISTEMA DRYWALL 5CM m2 16.47 52.98 872.51
TECHO Y/O COBERTURA 10130.72
TIJERAL SEGUN DISEÑO TIPO I und 5.00 1,132.99 5664.96
CORREAS DE MADERA m 120.00 10.74 1288.56
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 79.80 38.91 3104.7
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 7.50 9.67 72.5
REVOQUES ENLUCIDOS Y MOLDURAS 5345.89
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 48.89 27.76 1356.94
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 82.64 17.25 1425.37
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 41.68 19.26 802.92
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 26.10 23.19 605.29
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 43.20 9.83 424.57
BRUÑAS DE 1 cm m 180.00 4.06 730.8
CIELORRASOS 3062.32
CIELORRASOS CON TRIPLAY m2 41.48 40.24 1669.28
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 13.34 104.43 1393.04
PISOS Y PAVIMENTOS 4324.04
FALSO PISO DE 4" DE CONCRETO 1:10 m2 41.48 25.02 1037.75
PISO DE MADERA MACHIHEMBRADA AGUANO m2 41.48 79.23 3286.29
ZOCALOS Y CONTRAZOCALOS 290.59
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 25.80 11.26 290.59
CARPINTERIA METALICA 757.96
VENTANA METALICA TIPO VII und 2.00 251.20 502.39
VENTANA METALICA TIPO VIII und 2.00 127.79 255.57
CARPINTERIA DE MADERA 1216.4
PUERTA DE MADERA AGUANO TIPO I und 2.00 608.20 1216.4
VIDRIOS, CRISTALES Y SIMILARES 747.84
VIDRIOS SEMIDOBLES NACIONAL p2 141.69 5.28 747.84
PINTURA 2549.47
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 216.31 9.39 2030.5
PINTURA EN CIELO RASO - TRIPLAY M2 41.48 9.70 402.15
PINTURA EN CIELO RASO DE MADERA m2 13.34 8.76 116.82
SISTEMA DE AGUAS PLUVIALES 890.69
CANALETA DE AGUAS PLUVIALES m 15.00 44.84 672.63
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 11.80 18.48 218.06
INSTALACIONES ELECTRICAS 2038.68
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 4.00 41.57 166.29
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 4.00 43.01 172.03
INTERRUPTOR SIMPLE DE BAKELITA und 4.00 13.31 53.23
INTERRUPTOR DOBLE DE BAKELITA und 1.00 35.36 35.36
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 4.00 73.00 292.01
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 2.00 80.05 160.09
CABLE ELECTRICO TW No. 10(6 mm2) m 50.00 3.00 150.15
CABLE ELECTRICO TW No. 12(4 mm2) m 50.00 2.63 131.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 75.00 1.53 114.98
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 15.00 6.86 102.9
TUBERIA TOMACORRIENTE PVC D=3/4" m 20.00 6.67 133.42
TUBERIA INTERRUPTOR PVC D=3/4" m 7.00 6.50 45.47
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 1.00 29.61 29.61
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 407.93
VARIOS 3259.2
CONTROL DE CALIDAD GLB 4.00 126.00 504
FLETE TERRESTRE: DIRECCION+SECRETARIA+TOPICO+PSICOLOGIA GLB 1.00 2,755.20 2755.2
Costo Directo 60226.54
CONSTRUCCION DE SERVICIOS HIGIENICOS 47913.12
CONSTRUCCION DE SS.HH. ALUMNOS 41166.37
TRABAJOS PRELIMINARES 156.8
LIMPIEZA DE TERRENO MANUAL m2 35.00 2.20 76.93
TRAZO Y REPLANTEO m2 35.00 2.28 79.87
MOVIMIENTO DE TIERRAS 572.66
EXCAVACION PARA ZAPATAS Y CIMIENTOS EN TERRENO NORMAL m3 10.05 50.72 509.76
RELLENO CON MATERIAL PROPIO m3 7.15 6.50 46.5
ELIMINACION MATERIAL EXCEDENTE m3 2.40 6.83 16.4
CONCRETO SIMPLE 2299.95
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 3.84 18.24 70.02
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 8.67 126.59 1097.52
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 3.04 169.23 514.44
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 18.50 33.40 617.97
CONCRETO ARMADO 4482.73
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 2.30 282.98 650.84
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 36.63 3.84 140.51
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 0.83 282.98 234.87
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 12.45 47.09 586.26
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 74.23 3.84 284.75
CONCRETO EN VIGAS F'C=175 KG/CM2 m3 2.32 204.48 474.4
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 15.34 50.75 778.51
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 106.47 3.84 408.42
CONCRETO EN LAVADERO m3 0.95 180.81 171.77
ENCOFRADO Y DESENCOFRADO EN LAVADERO m2 14.93 38.96 581.7
ACERO EN LAVADERO kg 40.68 3.72 151.21
CONCRETO EN URINARIO m3 0.11 177.18 19.49
ALBAÑILERIA 4364.68
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 14.70 68.62 1008.73
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 28.60 117.34 3355.95
TECHO Y/O COBERTURA 4312.73
TIJERAL SEGUN DISEÑO TIPO II und 3.00 782.99 2348.98
CORREAS DE MADERA m 52.00 10.74 558.38
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 34.83 38.91 1355.1
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 5.20 9.67 50.27
REVOQUES ENLUCIDOS Y MOLDURAS 3042.9
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 35.34 27.76 980.86
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 52.94 17.25 913.11
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 9.45 19.26 182.04
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 14.32 23.19 332.1
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 46.00 9.83 452.09
BRUÑAS DE 1 cm m 45.00 4.06 182.7
CIELORRASOS 669.96
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 27.79 24.11 669.96
PISOS Y PAVIMENTOS 1089.34
PISO DE CONCRETO PULIDO F'C=140 kG/CM2 E=2" m2 20.79 29.45 612.24
VEREDA DE CONCRETO DE 4" m2 12.96 36.81 477.1
ZOCALOS Y CONTRAZOCALOS 3464.6
ZOCALO DE CEMENTO FROTACHADO m2 4.58 13.95 63.9
ZOCALO DE MAYOLICA BLANCA DE 11 X 11 CM DE 1RA m2 65.28 52.09 3400.7
CARPINTERIA METALICA 619.78
VENTANA METALICA TIPO XI und 2.00 177.91 355.81
VENTANA METALICA TIPO XII und 2.00 131.99 263.97
CARPINTERIA DE MADERA 3975.4
PUERTA DE MADERA AGUANO TIPO V und 2.00 507.40 1014.8
PUERTA DE MADERA AGUANO TIPO VI und 3.00 478.70 1436.11
PUERTA DE MADERA AGUANO TIPO VII und 4.00 381.12 1524.49
VIDRIOS, CRISTALES Y SIMILARES 276.36
VIDRIOS SEMIDOBLES NACIONAL p2 52.36 5.28 276.36
PINTURA 1358.63
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 125.34 9.39 1176.57
PINTURA EN CIELO RASO DE MADERA m2 20.79 8.76 182.06
INSTALACIONES ELECTRICAS 1712.71
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 6.00 58.08 348.47
INTERRUPTOR SIMPLE DE BAKELITA und 6.00 13.31 79.84
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 6.00 80.05 480.27
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 100.00 1.53 153.3
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 20.00 6.86 137.2
TUBERIA INTERRUPTOR PVC D=3/4" m 5.00 6.50 32.48
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 1.00 29.61 29.61
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 1.00 43.61 43.61
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 407.93
SISTEMA DE AGUA FRIA 1537.68
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 8.00 57.43 459.42
SALIDA DE AGUA CALIENTE CON TUBERIA CPVC pto 4.00 66.16 264.66
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 50.00 10.44 521.85
VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 4.00 56.81 227.22
VALVULA DE COMPUERTA 3/4" und 1.00 64.53 64.53
APARATOS Y ACCESORIOS SANITARIOS 2796.19
INODORO TANQUE BAJO BLANCO pza 2.00 287.00 574
INODORO TANQUE ALTO BLANCO pza 4.00 373.10 1492.4
PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 6.00 17.22 103.32
LAVATORIO BLANCO pza 2.00 111.93 223.86
COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES jgo 8.00 26.96 215.71
URINARIOS DE LOZA m 1.00 186.90 186.9
SISTEMA DE DESAGUE 1514.55
SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8.00 53.25 425.99
SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 6.00 59.60 357.59
RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 15.00 16.21 243.18
RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m 13.00 21.34 277.46
SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und 2.00 41.83 83.65
CAJA DE REGISTRO DE DESAGUE 12" X 24" und 1.00 126.68 126.68
VARIOS 2918.72
CONTROL DE CALIDAD und 4.00 82.18 328.72
TERMA SOLAR DE 1000 LT INC INSTALACION GLB 1.00 2,590.00 2590
CONSTRUCCION DE TANQUE SEPTICO DE 4.5M3 3027.02
OBRAS PRELIMINARES 193.2
LIMPIEZA DE TERRENO m2 7.50 24.30 182.28
TRAZO Y REPLANTEO m2 7.50 1.46 10.92
MOVIMIENTO DE TIERRAS 399.95
EXCAVACION MANUAL ' m3 8.40 38.78 325.75
ACARREO DE MATERIAL EXCEDENTE m3 7.80 9.51 74.2
OBRAS DE CONCRETO SIMPLE 984.83
FALSO PISO MEZCLA 1:8 E=4" m2 7.90 17.86 141.13
POZO SEPTICO DE MAMPOSTERIA DE PIEDRA m2 30.20 27.94 843.7
OBRAS DE CONCRETO ARMADO 764.86
LOSAS MACIZAS, CONCRETO 175 KG/CM2 m3 1.05 214.89 225.63
LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO m2 8.40 31.77 266.89
LOSAS MACIZAS, ACERO F'Y=4200 KG/CM2 kg 75.40 3.61 272.34
ALBAÑILERIA 202.43
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 2.95 68.62 202.43
REVOQUES Y ENLUCIDOS Y MOLDURAS 388.76
TARRAJEO FROTACHADO MUROS INT/EXT C:A 1:5 m2 30.20 12.87 388.76
VARIOS 92.99
SUMINISTRO Y COLOCACION DE ACCESORIOS DESAGUE und 1.00 92.99 92.99
CONSTRUCCIÓN DE TANQUE DE AGUA 2 M3 3719.73
TANQUE DE AGUA DE 2 M3 3719.73
TANQUE ELEVADO DE ETERNIT ACCESORIOS pza 1.00 2,083.83 2083.83
ESTRUCTURA METALICA APOYO TANQUE und 1.00 1,635.90 1635.9
Costo Directo 47913.12
CONSTRUCCION DE VIVIENDA DOCENTE 44700.62
TRABAJOS PRELIMINARES 182.07
LIMPIEZA DE TERRENO MANUAL m2 45.00 2.20 98.91
TRAZO Y REPLANTEO m2 45.00 1.85 83.16
MOVIMIENTO DE TIERRAS 982.09
EXCAVACION DE ZANJAS H>=2.0M. m3 17.10 50.72 867.35
RELLENO CON MATERIAL PROPIO m3 6.33 6.50 41.16
ELIMINACION MATERIAL EXCEDENTE m3 10.77 6.83 73.58
CONCRETO SIMPLE 2416.86
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 4.84 18.24 88.26
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 1.97 126.59 249.38
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 3.23 169.23 546.6
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 45.50 33.68 1532.62
CONCRETO ARMADO 10031.59
CONCRETO EN ZAPATAS F'C= 175 KG/CM2 m3 2.50 282.98 707.44
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 80.40 3.84 308.41
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 2.14 282.98 605.57
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 24.48 47.38 1159.76
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 843.40 3.84 3235.28
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 2.87 265.40 761.69
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 19.32 51.13 987.79
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 372.15 3.84 1427.57
CONCRETO EN VIGAS DE MOJINETE F'C=175 KG/CM2 m3 1.10 265.40 291.94
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 6.00 51.13 306.77
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE MOJINETE kg 62.40 3.84 239.37
ALBAÑILERIA 3892.3
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM. m2 15.34 68.62 1052.65
MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:5 X 1.5CM. m2 24.20 117.34 2839.65
TECHO Y/O COBERTURA 5879.1
TIJERAL SEGUN DISEÑO TIPO II und 5.00 782.99 3914.96
CORREAS DE MADERA m 52.00 10.74 558.38
COBERTURA CON PLANCHAS DE CALAMINA TIPO TEJA m2 34.84 38.91 1355.49
CUMBRERA DE PLANCHA DE ACERO GALVANIZADO m 5.20 9.67 50.27
REVOQUES ENLUCIDOS Y MOLDURAS 2929.16
TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM. m2 45.30 27.76 1257.3
TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM. m2 28.20 17.25 486.39
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 17.47 19.26 336.54
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 16.58 23.19 384.51
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 26.60 9.83 261.42
BRUÑAS DE 1 cm m 50.00 4.06 203
CIELORRASOS 4131.22
CIELORRASOS CON TRIPLAY m2 30.00 40.24 1207.29
CIELORRASOS DE ALEROS CON MADERA MACHIHEMBRADA m2 28.00 104.43 2923.93
PISOS Y PAVIMENTOS 3127.32
FALSO PISO DE 4" DE CONCRETO 1:10 m2 30.00 25.02 750.54
PISO DE MADERA MACHIHEMBRADA AGUANO m2 30.00 79.23 2376.78
ZOCALOS Y CONTRAZOCALOS 484.31
CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" m 43.00 11.26 484.31
CARPINTERIA METALICA 1495.74
VENTANA METALICA TIPO II und 2.00 608.41 1216.81
VENTANA METALICA TIPO VI und 1.00 278.93 278.93
CARPINTERIA DE MADERA 1824.61
PUERTA DE MADERA AGUANO TIPO I und 3.00 608.20 1824.61
VIDRIOS, CRISTALES Y SIMILARES 923.65
VIDRIOS SEMIDOBLES NACIONAL p2 175.00 5.28 923.65
PINTURA 1069.78
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 90.44 9.39 848.96
PINTURA EN CIELO RASO - TRIPLAY M2 14.62 9.70 141.74
PINTURA EN CIELO RASO DE MADERA m2 9.03 8.76 79.08
SISTEMA DE AGUAS PLUVIALES 1076.21
CANALETA DE AGUAS PLUVIALES m 24.00 44.84 1076.21
INSTALACIONES ELECTRICAS 2035.82
SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto 2.00 41.57 83.15
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 2.00 43.01 86.02
INTERRUPTOR SIMPLE DE BAKELITA und 2.00 13.31 26.61
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTALL und 1.00 73.00 73
MONTAJE DE AGUAS PLUVIALES PVC DIM 4" m 24.00 18.48 443.52
FLOURESCENTE CIRCULAR ISPE 2 X 32 W INCLUYENDO EQUIPO Y PANTALL und 2.00 80.05 160.09
CABLE ELECTRICO TW No. 10(6 mm2) m 100.00 3.00 300.3
CABLE ELECTRICO TW No. 12(4 mm2) m 50.00 2.63 131.6
CABLE ELECTRICO TW No. 14 (2.5 mm2) m 50.01 1.53 76.67
TUBERIAS PVC (ELECTRICAS) D=3/4" (CENTRO DE LUZ , TOMACORRIENTES E INTERRUPTOR) m 5.00 6.86 34.3
TUBERIA TOMACORRIENTE PVC D=3/4" m 7.00 6.67 46.7
TUBERIA INTERRUPTOR PVC D=3/4" m 3.00 6.50 19.49
INTERRUPTOR THERMOMAGNETICO 2 X 20A und 2.00 29.61 59.22
INTERRUPTOR THERMOMAGNETICO 2 X 40A und 2.00 43.61 87.22
TABLERO 2x15 A, 2x20 A, 3x40 A und 1.00 407.93 407.93
SISTEMA DE AGUA FRIA 981.27
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 8.00 57.43 459.42
RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 50.00 10.44 521.85
SISTEMA DE DESAGUE 1237.52
SALIDAS DE PVC SAL PARA DESAGUE DE 2" pto 8.00 53.25 425.99
SALIDAS DE PVC SAL PARA DESAGUE DE 4" pto 6.00 59.60 357.59
RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 28.00 16.21 453.94
Costo Directo 44700.62
CONSTRUCCION DE CERCO PERIMETRICO 190380.93
OBRAS PRELIMINARES 2392.44
LIMPIEZA DE TERRENO MANUAL m2 612.00 2.20 1345.18
TRAZO Y REPLANTEO m2 458.92 2.28 1047.26
MOVIMIENTO DE TIERRAS 9120.88
EXCAVACION PARA ZAPATAS Y CIMIENTOS EN TERRENO NORMAL m3 158.72 50.72 8050.6
RELLENO CON MATERIAL PROPIO m3 42.84 6.50 278.59
ELIMINACION MATERIAL EXCEDENTE m3 115.88 6.83 791.69
CONCRETO SIMPLE 36939.49
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 92.16 18.24 1680.54
ZAPATAS DE CONCRETO CICLOPEO 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 36.86 137.31 5061.06
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 1073.52 4.05 4350.98
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 65.70 126.59 8316.83
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 28.35 169.23 4797.53
ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA 0.40 MT m2 378.00 33.68 12732.55
CONCRETO ARMADO 50929.06
CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 27.90 282.98 7895
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 278.71 47.38 13204.16
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 3504.96 3.84 13445.03
CONCRETO EN VIGAS F'C=210 KG/CM2 m3 14.80 265.40 3927.89
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 146.70 51.13 7500.48
ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 1292.10 3.84 4956.5
ALBAÑILERIA 45049.06
MURO CARAVISTA DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:5 X 1.5CM m2 582.30 77.36 45049.06
REVOQUES ENLUCIDOS Y MOLDURAS 30609.56
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 582.30 27.15 15811.19
TARRAJEO DE COLUMNAS INCLUYE ARISTAS m2 312.48 19.26 6019.61
TARRAJEO DE VIGAS INCLUYE ARISTAS m2 182.90 23.19 4241.63
VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS. m 15.50 9.83 152.33
BRUÑAS DE 1 cm m 1080.00 4.06 4384.8
ZOCALOS Y CONTRAZOCALOS 2264.6
ZOCALO DE CEMENTO FROTACHADO m2 162.00 13.98 2264.6
CARPINTERIA METALICA 2072.58
PUERTA METALICA TIPO I und 1.00 1,407.29 1407.29
PUERTA METALICA TIPO II und 1.00 665.29 665.29
PINTURA 10285.34
PINTURA EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 1095.70 9.39 10285.34
VARIOS 717.92
JUNTA DE CONSTRUCCION CON TEKNOPORT m2 32.40 13.30 430.92
LIMPIEZA FINAL DE OBRA GLB 1.00 287.00 287
Costo Directo 190380.93
OBRAS COMPLEMENTARIAS 173533.93
CONSTRUCCION DE PLATAFORMA DEPORTIVA 124361.02
TRABAJOS PRELIMINARES 3630.9
LIMPIEZA DE TERRENO m2 650.00 1.27 823.55
TRAZO DE NIVELES Y REPLANTEO m2 650.00 1.26 819
TRAZO DURANTE LA EJECUCION DE LA OBRA m2 650.00 3.06 1988.35
MOVIMIENTO DE TIERRAS 7593.78
CORTE DE MATERIAL SUELTO R=810 M3/DIA m3 128.00 12.01 1537.54
NIVELACION Y COMPACTACION CON EQUIPO LIVIANO m2 63.89 1.45 92.58
ENROCADO CON PIEDRA MEDIANA m3 128.00 36.99 4734.46
ELIMINACION DE MATERIAL EXCEDENTE m3 400.00 3.07 1229.2
GRADERIOS 20531.86
CONCRETO CICLOPEO f'c=140 KG/CM2 + 70 % PG. m3 109.44 139.34 15248.82
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 148.45 35.59 5283.04
REVOQUES ENLUCIDOS Y MOLDURAS 1752.76
TARRAJEO EN EXTERIORES + FROTACHADO m2 180.24 7.58 1366.4
TARRAJEO EN CIMIENTOS CORRIDOS m2 15.40 25.09 386.36
PISOS Y PAVIMENTOS 43789.8
CONCRETO f'c = 175 kg/cm2 LOSA DEPORTIVA m3 144.00 274.95 39593.23
ENCOFRADO Y DESENCOFRADO LOSA DEPORTIVA m2 83.00 32.39 2688.29
JUNTAS ASFALTICAS m 332.00 4.54 1508.28
PINTURA 1963.72
PINTADO DE GRADERIOS m2 195.64 5.76 1127.08
PINTADO DE MARCAS DE LOSA DEPORTIVA m 480.00 1.74 836.64
EQUIPAMIENTO DE LOSA DEPORTIVA 7420
ARCO METALICO DE FULBITO Y BASKET und 2.00 2,730.00 5460
POSTES DE FIERRO Y NET PARA VOLEY und 1.00 1,960.00 1960
PRUEBAS DE CONTROL DE CALIDAD 688.8
PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO und 20.00 34.44 688.8
MALLA TIPO RASCHELL 33069.4
MALLA TIPO RASCHELL m2 650.00 50.88 33069.4
PARARRAYOS INC INSTALACIÓN 3920
INSTALACIÓN DE PARARRAYOS GLB 1.00 3,920.00 3920
CONSTRUCCION DE VEREDAS 8623.57
COMPONENTE: 03 AULA 1754.87
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 11.85 41.29 489.24
VEREDA DE CONCRETO DE 4" m2 30.67 36.81 1129.05
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 91.6
JUNTAS ASFALTICAS m 9.90 4.54 44.98
COMPONENTE: 01 SUM 1985.62
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 12.80 41.29 528.46
VEREDA DE CONCRETO DE 4" m2 35.70 36.81 1314.22
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 91.6
JUNTAS ASFALTICAS m 11.30 4.54 51.34
COMPONENTE: ADMINISTRACIÓN 1490.14
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 10.35 41.29 427.31
VEREDA DE CONCRETO DE 4" m2 25.42 36.81 935.79
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 91.6
JUNTAS ASFALTICAS m 7.80 4.54 35.44
COMPONENTE: COCINA + COMEDOR + DEPOSITO 1754.87
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 11.85 41.29 489.24
VEREDA DE CONCRETO DE 4" m2 30.67 36.81 1129.05
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 3.00 30.53 91.6
JUNTAS ASFALTICAS m 9.90 4.54 44.98
COMPONENTE: VIVIENDA DOCENTE 758.37
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 6.52 41.29 269.18
VEREDA DE CONCRETO DE 4" m2 11.61 36.81 427.4
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 1.50 30.53 45.8
JUNTAS ASFALTICAS m 3.52 4.54 15.99
COMPONENTE: CERCO PERIMETRICO 879.7
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 3.00 41.29 123.86
VEREDA DE CONCRETO DE 4" m2 15.00 36.81 552.2
RAMPA DE CONCRETO PARA MINUSVALIDOS DE 1.00 X 1.50 M. m2 6.00 30.53 183.2
JUNTAS ASFALTICAS m 4.50 4.54 20.44
INSTALACION DE AREAS VERDES 8086.85
SEMBRADO DE GRASS EN JARDINERAS m2 100.87 80.17 8086.85
SISTEMA DE EVACUACIÓN DE AGUAS PLUVIALES 11742.49
EXCAVACION PARA CANALES DE DRENAJE EN TERRENO NORMAL m3 50.00 50.72 2536.1
CANAL DE AGUAS PLUVIALES CONCRETO FC'175 KG/CM2 m3 13.40 121.30 1625.37
ENCOFRADO Y DESENCOFRADO CANALES m2 76.00 40.65 3089.32
TARRAJEO EN CANALES m2 82.58 21.69 1791.41
REJILLA SUMIDERO-PLAT 1 1/4"X1/4"@1/2" Y MARCO "L" 1 1/4" m2 42.40 63.69 2700.29
FLETE TERRESTRE POR VOLUMEN Y PESO 17080
FLETE TERRESTRE: 03 AULAS GLB 1.00 3,640.00 3640
FLETE TERRESTRE SALON DE USOS MULTIPLES Y AULA INNOVACION PEDAGOGICA GLB 1.00 3,150.00 3150
FLETE TERRESTRE: COCINA+COMEDOR GLB 1.00 1,960.00 1960
FLETE TERRESTRE: VIVIENDA DOCENTE GLB 1.00 1,260.00 1260
FLETE TERRESTRE: SSHH GLB 1.00 1,960.00 1960
FLETE TERRESTRE: CERCO PERIMETRICO GLB 1.00 2,240.00 2240
FLETE TERRESTRE: CONTRUCCION DE VEREDAS GLB 1.00 1,050.00 1050
FLETE TERRESTRE: EQUIPAMIENTO Y MOBILIARIO GLB 1.00 1,820.00 1820
IMPACTO AMBIENTAL 3640
IMPACTO AMBIENTAL GLB 1.00 3,640.00 3640
Costo Directo 173533.93
EQUIPAMIENTO Y MOBILIARIO 78785
EQUIPAMIENTO Y MOBILIARIO GLB 1.00 78,785.00 78785
Costo Directo 78785
CAPACITACION 16762.2
MATERIALES Y RECURSOS 2412.2
MATERIALES PARA CAPACITACION est 2.00 681.10 1362.2
PREPARACION DE REFRIGERIOS DIA 10.00 105.00 1050
SERVICIOS DE TERCEROS 14350
PAGO PROFESIONALES ESPECIALIZADOS DIA 5.00 2,100.00 10500
SUPERVISION GLB 1.00 1,750.00 1750
ELABORACION DE TERMINOS DE REFERENCIA GLB 1.00 2,100.00 2100
Costo Directo 16762.2
COSTO

1,020.19
3.14
104.02
13.22
3.34

1,919.35

14,500.00
3,800.00
1,400.00
1,200.00
1,800.00

6.31
7.15

3.14
3.26
23.90
6,200.00

3.14
2.64

72.46
9.29
12.20

26.05
180.84
241.75
35.62

404.25
5.48
304.14
59.56
5.48
404.25
67.68
5.48
379.14
73.04
5.48
379.14
73.04
5.48

98.03
167.63

1,618.56
15.34
23.87
13.81

39.65
24.64
27.52
33.13
14.04
5.80
57.49
149.18

35.74
113.18

16.09

106.85

868.86

7.54

13.41
13.85
12.51

64.06
26.40

59.39
61.44
19.01
50.51
104.29
114.35
4.29
3.76
2.19
9.80
9.53
9.28
42.30
62.30
582.75
3,223.51

180.00

3.14
2.64

64.32
72.46
9.29
9.76

26.05
180.84
241.75
48.12

404.25
5.48
404.25
67.68
5.48
379.14
73.04
5.48
379.14
73.04
5.48

98.03
167.63

1,618.56
15.34
55.58
13.81

39.65
24.64
27.52
33.13
14.04
5.80

96.30

35.74
113.18

16.09

358.85
182.55
358.85
203.05

868.86

7.54

13.41
13.85
12.51

64.06
26.40

59.39
61.44
19.01
50.51
104.29
114.35
4.29
3.76
2.19
9.80
9.53
9.28
42.30
62.30
582.75

180.00

3.14
2.74

72.46
9.29
9.76

26.05
180.84
241.75
48.12
404.25
5.48
304.14
59.56
5.48
404.25
67.68
5.48
379.14
73.04
5.48
379.14
73.04
5.48

98.03
167.63

1,618.56
1,118.56
15.34
23.87
13.81

39.65
24.64
27.52
33.13
14.04
5.80

57.49
149.18

35.74
113.18

16.09

106.85

868.86

7.54

13.41
13.85
12.51

64.06
26.40

59.39
61.44
19.01
50.51
104.29
114.35
4.29
3.76
2.19
9.80
9.53
9.28
42.30
62.30
582.75
180.00

3.14
2.64

72.46
9.29
9.76

26.05
180.84
241.75
48.12

404.25
5.48
404.25
67.68
5.48
379.14
73.04
5.48
379.14
73.04
5.48

98.03
167.63
75.68

1,618.56
15.34
55.58
13.81

39.65
24.64
27.52
33.13
14.04
5.80

57.49
149.18

35.74
113.18

16.09

358.85
182.55

868.86

7.54

13.41
13.85
12.51

64.06
26.40

59.39
61.44
19.01
50.51
104.29
114.35
4.29
3.76
2.19
9.80
9.53
9.28
42.30
62.30
582.75

180.00
3,936.00

3.14
3.26

72.46
9.29
9.76

26.05
180.84
241.75
47.72

404.25
5.48
404.25
67.27
5.48
292.12
72.50
5.48
258.30
55.66
5.31
253.12

98.03
167.63

1,118.56
15.34
55.58
13.81

39.65
24.64
27.52
33.13
14.04
5.80

34.44

42.07
52.59

19.93
74.42
254.15
188.55

724.86
683.86
544.46

7.54

13.41
12.51

82.97
19.01
114.35
2.19
9.80
9.28
42.30
62.30
582.75

82.04
94.52
14.91
81.15
92.19

410.00
533.00
24.60
159.90
38.52
267.00

76.07
85.14
23.16
30.49
59.75
180.97

117.40
3,700.00

34.72
2.08

55.40
13.59

25.52
39.91

306.98
45.39
5.16

98.03

18.39

132.84

2,976.90
2,337.00

3.14
2.64

72.46
9.29
9.76

26.05
180.84
241.75
48.12

404.25
5.48
404.25
67.68
5.48
379.14
73.04
5.48
379.14
73.04
5.48

98.03
167.63

1,118.56
15.34
55.58
13.81

39.65
24.64
27.52
33.13
14.04
5.80

57.49
149.18

35.74
113.18

16.09

869.15
398.47

868.86

7.54

13.41
13.85
12.51

64.06

59.39
61.44
19.01
104.29
26.40
114.35
4.29
3.76
2.19
9.80
9.53
9.28
42.30
62.30
582.75

82.04
14.91

76.07
85.14
23.16

3.14
3.26

72.46
9.29
9.76

26.05
196.15
5.79
180.84
241.75
48.12

404.25
67.68
5.48
379.14
73.04
5.48

110.52

38.79
27.52
33.13
14.04
5.80

19.97

2,010.42
950.42

13.41

19.00
410.00

1.81
1.80
4.37

17.16
2.07
52.84
4.39

199.05
50.84

10.83
35.84

392.79
46.27
6.49

8.23
2.49

3,900.00
2,800.00

49.20

72.68

5,600.00

58.98
52.59
43.62
6.49

58.98
52.59
43.62
6.49

58.98
52.59
43.62
6.49

58.98
52.59
43.62
6.49

58.98
52.59
43.62
6.49

58.98
52.59
43.62
6.49

114.53

72.46
173.28
58.07
30.99
90.98

5,200.00
4,500.00
2,800.00
1,800.00
2,800.00
3,200.00
1,500.00
2,600.00

5,200.00

112,550.00

973.00
150.00

3,000.00
2,500.00
3,000.00
AULA COMUN

Anda mungkin juga menyukai