Hoja resumen
TANGIBLES
1 Presupuesto Obra
SUBTOTAL 01 68,334,474.79
CONTINGENCIA 3,564,701.09
SUBTOTAL 02 3,564,701.09
EQUIPAMIENTO 24,097,411.72
SUBTOTAL 02 24,097,411.72
INTANGIBLES
SUBTOTAL 03 5,585,228.17
Hoja resumen
TANGIBLES
1 Presupuesto Obra 1.2
001 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 655,905.82 0.98% 472,169.39
002 ESTRUCTURAS 20,935,655.55 31.23% 15,071,029.05
003 ARQUITECTURA 16,128,879.70 24.06% 11,610,757.25
004 INSTALACIONES SANITARIAS 7,529,185.65 11.23% 5,420,063.17
005 INSTALACIONES ELECTRICAS 7,810,347.41 11.65% 5,622,464.15
006 INSTALACIONES MECANICAS 6,227,806.81 9.29% 4,483,234.70
007 INSTALACIONES DE COMUNICACIONES 7,750,098.00 11.56% 5,579,092.18
67,037,878.94 48,258,809.88
(CD) S/. 48,258,809.88
SUBTOTAL 01 68,334,474.79
CONTINGENCIA 3,564,701.09
SUBTOTAL 02 3,564,701.09
EQUIPAMIENTO 24,097,411.72
SUBTOTAL 03 24,097,411.72
INTANGIBLES
SUBTOTAL 03 5,585,228.17
Localización JUNIN-SATIPO-PANGOA
Fecha Al MAYO 2018
TANGIBLES
EQUIPAMIENTO 6,460.00
SUBTOTAL 02 6,460.00
Hoja resumen
TANGIBLES
1 Presupuesto Obra 1.2
001 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 655,905.82 0.98% 347,094.82
002 ESTRUCTURAS 20,935,655.55 31.23% 11,078,812.45
003 ARQUITECTURA 16,128,879.70 24.06% 8,535,143.92
004 INSTALACIONES SANITARIAS 7,529,185.65 11.23% 3,984,324.04
005 INSTALACIONES ELECTRICAS 7,810,347.41 11.65% 4,133,110.33
006 INSTALACIONES MECANICAS 6,227,806.81 9.29% 3,295,655.27
007 INSTALACIONES DE COMUNICACIONES 7,750,098.00 11.56% 4,101,227.31
67,037,878.94 35,475,368.14
(CD) S/. 35,475,368.14 42,570,441.77
CONTINGENCIA 556,614.16
EQUIPAMIENTO 17,335,988.38
INTANGIBLES
SUBTOTAL 03 4,676,587.10
OBRA 42,570,441.77
CONTINGENCIA 566,048.30 INC GGU 471,706.92
MAX 43,136,490.07
EQUIPAMIENTO * 17,629,818.69