BAB III Tugas Uas
BAB III Tugas Uas
SPESIFIKASI PERALATAN
REAKTOR
: Code : R-101
: Jumlah : 1
Operation : Kontinyu
Torispherical head
Stainless steel
Agitator
Volume : 5,789 m³
Composition
𝐶𝐻3 𝐶𝑂𝑂𝐻
𝐶4 𝐻9 𝑂𝐻
𝐻2 𝑆𝑂4
𝐶𝐻3 𝐶𝑂𝑂𝐶4 𝐻9
𝐻2 𝑂
Design data :
Diameter = 2,134 m
Jari-jari = 0,973 m
Tinggi = 2,877 m
Impeler = 6 flat blade
Motor = 11.5 HP
Temperatur = 100 °C
Tekanan = 1 atm
TANK
: Code : TK-101
: Jumlah : 2
Operation : Kontinyu
Torispherical head
Stainless steel
Volume : 265,2048m³
Design data :
Diameter = 5,528 m
Jari-jari = 2,764 m
Tinggi = 11,056 m
Temperatur = 30 °C
Tekanan = 1 atm
TANK
: Code : TK-102
: Jumlah : 3
Operation : Kontinyu
Torispherical head
Stainless steel
Volume : 282,615 m³
Design data :
Diameter = 5,646 m
Jari-jari = 2,823 m
Tinggi = 11,293 m
Temperatur = 30 °C
Tekanan = 1 atm
TANK
: Code : TK-103
: Jumlah : 1
Operation : Kontinyu
Torispherical head
Stainless steel
Volume : 1,028 m³
Design data :
Diameter = 1,094 m
Jari-jari = 0,547 m
Tinggi = 1,132 m
Temperatur = 30 °C
Tekanan = 1 atm
: Code : TK-104
: Jumlah : 1
Operation : Kontinyu
Torispherical head
Stainless steel
Volume : 117,336 m³
Design data :
Diameter = 3,374 m
Jari-jari = 1,687 m
Tinggi = 6,749 m
Temperatur = 30 °C
Tekanan = 1 atm
REAKTOR
: Code : R-102
: Jumlah : 1
Function : Tempat berlangsungnya reaksi netralisasi
Operation : Kontinyu
Torispherical head
Stainless steel
Agitator
Volume : 12,772 m³
Composition
𝐶𝐻3 𝐶𝑂𝑂𝐻
𝐶4 𝐻9 𝑂𝐻
𝐻2 𝑆𝑂4
𝐶𝐻3 𝐶𝑂𝑂𝐶4 𝐻9
𝐻2 𝑂
NaOH
𝐶𝐻3 𝐶𝑂𝑂𝑁𝑎
𝑁𝑎2 𝑆𝑂4
Design data :
Diameter = 2,011 m
Jari-jari = 1,005 m
Tinggi = 4,44 m
Putaran = 84 rpm
Motor = 4,427 HP
Temperatur = 50 °C
Tekanan = 1 atm
VESSEL
: Code : V-101
: Jumlah : 1
Operation : Kontinyu
Tipe : Horizontal
Carbon steel
Volume : 2,177 m³
Composition
𝐶𝐻3 𝐶𝑂𝑂𝑁𝑎
𝐶4 𝐻9 𝑂𝐻
𝑁𝑎2 𝑆𝑂4
𝐶𝐻3 𝐶𝑂𝑂𝐶4 𝐻9
𝐻2 𝑂
Design data :
Panjang = 2,773 m
Tinggi = 1,386 m
Temperatur = 30 °C
Tekanan = 1 atm
Utilitas : Cooling water
PACKING COLUMN
: Code : T-101
: Jumlah : 1
Operation : Kontinyu
Composition
𝐶4 𝐻9 𝑂𝐻
𝐶𝐻3 𝐶𝑂𝑂𝐶4 𝐻9
𝐻2 𝑂
Design data :
No of tray = 12 plate
Tray spacing = 20 in
Feed stage = 7
Diameter = 0,5 m
Tinggi = 4,44 m
Tekanan = 1 atm
VESSEL
: Code : V-102
: Jumlah : 1
Operation : Kontinyu
Tipe : Horizontal
Carbon steel
Volume : 2,26 m³
Design data :
Panjang = 4,052 m
Tinggi = 0,9 m
Temperatur = 110,8 °C
Tekanan = 1 atm
PACKING COLUMN
Identification : Item : Distillation Column
: Code : T-102
: Jumlah : 1
Operation : Kontinyu
Composition
𝐶4 𝐻9 𝑂𝐻
𝐶𝐻3 𝐶𝑂𝑂𝐶4 𝐻9
𝐻2 𝑂
Design data :
No of tray = 42 plate
Tray spacing = 20 in
Feed stage = 26
Diameter = 2,6 m
Tinggi = 21,846 m
Tekanan = 1 atm
: Code : V-103
: Jumlah : 1
Operation : Kontinyu
Tipe : Horizontal
Carbon steel
Volume : 1,39 m³
Design data :
Panjang = 2,21 m
Tinggi = 0,68 m
Temperatur = 117,8 °C
TANK
: Code : TK-106
: Jumlah : 2
Operation : Kontinyu
Torispherical head
Stainless steel
Volume : 247,697 m³
Design data :
Diameter = 5,403 m
Jari-jari = 2,701 m
Tinggi = 12,029 m
Temperatur = 30 °C
Tekanan = 1 atm
Temperature : 30°C
Tekanan : 1 atm
𝑘𝑔⁄
Ρ bahan : 810 𝑚3
𝑘𝑔
= 4.166,667 𝑗𝑎𝑚
𝑘𝑔
4.166,667 ⁄𝑗𝑎𝑚
Molaritas (n) = 𝑔𝑟
116 ⁄𝑚𝑜𝑙
= 35,92 𝑘𝑚𝑜𝑙⁄𝑗𝑎𝑚
Nilai X = 78,03 %
35,92 𝑘𝑚𝑜𝑙⁄𝑗𝑎𝑚
Maka jumlah umpan : NA0 = 0,7803
= 46,034 𝑘𝑚𝑜𝑙⁄𝑗𝑎𝑚
Berat C4H9OH = n × Mr
𝑘𝑚𝑜𝑙 𝑔𝑟 1 𝑘𝑔 1000 𝑚𝑜𝑙
= 46,034 × 74 × 1000 𝑔𝑟 ×
𝑗𝑎𝑚 𝑚𝑜𝑙 1 𝑘𝑚𝑜𝑙
𝑘𝑔
= 3.406,516 ⁄𝑗𝑎𝑚
𝑘𝑔
3406,516 ⁄𝑗𝑎𝑚
Volumetrik rit C4H9OH = 𝑘𝑔
810 ⁄ 3
𝑚
3
= 4,206 𝑚 ⁄𝑗𝑎𝑚
3 24 𝑗𝑎𝑚
Volume C4H9OH = 4,206 𝑚 ⁄𝑗𝑎𝑚 × 7 ℎ𝑎𝑟𝑖 × 1 ℎ𝑎𝑟𝑖
= 706,537 m3
Over Design = 20 %
= 282,615 m3
𝜋
282,615 m3 = 2 × 𝐷3
= 3,14
282,615 m3 × 𝐷3
2
D3 = 180,009 m3
D = 5,646 m = 222,283 in
R = 2,823 m = 111,142 in
H = 11,293 m = 444,606 in
Hcairan = 9,412 m
Tekanan Desain
Poperasi = 1 atm
g = 9,8 𝑚⁄𝑠 2
𝑘𝑔⁄ 𝑁
= 74708,967 𝑚. 𝑠 2 = 74708,967 ⁄𝑚2
𝑏𝑎𝑟 . 𝑚 1,013 𝑎𝑡𝑚 2
14,696 𝑝𝑠𝑖
= 74708,967 𝑁⁄𝑚2 × 10−5 𝑁 × 𝑏𝑎𝑟 × 1 𝑎𝑡𝑚
Safety factor = 20 %
Tebal tangki
𝑃 ×𝑟
𝑡= +𝑐
𝑓. 𝐸 − 0,6 𝑃
E = 0,8
f = 12650 psi
C = 0,125 in
dipilih ts 0,625
Do = Di + 2 ts
= 223,533 in
Di = OD – (2 x ts)
= 238,75 in
Icr = 14,4375
r = 180 in
1
1 𝑟 2
W = 4 × [3 + (𝑖𝑐𝑟) ]
1
1 180 2
W = 4 × [3 + (14,4375) = 1,633 𝑖𝑛
Sehingga :
44,087 psi ×180 in ×1,633 in
Th = (2×12650 𝑝𝑠𝑖 ×0,8)−(0,2×44,087 psi ) + 0,125 𝑖𝑛
Th = 0,766 in
a = ID/2 = 119,375 in
BC = r – icr = 165,563 in
AC = (BC2-AB2)0,5 = 128,059 in
b = r – AC = 51,941 in
Sf = 3 in
OA = th + b + Sf
= 55,816 in = 1,418 m
H total = Htangki + OA
Temperature : 30°C
Tekanan : 1 atm
𝑘𝑔⁄
Ρ bahan : 1050 𝑚3
𝑘𝑔
= 4.166,667 𝑗𝑎𝑚
𝑘𝑔
4.166,667 ⁄𝑗𝑎𝑚
Molaritas (n) = 𝑔𝑟
116 ⁄𝑚𝑜𝑙
= 35,92 𝑘𝑚𝑜𝑙⁄𝑗𝑎𝑚
Nilai X = 78,03 %
35,92 𝑘𝑚𝑜𝑙⁄𝑗𝑎𝑚
Maka jumlah umpan : NA0 = 0,7803
= 46,034 𝑘𝑚𝑜𝑙⁄𝑗𝑎𝑚
Berat CH3COOH = n × Mr
𝑘𝑚𝑜𝑙 𝑔𝑟 1 𝑘𝑔 1000 𝑚𝑜𝑙
= 46,034 × 60 × 1000 𝑔𝑟 ×
𝑗𝑎𝑚 𝑚𝑜𝑙 1 𝑘𝑚𝑜𝑙
𝑘𝑔
= 2.762,04 ⁄𝑗𝑎𝑚
𝑘𝑔
2762,04 ⁄𝑗𝑎𝑚
Volumetrik rit CH3COOH = 𝑘𝑔
1050 ⁄ 3
𝑚
3
= 2,631 𝑚 ⁄𝑗𝑎𝑚
3 24 𝑗𝑎𝑚
Volume CH3COOH = 2,631 𝑚 ⁄𝑗𝑎𝑚 × 7 ℎ𝑎𝑟𝑖 × 1 ℎ𝑎𝑟𝑖
= 442,008 m3
Over Design = 20 %
= 265,2048 m3
𝜋
265,2048 m3 = × 𝐷3
2
= 3,14
265,2048 m3 × 𝐷3
2
D3 = 168,92 m3
D = 5,528 m = 217,638 in
R = 2,764 m = 108,819 in
H = 11,056 m = 435,276 in
3,14
221,004 m3 = 4
× (5,528 m)2 × 𝐻𝑐𝑎𝑖𝑟𝑎𝑛
Hcairan = 9,213 m
Tekanan Desain
Poperasi = 1 atm
g = 9,8 𝑚⁄𝑠 2
𝑘𝑔⁄ 𝑁
= 94.801,77 𝑚. 𝑠 2 = 94.801,77 ⁄𝑚2
𝑏𝑎𝑟 . 𝑚 1,013 𝑎𝑡𝑚 2
14,696 𝑝𝑠𝑖
= 94.801,77 𝑁⁄𝑚2 × 10−5 𝑁 × 𝑏𝑎𝑟 × 1 𝑎𝑡𝑚
Safety factor = 20 %
Tebal tangki
𝑃 ×𝑟
𝑡= +𝑐
𝑓. 𝐸 − 0,6 𝑃
E = 0,8
f = 12650 psi
C = 0,125 in
t = 0,6 in
dipilih ts 0,625
Menentukan Diameter tangki sesungguhnya
Diameter luar
Do = Di + 2 ts
= 218,888 in
Di = OD – (2 x ts)
= 226,75 in
Icr = 13,75
r = 180 in
1
1 𝑟 2
W = 4 × [3 + (𝑖𝑐𝑟) ]
1
1 180 2
W = × [3 + ( ) = 1,655 𝑖𝑛−1
4 13,75
Sehingga :
44,087 psi ×180 in ×1,655 𝑖𝑛−1
Th = (2×12650 𝑝𝑠𝑖 ×0,8)−(0,2×44,087 psi ) + 0,125 𝑖𝑛
Th = 0,774 in
BC = r – icr = 166,25 in
AC = (BC2-AB2)0,5 = 133,094 in
b = r – AC = 46,906 in
Sf = 3 in
OA = th + b + Sf
= 50,781 in = 1,290 m
H = Htangki + OA
Jumlah : 1 unit
Tekanan : 1 atm
Temperatur : 100 °C
𝑘𝑔
𝑚 6173,02 ×0,667 𝑗𝑎𝑚
𝑗𝑎𝑚
Volume campuran = ×𝜏= = 4,824 𝑚³
𝜌 853,48 𝑘𝑔/𝑚³
= 1,2474 atm
= 18,322 psi
Untuk cylindrical vessel pada tekanan atmosfer dan dihitung berdasarkan tekanan
internal:
𝑃 × 𝑟𝑖
𝑡=( ) + 𝐶 (𝑃𝑒𝑡𝑒𝑟, 𝑡𝑎𝑏𝑒𝑙 4, ℎ𝑎𝑙 537)
𝑓 × 𝐸 − 0,6 × 𝑃
Dimana:
Jenis penyambungan = single welded butt joint (Brownell & young, tabel
13.52, hal 254)
C = Corrosion allowance = 0,0125 in/tahun (Brownell & young, tabel 3.1, hal
37)
Untuk menghitung tebal head, digunakan pers. 7.76 dan 7.77, Brownell & young, hal
138:
1
𝑊 = (3 + √𝑟𝑐 /𝑟𝑖 )
4
Dimana:
W = stress intensification factor for torispherical head
rc = radius of crown =r = 84 in
ri = inside corner radius = icr = 5,125 in
W = 1,762 in
(𝑃 × 𝑟𝑐 × 𝑊)
𝑡ℎ = + 𝐶 = 0,103 𝑖𝑛
(2 × 𝑓 × 𝐸 − 0,2 × 𝑃)