Appendix 1 - Disposal Area Requirements

Percolation Rate 0 square root of Perc Rate 0.000


Soil Loading Rate (l/sq m) #DIV/0!
(Gal/sq ft) #DIV/0!

Bedrooms 0 Expected Volume of Sewage per Day (L) 0


(gal) 0

Disposal Area Required #DIV/0! sq meters


#DIV/0! sq feet
Appendix 2 - Expected Volume of Sewage Per Day
Expected
Sewage per day Number Expected
Facility per unit Unit of Units Sewage per day
litres gallons litres gallons
Airport 10 2.2 per passenger 0 0.0
Apartment 190 41.8 per person 0 0.0
Assembly Hall/Town Hall/Churches 10 2.2 per seat 0 0.0
Automotive Service Station/Garage/Gas Station 45 9.9 per vehicle served 0 0.0
50 11.0 per employee 0 0.0
550 121.0 per double pump unit 0 0.0
Bar/Tavern/Cocktail Lounge 75 16.5 per customer 0 0.0
50 11.0 per employee 0 0.0
Bowling Alley 400 88.0 per lane 0 0.0
Cabin, Resort 150 33.0 per person 0 0.0
Cafeteria (workplace no food service) 10 2.2 per customer 0 0.0
40 8.8 per employee 0 0.0
Campground with flush tiolets, showers 130 28.6 per person 0 0.0
Day Camps (no meals served) 50 11.0 per person 0 0.0
Construction Camp (semi-permanent) 190 41.8 per person 0 0.0
Cottages and Small Dwellings with Seasonal
Occupancy 150 33.0 per person 0 0.0
Country Club 400 88.0 per member present 0 0.0
50 11.0 per employee 0 0.0
Dance Halls 45 9.9 per person 0 0.0
Dining Hall 30 6.6 per meal served 0 0.0
Dormitory, Bunkhouse 150 33.0 per person 0 0.0
Dwelling, Single Family and duplex (two bedrooms per person at 2
or less) 340 74.8 persons per bedroom 0 0.0
Dwelling, Single Family and duplex (three bedrooms per person at 1.5
or more) 340 74.8 persons per bedroom 0 0.0
Dwelling (includes mobile home trailers) - other than
single family or duplex 675 148.5 per bedroom 0 0.0
Golf Club 45 9.9 per member 0 0.0
Hospital 630 138.6 per bedroom 0 0.0
Hotel/Motel - Resort 200 44.0 per person 0 0.0
40 8.8 per employee 0 0.0
Industrial and Commercial building (does not include
process water, showers or a cafeteria) 50 11.0 per employee 0 0.0
Industrial and Commercial building (with showers) 90 19.8 per employee 0 0.0
Laundry, Self-service 2100 461.9 per machine 0 0.0
Mobile Home Park/Trailer Park 675 148.5 per bedroom 0 0.0
Motel/Hotel 200 44.0 per single bed 0 0.0
Nursing and Rest Homes 350 77.0 per person 0 0.0
Office Building 50 11.0 per employee 0 0.0
Picnic Park - tiolets only 20 4.4 per picnicker 0 0.0
Picnic Parks - bathhouses, showers, flush tiolets 40 8.8 per picnicker 0 0.0
Prison 450 99.0 per inmate 0 0.0
40 8.8 per employee 0 0.0
Restaurant (including coffee shops) 40 8.8 per customer 0 0.0
Restaurant Licensed 50 11.0 per customer 0 0.0
Rooming House 150 33.0 per seat 0 0.0
School - day with cafeteria, gym, showers 80 17.6 per student 0 0.0
School - day with cafeteria 60 13.2 per student 0 0.0
School - day with no cafeteria, gym, showers 40 8.8 per student 0 0.0
School Boarding 280 61.6 per student 0 0.0
Shopping Centre 5 1.1 per parking space 0 0.0
40 8.8 per employee 0 0.0
Store, Department 2000 439.9 per tiolet room 0 0.0
40 8.8 per employee 0 0.0
Swimming Pool (public) 40 8.8 per person/employee 0 0.0
Movie Theatre 10 2.2 per auditorium seat 0 0.0
Drive-in Theatre 20 4.4 per car space 0 0.0
Visitor Centre 20 4.4 per visitor 0 0.0
Youth Camp 190 41.8 per person 0 0.0

Notes TOTAL 0 0.0


* Should Garburators (garbage grinders) be installed, the daily sewage flow calculation is to be increased by a factor
of 24%
* Care should be taken when using typical numbers for design purposes
Appendix 3a - Design of Gravity Chamber System
Choose 1 = Metric
Units 1 2 = Imperial

Step 1) You need to know


The daily sewage volume
The adsorptive capacity of the soil where the chamber system will be located

Expected Volume of
Sewage per Day
litres/day

(Note one can use Appendix 1 to


obtain the Total Soil Treatment
Step 2) Determine the total soil treatment area required. Area Required)

Total Soil
Expected Volume of Treatment Area
Sewage per Day Divided by Soil Loading Rate Equals Required
0 #DIV/0!
litres/day litres/m2 Square meters
(Calculated or
entered from
(From Appendix 1) Appendix 1)

Step 3) Determine the effective soil treatment area per chamber

Effective Treatment
Actual Area of each Area of Each
Chamber times conversion factor equals Chamber
1.6 0
Square meters Square meters

Step 4) Calculate the number of chambers required

Effective Number of
Total Soil Treatment Treatment Area of Chambers
Area Required Divided by Each Chamber equals Required
#DIV/0! 0.0 #DIV/0! #DIV/0!
Chambers
(rounded
Square meters Square meters Chambers up)
Appendix 3a - Design of Pressure Chamber System
Choose 1 = Metric
Units 1 2 = Imperial

Step 1) You need to know


The daily sewage volume
located

Expected Volume of
Sewage per Day
litres/day

(Note one can use Appendix 1 to obtain


Step 2) Determine the total soil treatment area required. the Total Soil Treatment Area Required)

Total Soil
Treatment
Expected Volume of Soil Loading Area
Sewage per Day Divided by Rate Equals Required less 20%
0 #DIV/0!
Square
litres/day litres/m2 meters
(Calculated or
(From entered from
Appendix 1) Appendix 1)

Step 3a) Determine the effective soil treatment area per chamber

Effective
Treatment
Actual Area of each conversion Area of Each
Chamber Times factor Equals Chamber
1.6 0
Square
Square meters meters

Step 3b) Calculate the number of chambers required

Effective
Total Soil Treatment Treatment Number of
Area Required Area of Each Chambers
(adjusted) Divided by Chamber Equals Required
#DIV/0! 0.0 #DIV/0! #DIV/0!
Square Chambers
Square meters meters Chambers (rounded up)
Step 3c) Determine the length of the chamber system
Number of Length of Total Length
Chambers Times each chamber Equals of System
#DIV/0! #DIV/0!
Chambers
(rounded to) meters meters

Determine the Diameter of the distribution pipe, the number of orifices, and the diameter of
Step 4) the orifices.

Determine by using Appendix 4

Diameter of Number of Diameter of


Distribution Pipe Orifices Orifices

mm Number mm

Step 5) Determine the spacing of the orifices

Spacing
Length of Pressure Number of between
Distribution Lateral Divided by Orifices plus 1 equals Orifices
#DIV/0! 0 1 #DIV/0!
meters Number Metres
(note: Calculation only valid for end feed manifolds

Step 5 - If laterals are of differing lengths calculate separately and add the number of orifices
Optional together

Number of
Length of Pressure Number of Orifices per
Lateral # Distribution Lateral Divided by Orifices plus 1 equals Lateral
a 0 1 1 1
b 0 1 1 1
c 0 1 1 1
d 0 1 1 1
e 0 1 1 1
total 0 5 5
meters Number Number
(note: space for only 5 lateral calculations is provided)

Step 6) Use Appendix 5 to determine the total flow from all orifices.

Total Number of Flow for each


Orifices Times orifice Equals Total Flow
0
Number L/min L/min
(from step 5 or step
5 optional)
Step 7) Determine the type and size of the effluent delivery pipe.

Pipe Type Nominel Options


1= PVC 20 mm
PE 2= PE mm 25 mm
32 mm
Note:Schedule 40 pipe used 40 mm
Flow Diameter Area 50 mm
0 #N/A #N/A 75 mm
L/min mm Sq. mm
Note: Calculations only valid for Sch. 40
Standard piping
Checks
Velocity
#N/A
m/s
#N/A
Step 8) Determine pressure loss due to pipe fittings

Number of Equivalent
Type of fitting fittings Length Total
Iron Pipe Adaptors #N/A #N/A
Couplings and Tee
fittings on the run #N/A #N/A
Elbows and Tee
Fittings Run to
Branch #N/A #N/A
Screen or Filter if
placed after the
pump - Use
Manufacturer's
estimated pressure
loss 0
Other 0
TOTAL #N/A meters
Step 9) Determine total length to be used to calculate Pressure Loss

Total
Length of Pressure Equivalent Equivalent
Distribution Lateral plus Length equals Length
#N/A #N/A
meters meters meters

Step 10) Calculate the pressure head loss in delivery pipe including fittings

Total Equivalent
Length
CHECK TO
#N/A #N/A LEFT
meters #N/A
meters
Hazen-Williams
Coefficient
147
Step 11) Calculate the total pressure head required at the pump

Lift Distance
of effluent
from low level Squirt height
Delivery Piping in tank to design
Pressure Loss plus orifices plus pressure plus
#N/A 1.524
meters meters meters

Total Pressure
Head
#N/A
meters
Step 12) Detail the pump specification required

Required
pressure
Required Flow Rate at head
0 @ #N/A
L/min meters
m

se Appendix 1 to obtain
atment Area Required)

Total Soil
Treatment
Area
Required
(adjusted)
#DIV/0!
Square
meters
s, and the diameter of

mber of orifices
ns only valid for Sch. 40
Pressure
loss along
distribution
lateral
0.3048
meters
(assumed)
Appendix 4 - Number of Orifices
Appendix 4 - Number of Orifices in a Distribution Lateral
Pipe
Suitable for 600 mm (2ft) to 1900 mm (6 ft) Pressure Head

Units 1 Note: Calculations only valid for Sch. 40 Standard piping


1 = Metric
2 = Imperial

Orifice Diameter 3.2mm 4mm


Diameter Nominel of
Distribution Lateral 20mm 25mm 32mm 40mm 50mm 20mm 25mm 32mm 40mm 50mm
Distribution Minimum
Lateral Pipe Number of
Length Orifices Maximum Number of Orifices Maximum Number of Orifices
m
3 3 21 21 21 21 21 18 21 21 21 21
4.6 4 23 31 31 31 31 15 31 31 31 31
6.1 5 20 41 41 41 41 13 27 41 41 41
7.6 6 17 37 51 51 51 11 24 43 51 51
9.1 7 16 34 61 61 61 10 22 39 61 61
10.7 8 15 31 56 71 71 9 20 36 58 71
12.2 9 14 29 52 81 81 18 33 54 81
13.7 10 13 27 49 79 91 17 31 50 91
15.2 11 12 26 46 74 101 16 29 48 101
16.8 12 24 44 71 111 16 28 45 96
18.3 13 23 42 67 121 15 27 43 92
19.8 14 22 40 64 131 26 41 88
21.3 15 21 38 62 132 25 40 84
22.9 16 21 37 60 127 24 38 81
24.4 17 20 36 58 123 23 37 79
25.9 18 19 35 56 119 22 36 76
27.4 19 33 54 115 21 35 74
29 20 32 52 112 21 34 72
30.5 21 32 51 109 33 70
32 22 31 50 106 32 68
33.5 23 30 48 103 31 66
35.1 24 29 47 101 30 65
36.6 25 29 46 99 30 63
38.1 26 28 45 96 29 62
39.6 27 44 94 28 60
41.1 28 43 92 59
42.7 29 43 91 58
44.2 30 42 89 57
45.7 31 41 87 56
48.8 33 40 84 54
51.8 35 38 82 52
54.9 37 79 51
57.9 39 77 49
61 41 75 48
68.6 46 70
76.2 51 66
Appendix 4 - Number of Orifices
Appendix 4 - Number of Orifices in a Distribution Lateral
Pipe
Suitable for 600 mm (2ft) to 1900 mm (6 ft) Pressure Head

Units 1
1 = Metric
2 = Imperial

Orifice Diameter 4.8mm 5.6mm


Diameter Nominel of
Distribution Lateral 20mm 25mm 32mm 40mm 50mm 20mm 25mm 32mm 40mm 50mm
Distribution Minimum
Lateral Pipe Number of
Length Orifices Maximum Number of Orifices Maximum Number of Orifices
m
3 3 13 21 21 21 21 9 20 21 21 21
4.6 4 10 22 31 31 31 8 16 29 31 31
6.1 5 9 19 34 41 41 6 14 25 40 41
7.6 6 8 17 30 48 51 12 22 35 51
9.1 7 15 27 43 61 11 20 32 61
10.7 8 14 25 40 71 10 18 29 63
12.2 9 13 23 37 79 17 27 58
13.7 10 12 22 35 74 16 26 55
15.2 11 20 33 70 15 24 52
16.8 12 19 31 67 14 23 49
18.3 13 19 30 64 14 22 47
19.8 14 18 29 61 21 45
21.3 15 17 28 59 20 43
22.9 16 27 46 19 42
24.4 17 26 55 19 40
25.9 18 25 53 39
27.4 19 24 51 38
29 20 23 50 37
30.5 21 23 48 36
32 22 47 35
33.5 23 46 34
35.1 24 45 33
36.6 25 44 32
38.1 26 43 31
39.6 27 42 31
41.1 28 41 30
42.7 29 40 30
44.2 30 40
45.7 31 39
48.8 33 38
51.8 35 36
54.9 37
57.9 39
61 41
68.6 46
76.2 51
Appendix 4 - Number of Orifices
Appendix 4 - Number of Orifices in a Distribution Lateral
Pipe
Suitable for 600 mm (2ft) to 1900 mm (6 ft) Pressure Head

Units 1
1 = Metric
2 = Imperial

Orifice Diameter 6.4mm 7.1mm


Diameter Nominel of
Distribution Lateral 20mm 25mm 32mm 40mm 50mm 20mm 25mm 32mm 40mm 50mm
Distribution Minimum
Lateral Pipe Number of
Length Orifices Maximum Number of Orifices Maximum Number of Orifices
m
3 3 7 15 21 21 21 6 12 21 21 21
4.6 4 6 12 22 31 31 5 10 17 28 31
6.1 5 11 19 30 41 8 15 24 41
7.6 6 9 17 27 51 7 13 21 45
9.1 7 8 15 24 52 12 19 41
10.7 8 14 23 48 11 18 38
12.2 9 13 21 45 10 17 35
13.7 10 12 20 42 16 33
15.2 11 12 19 40 15 31
16.8 12 18 38 14 30
18.3 13 17 36 28
19.8 14 16 34 27
21.3 15 33 26
22.9 16 32 25
24.4 17 31 24
25.9 18 30 23
27.4 19 29 23
29 20 28 22
30.5 21 27
32 22 26
33.5 23 26
35.1 24 25
36.6 25
38.1 26
39.6 27
41.1 28
42.7 29
44.2 30
45.7 31
48.8 33
51.8 35
54.9 37
57.9 39
61 41
68.6 46
76.2 51
Appendix 4 - Number of Orifices
Appendix 4 - Number of Orifices in a Distribution Lateral
Pipe
Suitable for 600 mm (2ft) to 1900 mm (6 ft) Pressure Head

Units 1
1 = Metric
2 = Imperial

Orifice Diameter 7.9mm


Diameter Nominel of
Distribution Lateral 20mm 25mm 32mm 40mm 50mm
Distribution Minimum
Lateral Pipe Number of
Length Orifices Maximum Number of Orifices
m
3 3 5 10 18 21 21
4.6 4 8 14 23 31
6.1 5 7 12 20 41
7.6 6 11 17 37
9.1 7 10 16 33
10.7 8 9 14 31
12.2 9 13 29
13.7 10 13 27
15.2 11 12 25
16.8 12 24
18.3 13 23
19.8 14 22
21.3 15 21
22.9 16 20
24.4 17 20
25.9 18 19
27.4 19
29 20
30.5 21
32 22
33.5 23
35.1 24
36.6 25
38.1 26
39.6 27
41.1 28
42.7 29
44.2 30
45.7 31
48.8 33
51.8 35
54.9 37
57.9 39
61 41
68.6 46
76.2 51
Appendix 5 - Orifice Discharge
Units 1 Note: Calculations only valid for Sch. 40 Standard piping
1 = Metric
2 = Imperial
Orifice Discharge in Litres per Minute
Pressure
Head Orifice Diameter
mm mm
3.2000 4.0000 4.8000 5.6000 6.4000 7.1000 7.9000 8.7000
600 0.99 1.55 2.24 3.04 3.97 4.89 6.05 7.34
750 1.11 1.74 2.50 3.40 4.44 5.47 6.77 8.21
900 1.22 1.90 2.74 3.73 4.87 5.99 7.42 8.99
1050 1.31 2.05 2.96 4.02 5.26 6.47 8.01 9.71
1200 1.40 2.20 3.16 4.30 5.62 6.92 8.56 10.38
1350 1.49 2.33 3.35 4.56 5.96 7.34 9.08 11.01
1500 1.57 2.45 3.53 4.81 6.28 7.73 9.57 11.61
1800 1.72 2.69 3.87 5.27 6.88 8.47 10.49 12.72
9.5000
8.76
9.79
10.72
11.58
12.38
13.13
13.84
15.16
Appendix 6 - Friction Loss in Pipe
Diameter
Units Pipe Material Nominel
1 2 20 mm
Options Below Options Below Options Below
1 = Metric 1: PVC 20 mm
2 = Imperial 2: PE 25 mm
3 = US Units 3: Other 32 mm
Pipe Length 40 mm
m 50 mm
Flow 65 mm
lpm 75 mm
C 147
User Entered C
Inside Diameter 20.9296 mm
Flow 0 m3/s
Area 0.0003440423 m2
Perimeter 0.0657522849 m
Hydraulic Radius 0.0052324 m

The Headloss in 0 m
is 0.00 m

Note: Calculations only valid for Sch. 40 Standard piping


Appendix 7 - Treatment Mound: Area Sizing
Units 2
1 = Metric
2 = Imperial

Step 1) Determine to expected volume of sewage per day


Use Appendix 1

0 igpd

Step 2) Calculate the treatment area of the sand layer

Expected
Volume of Sand Layer Treatment Area
Sewage Per Effluent Loading Required for
Day divided by Rate equals Sand Layer
0 1 0
igpd gal/sq ft/ day sq. ft.

Step 3) Determine the minimum allowable sand area layer

Mimimm Area of Sand Area of Sand


Sand Layer Layer Layer
400.000 OR 0 400.000
sq. ft. sq. ft. sq. ft.

Step 4) Calculate the length of the sand layer

Area of Sand Width of Sand Length of Sand


Layer divided by Layer equals Layer
400.000 0 #DIV/0!
sq. ft. ft. ft.
Choose a width to
a maximum of 10
ft

Step 5) Determine the (design) soil effluent loading rate

Note: The Effluent loading rate can be determined from soil texture
Classification or from percolation test results.

Soil Effluent
Loading Rate
0
gal/sq ft/ day

Step 6) Calculate the preliminary infiltration area of soil before area reduction factors
Expected
Volume of
Sewage per Soil Effluent Preliminary
Day divided by Loading Rate equals Infiltration Area
0 0 #DIV/0!
igpd gal/sq ft/ day sq. ft.

Step 7) Calculate the required infiltration area including allowed area reduction factors

Infiltration
Area
Required for Reduced Area Required
Soil times Factor equals Infiltration Area
#DIV/0! 0.7 #DIV/0!
sq. ft. A reduction of up sq. ft.
to 30% (1-0.70)
can be applied to
treatment mounds

Step 8) Calculate the required width of the infiltration area

Required Width of
Infiltration Length of Sand Required
Area divided by Layer equal Infiltration Area
#DIV/0! #DIV/0! #DIV/0!
sq. ft. ft. ft.

Step 9) Determine the slope criteria of the installation site

If the slope of the installation site exceeds 1% proceed to Step 12.


If the slope is 1% or less, proceed to Step 10.

Slope of
Installation Site

Note: The following calculations apply ONLY to the minimum height configuration of a mound. If
it is necessary to raise the sand layer, (for example to provide clearance to the water table) the
following calculations are NOT adequate for the design.

For slopes of 1% or less, Use Steps 10 to 11.

Step 10) Determine the toe to toe width of the mound

Toe to Toe Width Toe to Toe


Toe to Toe based on Width of Mound
Width based Required (greater of the
on 4:1 Slope Infiltration Area two previous
Requirement (Step 8) values)
OR #DIV/0! #DIV/0!
ft. ft. ft.

Step 11) Proceed to Step 16

Step 12 to 15 are used only for installations where the slope exceeds 1%

Note: The following calculations (Steps 12 to 15) apply ONLY to sites where the slope exceeds
1%.

Step 12) Determine the width of the sand layer plus downslope berm

The width of the mound is based on the greater of: the width as determined by the 4:1 slope
requirement OR the width required to provide adequate infiltration area.

Downslope
Berm Width
Downslope Based on 4:1
Berm Width Slope
Based on 4:1 Requirement
Slope plus Width of
Requirement plus Sand Layer Width equals Sand Layer
0 0
ft. ft. ft.

Width of Required Infiltration Area under


Sand Layer and Downslope Berm
#DIV/0!
ft.

Greater of Downslope Berm Width Based on


4:1 Slope Requirement plus Width of Sand
Layer OR Width of Required Infiltration Area
under Sand Layer and Downslope Berm
#DIV/0!
ft.

Step 13) Determine the width of the upslope berm

Width of the
Upslope
Berm

ft.

Step 14) Determine the toe to toe width of the mound


Width of
Sand Layer
and
Downslope Width of the Toe to Toe
Berm plus Upslope Berm equals Width of Mound
#DIV/0! 0 #DIV/0!
ft. ft. ft.

Step 15) Proceed to Step 16

Step 16) Summarize the Information

Width of the
Sand Layer 0.000 ft.
Length of
Sand Layer #DIV/0! ft.
Slope of
Installation
Site 0 %
Toe to Toe As calculated in
Width of the Step 10 or Step
Mound ft. 14

Complete the Berm Diagram included in the Saskatchewan Onsite Wastewater Disposal
Step 17) Guide

Step 18) Confirm the design complies with the Standard of Practice

The worksheet does NOT consider all requirements of the mandatory Standard. Please ensure
that all public health and environmental consideration are addressed.
Please work safely and follow safe practices near trenches and open excavations.
Report Form - Percolation Test

Name(s)

Legal Address
(lot, block, plan,
etc)

Mailing Address

House Size
Lot Size (Acres/ (sq. ft or sq.
Square Meters m.)

Number of Normal
Bedrooms Occupancy

Soil Conditions
(see Soil Tests
Section)

Percolation Test Percolation


#1 Test #2

Average
Percolation Test

Note: Average percolation test equals (Test 1 plus Test 2) divided by 2


Appendix 13 - Friction Loss for Insert Fittings
Units 2
1 = Metric
2 = Imperial

Pressure Loss Equivalent Lengths for Polyethylene Piping Insert Fittings


Epressed in Approximate Length of Straight Pipe

Couplings
and Tee
Fittings Elbows and Tee
Iron Pipe on the Fittings Run to
Pipe Size Adapters Run Branch
inches feet feet feet
0.75 1.5 0.75 4.3
1 2 1 6
1.25 2.7 1.3 8.6
1.5 3.4 1.6 10.5
2 4.4 2 13.2
3 6.2 2.9 17
Appendix 13 - Liquid Volumes of Pipe
Units 2
1 = Metric
2 = Imperial

Liquid Volume of Various Sizes of Plastic Pipes

Nominal Pipe Volume (per 100


Diameter Inside Diameter feet of pipe)
inches inches Imperial Gallons
0.75 0.824 2.31
1 1.049 3.74
1.25 1.380 6.47
1.5 1.610 8.81
2 2.067 14.51
3 3.068 31.98
4 4.026 55.06

Note: Calculations only valid for Sch. 40 Standard piping


Appendix 17 - Pressure Distribution: Orifice, Pipe and Pump
Sizing
Units 1
1 = Metric
2 = Imperial

This worksheet is used to size the orifices in the distribution lateral pipes, size effluent delivery piping
and to calculate the required capacity and presure head capability of the effluent pump. It can be
used for calculating the delivery of effluent to laterals in disposal fields, mounds, and sand filters.

Step 1) Select the Pressure to be maintained at the orifices

Minimum Design
pressure at the Pressure at
orifice (mound) Orifice
0.61 m 0.61
m

Step 2) Select the Size of the orifices in the laterals

Minimum size is 1/8 in. (3.2 mm). Larger sizes are less likely to plug.

Orifice diameter
selected
(note: use decimal value)
mm
Select the spacing of the orifices and determine the number of orifices to be installed in the
Step 3) distribution laterals

Rounded
Length of Spacing of Calculated up to the
distribution lateral divided by orifices equals orifices nearest 1
#DIV/0!
m m number
From system design
drawings

Select a spacing of orifices to attain even distribution over the treatment area. Maximum spacings,
for a mound, are 5ft (1.52 m). Close spacing provides effective, even distribution.

Calculated
orifices (rounded 1 for orifice at Total orifices in
up) plus each end equals each lateral
#DIV/0! 1 #DIV/0!

Total number of
Total orifices in Number of orifices in all
each lateral times laterals equals laterals
#DIV/0! 1 #DIV/0!

(Note: if distribution laterals are of differing lengths, each lateral must be considered separately.
Above calculation only valid for an end feed manifold/header)

Step 4 -
Optional If laterals are of differing lengths calculate separately and add the number of orifices together

Length of Number
Pressure of Orifices
Distribution Number of per
Lateral # Lateral Divided by Orifices plus 1 equals Lateral
a 0 1 1 1
b 0 1 1 1
c 0 1 1 1
d 0 1 1 1
e 0 1 1 1
total 0 5 5 5
meters Number Number
(note: space for only 5 lateral calculations is provided)

Step 4) Determine the minimum pipe size of the distribution laterals


Length of
distribution Total orifices
Orifice diameter lateral each lateral
0 0 #DIV/0!
mm m

Size of
distribution Note: Calculations only valid
lateral for Sch. 40 Standard piping

mm-DN

Step 5) Determine the total flow from all orifices

Total number of Litres/min for


orifices times each orifice equals Total Flow
#DIV/0! #DIV/0!
lpm lpm
From Appendix 5

Step 6) Select the type and size of effluent delivery pipe

Use Appendix 6 to aid in the decision. A larger pipe will reduce the pressure loss.
A minimum flow rate will help scour the pipe: 59 Lpm for 40 mm, 77 Lpm for 50 mm and 168 Lpm for
75 mm.

Selected pipe Selected pipe H-W Pipe


size type Coeficient Sizes
147 20 mm
mm-DN PVC or PE 25 mm
32 mm
Checks Flow Area 40 mm
Velocity #DIV/0! #N/A 50 mm
#DIV/0! m3/m sq. m. 75 mm
m/s
#DIV/0!
Step 7) Calculate the equivalent length of pipe for pressure loss due to fittings

In the line from the pump to the furthest end of the header for distribution laterals

Number of Equivalent
Type of fitting fittings Length Total
Iron Pipe
Adaptors #N/A #N/A
Couplings and
Tee fittings on the
run #N/A #N/A
Elbows and Tee
Fittings Run to
Branch #N/A #N/A
Screen or Filter if
placed after the
pump - Use
Manufacturer's
estimated
pressure loss 0
Other 0
Equivalent Length of all Fittings #N/A meters

Step 8) Calculate the total equivalent length of pipe

In the line from the pump to the furthest end of the header for distribution laterals

Equivalent
length of Total Equivalent
Length of piping plus fittings equals Length
#N/A #N/A
meters meters meters
Step 9) Calculate the pressure head loss in the pipe including fittings

Delivery piping
pressure loss IGPM #DIV/0! M3/s #DIV/0! Perimeter
#DIV/0! coeff 147 coef 147 Hy Rad
meters dia #N/A dia m #N/A Length of p
Friction
loss #DIV/0! Area (m2) #N/A Friction Lo
Step 10) Calculate the total pressure head required at the pump

Delivery Piping
Pressure Loss #DIV/0! meters
+

Distance of
effluent from low
effluent level in
the tank to the
orifices meters
+
Design pressure
at the orifices 0.61 meters
+
Add to allow for
pressure loss
along the
distribution
laterals 0.3048 meters
equals
Total pressure
head required at
pump #DIV/0! meters

Step 11) Detail the pump specification required

Required flow Required


rate pressure head
#DIV/0! at #DIV/0!
lpm @ meters

Step 12) Repeat the calculations if it is necessary to change the pump specifications

If the flow rate through the orifices is too high, reduce the orifice diameter in Step 2, increase the
orifice spacing in Step 3, or include a distributing valve to sequentially dose small portions of the
system.
If the pressure head required is too high, select a lower design pressure in Step 1, reduce the flow
rate as above, or increase the effluent delivery pipe size in Step 6.
Step 13) Select a make and model of pump and screen assembly

Make or
manufacturer Model Power

Watts

Voltage & 1
Phase or 3
Phase Amps Weight

amps kg

Pump Pressure Screen


Pump Flow Rate Head Description

at
lpm m

Step 14) Confirm the design complies with the Guide

The worksheet does NOT consider all requirements of the mandatory Standard. Please ensure that
all public health and environmental considerations are addressed.
Please work safely and follow safe practices near trenches and open excavations.
and Pump

ize effluent delivery piping


fluent pump. It can be
unds, and sand filters.
s to be installed in the

Calculated
orifices
(rounded up)
#DIV/0!

ea. Maximum spacings,


bution.

nsidered separately.

mber of orifices together


e loss.
r 50 mm and 168 Lpm for

terals
terals
#N/A
#N/A
#N/A

#DIV/0!

ations

n Step 2, increase the


small portions of the

Step 1, reduce the flow


dard. Please ensure that

vations.
Appendix3A Appendix6
Nominal Pipe Size ID Nominal Pipe SizeID
Err:504 Err:504 19 20.9296
Err:504 Err:504 25 26.6446
Err:504 Err:504 31 35.052
Err:504 Err:504 38 40.894
Err:504 Err:504 50 52.5018
Err:504 Err:504 63 62.7126
Err:504 Error 75 77.9272
77 Error
Equivalent Length App3A
Couplings and Elbows and Tee
Tee Fittings on Fittings Run to
Iron Pipe Adapters the Run Branch
Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504
Err:504 Error

App 3a
Equivalent Length
Couplings and Elbows and Tee
Tee Fittings on Fittings Run to
Iron Pipe Adapters the Run Branch
Err:504 0.46 0.23 1.31
Err:504 0.61 0.3 1.83
Err:504 0.82 0.4 2.62
Err:504 1.04 0.49 3.2
Err:504 1.34 0.61 4.02
Err:504 1.89 0.88 5.18
Err:504 Err:504 Error Error
Err:504
Appendix17 Err:504
Nominal Pipe Size Err:504 Area Flow Velocity (m/s) Velocity (ft/s)
20 Err:504 Err:504 Err:504 Err:504
25 Err:504 Err:504 Err:504 Err:504
32 Err:504 Err:504 Err:504 Err:504
40 40.894 0.0013133977 49 0.6217969273 2.040016
50 52.5018 0.0021648383 64 0.4927234868 1.616547
75 77.9272 0.0047693063 140 0.4892395621 1.605117
77 Error

Equivalent Length App17


Couplings and Elbows and Tee
Tee Fittings on Fittings Run to
Iron Pipe Adapters the Run Branch
20 0.46 0.23 1.31
25 0.61 0.3 1.83
32 0.82 0.4 2.62
40 1.04 0.49 3.2
50 1.34 0.61 4.02
75 1.89 0.88 5.18
77 Error Error Error
Velocity (ft/s)
Alberta Alberta
US Gal 1
imp gal 25 igpm 0.833333
coeff 147 150
dia 1.049 in 1.049
length of pipe 100 ft 100
Friction Loss in Feet 43.649228 0.077816
13.3076915

Metric
M3/s 0.00189417
coef 147
dia 0.0266446 m
Area 0.00055756
Perimeter 0.08370401
Hy Rad 0.00666115 0.006661
Length of pipe 30.5
Friction Loss in M 13.3100369